About this file
This document is an Excel spreadsheet containing pricing details for a federal contract opportunity for Operations Support services at the Naval Support Facility Indian Head. The contract will require the contractor to provide labor, supervision, management, tools, materials, equipment, facilities, transportation, and incidental engineering to perform both scheduled and unscheduled work across various mission-related locations. The specific services include rigging support, material moves, equipment moves, digging support, furniture assembly, operator testing and licensing, and rental and maintenance of heavy equipment. The contract will be structured with both recurring and non-recurring work, with pricing provided for each service line item. The contract opportunity is being solicited by the Department of the Navy's Naval Sea Systems Command. Key details on response dates, award dates, pricing terms, set asides, and incumbents are not provided in this document.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base IQ
| Est. | Unit | Total | |||
| ELIN | 102 Operations Support - Base Year -Non Recurring Work | Qty. | Unit | Price | Amount |
| Support Services | |||||
| A900 | Rigging Support - 0 to 20 Ton Crane (Normal Working Hours): The Contractor shall provide a crane that meets OSHA standards, qualified operator and personnel to support all crane service requirements ofNSWC IHD. Crane service shall include, but not be limited to: loading and unloading of materials, making lifts in support of activity maintenance operations, loading and unloading of inert missile components, in loading and off-loading materials and in support of the repair and maintenance of production equipment. All cranes utilized on the activity will be required to possess an annual safety inspection , lift plan,load test & rigging gear certificates which meets or exceeds Navy standards and meets all P-307 requirements. The Contractor shall provide to the PAR a completed and signed copy of issued service work by COB on the date work was performed. The Contractor shall respond within 30 minutes during normal working hours. Completion times shall be 24 clock hours unless otherwise specified. | 10 | Each | ||
| A901 | Rigging Support - 0 to 20 Ton Crane (After Normal Working Hours): The Contractor shall provide a crane that meets OSHA standards, qualified operator and personnel to support all crane service requirements of NSWC IHD. Crane service shall include, but not be limited to: loading and unloading of materials, making lifts in support of activity maintenance operations, loading and unloading of inert missile components, in loading and off-loading materials and in support of the repair and maintenance of production equipment. All cranes utilized on the activity will be required to possess an annual safety inspection, lift plan, load test & rigging gear certificates which meets or exceeds Navy standards and meets all P-307 requirements. The Contractor shall provide to the PAR a completed and signed copy of issued service work by COB on the date work was performed. The Contractor shall respond within 1 hour after normal working hours. Completion times shall be 24 clock hours unless otherwise specified. | 10 | Each | ||
| A902 | Rigging Support - 0 to 20 Ton Crane (All NSWC IH Detachments): The Contractor shall provide a crane that meets OSHA standards, qualified operator and personnel to support all crane service requirements of NSWC IH Detachment its tenant activities. Crane service shall include, but not be limited to: loading and unloading of materials, making lifts in support of activity maintenance operations, loading and unloading of inert missile components, in loading and off-loading materials and in support of the repair and maintenance of production equipment. All cranes utilized on the activity will be required to possess an annual safety inspection, lift plan, load test & rigging gear certificates which meets or exceeds Navy standards and meets all P-307 requirements. The Contractor shall provide to the PAR a completed and signed copy of issued service work by COB on the date work was performed. The Contractor shall respond within 30 minutes during normal working hours. Completion times shall be 24 clock hours unless otherwise specified. | 10 | Each | TBD at task order level | TBD at task order level |
| A903 | Rigging Support - 21to 50 Ton Crane (Normal Working Hours): The Contractor shall provide a crane that meets |
OSHA standards, qualified operator and personnel to support all crane service requirements of NSWC IHD. Crane service shall include, but not be limited to: loading and unloading of materials, making lifts in support of activity maintenance operations, loading and unloading of inert missile components, in loading and offloading materials and in support of the repair and maintenance of production equipment. All cranes utilized on the activity will be required to possess an annual safety inspection lift plan, load test & rigging gear certificates which meets or exceeds Navy standards and meets all P-307 requirements. The Contractor shall provide to the PAR a completed and signed copy of
| issued service work by COB on the date work was performed. The Contractor shall respond within 30 minutes during normal working hours. Completion times shall be 24 clock hours unless otherwise specified. | 10 | Each |
| A904 | Rigging Support - 21to 50 Ton Crane (After Normal Working Hours): The Contractor shall provide a crane that |
meets OSHA standards, qualified operator and personnel to support all crane service requirements of NSWC IHD. Crane service shall include, but not be limited to: loading and unloading of materials, making lifts in support of activity maintenance operations, loading and unloading of inert missile components, in loading and offloading materials and in support of the repair and maintenance of production equipment. All cranes utilized on the activity will be required to possess an annual safety inspection, lift plan, load test & rigging gear certificates which meets or exceeds Navy standards and meets all P-307 requirements. The Contractor shall provide to the PAR a completed and signed copy of issued service work by COB on the date work was performed. The Contractor shall respond within 1 hour after
| normal working hours. Completion times shall be 24 clock hours unless otherwise specified. | 10 | Each |
| A905 | Rigging Support - 21to 50 Ton Crane ( ALL NSWC IH Detachments): The Contractor shall provide a crane that meets |
OSHA standards, qualified operator and personnel to support all crane service requirements of NSWC IHD. Crane service shall include, but not be limited to: loading and unloading of materials, making lifts in support of activity maintenance operations, loading and unloading of inert missile components, in loading and offloading materials and in support of the repair and maintenance of production equipment. All cranes utilized on the activity will be required to possess an annual safety inspection, lift plan, load test & rigging gear certificates which meets or exceeds Navy standards and meets all P-307 requirements. The Contractor shall provide to the PAR a completed and signed copy of
| issued service work by COB on the date work was performed. The Contractor shall respond within 30 minutes during normal working hours. Completion times shall be 24 clock hours unless otherwise specified. | 10 | Each | TBD at task order level | TBD at task order level |
| A906 | Rigging Support - 51to 100 Ton Crane (Normal Working Hours): The Contractor shall provide a crane that meets |
OSHA standards, qualified operator and personnel to support all crane service requirements ofNSWC IHD. Crane service shall include, but not be limited to: loading and unloading of materials, making lifts in support of activity maintenance operations, loading and unloading of inert missile components, in loading and offloading materials and in support of the repair and maintenance of production equipment. All cranes utilized on the activity will be required to possess an annual safety inspection, lift plan,load test & rigging gear certificates which meets or exceeds Navy standards and meets all P-307 requirements. The Contractor shall provide to the PAR a completed and signed copy of issued service work by COB on the date work was performed. The Contractor shall respond within 30 minutes during
| normal working hours. Completion times shall be 24 clock hours unless otherwise specified. | 10 | Each |
| A907 | Rigging Support - 51to 100 Ton Crane (After Normal Working Hours): The Contractor shall provide a crane that |
meets OSHA standards, qualified operator and personnel to support all crane service requirements of NSWC IHD. Crane service shall include, but not be limited to: loading and unloading of materials, making lifts in support of activity maintenance operations, loading and unloading of inert missile components, in loading and offloading materials and in support of the repair and maintenance of production equipment. All cranes utilized on the activity will be required to possess an annual safety inspection, lift plan, load test & rigging gear certificates which meets or exceeds Navy standards and meets all P-307 requirements. The Contractor shall provide to the PAR a completed and signed copy of issued service work by COB on the date work was performed. The Contractor shall respond within 1 hour after
| normal working hours. Completion times shall be 24 clock hours unless otherwise specified. | 10 | Each |
| A908 | Rigging Support - 51to 100 Ton Crane (ALL NSWC IH Detachments): The Contractor shall provide a crane that meets |
OSHA standards, qualified operator and personnel to support all crane service requirements of NSWC IHD. Crane service shall include, but not be limited to: loading and unloading of materials, making lifts in support of activity maintenance operations, loading and unloading of inert missile components, in loading and offloading materials and in support of the repair and maintenance of production equipment. All cranes utilized on the activity will be required to possess an annual safety inspection, lift plan, load test & rigging gear certificates which meets or exceeds Navy standards and meets all P-307 requirements. The Contractor shall provide to the PAR a completed and signed copy of issued service work by COB on the date work was performed. The Contractor shall respond within 30 minutes during
| normal working hours. Completion times shall be 24 clock hours unless otherwise specified. | 10 | Each | TBD at task order level | TBD at task order level |
| A909 | Rigging Support - 101to 120 Ton Crane (Normal Working Hours): The Contractor shall provide a crane that |
meets OSHA standards, qualified operator and personnel to support all crane service requirements of NSWC IHD. Crane service shall include, but not be limited to: loading and unloading of materials, making lifts in support of activity maintenance operations, loading and unloading of inert missile components, in loading and offloading materials and in support of the repair and maintenance of production equipment. All cranes utilized on the activity will be required to possess an annual safety inspection, lift plan, load test& rigging gear certificates which meets or exceeds Navy standards and meets all P-307 requirements. The Contractor shall provide to the PAR a completed and signed copy of issued service work by COB on the date work was performed. The Contractor shall respond within 30 minutes during
| normal working hours. Completion times shall be 24 clock hours unless otherwise specified. | 10 | Each |
| A910 | Rigging Support - 101to 120 Ton Crane (After Normal Working Hours): The Contractor shall provide a crane |
that meets OSHA standards, qualified operator and personnel to support all crane service requirements of NSFIH and its tenant activities. Crane service shall include, but not be limited to: loading and unloading of materials, making lifts in support of activity maintenance operations, loading and unloading of inert missile components, in loading and off-loading materials and in support of the repair and maintenance of production equipment. All cranes utilized on the activity will be required to possess an annual safety inspection, lift plan, load test & rigging gear certificates which meets or exceeds Navy standards and meets all P-307 requirements. The Contractor shall provide to the PAR a completed and signed copy of issued service work by COB on the date work was performed. The Contractor shall respond within 1 hour after
| normal working hours. Completion times shall be 24 clock hours unless otherwise specified. | 10 | Each |
| A911 | Rigging Support - 101to 120 Ton Crane (ALL NSWC IH Detachments ): The Contractor shall provide a crane that |
meets OSHA standards, qualified operator and personnel to support all crane service requirements of NSWC IHD. Crane service shall include, but not be limited to: loading and unloading of materials, making lifts in support of activity maintenance operations, loading and unloading of inert missile components, in loading and offloading materials and in support of the repair and maintenance of production equipment. All cranes utilized on the activity will be required to possess an annual safety inspection, lift plan,load test & rigging gear certificates which meets or exceeds Navy standards and meets all P-307 requirements. The Contractor shall provide to the PAR a completed and signed copy of issued service work by COB on the date work was performed. The Contractor shall respond within 30 minutes during
| normal working hours. Completion times shall be 24 clock hours unless otherwise specified. | 10 | Each | TBD at task order level | TBD at task order level | ||
| A912 | Scale/Magazine Support (Normal Working Hours): The Contractor shall provide service to pickup and deliver material, trailers and MHE’s from the NSWC IHD Explosive Scales/ Magazine site and the adjacent holding lot. The Contractor shall transport explosive shipments/deliveries to various local destinations and to magazines throughout the Activity. The Contractor shall provide to the PAR a completed and signed copy of issued service work by COB on the date work was performed. The Contractor shall respond within 1 hour during normal working hours. Completion times shall be 24 clock hours unless otherwise specified. | 5 | Each | |||
| A913 | Material Moves, 0 - 500 Lbs, (Normal Work Hours): The Contractor shall provide labor and equipment to pickup various materials and supplies from various buildings on NSWC IHD and at Stump Neck, and deliver/unload at locations on the Activity. The service is required to unload incoming commercial carriers and delivery of material with the end result of minimizing the accumulation of undelivered material on the loading docks. This also covers unscheduled priority pick-up and delivery of material. Directions on special handling, scope of material to be picked up or delivered, along with any schedules, priorities, times, or dates for pick up and delivery will be coordinated with the workload and priorities. All work is completed safely and in the time specified. Appropriate equipment and qualified operators are provided with the designated time. Reports are accurate, on time, and complete. The Contractor shall provide to the PAR a completed and signed copy of issued work by COB on the date work was performed. The Contractor shall respond within 2 hours during normal hours and shall complete work within the same day or as scheduled by the OSGR. | 10 | Each | |||
| A914 | Material Moves, 0 - 500 Lbs, (After Normal Work Hours): The Contractor shall provide labor and equipment to pickup various materials and supplies from various buildings on NSWC IHD and at Stump Neck, and deliver/unload at locations on the Activity. The service is required to unload incoming commercial carriers and delivery of material with the end result of minimizing the accumulation of undelivered material on the loading docks. This also covers unscheduled priority pick-up and delivery of material. Directions on special handling, scope of material to be picked up or delivered, along with any schedules, priorities, times, or dates for pick up and delivery will be coordinated with the workload and priorities. All work is completed safely and in the time specified. Appropriate equipment and qualified operators are provided with the designated time. Reports are accurate, on time, and complete. The Contractor shall provide to the PAR a completed and signed copy of issued work by COB on the date work was performed. The Contractor shall respond within 2 hours after normal hours and shall complete work within the same day or as scheduled by the OSGR. | 10 | Each | |||
| A915 | Material Moves, 0 - 500 Lbs, (All NSWC IH Detachments): The Contractor shall provide labor and equipment to pickup various materials and supplies from various buildings on NSWC IHD and at Stump Neck, and deliver/unload at locations on the Activity. The service is required to unload incoming commercial carriers and delivery of material with the end result of minimizing the accumulation of undelivered material on the loading docks. This also covers unscheduled priority pick-up and delivery of material. Directions on special handling, scope of material to be picked up or delivered, along with any schedules, priorities, times, or dates for pick up and delivery will be coordinated with the workload and priorities. All work is completed safely and in the time specified. Appropriate equipment and qualified operators are provided with the designated time. Reports are accurate, on time, and complete. The Contractor shall provide to the PAR a completed and signed copy of issued work by COB on the date work was performed. The Contractor shall respond within 2 hours during normal hours and shall complete work within the same day or as scheduled by the OSGR. | 10 | Each | TBD at task order level | TBD at task order level | |
| A916 | Material Moves, 501 - 5000 Lbs, (Normal Work Hours): The Contractor shall provide labor and equipment to pickup various materials and supplies from various buildings on NSWC IHD and at Stump Neck, and deliver/unload at locations on the Activity. The service is required to unload incoming commercial carriers and delivery of material with the end result of minimizing the accumulation of undelivered material on the loading docks. This also covers unscheduled priority pick-up and delivery of material. Directions on special handling, scope of material to be picked up or delivered, along with any schedules, priorities, times, or dates for pick up and delivery will be coordinated with the workload and priorities. All work is completed safely and in the time specified. Appropriate equipment and qualified operators are provided with the designated time. Reports are accurate, on time, and complete. The Contractor shall provide to the PAR a completed and signed copy of issued work by COB on the date work was performed. The Contractor shall respond within 2 hours during normal hours and shall complete work within the same day or as scheduled by the OSGR. | 10 | Each | |||
| A917 | Material Moves, 501 - 5000 Lbs, (After Normal Work Hours): The Contractor shall provide labor and equipment to pickup various materials and supplies from various buildings on NSWC IHD and at Stump Neck, and deliver/unload at locations on the Activity. The service is required to unload incoming commercial carriers and delivery of material with the end result of minimizing the accumulation of undelivered material on the loading docks. This also covers unscheduled priority pick-up and delivery of material. Directions on special handling, scope of material to be picked up or delivered, along with any schedules, priorities, times, or dates for pick up and delivery will be coordinated with the workload and priorities. All work is completed safely and in the time specified. Appropriate equipment and qualified operators are provided with the designated time. Reports are accurate, on time, and complete. The Contractor shall provide to the PAR a completed and signed copy of issued work by COB on the date work was performed. The Contractor shall respond within 2 hours after normal hours and shall complete work within the same day or as scheduled by the OSGR. | 10 | Each | |||
| A918 | Material Moves, 501 - 5000 Lbs, (All NSWC IH Detachments ): The Contractor shall provide labor and equipment to pickup various materials and supplies from various buildings on NSWC IHD and at Stump Neck, and deliver/unload at locations on the Activity. The service is required to unload incoming commercial carriers and delivery of material with the end result of minimizing the accumulation of undelivered material on the loading docks. This also covers unscheduled priority pick-up and delivery of material. Directions on special handling, scope of material to be picked up or delivered, along with any schedules, priorities, times, or dates for pick up and delivery will be coordinated with the workload and priorities. All work is completed safely and in the time specified. Appropriate equipment and qualified operators are provided with the designated time. Reports are accurate, on time, and complete. The Contractor shall provide to the PAR a completed and signed copy of issued work by COB on the date work was performed. The Contractor shall respond within 2 hours during normal hours and shall complete work within the same day or as scheduled by the OSGR. | 10 | Each | TBD at task order level | TBD at task order level | |
| A919 | Material Moves, 5001 - 10000 Lbs, (Normal Work Hours): The Contractor shall provide labor and equipment to pickup various materials and supplies from various buildings on NSWC IHD and at Stump Neck, and deliver/unload at locations on the Activity. The service is required to unload incoming commercial carriers and delivery of material with the end result of minimizing the accumulation of undelivered material on the loading docks. This also covers unscheduled priority pick-up and delivery of material. Directions on special handling, scope of material to be picked up or delivered, along with any schedules, priorities, times, or dates for pick up and delivery will be coordinated with the workload and priorities. All work is completed safely and in the time specified. Appropriate equipment and qualified operators are provided with the designated time. Reports are accurate, on time, and complete. The Contractor shall provide to the PAR a completed and signed copy of issued work by COB on the date work was performed. The Contractor shall respond within 2 hours during normal hours and shall complete work within the same day or as scheduled by the OSGR. | 10 | Each | |||
| A920 | Material Moves, 5001 - 10000 Lbs, (After Normal Work Hours): The Contractor shall provide labor and equipment to pickup various materials and supplies from various buildings onNSWC IHD and at Stump Neck, and deliver/unload at locations on the Activity. The service is required to unload incoming commercial carriers and delivery of material with the end result of minimizing the accumulation of undelivered material on the loading docks. This also covers unscheduled priority pick-up and delivery of material. Directions on special handling, scope of material to be picked up or delivered, along with any schedules, priorities, times, or dates for pick up and delivery will be coordinated with the workload and priorities. All work is completed safely and in the time specified. Appropriate equipment and qualified operators are provided with the designated time. Reports are accurate, on time, and complete. The Contractor shall provide to the PAR a completed and signed copy of issued work by COB on the date work was performed. The Contractor shall respond within 2 hours after normal hours and shall complete work within the same day or as scheduled by the OSGR. | 10 | Each | |||
| A921 | Material Moves, 5001 - 10000 Lbs, (All NSWC IH Detachments ): The Contractor shall provide labor and equipment to pickup various materials and supplies from various buildings on NSWC IHD and at Stump Neck, and deliver/unload at locations on the Activity. The service is required to unload incoming commercial carriers and delivery of material with the end result of minimizing the accumulation of undelivered material on the loading docks. This also covers unscheduled priority pick-up and delivery of material. Directions on special handling, scope of material to be picked up or delivered, along with any schedules, priorities, times, or dates for pick up and delivery will be coordinated with the workload and priorities. All work is completed safely and in the time specified. Appropriate equipment and qualified operators are provided with the designated time. Reports are accurate, on time, and complete. The Contractor shall provide to the PAR a completed and signed copy of issued work by COB on the date work was performed. The Contractor shall respond within 2 hours after normal hours and shall complete work within the same day or as scheduled by the OSGR. | 10 | Each | TBD at task order level | TBD at task order level | |
| A922 | Material Moves, 10001 - 15000 Lbs, (Normal Work Hours): The Contractor shall provide labor and equipment to pickup various materials and supplies from various buildings on NSWC IHD and at Stump Neck, and deliver/unload at locations on the Activity. The service is required to unload incoming commercial carriers and delivery of material with the end result of minimizing the accumulation of undelivered material on the loading docks. This also covers unscheduled priority pick-up and delivery of material. Directions on special handling, scope of material to be picked up or delivered, along with any schedules, priorities, times, or dates for pick up and delivery will be coordinated with the workload and priorities. All work is completed safely and in the time specified. Appropriate equipment and qualified operators are provided with the designated time. Reports are accurate, on time, and complete. The Contractor shall provide to the PAR a completed and signed copy of issued work by COB on the date work was performed. The Contractor shall respond within 2 hours during normal hours and shall complete work within the same day or as scheduled by the OSGR. | 10 | Each | |||
| A923 | Material Moves, 10001 - 15000 Lbs, (After Normal Work Hours): The Contractor shall provide labor and equipment to pickup various materials and supplies from various buildings on NSFIH and at Stump Neck, and deliver/unload at locations on the Activity. The service is required to unload incoming commercial carriers and delivery of material with the end result of minimizing the accumulation of undelivered material on the loading docks. This also covers unscheduled priority pick-up and delivery of material. Directions on special handling, scope of material to be picked up or delivered, along with any schedules, priorities, times, or dates for pick up and delivery will be coordinated with the workload and priorities. All work is completed safely and in the time specified. Appropriate equipment and qualified operators are provided with the designated time. Reports are accurate, on time, and complete. The Contractor shall provide to the PAR a completed and signed copy of issued work by COB on the date work was performed. The Contractor shall respond within 2 hours after normal hours and shall complete work within the same day or as scheduled by the OSGR. | 10 | Each | |||
| A924 | Material Moves, 10001 - 15000 Lbs, (All NSWC IH Detachments ): The Contractor shall provide labor and equipment to pickup various materials and supplies from various buildings on NSWC IHD and at Stump Neck, and deliver/unload at locations on the Activity. The service is required to unload incoming commercial carriers and delivery of material with the end result of minimizing the accumulation of undelivered material on the loading docks. This also covers unscheduled priority pick-up and delivery of material. Directions on special handling, scope of material to be picked up or delivered, along with any schedules, priorities, times, or dates for pick up and delivery will be coordinated with the workload and priorities. All work is completed safely and in the time specified. Appropriate equipment and qualified operators are provided with the designated time. Reports are accurate, on time, and complete. The Contractor shall provide to the PAR a completed and signed copy of issued work by COB on the date work was performed. The Contractor shall respond within 2 hours after normal hours and shall complete work within the same day or as scheduled by the OSGR. | 10 | Each | TBD at task order level | TBD at task order level | |
| A925 | Material Moves, 15001 - 20000 Lbs, (Normal Working Hours ): The Contractor shall provide labor and equipment to pickup various materials and supplies from various buildings on NSWC IHD and at Stump Neck, and deliver/unload at locations on the Activity. The service is required to unload incoming commercial carriers and delivery of material with the end result of minimizing the accumulation of undelivered material on the loading docks. This also covers unscheduled priority pick-up and delivery of material. Directions on special handling, scope of material to be picked up or delivered, along with any schedules, priorities, times, or dates for pick up and delivery will be coordinated with the workload and priorities. All work is completed safely and in the time specified. Appropriate equipment and qualified operators are provided with the designated time. Reports are accurate, on time, and complete. The Contractor shall provide to the PAR a completed and signed copy of issued work by COB on the date work was performed. The Contractor shall respond within 2 hours after normal hours and shall complete work within the same day or as scheduled by the OSGR. | 10 | Each | |||
| A926 | Material Moves, 15001 - 20000 Lbs, (After Normal Working Hours ): The Contractor shall provide labor and equipment to pickup various materials and supplies from various buildings on NSWC IHD and at Stump Neck, and deliver/unload at locations on the Activity. The service is required to unload incoming commercial carriers and delivery of material with the end result of minimizing the accumulation of undelivered material on the loading docks. This also covers unscheduled priority pick-up and delivery of material. Directions on special handling, scope of material to be picked up or delivered, along with any schedules, priorities, times, or dates for pick up and delivery will be coordinated with the workload and priorities. All work is completed safely and in the time specified. Appropriate equipment and qualified operators are provided with the designated time. Reports are accurate, on time, and complete. The Contractor shall provide to the PAR a completed and signed copy of issued work by COB on the date work was performed. The Contractor shall respond within 2 hours after normal hours and shall complete work within the same day or as scheduled by the OSGR. | 10 | Each | |||
| A927 | Material Moves, 15001 - 20000 Lbs, (All NSWC IH Detachments ): The Contractor shall provide labor and equipment to pickup various materials and supplies from various buildings on NSWC IHD and at Stump Neck, and deliver/unload at locations on the Activity. The service is required to unload incoming commercial carriers and delivery of material with the end result of minimizing the accumulation of undelivered material on the loading docks. This also covers unscheduled priority pick-up and delivery of material. Directions on special handling, scope of material to be picked up or delivered, along with any schedules, priorities, times, or dates for pick up and delivery will be coordinated with the workload and priorities. All work is completed safely and in the time specified. Appropriate equipment and qualified operators are provided with the designated time. Reports are accurate, on time, and complete. The Contractor shall provide to the PAR a completed and signed copy of issued work by COB on the date work was performed. The Contractor shall respond within 2 hours after normal hours and shall complete work within the same day or as scheduled by the OSGR. | 10 | Each | TBD at task order level | TBD at task order level | |
| A928 | Material Moves, 20001 - 30000 Lbs, (Normal Working Hours ): The Contractor shall provide labor and equipment to pickup various materials and supplies from various buildings on NSWC IHD and at Stump Neck, and deliver/unload at locations on the Activity. The service is required to unload incoming commercial carriers and delivery of material with the end result of minimizing the accumulation of undelivered material on the loading docks. This also covers unscheduled priority pick-up and delivery of material. Directions on special handling, scope of material to be picked up or delivered, along with any schedules, priorities, times, or dates for pick up and delivery will be coordinated with the workload and priorities. All work is completed safely and in the time specified. Appropriate equipment and qualified operators are provided with the designated time. Reports are accurate, on time, and complete. The Contractor shall provide to the PAR a completed and signed copy of issued work by COB on the date work was performed. The Contractor shall respond within 2 hours after normal hours and shall complete work within the same day or as scheduled by the OSGR. | 10 | Each | |||
| A929 | Material Moves, 20001 - 30000 Lbs, (After Normal Working Hours ): The Contractor shall provide labor and equipment to pickup various materials and supplies from various buildings on NSWC IHD and at Stump Neck, and deliver/unload at locations on the Activity. The service is required to unload incoming commercial carriers and delivery of material with the end result of minimizing the accumulation of undelivered material on the loading docks. This also covers unscheduled priority pick-up and delivery of material. Directions on special handling, scope of material to be picked up or delivered, along with any schedules, priorities, times, or dates for pick up and delivery will be coordinated with the workload and priorities. All work is completed safely and in the time specified. Appropriate equipment and qualified operators are provided with the designated time. Reports are accurate, on time, and complete. The Contractor shall provide to the PAR a completed and signed copy of issued work by COB on the date work was performed. The Contractor shall respond within 2 hours after normal hours and shall complete work within the same day or as scheduled by the OSGR. | 10 | Each | |||
| A930 | Material Moves, 20001 - 30000 Lbs, (All NSWC IH Detachments ): The Contractor shall provide labor and equipment to pickup various materials and supplies from various buildings on NSWC IHD and at Stump Neck, and deliver/unload at locations on the Activity. The service is required to unload incoming commercial carriers and delivery of material with the end result of minimizing the accumulation of undelivered material on the loading docks. This also covers unscheduled priority pick-up and delivery of material. Directions on special handling, scope of material to be picked up or delivered, along with any schedules, priorities, times, or dates for pick up and delivery will be coordinated with the workload and priorities. All work is completed safely and in the time specified. Appropriate equipment and qualified operators are provided with the designated time. Reports are accurate, on time, and complete. The Contractor shall provide to the PAR a completed and signed copy of issued work by COB on the date work was performed. The Contractor shall respond within 2 hours after normal hours and shall complete work within the same day or as scheduled by the OSGR. | 10 | Each | TBD at task order level | TBD at task order level | |
| A931 | Equipment Moves (Normal Work Hours): The Contractor shall provide trucking services, which shall include, but not be limited to: transporting Material Handling Equipment (MHE) and aerial service platforms, movement of Government equipment to and from explosive magazines and buildings in support of the NSFIH and its’ tenants. The Contractor shall also transport and electrically charge MHE’s and pickup and deliver aerial service platforms. Refer to J-0200000-07 for Government furnished battery charging facility and J-1502000-02 for battery charging procedures. The Contractor must maintain a current log, indicating locations and status of all MHE’s. The Contractor shall provide to the PAR a completed and signed copy of issued service work by COB on the date work was performed. The Contractor shall respond within 2 hours during normal working hours. Completion times shall be 24 clock hours unless otherwise specified. | 10 | Each | |||
| A932 | Equipment Moves ( After Normal Work Hours): The Contractor shall provide trucking services, which shall include, but not be limited to: transporting Material Handling Equipment (MHE) and aerial service platforms, movement of Government equipment to and from explosive magazines and buildings in support of the NSFIH and its’ tenants. The Contractor shall also transport and electrically charge MHE’s and pickup and deliver aerial service platforms. Refer to J-0200000-07 for Government furnished battery charging facility and J-1502000-02 for battery charging procedures. The Contractor must maintain a current log, indicating locations and status of all MHE’s. The Contractor shall provide to the PAR a completed and signed copy of issued service work by COB on the date work was performed. The Contractor shall respond within 2 hours during normal working hours. Completion times shall be 24 clock hours unless otherwise specified. | 10 | Each | |||
| A933 | Equipment Moves ( All NSWC IH Detachemntss): The Contractor shall provide trucking services, which shall include, but not be limited to: transporting Material Handling Equipment (MHE) and aerial service platforms, movement of Government equipment to and from explosive magazines and buildings in support of the NSFIH and its’ tenants. The Contractor shall also transport and electrically charge MHE’s and pickup and deliver aerial service platforms. Refer to J-0200000-07 for Government furnished battery charging facility and J-1502000-02 for battery charging procedures. The Contractor must maintain a current log, indicating locations and status of all MHE’s. The Contractor shall provide to the PAR a completed and signed copy of issued service work by COB on the date work was performed. The Contractor shall respond within 2 hours during normal working hours. Completion times shall be 24 clock hours unless otherwise specified. | 10 | Each | TBD at task order level | TBD at task order level | |
| A934 | Operator Testing, Licensing and Training (Normal Working Hours): At the completion of training, the |
Contractor shall provide a copy of all licenses issued/renewed and other pertinent information needed for updating the Government’s testing, licensing, and equipment operator training for all NSWC IHD military and civilian personnel and other Activity employees as required. Documentation will be provided from the Contractor’s Personnel Certification System coordinator to the Government’s Personnel Certification System coordinator, who will be identified upon Contract award. Testing and licensing shall conform to IHDIVNAVSURFWARCEN In¬struction 11240.3K, NAVSEA OP-2239 and OP-5, NAVFAC P-300 and P-307, NAVSUP 284 and 538 and DOD and Interstate Commerce Commission instructions and regulations. The Contractor is responsible for initiating curriculum changes to remain current and in line with publication revisions as noted above. The Government will review and approve the initial curriculum/course outline, and additional changes to the curriculum/outline will follow the same procedure.
Refer to https://redskins.ih.navy.mil/forms/html/launch_pcs.html. Contractor is to provide all equipment such as fork lift and trucks, etc. required for road testing. All Contractor personnel who operate equipment are subject to these same provisions except the actual issuance of Government Operator's License. Qualified instructors must hold a license for the specific equipment for which they are conducting operator testing and be completely familiar with all aspects of its safe and effective operation. Further, they shall be competent to effectively instruct, examine, and test license applicants as demonstrated by their successful completion of an accredited training institution acknowledged by the Navy. This includes the capability to develop and conduct formal courses of classroom instruction on the various aspects of equipment operation and safety. The Contractor shall certify that instructors/examiners are currently qualified for instruction, testing, and licensing requirements specified herein. The Contractor shall provide within 48 clock hours of request evidence of qualifications. The Contractor shall submit a list of certified instructors/examiners and shall report any changes in writing to the Contracting Officer. Testing and licensing is performed in accordance with NAVFAC P-300 for CESE operators and NAVFAC P-307 for WHE operators.
Operators engaged in transporting ammunition, explosives, or other dangerous/hazardous materials are qualified in accordance with NAVSEA OP-2239 and NAVFAC P-300.
The following courses include:
a. American Automobile Association Driver Improvement or Defense Driver Course Program – eight (8) hours per class
b. New Government License Course - four (4) hours per class
c. Material Handling Equipment Operator’s, Explosive – 40 Hour Course
d. Man-lift (Scissor Lift) Course - four (4) hours per class
e. New Explosive Driver Course - 16 hours per class
f. Explosive Driver Renewal Course - 4 hours per class
g. Category III Crane Training – sixteen (16) hours per class
h. Construction Equipment Licensing Course - four (4) hours per class
i. Material Handling Equipment Operator’s, Renewal – four (4) Hour Course J. Boom Lift/ Scissor lift and Fall Protection class - 2 classes per year - 8 hour course.
The Contractor shall maintain all records as specified in the NAVFAC P-300, NAVFAC P-307, and NAVSEA OP-2239, including an individual file for each operator with all relevant forms and copy of license issued. Copies of both sides of the license are to be filed in the Operator's History File. A master listing shall be kept of all per¬sonnel, types of licenses, expiration date and a tickler date to flag renewal action 30 days before expiration. All records shall be maintained in a central file. The Contractor shall comply with State and Federal licensing requirements in addition to Navy requirements in training, testing, and licensing of Federal and Contractor personnel. The computer system for Personal Certification Program must be updated the same day as the completion of the training to reflect new expiration dates. The Contractor shall comply with State and Federal li¬censing requirements in addition to Navy requirements in training, testing, and licensing of Federal and Contractor personnel. Records shall be made available to the Government upon request and will be turned over to the Government upon contract completion. Refer to J- 1502000-06 for Operating, Licensing and Training Procedures.
The Contractor shall provide to the PAR a completed and signed copy of issued service work by COB on the date work was performed. The Contractor shall provide training as requested. Training shall be scheduled and completed
| in the times specified. | 10 | Each |
| A935 | Operator Testing, Licensing and Training (All NSWC IH Detachments): At the completion of training, the |
Contractor shall provide a copy of all licenses issued/renewed and other pertinent information needed for updating the Government’s testing, licensing, and equipment operator training for allNSWC IHD. military and civilian personnel and other Activity employees as required. Documentation will be provided from the Contractor’s Personnel Certification System coordinator to the Government’s Personnel Certification System coordinator, who will be identified upon Contract award. Testing and licensing shall conform to IHDIVNAVSURFWARCEN In¬struction 11240.3K, NAVSEA OP-2239 and OP-5, NAVFAC P-300 and P-307, NAVSUP 284 and 538 and DOD and Interstate Commerce Commission instructions and regulations. The Contractor is responsible for initiating curriculum changes to remain current and in line with publication revisions as noted above. The Government will review and approve the initial curriculum/course outline, and additional changes to the curriculum/outline will follow the same procedure.
Refer to https://redskins.ih.navy.mil/forms/html/launch_pcs.html. Contractor is to provide all equipment such as fork lift and trucks, etc. required for road testing. All Contractor personnel who operate equipment are subject to these same provisions except the actual issuance of Government Operator's License. Qualified instructors must hold a license for the specific equipment for which they are conducting operator testing and be completely familiar with all aspects of its safe and effective operation. Further, they shall be competent to effectively instruct, examine, and test license applicants as demonstrated by their successful completion of an accredited training institution acknowledged by the Navy. This includes the capability to develop and conduct formal courses of classroom instruction on the various aspects of equipment operation and safety. The Contractor shall certify that instructors/examiners are currently qualified for instruction, testing, and licensing requirements specified herein. The Contractor shall provide within 48 clock hours of request evidence of qualifications. The Contractor shall submit a list of certified instructors/examiners and shall report any changes in writing to the Contracting Officer. Testing and licensing is performed in accordance with NAVFAC P-300 for CESE operators and NAVFAC P-307 for WHE operators.
Operators engaged in transporting ammunition, explosives, or other dangerous/hazardous materials are qualified in accordance with NAVSEA OP-2239 and NAVFAC P-300.
The following courses include:
a. American Automobile Association Driver Improvement or Defense Driver Course Program – eight (8) hours per class
b. New Government License Course - four (4) hours per class
c. Material Handling Equipment Operator’s, Explosive – 40 Hour Course
d. Man-lift (Scissor Lift) Course - four (4) hours per class
e. New Explosive Driver Course - 16 hours per class
f. Explosive Driver Renewal Course - 4 hours per class
g. Category III Crane Training – sixteen (16) hours per class
h. Construction Equipment Licensing Course - four (4) hours per class
i. Material Handling Equipment Operator’s, Renewal – four (4) Hour Course J. Boom Lift/ Scissor lift and Fall Protection class - 2 classes per year - 8 hour course.
The Contractor shall maintain all records as specified in the NAVFAC P-300, NAVFAC P-307, and NAVSEA OP-2239, including an individual file for each operator with all relevant forms and copy of license issued. Copies of both sides of the license are to be filed in the Operator's History File. A master listing shall be kept of all per¬sonnel, types of licenses, expiration date and a tickler date to flag renewal action 30 days before expiration. All records shall be maintained in a central file. The Contractor shall comply with State and Federal licensing requirements in addition to Navy requirements in training, testing, and licensing of Federal and Contractor personnel. The computer system for Personal Certification Program must be updated the same day as the completion of the training to reflect new expiration dates. The Contractor shall comply with State and Federal li¬censing requirements in addition to Navy requirements in training, testing, and licensing of Federal and Contractor personnel. Records shall be made available to the Government upon request and will be turned over to the Government upon contract completion. Refer to J- 1502000-06 for Operating, Licensing and Training Procedures.
The Contractor shall provide to the PAR a completed and signed copy of issued service work by COB on the date work was performed. The Contractor shall provide training as requested. Training shall be scheduled and completed
| in the times specified. | 10 | Each | TBD at task order level | TBD at task order level | ||
| A936 | Rental of heavy equipment with operator. ( Normal Working Hours ) The contractor shall provide rental with a licensed operator of heavy equipment. This shall include but not be limited to : Backhoe, Skid Steer, Scissor Lift, Excavator, etc. . Directions on special handling, weight testing and preventative maintenance scope of work to be done, along with any schedules, priorities, times, or dates willl be coordinated with the workload and priorities. All work is completed safely and in the time specified. Appropriate equipment and qualified operators are provided with the designated time. Reports are accurate, on time, and complete. The Contractor shall provide to the PAR a completed and signed copy of issued work by COB on the date work was performed. The Contractor shall respond within 2 hours after normal hours and shall complete work within the same day or as scheduled by the OSGR. | 10 | Per day | |||
| A937 | Rental of heavy equipment with operator. ( After Normal Working Hours ) The contractor shall provide rental with a licensed operator of heavy equipment. This shall include but not be limited to : Backhoe, Skid Steer, Scissor Lift, Excavator, etc. . Directions on special handling, weight testing, preventative maintenance scope of work to be done, along with any schedules, priorities, times, or dates willl be coordinated with the workload and priorities. All work is completed safely and in the time specified. Appropriate equipment and qualified operators are provided with the designated time. Reports are accurate, on time, and complete. The Contractor shall provide to the PAR a completed and signed copy of issued work by COB on the date work was performed. The Contractor shall respond within 2 hours after normal hours and shall complete work within the same day or as scheduled by the OSGR. | 10 | Per day |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .