Solicitation Number: N00174-16-R-0004 Task 3
Attachment 3
Quality Assurance Surveillance Plan (QASP)
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to ensure systematic quality assurance methods are used in this performance based service contract. The Contractor shall perform in accordance with the QASP performance metrics, and the Government shall receive the quality of services identified in the contract. A properly executed QASP will assist the Government in achieving the objectives of this acquisition.
This contract provides Tri-Service Aircrew Escape Systems Total Life Cycle Management Support, Task 3: Technical Consulting Support. The resulting performance based contract will have firm fixed price Labor and Other Direct Cost (ODC) CLINs. The period of performance for this contract will cover a base period and three (3) option periods for a total of four (4) years. A properly executed QASP will assist the Government in achieving the overall objectives of this procurement.
2. AUTHORITY
Authority for issuance of this QASP is provided under Contract Section E – Inspection and Acceptance, which provides for inspection and acceptance of the services and documentation called for in service contracts, to be executed by the Contracting Officer or a duly authorized representative.
3. SCOPE
The QASP is put in place to provide Government surveillance and oversight of the Contractor’s efforts to assure that they are timely, effective and are delivering the results specified in the contract.
The Contractor’s performance on this contract will be evaluated by the Government as described below and summarized in the Contractor Self-Assessment Milestone Chart. The first evaluation will cover the period ending six months after date of contract award, with successive evaluations being performed for each twelve month period thereafter, until the Contractor completes performance under this contract. The evaluation will encompass all work performed by the Contractor during the assessment period, but will not include cumulative information from prior assessments. The Contractor will complete a self-assessment of the work performed, to be delivered to the Contracting Officer’s Representative (COR) and the Contract Administrator, as identified in the contract, No Later Than (NLT) 60 days after the end of the assessment period. The self-assessment shall cover all areas of the Government QASP. Based on the evaluation results, provided by the COR and the Contract Administrator, the Contracting Officer will assign an overall performance rating. If the Contracting Officer assigns an “Unsatisfactory” performance rating for the period evaluated, the next option period will not be exercised. A final assessment shall be completed by the Government within four months of the completion date of the contract (inclusive of all exercised options).
Attachment3
CONTRACTOR SELF-ASSESSMENT MILESTONE CHART
BASE OPTION I OPTION II OPTION
III CLOSE
Month 1 *PD
Month 1 PD 2 Month 1 PD 3 Month 1 PD 4 Month 1
Month 2 Month 2 Month 2 Month 2 Month 2 Month 3 Month 3 Month 3 Month 3 Month 4 Month 4 Month 4 Month 4 Month 5 Month 5 Month 5 Month 5 Month 6 Month 6 Month 6 Month 6 Month 7 PD 2 Month 7 PD 3 Month 7 PD 4 Month 7 PD 5 Month 8 Month 8 Month 8 Month 8 Month 9 Month 9 Month 9 Month 9 Month 10 Month 10 Month 10 Month 10 Month 11 Month 11 Month 11 Month 11 Month 12 Month 12 Month 12 Month 12
Contractor Self Assessment Reporting Due Date
*PD = Period
4. GOVERNMENT RESOURCES AND RESPONSIBILITIES
The following Government resources shall have responsibility for the implementation of this QASP:
Procurement Contracting Officer – The Procurement Contracting Officer (PCO) ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interest of the United States in the contractual relationship. It is the PCO that assures the Contractor receives impartial, fair and equitable treatment under the contract. The PCO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance. The PCO for this contract is identified in Section G.
Contract Administrator – An individual assigned by the PCO to assist in the daily administration of the contract. The Contract Administrator also provides input to the PCO and the COR as to the quality of performance for areas addressed in this QASP. The Contract Administrator for this contract is identified in Section G.
Contracting Officer’s Representative – The Contracting Officer’s Representative (COR) is responsible for technical administration of the contract and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms or conditions shall be referred to the PCO for action.
Government Technical Point of Contact – The COR designates an individual Government Technical Point of Contact (TPOC) to assist in administering specific projects under the contract. The Government TPOC is responsible for assisting in administering a specific project under the contract. A Government TPOC cannot, in any manner, alter the scope of the contract, make commitments or authorize any changes on the Government’s behalf.
Attachment3
5. METHODS OF QA SURVEILLANCE
a. QASP – The below listed methods of surveillance shall be used by the COR in the technical administration and the PCO/Contract Specialist in non-technical administration of this QASP. The QASP will be the prime determinant in exercising the option.
b. Contractor Performance Assessment Report System (CPARS) – The market place for information technology, engineering, and management support services is very competitive. As such, the successful offeror has a vested interest in the Government generated CPARS under this contract. Additionally, an evaluation using the CPARS format will be performed at the end of each year of performance. This evaluation will be one determinant in exercising an option. For this procurement, the Government will address the quality of product or service, schedule, cost control, business relations, management, and other important areas. As this information may affect future source selections throughout DoD, and the continuation of the contract, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the QASP.
6. DOCUMENTATION
In addition to providing annual reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.
7. SURVEILLANCE
The tables below set forth the performance ratings, standards, outcome and surveillance methods to document the results of the surveillance on an annual basis, as well as interim and informal reviews (i.e., In-Process Reviews (IPRs)) on a more frequent basis.
(a) Performance Ratings: The Government will evaluate the Contractor’s performance of the Statement of Work (SOW) and the Contracting Officer will assign one of the following ratings:
(1) Excellent
(2) Satisfactory
(3) Unsatisfactory
The standards associated with these ratings are given in the following Table 1:
Table 1: Overall Performance Ratings
Overall Performance Rating Standard Excellent “Excellent” ratings for all performance evaluation criteria.
Satisfactory A minimum of “Satisfactory” ratings for all performance evaluation criteria.
Unsatisfactory A rating of “Unsatisfactory” for one or more performance evaluation criteria.
(b) Objectives/Determination
1. Interim/Informal
Interim/Informal performance evaluations will be provided to assess performance at each IPR.
2. Annual
The PCO will make a performance determination at the end of each evaluation period. The determination will be based upon the COR’s recommendations, the Contractor’s comments, including any Self-Evaluation Report, and any other information deemed relevant by the PCO.
The PCO shall resolve disagreements between the COR’s recommendations and the Contractor’s comments/report regarding the evaluation. The PCO’s performance determination is unilateral and final. The PCO will document the determination and provide a copy to the Contractor within 30 days of receipt of the Contractor’s self-assessment.
Table 2: Objectives
Assessment Period Acceptable Performance Definition
Assessment Method Outcome
First 6 Months of the Base Period of the contract (Period 1)
All measurement areas rated at least “Satisfactory”
Using the QASP evaluation criteria set forth in the contract.
(+) Meets the acceptable performance definition as condition for exercise of Option 1.*
(-) Does not meet the acceptable performance definition as a condition for exercise of Option I.*
Last 6 months of Base Period and the first 6 months of Option I (Period 2)
All measurement areas rated at least “Satisfactory”
Using the QASP evaluation criteria set forth in the contract.
(+) Meets the acceptable performance definition as condition for exercise of Option 2.*
(-) Does not meet the acceptable performance definition as a condition for exercise of Option II.*
Last 6 months of Option I and the first 6 months of Option II (Period 3)
All measurement areas rated at least “Satisfactory”
Using the QASP evaluation criteria set forth in the contract.
(+) Meets the acceptable performance definition as condition for exercise of Option 3.*
(-) Does not meet the acceptable performance definition as a condition for exercise of Option III.*
Last 6 months of Option II and the first 6 months of Option III (Period 4)
All measurement areas rated at least “Satisfactory”
Using the QASP evaluation criteria set forth in the contract.
(+) Meets the acceptable performance definition as condition for the reporting period.
(-) Does not meet the acceptable performance definition as a condition for the reporting period.
Attachment3
Last 6 months of Option III (Period 5)
All measurement areas rated at least “Satisfactory”
Using the QASP evaluation criteria set forth in the contract.
Final QASP Rating
*The Government will not exercise the next option year term unless the Contractor meets the acceptable performance definition.
(c) Performance Evaluation Criteria. The Contractor’s performance will be evaluated using the criteria and standards provided for each objective and identified in Tables 3 through 5 of this contract QASP.
(d) Organization. The performance evaluation organization consists of the PCO, who will serve as the Determining Official, and the COR. In some instances, a TPOC will be assigned to the contract in addition to the COR.
(e) This performance evaluation does not replace any other requirement for evaluating Contractor performance that may be required by this contract such as a Contractor Performance Assessment Reporting System (CPARS) report or other required reports.
Table 3: Task Performance Evaluation Criteria and Standards
Criterion Unsatisfactory Satisfactory Excellent Task Performance Work product fails to meet
Acceptable Quality Levels (AQLs) defined in Performance Requirements Summary Table (4).
Work product routinely meets Acceptable Quality Levels (AQLs) defined in Performance Requirements Summary Table 4.
Work product frequently exceeds Acceptable Quality Levels (AQLs) defined in Performance Requirements Summary Table 4.
Staffing Contractor provides marginally qualified or unqualified personnel. Lapses in coverage occur regularly.
Contractor provides qualified personnel. Lapses in coverage may occasionally occur and are managed per individual contract policy.
Contractor provides highly qualified personnel. Contractor reassigns personnel to ensure proper coverage.
Actual lapses in coverage occur very rarely, if ever, and are managed per contract policy.
Contractor ensures staff training remains current.
Timeliness Contractor frequently misses deadlines, schedules, or is slow to respond to government requests or is non-responsive to government requests.
Contractor routinely meets deadlines, schedules, and responds quickly to government requests.
Contractor always meets deadlines, schedules, and responds immediately to government requests.
Customer Satisfaction Fails to meet customer expectations.
Meets customer expectations. Exceeds customer expectations to the benefit of the overall tasking.
Table 4: Performance Requirements Summary Table
SOW
Task Area
Performance Objective
Performance Standard
Acceptable Quality Level
Quality Assurance
Surveillance Plan Typical
Monitoring Methods
2.3.1 Engineering and
Technical Assistance for cartridges, CADs, PADs and related energetic and ballistic systems.
Analyses and investigations include adequate depth and breadth to clearly identify and qualify issues.
Current DoD policy and/or industry standards are followed. Results delivered IAW agreed upon schedules.
Analyses and reports require no more than two
(2) review/comment/ approval cycles, to meet acceptance. 90% completed by due date.
Government oversight of review/ comment/approval cycle.
2.3.2 Implementation of
development and engineering functions in the fields of ballistic power sources and energy transmission devices and their associated signal or energy transmission subsystems.
Adherence to applicable policies and regulations for energetic/explosive disposal. Current DoD policy and/or industry standards are followed.
Results delivered IAW agreed upon schedules
Documentation requires no more than two (2) review/comment/approval cycles, to meet acceptance. 90% completed by due date.
Government oversight of review/ comment/approval cycle.
2.3.3 Identify Subject
Matter Experts that focus on the combined community of engineers and scientists.
Analyses and investigations include adequate depth and breadth to clearly identify and qualify personnel.
Identification of SME(s) requires no more than two
(2) review/comment/ approval cycles, to meet acceptance. 90% completed by due date.
Government oversight of review/ comment/approval cycle.
2.3.4 Prepare
presentation materials, present briefings and facilitate meetings
Documents are technically accurate and grammatically correct. Documents and revisions are delivered IAW
Documentation requires no more than two (2) review/comment/ approval cycles, to meet acceptance. 90% completed by due date.
Government oversight of review/ comment/approval cycle.
Attachment3 in support of engineering efforts and JPO mission, tasking and goals.
agreed upon schedules.