amendment_2.pdf
PDF 121 KB Posted
- Solicitation number
- N0017418R0011
About this file
Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CIWS_-_dd1423-21-CDRL-A007-A008_(A).pdf | ||
| CIWS_-_dd1423-21-CDRL-A009-A010_(A).pdf | ||
| amendment1.pdf | ||
| CIWS_-_dd1423-21-CDRL-A005-A006_(A).pdf | ||
| CIWS_-_dd1423-21-CDRL-A003-A004_(A).pdf | ||
| CIWS_-_Key_Labor_Category_Requirements.pdf | ||
| SKM_C454e18031507170.pdf | ||
| SKM_C454e18031507180.pdf | ||
| CIWS_-_dd1423-21-CDRL-A001-A002_(A).pdf | ||
| Cost_Summary_Format.xlsx | XLSX spreadsheet | |
| SKM_C454e18031507181.pdf | ||
| SKM_C454e18031507190.pdf | ||
| SKM_C454e18031507191.pdf | ||
| QASP_2-10-2017.doc | DOC document | |
| CIWS_PastPerformanceMatrix.doc | DOC document | |
| CDRLs.pdf | ||
| N0017418R0011.pdf | ||
| CIWS_DD254.pdf | ||
| CIWS_PastPerformanceQuestionnaire.doc | DOC document | |
| CIWS_-_Key_Labor_Category_Requirements.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to extend the closing date to 02 April 2018 and correct language under "For Proposal Preparation Purposes Only" in Section L regarding ODCs.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 13
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Mar-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0017418R0011
X 9B. DATED (SEE ITEM 11)
27-Feb-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Mar-2018
CODE
NSWC IHEODTD N
4081 N. JACKSON RD
BLDG 841
INDIAN HEAD MD 20640-5116
N00174 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0017418R0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 2
Important Information for all Offerors:
This amendment:
1.Extends the solicitation closing date from 4pm Eastern time 29 March 2018 to 4pm Eastern time 02 April 2018.
2. Corrects language in Section L, under “For Proposal Preparation Purposes Only,” page 148, regarding the ODC Table 2.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 29-Mar-2018 04:00 PM to 02-Apr-2018 04:00 PM.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
SECTION L
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
1.0 OVERVIEW
The purpose of this requirement is to provide Contractor support to perform the functions of an Alteration Installation Team (AIT) with the installation of Ship Alterations (S/A), Ship Change Documents (SCDs), Ordnance Alterations (ORDALTs) and system repairs as related to the Close-In Weapon Systems (CIWS) on U.S. Navy, U.S.
Army , U.S. Coast Guard, and authorized Foreign Military Sales (FMS) customer Vessels (PHALANX, Sea RAM and Land Based PHALANX Weapon System).
1.1 Contract Award
1.1.1 The Government intends to award a single Indefinite-Delivery Indefinite-Quantity (IDIQ) contract as a result of this solicitation in accordance with Section M, to the responsible Offeror whose proposal represents the Best Value to the Government, utilizing a trade-off process in accordance with the Factors and Sub-factors set forth in the solicitation.
1.1.2 The Government may reject any or all proposals if such action is in the Government’s interest.
1.1.3 The Government reserves the right to award a contract based on initial offers and without holding discussions, but reserves the right to hold discussions at the Government's discretion; therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from a cost/price and technical standpoint.
2.0 NOTICES TO OFFERORS
Each Offeror must (1) submit an offer, (2) submit information that addresses the evaluation factors, and (3) submit supporting price data. The Government will evaluate each Offeror's understanding of the Government's requirements and ability to perform the work on the basis of its proposal. It is the Offeror's responsibility to provide information and evidence that clearly demonstrates its ability to meet the solicitation requirements. Unless otherwise allowed, all questions shall be submitted by 4:30PM EST within 10 business days from date of solicitation release, as time may not permit responses to questions received after that time.
3.0 INSTRUCTIONS FOR SUBMISSION OF OFFERS
3.1 Submission
3.1.1 Submission, modification, revision, and withdrawal of proposals
(i) The Offeror shall submit the following information in both hard copy and electronic copy format;
failure to do so will render an offer ineligible for award:
1. Six (6) copies of the Technical Volume I.
2. Two (2) copies of Past Performance Volume II, including Past Performance Matrix, and Past
Performance Questionnaire.
3. One (1) copy of the Cost Volume III, containing the completed and signed RFP package, with all representation certifications executed, and with prices in Section B.
(ii) Any proposal modification or revision not received/submitted by the exact time specified for receipt of offers is “late” and may not be considered. The solicitation will close at the exact date and time specified in the solicitation and Offerors will be unable to submit their proposal after that time.
(iii) Proposals may be withdrawn by written notice to the Contracting Officer provided such notice is received prior to contract award. Withdrawals are effective upon receipt of notice by the Contracting Officer.
4. Two (2) copies of the Small Business Subcontracting Plan Volume IV
Failure to submit a complete proposal prior to the solicitation closing date and time may render the proposal unacceptable.
3.2 Offer Expiration Date
Proposals in response to this solicitation shall be valid for 180 calendar days.
4.0 PROPOSAL FORMAT
4.1 General
Offerors must comply with the detailed instructions for the format and content of the proposal; proposals that do not comply with the detailed instructions for the format and content of the proposal may be considered non-responsive and may render the Offeror ineligible for award. Format shall comply with the following information:
8.5 x 11 inch paper Single-spaced typed lines 1 inch margins 12-point Times New Roman Font text
Offerors are instructed to clearly label all files with Volume number, company name and a unique identifying name which is reflective of the contents of the file (i.e., VOL. III, ABC COMPANY, PRIME COST PROPOSAL). Please keep the file names consistent for all volumes.
The Offeror shall submit proposals in hard copy to:
NSWC IHEODTD
Indian Head EOD Technology Division 4081 North Jackson Road Bldg. 841 Code 022DR Indian Head, MD 20640-5115
The Offeror shall also submit one proposal in electronic copy to:
Devon.renner@navy.mil
4.1.1 Page Numbering
The Offeror shall use a standard page numbering system to facilitate proposal references. Number consecutive pages within sections. Charts, graphs and other insert materials shall be page-numbered as part of the page numbering system.
4.1.2 Page Limitations
Page limitations are identified for each volume/section of the proposal, as described in paragraph 5.0 below and will be treated as maximums. If exceeded, excess pages will not be read or considered in proposal evaluation. When both sides of a sheet display printed material, it shall be counted as two pages. Graphs, charts, and tables are included in the page count. The following are not included in the page limitations:
(i) Title/Cover pages
(ii) Tables of contents
(iii) Glossaries of abbreviations and acronyms
(iv) Subcontracting agreements, letters of intent, resumes, and subcontract agreements
(v) Proposal Cross-Reference Tables
4.2 Cover letter, provided as a separate file, of the proposal must provide the following:
(i) The solicitation number;
(ii) Cage Code;
(iii) The name, address, e-mail address, and telephone and facsimile numbers of points of contact for the Offeror and teaming subcontractors;
(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation;
(v) Name, title, and signature of person authorized to sign the proposal.
(vi) A statement that the Offeror consents, meets and agrees with all terms, conditions, requirements, provisions, and amendments included in the solicitation. Offerors must meet all requirements at the time of proposal submission; or provide with their cover letter an acceptable plan to meet the requirements by the start date of the contract performance. Failure to meet all requirements at the time of proposal submission or provide an acceptable plan to meet the requirements by the start date of the contract performance may remove the Offeror from consideration of award. The following elements of the technical proposal shall be addressed in the cover letter:
• Organizational Conflict of Interest (OCI) Certification/Mitigation Plan: The Offeror shall certify compliance with the OCI clause HQ L-2-0005 - Notification Of Potential Organizational Conflict(s) Of Interest (NAVSEA) (JUN 1994). If a potential conflict of interest exists at any tier, each potential prime Offeror is requested to notify the Contracting Officer within 14 days of the date of this solicitation and present an acceptable plan to neutralize any potential organizational conflict of interest. Those Offerors deemed to have a conflict of interest may be ineligible for award.
• Quality Management System (QMS): Confirmation of NAVSEA 04 letter accepting Offeror’s
(QMS)
• Personnel: The Offeror shall certify that all proposed “key personnel” will be available upon Task Order award and non-key personnel and contingent hires within 30 days of contract award.
• Small Business Subcontracting Plan: The Offeror shall propose at least 5% to small businesses.
4.3 Cover Page, Table of Contents, Proposal Cross-Reference Table
Each proposal volume must include a Cover Page and a Table of Contents. The Cover Page shall identify the solicitation number, amendment number, proposal volume and title, and the Offeror’s name. Volume I shall include a Master Table of Contents and a Proposal Cross-Reference Table. The Proposal Cross-Reference Table shall indicate the required proposal content by solicitation section/page number and the section/page number where this content appears in the proposal.
4.4 Glossary of Abbreviations and Acronyms
Each volume shall contain a glossary which includes all abbreviations, acronyms and their corresponding definitions.
4.5 Cost Information
Cost or pricing information of any kind shall only be included in Volume III, Cost Proposal and Volume IV Small Business Subcontracting Plan. Cost summary and back-up spreadsheets must be submitted in MS Excel format.
5.0 PROPOSAL ORGANIZATION
Factors are listed in descending order of importance.
Volume I - TECHNICAL (Factor 1)
1. Technical Approach
2. Quality Assurance Plan
3. Facilities and Equipment
4. Personnel Staffing
5. Safety Plan
6. Management Plan
Volume II - PAST PERFORMANCE (Factor 2) Past Performance
Volume III - COST (Factor 3) Cost Proposal
Volume IV – SMALL BUSINESS SUBCONTRACTING PLAN (For Other Than Small Businesses Only) Not subject to merit evaluation (Factor 4).
FACTOR 1: TECHNICAL
The Offeror shall address each subfactor listed below, which are of equal importance. The technical proposal shall not exceed 70 single sided pages, not less than 12 point Times New Roman. The technical proposal shall not contain any hyperlinks or electronically imbedded links or cost/price information. If the technical proposal exceeds 70 single-sided pages, only the first 70 pages will be evaluated. The Offeror’s technical proposal must demonstrate an understanding of all requirements covered in the Performance Work Statement (PWS) and RFP terms and conditions.
The technical proposal shall contain information/documentation in sufficient detail to enable evaluation based on the factors/sub-factors listed in Section M, Clause entitled Best Value Evaluation and Basis for Award and as detailed below. To this end, each technical proposal shall be specific, detailed and complete as to clearly and fully demonstrate that the prospective contractor has a thorough knowledge and understanding of the requirements and has valid and practical solutions for technical problems. Statements that paraphrase the specifications or attest that standard procedures will be employed are inadequate to demonstrate how the Offeror will comply with the requirements of the specifications, and this clause.
The Offeror shall describe how it plans to accomplish the tasks associated with the following subfactors:
SUB-FACTOR 1: Technical Approach (Not to Exceed 20 Pages)
The Offeror shall submit a detailed description of their approach to perform the requirements listed in sections 3.2.1 through 3.2.14 of the Government provided PWS. Offeror’s proposals shall demonstrate an understanding of the Government requirements including any proposed innovations by the Offeror to performing the Government’s requirements.
SUB-FACTOR 2: Quality Assurance Plan (Not to exceed 10 pages)
The Offeror shall provide details of their Quality Management System (QMS) to ensure it complies with NAVSEA 9090-310 latest revision and shall provide a copy of their NAVSEA 04 letter accepting their QMS. The contractor's quality system is subject to periodic compliance audits by Government representatives throughout the execution of the contract. IAW paragraph 3.2.11.
SUB-FACTOR 3: Facilities and Equipment (Not to Exceed 10 Pages)
The Offeror shall provide a description of facilities and equipment necessary to comply with the applicable tasks in the Statement of Work: IAW paragraph 3.2.3.2. They shall provide information as to the specific facilities and equipment which they plan to utilize in support of the tasks in the Statement of Work. If any of the listed facilities and equipment is contingent on contract award, the Offeror shall demonstrate their plan to ensure the facilities and equipment will be available within one month of contract award.
SUB-FACTOR 4: Personnel Staffing (Not to Exceed 10 Pages)
The Offeror shall demonstrate that its proposed personnel possess the technical knowledge and capability necessary to meet the requirements of the PWS and the Key Personnel qualifications provided in Section J, Attachment 7 of the solicitation. The Offeror shall state the employment status of proposed personnel (i.e., currently employed by Offeror or proposed with a signed Letter of Intent).
The Offeror shall describe how it plans to incorporate flexibility in its staffing plan to accommodate new staffing requirements or to remove staff, if required, during the period of performance of this contract. The Offeror shall certify that the proposed key personnel will be available at the time of contract award, and non-key personnel and contingent hires within 30 days of contract award.
SUB-FACTOR 5: Safety Plan (Not to Exceed 10 Pages)
The Offeror shall demonstrate in their safety plan how they will comply with all applicable Department of Defense (DOD), Department of Navy (DON), Naval Sea Systems Command (NAVSEA), Naval Facilities Expeditionary Logistics Center (NFELC), Naval Surface Warfare Center Indian Head Explosive Ordnance Disposal Technology Division (NSWC IHEODTD), Occupational Safety and Health (OSHA) and private shipyard facility safety instructions, policies, procedures and guidance while on Government or private shipyard property. The Offeror shall demonstrate how they plan to ensure that all safety and personal protection equipment (PPE), such as hard hats, safety shoes and safety glasses are worn by their employees in designated areas.
SUB-FACTOR 6: Management Plan (Not to Exceed 10 Pages)
The Offeror shall provide a Management Plan that describes how the Offeror intends to manage and coordinate the task efforts of this task order, including planning, assigning responsibility, controlling personnel, controlling utilization of resources, tracking deliveries, and periodically monitoring performance and obtaining feedback.
The Management Plan shall describe the proposed subcontractors or team members, the planned division of tasks within the team, why the teaming agreements will benefit the Government and aid the contractor in achieving the requirements and objectives of the effort, the management structure for coordinating and controlling subcontractors and/or team members, subcontractor deliveries to the prime and payment tracking, points of contact and the sole bearer of ultimate responsibility for performance.
The Management Plan shall also describe the how the Offeror plans to coordinate communications with the incumbent contractor and NSWC IHEODTD, Picatinny Detachment staff as well as ensure uninterrupted workflow during the transition process.
FACTOR 2: PAST PERFORMANCE (No Page Limit)
Past performance information shall be provided for the Prime and all subcontractors in order to develop an Offeror's past performance rating.
Past performance information is one indicator of an Offeror’s (to include prime and subcontractors) ability to perform the contract successfully. In the evaluation of an Offeror’s past performance, the Government reserves the right to use relevant performance within the past five years. Relevant and timely past performance information in the Contractor Performance Assessment Reporting System (CPARS), and the Past Performance Information Retrieval System (PPIRS) (http://www.ppirs.gov/) including the Federal Awardee Performance and Integrity Information System (FAPIIS) will be considered during the evaluation of an Offeror’s past performance.
Using the Past Performance Matrix (as listed in Section J), the Offeror and all subcontractors shall provide a separate list of relevant contracts that were performed within the last five years. Contracts that are listed in PPIRS are preferred. The list for the Prime shall contain no more than seven relevant contracts. In addition, each subcontractor shall complete a separate matrix and provide no more than seven relevant contracts. The identified relevant contracts shall focus on performance that is relevant to the current solicitation requirement (i.e., Repair and Maintenance of Fire Control Equipment and Installation of Fire Control Equipment) cited in the Scope of this solicitation. Relevancy includes similarity of item, complexity and dollar value. With respect to relevancy, more relevant past performance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment than past performance of lesser relevance. If the Offeror has no relevant past performance within the last five years or cannot provide a list of relevant contracts, then the Offeror must provide an explanation.
Past Performance Questionnaires (as listed in Section J) only apply to relevant contracts for which performance information is not available through PPIRS. The Offeror and subcontractors shall submit the Past Performance Questionnaire to all of their references listed on the Past Performance Matrix that have NO PPIRS contracts, and shall request the references to complete the Past Performance Questionnaire and return it directly to:
NSWC IHEODTD –
Naval Surface Warfare Center Indian Head EOD Technology Division 4081 North Jackson Road Bldg. 841 Code 022DR Att: Devon Renner
Surveys may also be emailed to devon.renner@navy.mil which is the preferred method of delivery. All questionnaires must be received by the closing date and time of the solicitation.
FACTOR 3: COST (No Page Limit)
There is no limitation on number of pages, page format, or print size for the cost proposal.
The Offeror shall prepare the cost proposal in accordance with the following organization, content and format requirements to assist the Government in making a complete and thorough evaluation. An original and one copy of each prime and subcontractor, if applicable, cost proposal shall be submitted to the Procuring Contracting Officer for evaluation. Only one copy of Microsoft Excel 2010 or earlier, CD(s) with the contractor's and subcontractor's cost proposal need be submitted. Only Microsoft Excel is acceptable (Office 2010 preferably--any later version of Microsoft Excel is NOT ACCEPTABLE).
http://www.ppirs.gov/ mailto:devon.renner@navy.mil
The Offeror shall take precautions to the maximum practical extent to ensure that the disk submitted contains no computer viruses.
Furnish all cost proposal information in the order listed. This requirement also applies to any proposed subcontractor(s).
(a) Assumptions made in preparing the cost proposal. Any qualifications to any requirement of the cost proposal preparation process. Any inconsistency, whether real or apparent, between promised performance and cost shall be explained.
(b) ONE COPY OF YOUR COST PROPOSAL SHALL BE SENT TO YOUR COGNIZANT DCAA
CONCURRENT WITH THE SUBMISSION TO THE PROCURING CONTRACTING OFFICER. YOUR
PROPOSED SUBCONTRACTORS, IF ANY, SHALL BE INSTRUCTED TO DO THE SAME. Provide confirmation and date that copies of this cost proposal were submitted to DCAA, along with a current telephone number and point of contact.
(c) In accordance with FAR 52.244-2, when subcontractors and/or consultants are proposed, the Prime shall clearly identify their cost information to include a description of the supplies or services to be subcontracted;
identification of the type of subcontract to be used; identification of the proposed subcontractor; and the proposed subcontract price. List of subcontractors that are submitting cost information independently.
(d) Briefly describe information concerning the general financial condition of your firm and specific plans for financing the proposed contract, including the most recent income statement and balance sheet or equivalent financial statement.
(e) If you are currently being audited, or have been audited by Defense Contract Audit Agency (DCAA) within the past twelve months, it is requested that the name, phone number and location of the assigned DCAA office be furnished with your proposal along with the audit number.
(f) State the source and date of acceptance of adequacy of the Offeror's accounting system.
(g) If the Offeror has an approved Purchasing System in accordance with FAR Part 44, provide the source and date of latest review. If the Offeror does not have an approved Purchasing System, state what processes are used for purchases of such items as materials, travel, and training.
(h) State whether direct labor rates are subject to a Forward Pricing Rate Agreement (FPRA) with the Government. If so, the Offeror shall attach a copy of the FPRA as Attachment (1) to the Volume III- Cost Proposal.
(i) If the Offeror is aware of differences between DCAA recommended rates and the rates proposed, the Offeror shall identify the specific rates and explain the differences. This includes labor rates, indirect rates, material burdens, and G&A rates.
(j) State the escalation rate used for each year and the basis for this particular rate. Escalation shall not be applied to labor categories listed on the Department of Labor (DOL) Wage Determination.
(k) The cost proposal must furnish an explanation of the Offerors "company policy" on the accumulation of costs for vacations, sick leave, holidays, and other compensated leave or time off.
(l) Describe how the Offeror treats, for accounting purposes, the costs of employee training and whether such training occurs during the normal work week or outside the normal work week. Also, the Offeror shall define how Government-sponsored training costs are kept separate from contractor-training costs.
(m) It is recognized that some of the labor category titles used in the RFP may not exactly match the titles normally used in particular company operations. Accordingly, in order to permit a rapid comparison between the labor team proposed in response to this RFP and the Offerors actual labor mix, each proposal must provide the following:
(i) Direct labor rates related to the labor categories specified in the RFP.
(ii) A statement of the Offerors normally used nomenclature for each labor category included herein, together with a copy of the Offerors own position description for each labor category.
(iii) A statement of any other labor categories and related qualifications between any category established herein and the category normally used.
A cross-reference matrix of labor category nomenclature must be provided.
(n) If the Offeror is NOT proposing uncompensated overtime, so state. If the Offeror is proposing uncompensated overtime, 52.237-10 IDENTIFICATION OF UNCOMPENSATED OVERTIME (OCT 1997) applies.
(o) Define and explain the rationale for all burdens that will be applied to material. Explain how material rebates, incentives, or other inducements provided to the Offeror will be treated.
(p) Indicate any other proposed indirect rate(s) for each year and the base to which the rate is applied.
(q) Specify proposed General & Administrative (G&A) rate(s) for each year. Indicate the base to which the rate is applied.
(r) If an Offeror elects to claim facilities capital cost of money as an allowable cost, the Offeror must submit the calculation of the proposed amount on a DD Form 1861, Contract Facilities Capital Cost of Money, or computer generated equivalent with the applicable cost of money base and rates displayed. Failure to complete all necessary information may result in delay in analysis and delay in contract award. In addition, the Offeror must provide the percentages for the Distribution of Facilities Capital Employed by land, buildings, and equipment. Current Department of the Treasury Rates are available at http://www.publicdebt.treas.gov/opd/opdprmt2.htm.
(s) Each subcontractor must submit a statement indicating whether the release of pricing assistance data results to the Prime Contractor is allowed or prohibited. The Offerors are required to provide an assessment and determination that the cost proposed by any subcontractor is fair and reasonable (FAR 15.404-3).
(t) Offerors will submit a total compensation plan setting forth salaries and fringe benefits proposed for the professional employees who will work under the contract. Current annual salary is required only if the employee is currently employed by the Offeror or subcontractor. If the employee is a contingency hire, the Offeror or subcontractor must include the agreed to annual salary of the prospective employee. The compensation plan for new employees may be estimated, but shall be consistent with the Offeror's overall proposal. See FAR Clause 52.222-46 "Evaluation of Compensation for Professional Employees (FEB 1993)"of Section M of this RFP.
(u) Yearly Breakout: Each Offerors Cost Proposal shall be prepared based on the number of labor hours by labor category, and material estimates set forth below under the heading "For Proposal Preparation Purposes Only" herein.
Also, indicate how burden and G&A rates, and any other indirect rates are developed, by listing costs included in these indirect cost items.
The quantities of hours of labor for each labor category set forth under the heading "For Proposal Preparation Purposes Only" herein, is to be used by the Offeror for computing total labor costs and represent the Government's current best estimate of requirements. However, the Government cannot guarantee either the estimated quantities of labor hours shown for individual labor categories or the total estimated labor hours for the entire period of contract performance (base year plus option periods).
http://www.publicdebt.treas.gov/opd/opdprmt2.htm
All Offerors are to submit their cost proposal in accordance with the following instructions and sample/example format contained in Section J. All cost proposals are to be prepared using Microsoft Excel (Office 2010 preferably--any later version of Microsoft Excel is NOT ACCEPTABLE).
THE PRIME CONTRACTOR SHALL SUBMIT IT’S PROPOSAL ON WHITE BOND PAPER ONLY along with the CD(s) (appropriately labeled as to content) as needed for the entire cost proposal (prime and subcontractor(s), if applicable). Only one set of CDs need be submitted. Each proposal, prime and subcontractor, is to be prepared in accordance with the following instruction and sample.
The Cost Proposal submitted by an Other Than Small Business Concern shall demonstrate that at least 5% of the overall total dollar amount of the cost proposal will represent subcontract awards to Small Business Concerns. The Offeror shall clearly identify in its “Cost Summary Format” the proposed subcontractors it will use to fulfill the small business subcontracting plan requirement of 5%.
Each spreadsheet is to have the following information:
Company Name City, State, Zip Solicitation Number Work Site (Location) Element/Category
Direct Labor - Each spreadsheet is to list by title, the labor categories that the Offeror intends to use for performance of the contract and number of labor hours proposed. Offerors shall use their labor category nomenclature for each category title and shall use the labor hours per category per year as set forth in this section under the heading "For Proposal Presentation Purposes Only". A formula shall be written that multiplies proposed labor hours by proposed labor rates, with the resultant amount indicated in the amount column. The appropriate total number of hours is provided under the heading "For Proposal Preparation Purposes Only". The sample provided lists all labor categories identified for performance of this contract. If additional lines are required, the Offeror is to adjust the sample spreadsheet accordingly. However, the Offeror is cautioned and reminded that any adjustments to an individual spreadsheet cost proposal, (i.e., addition/deletion of lines) needs to be reflected on all spreadsheets, as all spreadsheets shall be linked. A suggestion would be for the Offeror to develop a generic cost proposal spreadsheet that reflects ALL of the intended labor categories.
Composite rates are required for any labor category under each type of services category in which more than one individual is proposed. These composite rates should properly weight individual labor rates (included in the composite) based on calculated percentages of the effort to total effort. The proposal shall clearly demonstrate the individual elements from which the composite rate is developed. Prime contractors and subcontractors can have their own composite rates.
The Offeror should also identify all labor categories subject to the Service Contract Act and identify what category on the Wage Determination applies to the contractor’s employees. The direct labor rate (unburdened) paid to each non-exempt employee should be listed next to the contractor’s labor category.
The cost proposal spreadsheets shall use the Offeror's labor category nomenclature.
Subtotal Direct Labor- A formula that adds all direct labor amounts shall be written with the resultant calculation indicated.
Labor Overhead - The Offeror is to indicate the base amount that is used to apply the labor overhead rate. If more than one labor overhead rate is proposed, or if Offeror has other indirect labor rate(s), i.e., separate fringe benefits rate(s), Offeror is to so indicate in the cost proposal spreadsheet, along with the base amount. A formula shall be written that multiplies the base amount(s) by the proposed labor overhead rate(s) and shall indicate the result in the amount column.
Subtotal Labor Overhead - A formula that adds all labor overhead amounts shall be written with the resultant calculation indicated.
Total - A formula shall be written that adds the subtotal amounts for direct and labor overhead with the resultant calculation indicated.
Total labor hours - A formula shall be written that adds all proposed direct labor hours proposed for performance of this contract.
Other Direct Costs - The Offeror is to include the following:
• Travel Costs. The Offeror is to use the estimated provided by the Government for this category. Fee is prohibited for Travel Costs.
• Material Costs. The Offeror is to use the estimates provided by the Government for this category. Fee is allowable for Material Costs.
• Supplies Costs. The Offeror is to use the estimates provided by the Government for this category. Fee is prohibited for Supplies Costs.
Material handling (or other overhead, if applicable) - The Offeror is to indicate the base amount that is used for this indirect rate, if applicable. If more than one indirect rate is proposed, the Offeror is to indicate this in the cost proposal spreadsheet, along with the base amount. A formula shall be written that multiplies the base amount(s) by the proposed indirect rate(s) and shall indicate the result in the amount column.
Grand Sub total - A formula shall be written that adds the totaled amount for labor and overhead to totaled amount for Other Direct Costs and material handling, or other indirect rate, if applicable and the result shall be indicated in the amount column.
G&A - The Offeror is to indicate the base amount that is used to apply the general and administrative (G&A) rate. If more than one G&A rate is proposed, or if the Offeror has other indirect rate(s), the Offeror is to so indicate in the cost proposal spreadsheet, along with the base amount to which any G&A rate is applied. A formula shall be written that multiplies the base amount(s) by the proposed G&A rate(s) with the resultant amount indicated in the amount column. In the narrative portion of Offeror’s cost proposal, Offeror is to state the base(s) for application of G&A(s) rate(s).
Subtotal - A formula shall be written that adds the amounts for G&A. If Offeror has only one G&A, then the formula written shall so reflect. If Offeror has more than one G&A amount, then the formula shall add the G&A amounts and that amount shall be displayed.
Total - A formula shall be written that adds the subtotaled amount for G&A with the grand subtotal.
Facilities Capital Cost of Money (FCCM) (If Applicable) - The Offeror is to indicate the base amount that is used to apply facilities capital cost of money factors, if applicable. A formula shall be written that multiplies the base amount(s) by the proposed facilities capital cost of money rate(s) and the result(s) indicated in the amount column.
Subtotal - A formula shall be written that adds the subtotal amount for Cost of Money, if applicable.
Fee - A formula shall be written that excludes FCCM (if applicable) from the grand subtotal. The formula shall add the fee amount and that amount shall be displayed.
NOTIFICATION TO OFFERORS REGARDING SUBCONTRACTOR FEE:
Offerors are hereby notified that all fees to be paid under this contract will be paid to the prime contractor for disbursement to their subcontractor. No subcontractor proposal shall contain an amount for fee. The prime contractor shall arrange the manner in which the company will distribute fee to each subcontractor.
The Government will not be involved in the distribution of fee to subcontractors.
Offeror is to copy all formulas used in the preparation of its cost proposal into columns that the Offeror shall label "DCAA" and "Government Cost Realism". The Government will use these columns to analyze the Offeror's proposal in conjunction with information received through DCAA. By having the contractor provide the methodology by which it developed its proposal, the Government will ensure that it analyzes and calculates these costs in the same manner that the Offeror has prepared its proposal.
DO NOT LOCK ANY CELLS. LOCKED CELLS WILL MAKE IT DIFFICULT FOR THE GOVERNMENT TO
EVALUATE YOUR COST PROPOSAL.
FOR PROPOSAL PREPARATION PURPOSES ONLY:
The Government has identified certain labor, and material/ODC amounts to be used by all Offerors in preparing their cost proposals as set forth herein.
1. Anticipated Award Date-The anticipated award date for this requirement will be in 4th Quarter Fiscal Year 2018. This information is provided for use as a basis for schedules and burden (labor, overheads, G&A, etc.).
2. Estimated Labor Hours / -The quantities of direct labor hours by labor category by period of contract performance, shown below, are to be used by the Offeror for computing estimated labor costs. This is the Government's best estimate. The Government cannot guarantee either the estimated quantities of labor hours shown for individual labor categories nor the total estimated labor hours for any period of contract performance.
TABLE 1
Labor Categories and Estimated Labor Hours
Labor Category Base Year Option One Option Two Option Three Option Four 12 Months 12 Months 12 Months 12 Months 12 Months
Govt.
Site
Ctr.
Site
Govt.
Site
Ctr.
Site
Govt.
Site
Ctr.
Site
Govt.
Site
Ctr.
Site
Govt.
Site
Ctr.
Site
Senior Field Service Engineer (K) 748 848 868
Field Service Engineer (K) 1098 1758 1838 1798 1658
Field Service Engineer (K) 6281
6880 7345 6995
Engineering Technician IV 5170 6086 6470 6181 5606 Engineering Technician III 9214 10390 10840 10560 9540 Engineering Technician II 6260 6086 6536 6198 5526 Engineering Technician I 2336 2966 3138 3010 2766 Welder III 1802 7390 7523 7425 7225 Mechanical Assembler III 1701 3650 3776 3680 3495 Secretary I 1013 1226 1310 1250 1136 Financial Analyst 324 304 325 312 279 Office Supervisor 930 1050 1110 1062 975 Quality Assurance 1114 1220 1302 1240 1130 Material Management 1084 1540 1620 1560 1460 Warehouse Specialist 330 520 544 526 505 Painter 350 602 630 610 587 Field Service Engineer (Key) (Shop) 610
804 850 815
Totals 33724 6641 44854 8466 47108 8917 45474 8606 41849 7966 K - Key Personnel Labor Category Man-year is based upon 1920 hours
3. ODC's - Offerors are instructed to use travel and material/supplies as specified in Table 2 below, to generate their cost proposals. Offerors are to apply any indirects to the amounts specified for the ODCs below. The ODCs below are Not to Exceed amounts that are inclusive of any associated indirect rates.
TABLE 2
Other Direct Costs Other Direct
Costs (ODC’s) Base Year Option One Option Two Option Three Option Four
Travel (Not-to-exceed) * $2,952,493.00 $3,041,067.79 $3,132,299.82 $3,226,268.82
$3,323,056.88
Materials (Not-to-exceed) * $274,127.00 $355,726.00 $365,725.20 $395,449.71 $355,345.69 Installation Hull Specific Materials $2,868,695.20 $3,202,628.80 $5,225,752.00 $5,212,126.08 $3,389,232.00
Total $6,095,315.20 $6,599,422.59 $8,723,777.02 $8,833,844.61 $7,067,634.57 *Non-fee bearing
REALISM OF COST PROPOSALS
An Offeror's proposal is assumed to represent its best efforts to respond to the solicitation. Any inconsistency whether real or apparent, between promised performance and cost should be explained in the proposal. For example, if the intended use of new and innovative techniques is the basis for an abnormally low estimate, the nature of these techniques and their impact on cost shall be explained. Additionally, if a corporate policy has been made to absorb a portion of the estimated cost, it shall be stated in the proposal. Any required explanation shall be included as an attachment to the cost proposal, and cross referenced to the specific section of the cost proposal that it refers to. Any significant inconsistency if unexplained, raises a fundamental issue of the Offeror's understanding of the nature and scope of the work required and of his financial ability to perform the contract, and may be grounds for rejection of the proposal. The burden of proof as to cost credibility rests with the Offeror. Offerors who do not have current DCAA approved rates or provisional billing agreements shall provide documentation such as payroll data, invoices, letters of intent and salary information with their cost proposal which will assist the Contract Specialist with analyzing their cost proposal for cost realism. Offerors shall require their subcontractor(s) to provide the same type of documentation to the Contract Specialist if the subcontractors do not have current DCAA approved rates or provisional billing agreements. If the Government is unable to verify the cost proposal, it will be deemed unrealistic and ineligible for award.
FACTOR 4: INDIVIDUAL SMALL BUSINESS SUBCONRACTING PLAN– (Mandatory for other than small business) (No Page Limit)
There is a mandatory Small Business subcontracting goal of 5% for this requirement.
The Offeror shall submit a Small Business Subcontracting Plan in accordance with FAR clause 52.219-9.
(End of Summary of Changes)
| Volume I - TECHNICAL (Factor 1) |
| 1. Technical Approach |
| 2. Quality Assurance Plan |
| Volume II - PAST PERFORMANCE (Factor 2) |
| Volume III - COST (Factor 3) |
| Cost Proposal |
| The Offeror shall address each subfactor listed below, which are of equal importance. The technical proposal shall not exceed 70 single sided pages, not less than 12 point Times New Roman. The technical proposal shall not contain any hyperlinks or e... |
| The Offeror shall describe how it plans to accomplish the tasks associated with the following subfactors: |
| There is no limitation on number of pages, page format, or print size for the cost proposal. |
| A cross-reference matrix of labor category nomenclature must be provided. |
| The cost proposal spreadsheets shall use the Offeror's labor category nomenclature. |
| Total - A formula shall be written that adds the subtotaled amount for G&A with the grand subtotal. |
| Subtotal - A formula shall be written that adds the subtotal amount for Cost of Money, if applicable. |
| NOTIFICATION TO OFFERORS REGARDING SUBCONTRACTOR FEE: |
| FOR PROPOSAL PREPARATION PURPOSES ONLY: |
File details come from the government source that posted it.