N00173-20-R-RJ02 - SSD IT Services_Amendment 2_RFP Conformed.pdf
PDF 664 KB Posted
- Attached to
- Space Science Information Technology Support (SSITS) Federal contract opportunity
- Solicitation number
- N00173-20-R-RJ02
About this file
This is a request for proposal (RFP) for information technology and engineering support services for the Naval Research Laboratory's (NRL) Space Science Division. The contractor shall provide management, evaluation, procurement, system integration, programming, maintenance, training, and testing associated with all resources supported by the SSD information systems administration activity. This includes desktop/cluster-based computers, communication equipment, operating systems, scientific software, and business management software. The contractor must also provide software engineering for web and database development and maintenance. Proposals are due by July 9, 2020 and shall be emailed to Richard Waterstreet at richard.waterstreet@nrl.navy.mil. Interested contractors shall email Richard Waterstreet for DD254 Security forms. The contract type will be cost plus fixed fee. The period of performance is one base year with four one-year options.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N00173-20-R-RJ02 - SSD IT Services_RFP Amendment 3.pdf | ||
| N00173-20-R-RJ02 - SSD IT Services_RFP Amendment 2.pdf | ||
| N00173-20-R-RJ02 - Bidders Questions Respones.xlsx | XLSX spreadsheet | |
| N00173-20-R-RJ02 - Amended RFP_Conformed.pdf | ||
| N00173-20-R-RJ02 - SSD IT Services_Amendment 1.pdf | ||
| N00173-20-R-RJ02 - SSD IT Services.pdf | ||
| A5 - Cost Proposal Template Workbook.xlsx | XLSX spreadsheet | |
| A3 - Requirements for Onsite Contractors.pdf | ||
| Exhibit A - N00173-20-R-RJ02 - CDRL - A003.pdf | ||
| Exhibit A - N00173-20-R-RJ02 - CDRL - A002.pdf | ||
| Exhibit A - N00173-20-R-RJ02 - CDRL - A004.pdf | ||
| Exhibit A - N00173-20-R-RJ02 - CDRL - A007.pdf | ||
| Exhibit A - N00173-20-R-RJ02 - CDRL - A006.pdf | ||
| A1 - Personnel Qualifications.pdf | ||
| Exhibit A - N00173-20-R-RJ02 - CDRL - A001.pdf | ||
| A4 - Past Performance Questionnaire.pdf | ||
| Exhibit A - N00173-20-R-RJ02 - CDRL - A005.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 03:00 PM local time 09 Jul 2020
X
A X B X C X D
EX
X
G F 49 - 66
67 - 82 X H 83 - 91
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO-C9 1 91
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00173 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
ELECTRONIC SUBMIT ONLY
conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 6
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
7 - 22
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
25 - 26
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 27 - 31 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 32 - 36 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
37 - 47
PART II - CONTRACT CLAUSES
NAVAL RESEARCH LABORATORY
WASHINGTON DC 20390
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
09 Jun 2020
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0017320RRJ02
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Hours IT Support & Engineering Services
CPFF
Contractor shall provide IT Support and Engineering Services in support of SSD Information Technology Infrastructure In accordance with (IAW) SOW Section 3.1-3.4.3.2.
*Offeror shall propose no more than 12,350 labor hours for CLIN 0001 FOB: Destination
PSC CD: D318
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
0002 Lot Other Direct Costs (ODC)
COST
COST ONLY (No Fee) ODC's in support of CLIN 0001. ODC's are not to exceed (NTE) $20,000.
Data (CDRLs)
Contract Data Requirements List (CDRLs) Data in accordance with Exhibit A (DD Form 1423)
NOT SEPERATELY PRICED
NET AMT
1001 Hours OPTION IT Support & Engineering Services
CPFF
Contractor shall perform Hardware and Software Engineering Services in support of SSD Information Technology Infrastructure.
In accordance with (IAW) SOW Section 3.1-3.4.3.2 *Offeror shall propose no more than 12,350 labor hours for CLIN 1001
1002 Lot OPTION Other Direct Costs (ODC)
COST
ODC's in support of CLIN 1001. ODC's are not to exceed (NTE) $20,000.
2001 Hours OPTION IT Support & Engineering Services
CPFF
Contractor shall provide IT Support and Engineering Services in support of SSD Information Technology Infrastructure In accordance with (IAW) SOW Section 3.1-3.4.3.2.
*Offeror shall propose no more than 12,350 labor hours for CLIN 2001
2002 Lot OPTION Other Direct Costs (ODC)
COST
ODC's in support of CLIN 2001. ODC's are not to exceed (NTE) $20,000.
3001 Hours OPTION IT Support & Engineering Services
CPFF
Contractor shall provide IT Support and Engineering Services in support of SSD Information Technology Infrastructure In accordance with (IAW) SOW Section 3.1-3.4.3.2.
*Offeror shall propose no more than 12,350 labor hours for CLIN 3001
3002 Lot OPTION Other Direct Costs (ODC)
COST
ODC's in support of CLIN 3001. ODC's are not to exceed (NTE) $20,000.
4001 Hours OPTION IT Support & Engineering Services
CPFF
Contractor shall provide IT Support and Engineering Services in support of SSD Information Technology Infrastructure In accordance with (IAW) SOW Section 3.1-3.4.3.2.
*Offeror shall propose no more than 12,350 labor hours for CLIN 4001
4002 Lot OPTION Other Direct Costs (ODC)
COST
ODC's in support of CLIN 4001 and CLIN 4003. ODC's are not to exceed (NTE) $20,000.
5001 Hours OPTION IT Support & Engineering Services
CPFF
Option Exercise IAW FAR 52.218-7 - Option to Extend Services.
Contractor shall provide IT Support and Engineering Services in support of SSD Information Technology Infrastructure In accordance with (IAW) SOW Section 3.1-3.4.3.2.
Section C - Descriptions and Specifications
C-1 STATEMENT OF WORK
The work and services to be performed hereunder shall be subject to the requirements and standards contained in Attachment (1), Statement of Work, Exhibit A, Contract Data Requirements List, and all other Attachments cited in Section J, which are incorporated by reference into Section C.
Space Science Information Technology Support (SSITS)
1 Introduction The Naval Research Laboratory (NRL) is the Navy and Marine Corps corporate laboratory. The Space Science Division (SSD) at NRL conducts a broad spectrum of basic and applied research programs in the space sciences to satisfy Naval and national goals. These include upper/middle atmospheric science, high-energy astrophysics, terrestrial applications, and solar and heliospheric physics.
2 Scope The scope of this effort encompasses the management, evaluation, procurement, system integration, programming, maintenance, training, and testing associated with all resources supported by the SSD information systems administration activity that is organizationally located within the SSD Administrative Office and within the SSD branches. The information technology tasks to be performed require knowledge and experience with system integration for desktop/cluster-based computers that include office automation systems, communication equipment, operating systems, scientific software, and business management software currently maintained in the SSD, in the context of enabling forefront space science research and development.
In addition, a capability is needed for software engineering related to web and database development and maintenance. These services shall be provided for multiple NRL offices, including both scientific and administrative offices. All tasks will be performed at the technical direction of the COR.
3 Requirements The tasks to be performed by the Contractor are organized under a top-level work breakdown consisting of:
a. Hardware and software engineering services for SSD information technology infrastructure;
b. Information technology systems and network management, operations, security and help desk support;
c. Management Information Systems (MIS) software engineering and support; and
d. Scientific research software engineering and support within the SSD branches.
These tasks are described in the following sub-sections 3.1 - 3.4, respectively.
All tasks shall comply with all federal and NRL directives as well as Security Technical Installation Guides (STIGs).
Numbers denote the current inventory of resources; however, numbers may fluctuate (usually increase) as indicated by the (+) sign.
The contractor shall accommodate fluctuations in the number of resources.
3.1 Hardware and Software Engineering Services for SSD Information Technology Infrastructure
The Contractor shall support the following information technology, scientific computing, office automation, and networking resources:
3.1.1 Office Automation Resources
The Contractor shall provide office automation resources for over 400+ laptops, desktops and servers of Windows, Mac and Linux type operating systems, plus associated printers and other devices.
3.1.2 Information Server Resources
Typical technologies utilized within the SSD office include servers with MS Windows and Linux operating systems. These are used for MS Exchange Email, database, file and print servers, DNS servers and domain controllers with Redundant Array of Inexpensive Disk (RAID) array technology in an Active Directory environment. Also, an Ivanti Patch Server used to push Microsoft security patches (IAVA/B’s) to domain Windows desktops and run reports.
3.1.3 Management Information System Resources
This includes an Oracle database server; an Oracle Fusion Middleware Forms/Reports, OID, LDAP, Identity/Access management, OHS, Enterprise Management server; and future development server with Oracle Audit Vault, all based on a linux (RedHat) operating system.
3.1.4 Software Resources to be supported include:
Microsoft Office Suites for Windows and Mac Microsoft Exchange Adobe Acrobat Suites Email Clients
- Outlook
- Thunderbird
- Apple Mail
MIS (Custom Management Information System database applications) DTS (Defense Travel System)
IMPS
LABMIS
Baseprogram
EBIS
MODERN
SLDCADA
Various Web browsers (IE, Chrome, Firefox, Safari, Internet Explorer) Scientific analysis/visualization software (IDL, python, Matlab) Scientific programming languages and packages (FORTRAN, C/C++, and IDL) Cross-platform networking solutions (SAMBA, NFS) Symantec Antivirus McAfee Antivirus Fiery Xerox SW QVT Net/ LABMIS IAVA and IAVB reporting ActivClient CAC SW and HW Putty CAC Key Centrify PRISMVxWorks
ITOS
Oracle forms and reports
JAVA
Other Windows, Mac and Linux variety software as needed
3.1.5 Scientific Computing Resources
The SSD scientific computing resources are comprised of over 300+ Solaris, Unix, Linux, Mac and Windows systems supporting ground system software development, hardware design and building, data process, data pipelines, and data hosting using various scientific programs such as PRISM, IDL, ITOS, Python, Matlab, FORTRAN, C++, C#, Java, Javascript, Perl, Python, MPI and openMP as well as SolidWorks and PTC Creo (formerly known as Pro/Engineering). The contractor shall install, configure and maintain the scientific data processing systems.
3.1.6 Office Automation Resources
The Contractor shall maintain the Division Office Automation (OA) systems. SSD operates a distributed, network OA system supporting word processing and document management, electronic mail, calendaring and scheduling, spreadsheet applications, and Dynamic Data Exchange (DDE)- and Open Database Connectivity (ODBC)-based client server data links.
3.1.7 Networking Resources
The backbone consists of three interconnected Hewlett Packard (HP) switches that provide 1 Gb/s access to the desktops and 10 Gb/s access to branch computer room. The up-link is currently 1 Gb/s. NRL network group maintains the building network from the up-link to the backbone to wall jacks. The SSD contractor shall be able to read network maps, understand networking protocols, use network monitoring tools and capable of installing and configuring applicable network resources.
3.1.8 Conference Resources
The SSD Conference Room includes video projector and computers that shall be maintained by the SSD information systems administration activity contractor. Hardware and software are all maintained for SSD meetings. At times, attendance of Information Technology (IT) personnel may be required in a meeting venue to ensure smooth transitions.
3.1.9 Information Systems Hardware and Software Engineering
The Contractor shall provide hardware and software engineering services both within SSD and also for other NRL Divisions on an as-needed basis. The Contractor shall provide the necessary information systems hardware/software support required by the SSD. These services may include technology planning, systems and network management, scientific software engineering, information systems development and maintenance, systems engineering, and information cyber security compliance. [CDRL A003, A004]
3.1.10 Systems Engineering and Resources Planning
The Contractor shall keep abreast of updates and new innovations available and upon request provide, informed consultations and/or formal assessments to the Federal Information Assurance Officer/Network Technical Representative (IAO/NTR) and COR as to whether changes should be implemented. The contractor shall perform the necessary surveys, evaluation, and recommendation to the COR for selection of hardware and software products required.
Consideration will be given to maintaining continuity and compatibility of these products where tasks to be performed are interrelated or interdependent. [CDRL A005, A006]
3.2 Information Technology Systems and Network Management, Operations, Security and Help Desk Support
The Contractor shall perform:
(a) Technical and systems management and administration;
(b) Security administration of the hardware/ software identified in Section 3.1;
(c) Provide a help desk capability in accordance with Technical Direction from the COR; and
(d) Support the maintenance of web pages and databases for the efficient use of scientific data both for public release and to provide for information transfer to other software systems.
All activities shall be documented in the monthly financial and technical reports [CDRL 0001, 0003]
3.2.1 Technical Management
Major activities and tasks to be performed by the Contractor include:
a. Maximize reliability, maintainability and availability of SSD IT hardware and associated peripherals.
b. Interface with NRL Information Systems Security (Code 1221) and implement all required computer security procedures.
c. Interface with the NRL networking group (Code 5592) to maintain the SSD networking infrastructure.
d. Provide IT technical support and training for the scientific and administrative users.
e. Provide performance monitoring and tuning on SSD IT hardware and software systems in accordance with technical direction.
f. Install hardware and software upgrades to SSD IT systems in accordance with technical direction.
g. Perform SSD IT system software modifications in accordance with technical direction.
h. Maintain the SSD computer configuration management systems and databases including hardware component lists, modifications, upgrades and maintenance histories.
i. Coordinate effectively with IT hardware and software vendor representatives in troubleshooting resources affecting SSD computing.
j. Ensure proper integration of multiple computer systems and types to the SSD shared computer systems and infrastructure including satisfying both technical and administrative interface requirements in both IT hardware and software.
k. Ensure proper operation of IT desktop and portable hardware, software, and servers that are critical to any and all SSD space flight mission projects.
l. Perform SSD information security updates, including Information Assurance Vulnerability Alerts (IAVAs), Information Assurance Vulnerability Bulletins (IAVBs) as well as Assured Compliance Assessment Solution (ACAS), Retina scans and Plan of Actions and Milestones (POAM) to identify and address vulnerabilities to ensure compliance with NRL/DoD Navy regulations. Verify software installs comply with the DoD approved list in the DADMS database. System Hardware and Software.
The Contractor shall perform system management of the SSD IT servers listed in, but not exclusive to, Section 3.1. The Contractor shall also perform daily system backups and implement proper disaster-recovery procedures. The Contractor shall install, upgrade, and configure network software for any and all Mac, Windows and Linux servers used in the Division. Linux servers may include CentOS, Ubuntu and/or Redhat. The Contractor shall perform the necessary system configuration monitoring and tuning to optimize system performance and response. The Contractor shall coordinate scheduled and emergency maintenance with third party maintenance vendors.
3.2.2 Database Administration
The Contractor shall perform software development, software installation, version upgrades to clients and servers (e.g., Linux, Mac, Windows, and Oracle Development software), performance tuning, user account maintenance and security, storage management, database backups and disaster recovery, and application-specific administration.
3.2.3 Network Applications
The Contractor shall be committed to providing publication-quality word processing and document management based primarily on a Microsoft Office environment (Word, Excel, and PowerPoint) and custom DMIS publication system. Client/server POP, IMAP, and MS Exchange services are provided. Outlook, Thunderbird, Apple Mail and Outlook web Access clients are used. The Contractor shall be responsible for implementing and maintaining e-mail service environments, and for the system-wide management of the SSD e-mail software. The Contractor shall also provide technical assistance and training in the use of all SSD network applications and resources in accordance with Technical Direction from the COR.
3.2.4 Information System Security
The Contractor shall act as a temporary point-of-contact in the absence of the Federal IAO/NTR Information Assurance Officer/Network Technical Representative (IAO/NTR). The Contractor shall, at a minimum, perform the following security administration tasks:
User support:
a. Recommend to the Federal IAO/NTR and, as needed, nominating qualified network users for approval by the NRL Security Networking Group.
b. Ensuring SSD IT users have access to the network, only after approval by the
NRL Code 1220.
c. Training new SSD IT users on the proper operating and security procedures.
d. Ensuring departed users accounts are secured and closed according to NRL directives and policies.
e. Ensure appropriate vetting process, training and forms are completed according to the type of SSD IT account needed (i.e., contractor, Federal Employee, Collaborator, Foreign National, etc.)
SSD IT systems support:
a. Ensuring that approved configurations of connected systems are maintained and that configuration changes are approved by the NRL Security Networking Group before implementation.
b. Using Shavlik HFNetChk and windows group policies, ensuring that the Division desktop and portable IT systems and the SSD shared computer systems and infrastructure meet DoD and DoN security standards, and reporting completed IAVA/B’s to the SSD NTR or NRL Security Networking Group or both in accordance with technical direction.
c. Notifying the COR, the Federal IAO/NTR, and the NRL Security Networking Group of security violations or suspicious activities pertaining to the SSD computer systems, servers and the SSD shared computer systems and infrastructure.
3.2.5 Help Desk Operation/IT Support
The Contractor shall provide a capacity to maintain a help desk operation to assist users with computer-related problems. The help desk receives requests via electronic mail, a telephone “hot line”, or personal visit. This capability can be addressed informally via the various on-site Contractor staff; however, it must accommodate the staggered working hours that are commonplace in the SSD, typically 7 AM to 7 PM, Monday through Friday. The Contractor shall respond to user requests as well as prioritize, track, report, and analyze these requests. The tasks required by the help desk may include, but are not limited to: assisting users when system-related problems arise, creating and maintaining administrative user training and help documentation; and troubleshooting and diagnosing problems, such as system failures, determining whether the source is hardware, system software, or applications software related and providing customers with GFE backup systems to perform work in the event of catastrophic failures if system-related problems cannot be resolved in a timely fashion.
The Contractor shall provide briefing/ presentations and meeting support to include (a) setup and maintenance of IT and IT-related hardware such as video projectors and laptops, (b) software help, and (c) information technology services for SSD meetings.
3.2.6 Systems Management and Support Planning
The Contractor shall remain aware of updates and new innovations available in the automation field and provide informed assessments and recommendations to the COR and the Federal IAO/NTR on whether changes should be implemented. The contractor shall survey, evaluate, and recommend selection of required hardware and software products to the COR.
Consideration will be given to maintaining continuity and compatibility of these products where tasks to be performed are interrelated or interdependent. [CDRL, 004, 005, 006]
3.2.7 Web and Database Development Software Support
The Contractor shall provide support on an as needed basis to develop and maintain access to controlled web pages for SSD projects. Expected level of support is for 8-12 projects. This includes revising, existing or developing new web pages, as needed, to access space flight databases, to organize and maintain project information and data for public release, as appropriate. Such public information shall have been approved for public release according to the applicable NRL procedures.
3.3 Management Information Systems (MIS) Software Engineering and Support
The Contractor shall perform the software engineering of a comprehensive Management Information System (MIS) based upon the existing Space Science Division Management Information System (SSDMIS) and extensions thereto. Deliverables for Section 3.3 are CDRLs A001, A003, A004, A005 and A006.
The SSDMIS has been developed using the Oracle Relational Database Management System (RDBMS), Oracle Forms and Reports, OID, LDAP, Fusion Middleware, and Linux OS. The contractor shall be responsible for the entire systems development life cycle using the Oracle
RDBMS, Developer Server, Application Server, Forms and Reports, and Designer in order to maintain existing applications and develop specified extensions.
3.3.1 Software Engineering for the Space Science Division MIS (SSDMIS)
The SSDMIS consists of the eight major subsystems:
1. Job Cost Information Subsystem
2. Comptroller Data Interface Subsystem (Reconciliation)
3. Budget Management Subsystem
4. Contracts Tracking Subsystem
5. DCPS Labor Transfer Subsystem
6. Library Publications Tracking Subsystem (LTS)
7. Inventory/ADP Resources Management Subsystem
8. Personnel Information Subsystem
Each subsystem is described below. Each subsystem description consists of two sections: current system features and new development efforts.
The Contractor shall provide and maintain a set of standard reports available to users, for all subsystems. The reports shall be viewed interactively on display screens, printed, or stored in data files for future examination. Data access shall be determined by various security levels determined by the COR, the IT Administrative Officer and/or Federal IAO/NTR.
The following sections 1 through 9 are a listing of the eight applicable major subsystems.
1. Job Cost Information Subsystem
The Job Cost Information Subsystem (JCIS) is the core subsystem of the SSDMIS. It organizes the general ledger activities and job cost accounting in NRL’s Navy Working Capital Fund (NWCF) environment.
Current system features:
Maintain general journals to enter and track labor, procurement, travel, training, miscellaneous, distribution and transfer costs.
Maintain a general ledger to accumulate and report costs by both expense type and job order number.
Maintain job order data including sponsor and principal investigator information.
Maintain ability to track costs by project which could include various job order numbers.
Maintain ability to track costs by expense element sub categories.
Maintain ability to report overtime hours authorized verses worked.
Maintain ability for “prior year” storage and reconciliation module to manage unexpended balance issues.
The Contractor shall add the ability to upload funding documents and associate them with Job Order Numbers. The Contractor shall maintain all current capabilities and add new development features in accordance with technical direction.
2. Comptroller Data Interface Subsystem (Reconciliation)
The Comptroller Data Interface Subsystem (CDIS) manages the ability to compare the Division job cost financial data against financial data maintained by the NRL Comptroller.
Current system features:
Produce reports that help identify discrepancies between the SSDMIS and NRL financial reports.
Share information with the Job Cost information system, such as procurement status, TID labor costs, and cumulative job order costs.
Maintain on-line storage of all the bi-weekly NRL financial reports, including monitoring email distribution. Provide printing capabilities at various security levels.
The Contractor shall maintain all current capabilities and add new development features in accordance with technical direction.
3. Budget Management Subsystem
The Budget Management Subsystem (BMS) provides a method for budgeting for costs tracked in the JCIS and CDIS. The BMS is used for developing budgets at the beginning of the fiscal year, tracking expenditures against budgets, and to project spending throughout the year.
Current system features:
Maintain storage of all of the following types of budget information: job orders, labor, travel, materials and supplies, miscellaneous expenses, and out-of-division expenses. Budgeted costs shall be maintained by cost element, sub-cost element and job order.
Allow the selective viewing of Division budget information, both in report form and interactively on display screens. Various security levels are maintained.
At both the Division and Branch level, produce cost status and year-end projection reports detailing budget verses actual cost for each job order.
Maintain ability to track employee labor hours budgeted versus actual.
Maintain ability to budget and report by project and WBS.
The Contractor shall maintain all current capabilities and add new development features in accordance with technical direction.
4. Contracts Tracking Subsystem
The Contracts Tracking Subsystem (CTS) allows the monitoring of all Division contracts from RFP through stages of modification, funding, invoicing, and liquidation.
Current system features:
Maintain on-line storage of all of the following types of contract related information:
deliverables, government furnished equipment, government approved items, action items, budgets, expenditures, funding, value, modifications, accruals and invoices.
Share contract obligation, invoice, and expenditure rate information with the JCIS and the
CDIS.
Maintain ability to track contract costs and funding by project and WBS.
Maintain contractor personnel capabilities to track historical employment and badging information.
Maintain ability of contractors to upload Financial Reports (monthly) to system.
The Contractor shall maintain all current capabilities and add new development features in accordance with technical direction.
5. DCPS Labor Transfer Subsystem
The Division is required to enter bi-weekly time and attendance information in the Defense Civilian Payroll System (DCPS). This labor information is transferred from the JCIS via
SLDCADA.
Current system features:
Provide for daily in/out time entry and job order assignment for employee timecards.
Provide a transfer capability from timecard to JCIS labor.
Provide upload capability from SLDCADA to JCIS via SLDCADA-generated PDF.
Provide corrected time card capability to facilitate labor audit.
Provide time card capability via http/https.
The Contractor shall maintain all current capabilities and add new development features to the DCPS labor transfer subsystem, as tasked.
6. Library Publications Tracking Subsystem (LTS)
The Division maintains a database of publication information. This database tracks all publications and presentations credited to Division scientists.
Current system features:
Electronic creation and document management of NRL Presentation Release forms.
Report publication credits by author, branch, and type.
Electronic creation and management of Publication Approval form
Ability to upload electronic version of publication being tracked, as tasked.
The Contractor shall maintain all current capabilities of the LTS and add new development features as tasked.
7. Inventory/ADP Resources Management Subsystem
The Inventory/ADP Resources Management Subsystem (IMS) provides the Division with a method of identifying and tracking inventory through all stages of procurement custody, maintenance, and disposal.
Current system features:
On-line storage of inventory information for both ADP and non-ADP equipment.
Maintain information about software: licenses, maintenance, installation, and version.
Duplicate data stored in the NRL Asset Management System for independent verification.
Provide capability to monitor Government Furnished Equipment while assigned to a contractor.
The Contractor shall maintain all current capabilities of IMS and add new development features as tasked.
8. Personnel Information Subsystem
The personnel subsystem is used for tracking Human Resources information concerning Federal Employees.
Current system features:
Maintain personal data including locator, education, physical, safety and salary information.
Provide phone lists, employee lists, grade and code information and clearances.
The Contractor shall maintain all current capabilities of the PIS and add new development features as tasked.
9. Additional Information Tracking
Below is the additional information that is tracked by the system.
Contractor Badge Request
Common Access Card Request
Overtime Request
Facilities Repair Request
DMIS Problem Reporting System
Organization Chart
The Contractor shall maintain all current capabilities of the Additional Information Tracking subsystems and add new development features as tasked.
3.3.2 Software Engineering for Other Divisions’ MIS
The Contractor shall provide MIS software engineering for other NRL Divisions, which shall be provided through the development of a generic Divisional Management Information System (DMIS). The DMIS is maintained by porting SSDMIS code to UNIX machines across the network. As DMIS revisions are performed for the SSD, these revisions are propagated outward to the other DMIS divisions at NRL. The Contractor shall provide SSD MIS software engineering. Database administration, development, configuration management, and help desk activities shall be performed for each of the divisions.
The Government anticipates that a minimum of 2 divisions (current number) and a maximum of 4 divisions will be involved, with a fraction of 1 person’s time required even at maximum.
3.4 Scientific Research Software Engineering and Support
3.4.1 Geospace Science and Technology Branch (Code 7630) Support
3.4.1.1 Introduction
The Geospace Space and Technology (S&T) Branch (Code 7630) conducts research to observe, understand, model, and forecast the geospace environment and its connections to its lower and upper boundaries. These research activities involve a combination of data analysis from both ground and space-based observations systems and extensive modeling of the geospace environment using a suite of global and regional models. The computational resources supporting this research typically include (1) multiprocessor Linux-based servers for running geospace modeling and data analysis/visualization applications in both serial and parallel modes with terabyte scale storage capacity; (2) high-performance computing clusters; (3) both Linux and non-Linuxbased data servers; (4) and approximately 100 desktop/laptop resources including PCs, MACs, and LINUX devices.
3.4.1.2 Requirements
The Contractor shall provide system management, space scientific technical expertise with emphasis on large observational databases, and set up, maintain and provide upgrades as needed for these computer systems. Specific expertise is required for installation, maintenance, and license management of scientific analysis and visualization tools (e.g., IDL, Python, Matlab), scientific programming languages and packages with parallel processing support (e.g., Intel FORTRAN, MPI, openMP) and batch scheduling software. The Contractor shall perform selection, installation, and upkeep of computer hardware, including system administration tasks for all servers, workstations, and laptops with Macintosh, Windows, and Linux operating systems. The Contractor shall maintain and support cross-platform networking solutions to allow access to shared resources such as data servers and printers. The Contractor shall perform system backups on all critical systems as needed. The Contractor shall author and implement proper disaster-recovery procedures. The Contractor shall maintain an anonymous ftp server or equivalent solution to allow incoming and outgoing transfer of data files between scientists and external sponsors/collaborators in accordance with all current and future NRL security requirements. The Contractor shall implement system software updates and security patches, user account generation and maintenance, system hardware and software troubleshooting and repair.
3.4.2 High Energy Space Environment Branch (Code 7650) Support
3.4.2.1 Introduction
The High Energy Space Environment Branch conducts a multifaceted program in observational and theoretical research in high energy astrophysics and associated detector and radiation transport simulation technologies. This research includes the collection and analyses of large volumes of scientific data from such missions as the Fermi Gamma ray Space Telescope and upcoming projects to be deployed on the International Space Station. In support of this research the Branch maintains an office automation environment of a total of more than 100 hosts, including Windows PCs, Macs, Linux machines, and a supporting array of printer/plotters.
Scientific analyses are supported by multiprocessor Linux-based servers supporting high energy astrophysics data analysis, detector development and operations, and supporting Monte Carlo simulations of radiation transport. A tape backup system is used to backup and archive data and software products.
3.4.2.2 Requirements
The Contractor shall provide IT system management for the Code 7650 branch staff and perform set up and maintenance for the branch computer systems. The contractor shall provide system software updates and security patches. The contractor shall provide user account generation and maintenance. The contractor shall provide data backup operations. The contractor shall provide system hardware and software troubleshooting and repair.
3.4.3 Solar and Heliospheric Physics Branch (Code 7680) Support
3.4.3.1 Introduction
The Solar and Heliospheric Physics branch conducts a multifaceted program in observational and theoretical research in solar physics and space physics. This is accomplished through the development, operation, and analysis of data from space based sensors incorporating optical, and detector technologies. This research includes the generation of engineering documentation as well as the collection and analyses of large volumes of scientific data from such missions/spacecraft as the Solar and Heliospheric Observatory (SOHO), the Solar Terrestrial Relations Observatory (STEREO), Hinode, the Solar Dynamics Observatory (SDO), Parker Solar Probe (PSP), Solar Orbiter (SolO), Compton Gamma Ray Observatory (CGRO), Chandra X-ray Observatory, Hubble Space Telescope as well as space flight instruments such as the Ultraviolet Spectro-Coronagraph (UVSC) and the Compact Coronagraph (CCOR). In support of this research the Branch maintains an office automation environment of a total of 300 hosts (PCs, MACs, LINUX, Solaris) with a supporting array of printer/plotters. The branch supports ground system software development using ITOS for projects such as LASCO, SECCHI, WISPR, and SOLOHI. Customized software, Epiware software is used in data collection and management support for various projects.
Scientific analyses are supported by a cluster of Linux computers (a) to process the spacecraft telemetry data in near-real time (b) to process archival data not in real-time and (c) to serve the processed data to the Web and LINUX storage arrays of 75 TBytes. A tape backup system is used to backup and archive data and software products.
3.4.3.2 Requirements
The Contractor shall provide system management, mission support and expertise in handling the processing and rapid dissemination of terabytes of space science data generated by a fleet of spacecraft instrumentation that are operated by a variety of sponsoring and operational agencies.
These agencies can include NASA or NOAA as well as the European Space Agency and the Contractor needs to be able to accommodate the differences in data security and data availability requirements imposed by these agencies. In addition to this mission support, other duties shall include system software updates and security patches, user account generation and maintenance, data backup operations, system hardware and software troubleshooting and repair, setup and maintenance of a large-format multi-monitor video display system.
Deliverables – 3.4:
A003 – Monthly Technical Report A004 – Technology Evaluation Report A005 – Work Plan/Manpower Estimate A006 – Software Databases/Models/Algorithms/Source Codes/Decision Support Systems, Documentation/ Instructions, etc.
4. SPECIAL REQUIREMENTS
This section describes the special requirements for this effort. The following sub-sections provide details of various considerations on this effort.
4.1 Security and Safety Compliance
All Contractor personnel who require NRL base access or access to NRL unclassified material and/or unclassified systems shall possess a favorably completed DoD National Agency Check with Law and Credit (NACLC). Contractors who require access to Secret material must have, at a minimum, a favorably completed DoD National Agency Check with Law and Credit (NACLC) and final DoD granted SECRET security clearance the time of proposal submission. The Contractor shall ensure that all classified material is handled in accordance with the issued DD 254, the National Security Program Operating Manual (NISPOM) (DoD 5220.22M) and all NRL and applicable Security Program Guides/Directives.
Contractor personnel performing any function designated as a component of the Cyber Security Work Force (CSWF), and/or having privileged user access to NRL information systems shall require background investigations and security clearances commensurate with the access level and security classification of the system being accessed as specified in SECNAV M-5510.30.
System Administrators with privileged access may work in the computing, network and/or enclave environments. System Administrators with privileged access shall meet the training and certification requirements for IAT level I at the computing environment (CE), IAT level II at the network environment (NE), and IAT level III for the enclave environment as specified in SECNAV M-5239.2. The submitted DoD Tier 5 Investigation is required for all System Administrators with privileged access serving in these positions.
4.2 Transition
As part of their Management Plan, the Contractor shall include a transition plan and keep the the Government fully informed of its status throughout the transition period from the incumbent contractor.
As applicable, this plan should describe the Contractor's transition in to service at the beginning of the contract, and how work would be transitioned to a different contractor or contract vehicle at the end of the contract. It should include a staffing and training plan for new personnel. The Contractor should plan for the transfer of work control and information, addressing security issues, the transfer and accountability of GFE, inspections and acceptance, and delineating the method for processing and assigning tasks during the phase-in/phase-out periods. The plan should address how the Contractor shall implement adequate measures to coordinate communications with the incumbent contractor and NRL staff in order to ensure uninterrupted workflow and minimal mission impact during the transition process.
5. DELIVERABLES
5.1 Reports, Data and Other Deliverables
Requirements are listed in Exhibit A, the Contract Data Requirements List (CDRL), DD 1423 and are called out in Section 3 above. In addition, the following shall be provided:
5.1.1 Contract Final Report – CDRL A002
The final report shall be a concise but comprehensive summary of the scientific and technical objectives; findings and recommendations made over the entire contract period. Both monthly and final reports must be submitted to the COR for approval prior to publication and distribution.
5.1.2 Contractor On-Site Labor Report – CDRL A007
The Awardee shall deliver On-Site Labor Reports no later than five (5) days after the end of each reporting month. The required report shall, as a minimum, include the following data: Reporting Period, Award Number, Award Value, Current Funding, Amount Expended in Current Period, Total Expenditure to Date, and Date Submitted. Labor (including subcontractor effort) broken out by labor category/employee name: Show employee name, number of hours, and total amount billed for Awardee employees working on-site at NRL. If the Awardee employees worked on multiple tasks (as defined by the COR), the number of hours worked on each task shall be shown separately. The report shall be submitted electronically and be in a format specified by the COR.
The current format is a .csv (comma separated values) file.
C-2 ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (ECMRA)
The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Naval Research Laboratory via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:
(1) W, Lease/Rental of Equipment;
(2) X, Lease/Rental of Facilities;
(3) Y, Construction of Structures and Facilities;
(4) D, Automatic Data Processing and Telecommunications, IT and Telecom-Telecommunication (D304) and
Internet (D322) ONLY;
(5) S, Utilities ONLY;
(6) V, Freight and Shipping ONLY.
The contractor is required to completely fill in all required data fields using the following web address https://www.ecmra.mil.
Reporting inputs will be for the labor executed during the period of performance, during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://www.ecmra.mil .
Section D - Packaging and Marking
D-1 PACKAGING AND MARKING All unclassified data and deliverable contract line items shall be preserved, packaged, packed and marked and must conform to normal commercial packing standards to assure safe delivery at destination.
D-2 Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), DOD 5220.22-M dated February 28, 2006 and the DD254 - Contract Security Classification Specification.
D-3 The Contractor shall mark all shipments under this contract in accordance with the addition of ASTM-D-3951-90 “Standard Practice for Commercial Packaging” in effect on the date of the contract.
D-4 The Contractor shall comply with FED STD 313 (Symbols for Packages and Containers for Hazardous Industrial Chemical and Materials) to the extent applicable.
Section E - Inspection and Acceptance
E-1 INSPECTION AND ACCEPTANCE CLAUSES INCORPORATED BY
REFERENCE:
FAR CLAUSE TITLE
52.246-5 Inspection of Services - Cost Reimbursement (APR 1984)
DFARS
CLAUSE
TITLE
252.246-7000 Material Inspection and Receiving Report (MAR 2008)
E-2 INSPECTION AND ACCEPTANCE
Inspection and acceptance of the final delivery will be accomplished by the Technical Manager (TM) or Contracting Officer Representative (COR) designated in Section G of this contract.
Inspection and acceptance will be performed at the Naval Research Laboratory, Washington DC 20375-5320. Constructive acceptance, in accordance with FAR 32.904, shall be deemed to have occurred on the seventh (7th) day after the final delivery.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 N/A N/A N/A N/A 1001 Destination Government Destination Government 1002 N/A N/A N/A Government 2001 Destination Government Destination Government 2002 N/A N/A N/A Government 3001 Destination Government Destination Government 3002 N/A N/A N/A Government 4001 Destination Government Destination Government 4002 N/A N/A N/A Government 5001 N/A N/A N/A Government
Section F - Deliveries or Performance
SECTION F DELIVERIES OR PERFORMANCE
F-1 PERIOD OF PERFORMANCE
The work under this contract award shall commence on 06 SEPT 2020 and run through than 05 SEPT 2021. At the PCO’s discretion, Options under this contract may be exercised to ultimately extend the PoP through 05 SEPT 2025 for a total of 60 months.
Base Year – 12 Months Option Year 1 – 12 Months Option Year 2 – 12 Months Option Year 3 – 12 Months Option Year 4 – 12 Months
Exercise of CLIN 5001, while at the sole discretion of the Government, is not included within this five-year contract period. If CLIN 5001 is exercised before the end of the current contract, the total possible contract PoP will be 66 months.
F-2 PLACE OF PERFORMANCE
The principal place of performance of this contract shall be Naval Research Laboratory, Washington DC.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
0002 N/A N/A N/A N/A
0003 N/A N/A N/A N/A
1001 N/A N/A N/A N/A
1002 N/A N/A N/A N/A
2001 N/A N/A N/A N/A
2002 N/A N/A N/A N/A
3001 N/A N/A N/A N/A
3002 N/A N/A N/A N/A
4001 N/A N/A N/A N/A
4002 N/A N/A N/A N/A
5001 N/A N/A N/A N/A
Section G - Contract Administration Data
G-1 CONTRACT ADMINISTRATION DATA
(a) David Siskind, Code 7632, (202) 767-0928, David.siskind@nrl.navy.mil is hereby designated as the Contracting Officer's Representative (COR). Unless terminated sooner, this appointment is effective for the period of performance of this contract including any options, if exercised. COR authority may not be re-delegated. No change in COR assignment shall be made without written notice by the Contracting Officer, who will modify the contract to reflect the change of COR assignment. The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the contractor via contract modification.
(b) The responsibilities and limitations of the COR are as follows:
(1) Providing technical direction and guidance as necessary with respect to the performance of work under this contract. Technical direction and guidance may be used to provide technical advice/recommendations/clarifications on the statement of work/specifications. It MAY NOT be used to tell the contractor how to perform the work.
(2) Submitting interim and final Contractor Performance Assessment Reports (CPARS) at www.cpars.csd.disa.mil/cparsmain.htm.
(3) Quality assurance of services performed or deliveries made
(4) Inspection and acceptance of services or deliverables
(5) Ensuring that Government Furnished Property, to include any contractor use of on-site equipment and/or IT resources is adequately monitored and accounted for.
(6) Security requirements on Government installation, such as the request and retrieval of personnel security badges and vehicle passes.
(7) Monitoring contractor's performance and promptly report problems and recommendations for corrective action to the PCO
(8) Annually, furnish a written report on performance of the contractor to the PCO. And, if deemed necessary, attending a follow-up meeting to discuss.
(9) Attend post award conference, if conducted.
(10) Ensuring a copy of all Government technical correspondence, to include Technical Direction Memorandums/Guidance, is forwarded to the PCO for placement in the contract file.
(11) Monitoring of funds expended
(12) Ensuring that the Contractor does not exceed the defined statement of work set forth in the contract.
(c) Limitations: The COR is not authorized to take any action, either directly or indirectly, that could result in a change in the cost/price, quantity, quality, place of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .