N00173-14-R-KC02.pdf

PDF 289 KB Posted

Attached to
Scientific and Engineering Support for Advanced Electronic Warfare Techniques
Solicitation number
N00173-14-R-KC02
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
Attachment_L-02_-_Past_Performance_Information_14-R-KC02.pdf PDF
Amendment_0001.pdf PDF
Exhibit_A_-_CDRLs_14-R-KC02.pdf PDF
Attachment_2_-_DD254_14-R-KC02.pdf PDF
Attachment_5_-_Sample_Task_Order_Statement_of_Work_14-R-KC02.pdf PDF
Attachment_3_-_Personnel_Qualifications_14-R-KC02.pdf PDF
Attachment_L-04_-_EPW_14-R-KC02.xlsx XLSX spreadsheet
Attachment_4_-_Requirements_for_Onsite_Contractors_14-R-KC02.pdf PDF
Attachment_L-01_-_Key_Personnel_Resume_Template_14-R-RK02.xlsx XLSX spreadsheet
Attachment_1_-_SOW_14-R-KC02.pdf PDF
Attachment_L-03_-_Past_Performance_Questionnaire_14-R-KC02.pdf PDF
SOW_Advanced_EW_Techniques_v_1_7.doc DOC document
57_5002_15_CDRL_Oct15_DSF.pdf PDF
Attachment_L-01_-_Key_Personnel_Resume_Template_14-R-RK02.xlsx XLSX spreadsheet
Attachment_L-04_-_EPW_14-R-KC02.xlsx XLSX spreadsheet
Exhibit_A_-_CDRLs_14-R-KC02.pdf PDF
Attachment_L-03_-_Past_Performance_Questionnaire_14-R-KC02.pdf PDF
N00173-14-R-KC02.pdf PDF
Attachment_2_-_DD254_14-R-KC02.pdf PDF
Attachment_1_-_SOW_14-R-KC02.pdf PDF
Attachment_3_-_Personnel_Qualifications_14-R-KC02.pdf PDF
Synopsis_for_N00173-14-R-KC02.docx DOCX document
Attachment_4_-_Requirements_for_Onsite_Contractors_14-R-KC02.pdf PDF
Attachment_5_-_Sample_Task_Order_Statement_of_Work_14-R-KC02.pdf PDF
Attachment_L-02_-_Past_Performance_Information_14-R-KC02.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

RATING PAGE OF PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXTENSION

C. E-MAIL ADDRESS

11. TABLE OF CONTENTS

(X) SEC. DESCRIPTION PAGE(S) (X) SEC. PAGE(S)DESCRIPTION

A

B

C

D

E

F

G

H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECS./WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS(%)

DATEAMENDMENT NO.AMENDMENT NO. DATE

15A. NAME AND

ADDRESS

OF OFFER-

OR

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER SUCH

ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION:

10 U.S.C. 2304 (c) ( )41 U.S.C. 3304(a)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV. 6/2014)

Prescribed by GSA - FAR (48 CFR) 53.214 (c)

SEALED BID (IFB)

NEGOTIATED (RFP)

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

1 56

57-5002-15

N00173

US Naval Research Laboratory 4555 Overlook Avenue SW, Washington DC 20375-5326

N00173-14-R-KC02

[See Section L]

Building 222 Rm. 115 1:00 PM

Lauren Levy Lauren.Levy@nrl.navy.mil

2-3 8-15 16-20 51-56

38-50

21-26

08/26/2016

202 767 6542

07/26/2016

28-37

N00173-14-R-KC02

Section B Supplies or Services and Prices

B-1 SUPPLIES/SERVICES AND COSTS

ITEM NO SUPPLIES/SERVICES MAXIMUM

ESTIMATED COST

FIXED FEE MAXIMUM ESTIMATED

CPFF

Scientific and Engineering Support

R&D in accordance with the Statement of Work (SOW) entitled, "Scientific and Engineering Support for Advanced Electronic Warfare Techniques" and any SOW included in Task Orders (TO) issued under this contract.

FSC/PSC: AC30

FIXED FEE MAXIMUM ESTIMATED

COST

0002 $1,750,000.00

Other Direct Costs (ODCs)

This CLIN consists of other direct costs such as all materials, supplies, and equipment. ODCs shall be non-fee bearing. This CLIN shall not be exceeded without prior written approval from the Contracting Officer.

MAXIMUM ESTIMATED

COST

0003 $500,000.00

Travel

All actual travel costs including transportation, lodging, meals, POV mileage, etc. Travel shall be non-fee bearing. Travel costs will be considered reasonable and allowable only to the extent that they do not exceed on a daily basis, the maximum per diem rates in effect at the time of the travel in accordance with FAR 31.205-46 and the Joint Travel Regulations (JTR).

ITEM NO SUPPLIES/SERVICES MAXIMUM

ESTIMATED COST

FIXED FEE MAXIMUM ESTIMATED

CPFF

0004 NSP

Data

Deliver Data IAW Exhibit A, Contract Data Requirements List (CDRL), DD FORM 1423, Dated 9 October 2015

TOTAL CONTRACT VALUE ALL CLINs

EST COST

ALL CLINs

FIXED FEE

ALL CLINs

TOTAL CPFF

B-2 MINIMUM AND MAXIMIM QUANTITIES

As contemplated the contract clause entitled, "Indefinite Quantity", the minimum quantity that will be ordered by the Government during the effective period of the contract is research and development support with a total estimated cost and fixed fee of at least $10,000.00.

The maximum quantity that the Government may order during the effective period of the contract is research and development support with a total estimated cost and fixed fee not exceeding the total maximum estimated cost and fixed of $38,000,000.00.

The minimum and maximum quantities may consist of any combination of the tasks contained in the statement of work.

Section C Descriptions and Specifications

C-1 STATEMENT OF WORK

The work and services to be performed hereunder shall be subject to the requirements and standards contained in Attachment (1), Statement of Work, entitled “Scientific and Engineering Support for Advanced Electronic Warfare Techniques,” Exhibit A, Contract Data Requirements List, and all other Attachments cited in Section J, which are incorporated by reference into Section C.

The specific work to be carried out shall be further described in orders issued under this contract.

C-2 ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (ECMRA)

The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Naval Research Laboratory via a secure data collection site.

Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:

(1) W, Lease/Rental of Equipment;

(2) X, Lease/Rental of Facilities;

(3) Y, Construction of Structures and Facilities;

(4) S, Utilities ONLY;

(5) V, Freight and Shipping ONLY.

The contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil.

Reporting inputs will be for the labor executed during the period of performance, during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil.

C-3 SECURITY REQUIREMENTS

The contractor shall comply with the DD Form 254, Contract Security Classification Specification, and any documents attached thereto or referenced thereon as applicable and specified on each TOs.

Section D Packaging and Marking

D-1 All unclassified data and deliverable contract line items shall be preserved, packaged, packed and marked and must conform to normal commercial packing standards to assure safe delivery at destination.

D-2 Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), DOD 5220.22-M dated February 28, 2006 and the DD 254 - Contract Security Classification Specification.

D-3 The Contractor shall mark all shipments under this contract in accordance with the addition of ASTM-D- 3951-90 “Standard Practice for Commercial Packaging” in effect on the date of the contract.

D-4 The Contractor shall comply with FED STD 313 (Symbols for Packages and Containers for Hazardous Industrial Chemical and Materials) to the extent applicable.

Section E Inspection and Acceptance

E-1 INSPECTION AND ACCEPTANCE CLAUSES INCORPORATED BY REFERENCE:

52.246-5 Inspection Of Services Cost-Reimbursement APR 1984 52.246-8 Inspection Of Research And Development Cost

Reimbursement

MAY 2001

252.246-7000 Material Inspection And Receiving Report MAR 2008

E-2 INSPECTION AND ACCEPTANCE

Inspection and acceptance of the final delivery will be accomplished by the Technical Manager (TM) or Contracting Officer Representative (COR) designated in Section G of this contract. Inspection and acceptance will be performed at the Naval Research Laboratory, Washington DC 20375-5320.

Constructive acceptance, in accordance with FAR 32.904, shall be deemed to have occurred on the 7th day after the final delivery.

E-3 SUPPLIES/SERVICES WILL BE INSPECTED/ACCEPTED AT:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government

Section F Deliveries or Performance

F-1 DELIVERIES OR PERFORMANCE CLAUSES INCORPORATED BY REFERENCE:

52.242-15 Stop-Work Order AUG 1989 52.242-15 Alt I Stop-Work Order (Aug 1989) - Alternate I APR 1984 52.247-34 F.O.B. Destination NOV 1991

F-2 PERIOD OF PERFORMANCE

(a) The effective period of this contract during which task orders may be issued is from 18 November 2016 through 17 November 2021.

(b) Each task order shall specify the period of performance.

(c) All deliverables required by CLIN 0004 under each order shall be shipped FOB Destination, Naval Research Laboratory, Washington DC 20375-5320, consigned to:

Contracting Officer's Representative* Naval Research Laboratory Contract Number:* Task Order Number: _____________ Building: * Code: * 4555 Overlook Avenue, SW Washington DC 20375-5320

(d) Each task order shall specify the place of performance.

(* To be filled in at time of award)

Section G Contract Administration Data

G-1 CONTRACT ADMINISTRATION

In order to expedite administration of this contract, the following delineation of duties is provided, including the names and contact information, for each individual or office specified. Contact the individual/position designated as having responsibility for any questions, clarifications or information regarding the functions assigned herein.

(a) The Administrative Contracting Officer (ACO), designated in Block 6 on the Standard Form 26, will expedite administration of the contract and direct inquiries to the appropriate office listed below.

(b) The Contract Administration Office (CAO) designated in Block 20A on the Standard Form 26 is responsible for all matters specified in FAR 42.302(a) and DFARS 242.302(a), except in those areas otherwise designated herein.

Contract Specialist Lauren Levy, Lauren.Levy@nrl.navy.mil, (202) 767-6542

Security Matters Contracting Officer Representative for Security, Code 1226, (202) 767- 2240, DSN 297-2240, security-group@nrl.navy.mil

Safety Matters Head Safety Branch, Code 3540, (202)767-2232, safety@nrl.navy.mil

Patent Matters Associate Counsel (Intellectual Property), Code 1008.2, (202) 404-1552, DSN 297-1552, patents@nrl.navy.mil

Release of Data Public Affairs Officer, Code 1030, (202) 767-2541, DSN 297-2541, publicaffairs@nrl.navy.mil. For FOIA information, see http://www.nrl.navy.mil/media/public-affairs-office/foia/

(c) Inquiries regarding payment should be referred to DFAS at:

http://www.dod.mil/dfas/contractorpay/myinvoice.html

G-2 CONTRACTING OFFICER’S REPRESENTATIVE (COR) – FUNCTIONS AND LIMITATIONS

(a) COR information will be filled in at award. Unless terminated sooner, this appointment is effective for the period of performance of this contract. COR authority may not be re-delegated. No change in COR assignment shall be made without written notice by the Contracting Officer, who will modify the contract to reflect the change of COR assignment. The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the contractor via contract modification.

(b) The responsibilities and limitations of the COR are as follows:

(1) Providing technical direction and guidance as necessary with respect to the performance of work under this contract. Technical direction and guidance may be used to provide technical advice/recommendations/clarifications on the statement of work/specifications. It MAY NOT be used to tell the contractor how to perform the work.

(2) Submitting interim and final Contractor Performance Assessment Reports (CPARS) at www.cpars.csd.disa.mil/cparsmain.htm.

(3) Quality assurance of services performed or deliveries made.

(4) Inspection and acceptance of services or deliverables.

(5) Ensuring that Government Furnished Property, to include any contractor use of on-site equipment and/or IT resources is adequately monitored and accounted for.

(6) Security requirements on Government installation, such as the request and retrieval of personnel security badges and vehicle passes.

(7) Monitoring contractor's performance and promptly report problems and recommendations for corrective action to the PCO.

(8) Annually, furnish a written report on performance of the contractor to the PCO. And, if deemed necessary, attending a follow-up meeting to discuss.

(9) Attend post award conference, if conducted.

(10) Ensuring a copy of all Government technical correspondence, to include Technical Direction Memorandums/Guidance, is forwarded to the PCO for placement in the contract file.

(11) Monitoring of funds expended.

(12) Ensuring that the Contractor does not exceed the defined statement of work set forth in the contract.

(c) Limitations: The COR is not authorized to take any action, either directly or indirectly, that could result in a change in the cost/price, quantity, quality, place of performance, delivery schedule, or any other terms or conditions of the contract. If, as a result of technical discussions, it is desirable to alter contract obligations or the statement of work/specifications, a modification must be issued in writing and signed by the Contracting Officer in order to effect such changes. No such changes shall be made without the express written prior authorization/direction of the Contracting Officer.

G-3 DFARS 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

TBD at Task Order / 2-in-1

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

Not Applicable

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

ROUTING TABLE

DATA REQUIRED FOR SUBMISSION OF INVOICE TO WAWF

Document Type Cost Voucher Invoice and Receiving Report (COMBO) Invoice as 2-in-1 (services only)

Contract Number N00173-16-D-

Issued By DoDAAC N00173

Admin By DoDAAC

Pay DoDAAC

Ship To DoDAAC N00173

Service Acceptor N00173

DCAA Auditor DoDAAC

CAGE Code

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

CS: Lauren.Levy@nrl.navy.mil

KO: Leigh.Kellstrom@nrl.navy.mil

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

Donna Dargan: Donna.Dargan@nrl.navy.mil

Jovanka Caton- Campbell:Jovanka.Caton@nrl.navy.mil

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

(End of clause)

G-4 SUBCONTRACTORS/CONSULTANTS

(a) Advance notification or requests for consent pursuant to the contract clause entitled "Subcontracts" (FAR

52.244-2) shall be directed to the cognizant administrative contracting officer (ACO).

(b) Paragraph (j) of FAR 52.244-2 is filled in as follows. The following subcontractor/consultants have been identified in the Contractor’s proposal as necessary for performance of this contract and were evaluated during negotiations:

SUBCONTRACTOR/CONSULTANT NAME ESTIMATED TOTAL COST

G-5 INCREMENTAL FUNDING

Orders issued under this contract may be incrementally funded. Incrementally funded orders will contain a provision substantially as follows:

Pursuant to the Limitation of Funds clause (FAR 52.232-22), the total amount allotted to this order is $*{FILL IN} and it is estimated that this amount is sufficient for performance through *{FILL IN}.

(* To be filled in at time of award)

G-6 INFORMATIONAL SUBLINE ITEMS

It is anticipated that the research and development services performed under this contract will be paid for from multiple sources of funds. Informational subline items will be established as necessary to identify each accounting citation classification.

G-7 PAYMENT INSTRUCTIONS FOR MULTIPLE ACCOUNTING CLASSIFICATION CITATIONS (COST-

REIMBURSEMENT)

Payment instructions in accordance with PGI 204.7108 will be issued under each individual task order.

G-8 TASK ORDER CEILING PRICE

(a) The amount of ${FILL IN} is presently available for payment and allotted to this order. This amount is the ceiling price that the contractor shall not exceed except at its own risk. It is estimated that this amount is sufficient for performance of the order through {FILL IN}.

(b) The not-to-exceed price stated in Section B is the Government’s estimate of the price of the maximum labor and materials required to perform this order. The parties contemplate that the Government will allot additional funds incrementally to the order up to the full not-to-exceed amount or to a lesser amount necessary to perform the order.

(c) The Contractor agrees to perform up to the point at which the total amount payable by the Government, including reimbursement in the event of termination for the Government’s convenience, approximates the total amount currently allotted to the order. The Contractor will not be obligated to continue work beyond that point. The Government will not be obligated in any event to reimburse the Contractor in excess of the amount allotted to the order regardless of anything to the contrary in any other clause or provision of this order.

(d) The Contractor shall notify the Contracting Officer in writing at least sixty days prior to the date when, in the Contractor’s best judgment, the work under the order will reach the point at which the total amount payable by the Government, including any cost for termination for convenience, will approximate the total amount then allotted to the contract. The notification will state (1) the estimated date when that point will be reached and (2) an estimate of additional funding, if any, needed to continue performance through the current period of performance or to a mutually agreed upon substitute date. If after such notification additional funds are not allotted by the date identified in the Contractor’s notification, or by an agreed substitute date, the Contracting Officer, upon the Contractor’s written request, will terminate the order on that date in accordance with the provisions of the Termination clause of this contract.

(e) If, solely by reason of failure of the Government to allot additional funds in amounts sufficient for timely performance of the order, the Contractor incurs additional costs or is delayed in the performance of the work under this order and if additional funds are allotted, an equitable adjustment will be made in the price or in the period of performance, or both.

Failure to agree to any such equitable adjustment hereunder will be a dispute concerning a question of fact within the meaning of the clause entitled “Disputes.”

(f) The Government may at any time prior to termination allot additional funds for the performance of the order.

(g) Nothing in this clause affects the rights of the Government to terminate this order pursuant to other clause or provisions of this contract.

G-9 ACCOUNTING AND APPROPRIATION DATA

Each task order will contain the accounting and appropriation data for payment under this contract.

G-10 TASK ORDER PROCEDURES FOR INDEFINITE QUANTITY CONTRACTS

The following procedure shall be followed when placing task orders under this contract:

(a) Only properly appointed Contracting Officers employed at the Naval Research Laboratory (NRL) shall issue task orders under this contract.

(b) A DD Form 1155 will be issued for each task order. The DD Form 1155, "Order for Supplies or Services", shall constitute the instrument for the placement of requirements under this contract.

(c) Each task order shall be subject to FAR 52.232-20 Limitation of Cost or FAR 52.232-22 Limitation of Funds clause, as appropriate. Each task order is subject to the terms and conditions of the clause in Section H entitled, "Level of Effort Task Orders".

(d) Prior to the issuance of a task order, the contractor will be provided with the statement of work and shall promptly submit a cost proposal for performing the work. The fixed fee shall be in the same proportion to the estimated cost for each task order as the maximum fixed fee is to the maximum estimated cost for the contract as set forth in Section B.

(e) Task orders issued shall include, but not be limited to, the following information:

(1) Date of Order

(2) Contract Number and Task Order Number

(3) Accounting and Appropriation Data

(4) Description of the Work to be Performed

(5) Level of Effort

(6) DD Form 1423 (Contract Data Requirements List)

(7) Place of Performance

(8) Period of Performance

(9) Estimated Cost Plus Fixed Fee

(10) DD Form 254 (Contract Security Classification Specifications)

(11) List of Government furnished material and the estimated value thereof for each order.

(f) The ceiling amount for each task order will be the ceiling price stated therein and may not be exceeded except when authorized by a modification to the task order.

G-11 INFORMATION REQUIRED FOR SUBMISSION OF EACH ORDER

(a) The COR or TM assigned in Section G will provide the contractor with a Statement of Work (SOW) for each order.

The Contractor shall provide the COR or TM with a proposal in response to the SOW. The COR or TM will prepare an acquisition package and forward to the NRL Contracting Division for issuance of an order.

(b) Direct Labor Hours, travel and material costs are subject to negotiation prior to award. In order to fully evaluate each order proposal, the contractor shall provide the following as applicable:

(1) A time phased (e.g., monthly, quarterly, etc.) breakdown of direct labor by labor category.

(2) A complete breakdown for travel identifying each cost mode of travel and the reason for the travel proposed.

(3) A complete list of all material including quantity and cost. The contractor shall provide specific documentation to serve as the basis for price verification (i.e., vendor quotations, invoices, published price lists, GSA schedule lists, etc.).

G-12 ONR 5252.242-9718 TECHNICAL DIRECTION (FEB 02)

(a) Performance of the work hereunder is subject to the technical direction of the Program Officer/COR designated in this contract, or his duly authorized representative. For the purposes of this clause, technical direction includes the following:

(1) Direction to the Contractor which shifts work emphasis between work areas or tasks, requires pursuit of certain lines of inquiry, fills in details or otherwise serves to accomplish the objectives described in the statement of work;

(2) Guidelines to the Contractor which assist in the interpretation of drawings, specifications or technical portions of work description.

(b) Technical direction must be within the general scope of work stated in the contract. Technical direction may not be used to:

(1) Assign additional work under the contract,

(2) Direct a change as defined in the contract clause entitled "Changes";

(3) Increase or decrease the estimated contract cost, the fixed fee, or the time required for contract performance; or

(4) Change any of the terms, conditions or specifications of the contract.

(c) The only individual authorized to in any way amend or modify any of the terms of this contract shall be the Contracting

Officer. When, in the opinion of the Contractor, any technical direction calls for effort outside the scope of the contract or inconsistent with this special clause, the Contractor shall notify the Contracting Officer in writing within ten working days after its receipt. The Contractor shall not proceed with the work affected by the technical direction until the Contractor is notified by the Contracting Officer that the technical direction is within the scope of the contract.

(d) Nothing in the foregoing paragraphs may be construed to excuse the Contractor from performing that portion of work statement, which is not affected by the disputed technical direction.

G-13 TECHNICAL DIRECTION MEMORANDUM (TDM)

(a) For the purposes of this clause, technical direction includes the following:

(1) Direction to the Contractor which shifts work emphasis between work areas or tasks, requires pursuit of certain lines of inquiry, fills in details or otherwise describes work which will accomplish the objectives described in the statement of work;

(2) Guidelines to the Contractor, which assist in interpretation of drawings, specifications or technical portions of, work description.

(b) Technical instructions must be within the scope of work stated in the contract. Technical instructions may not be used to:

(1) Assign additional work under the contract;

(2) Direct a change as defined in the contract clause entitled "Changes";

(3) Increase or decrease the estimated contract cost, the fixed fee, or the time required for contract performance; or

(4) Change any of the terms, conditions or specifications of the contract

(c) The TDM shall be written by the Contracting Officer’s Representative (COR), with the original given to the Contractor and a copy retained in the CORs file. Technical direction may be issued orally only in emergency situations. If technical direction is issued orally, a TDM must follow within two (2) working days from the date of the oral direction. Amendments, corrections, or changes to TDMs shall also be in written format and shall include all the information set forth in paragraph (e) below.

(d) A TDM shall be considered issued when the Government deposits it in the mail, or if transmitted by other means, when it is physically delivered to the contractor.

(e) TDMs shall include, at a minimum, the following information:

(1) Date of TDM,

(2) Contract Number,

(3) Reference to the relevant portion or item in the Statement of Work,

(4) The specific technical direction or clarification,

(5) The type of work to be performed, i.e., (a) SETA support or (b) R&D work,

(6) A reference to the appropriate CLIN or SubCLIN,

(7) The anticipated level of effort, materials and travel expected as a result of the TDM,

(8) The JON, Program Element, and associated dollar amount, and

(9) The signature of the COR

(f) CORs shall provide a copy of each TDM with the necessary increment of funds to the Contracting Officer for retention in the official contract file. CORs shall retain all files containing TDMs for a period of two (2) years after the final contract completion date.

(g) The only individual authorized in any way to amend or modify any of the terms of this contract shall be the Contracting Officer. When, in the opinion of the Contractor, any technical direction calls for effort outside the scope of the contract or inconsistent with this special clause, the Contractor shall notify the Contracting Officer in writing within ten (10) working days after its receipt.

G-14 ALLOTMENT OF FUNDS

Pursuant to the Limitation of Funds clause (FAR 52.232-22), the total amount allotted to this task order is $ (*) .

The amounts presently available and allotted to this task order for payment of cost and fixed fee and the period covered by these amounts for incrementally funded CLINs is set forth below:

(* - To be completed at time of award and each time an increment is added)

CLIN ALLOTTED TO COST ALLOTTED TO FEE ESTIMATED PERIOD COVERED

0001 * * *

0002 * N/A *

0003 * N/A *

Section H Special Contract Requirements

H-1 TYPE OF CONTRACT

The Government anticipates single award IDIQ contract with Cost Plus Fixed Fee (CPFF) term type task orders.

H-2 ONR 5252.237-9705 - KEY PERSONNEL (DEC 88)

(a) The Contractor agrees to assign to the contract tasks those persons whose resumes were submitted with its proposal and who are necessary to fulfill the requirements of the contract as "key personnel". No substitutions may be made except in accordance with this clause.

(b) The Contractor understands that during the first ninety (90) days of the contract performance period, no personnel substitutions will be permitted unless these substitutions are unavoidable because of the incumbent's sudden illness, death or termination of employment. In any of these events, the Contractor shall promptly notify the Contracting Officer and provide the information described in paragraph (c) below. After the initial ninety

(90) day period the Contractor must submit to the Contracting Officer all proposed substitutions, in writing, at least thirty (30) days in advance (sixty (60) days if security clearance must be obtained) of any proposed substitution and provide the information required by paragraph (c) below.

(c) Any request for substitution must include a detailed explanation of the circumstances necessitating the proposed substitution, a resume for the proposed substitute, and any other information requested by the Contracting Officer. Any proposed substitute must have qualifications equal to or superior to the qualifications of the incumbent. The Contracting Officer or his/her authorized representative will evaluate such requests and promptly notify the Contractor of his/her approval or disapproval thereof.

(d) In the event that any of the identified key personnel cease to perform under the contract and the substitute is disapproved, the contract may be immediately terminated in accordance with the Termination clause of the contract.

The following are identified as key personnel:

LABOR CATEGORY

Program Manager/Senior Electro-Optical Scientist

Senior Electro-Optical Scientist/Engineer

Senior Electrical Engineer Senior Systems Engineer

Senior Analyst

H-3 ONR 5252.235-9714 – REPORT PREPARATION (JUL 2005)

Scientific or technical reports prepared by the Contractor and deliverable under the terms of this contract will be prepared in accordance with format requirements contained in ANSI/NISO Z39.18-2005, Scientific and Technical Reports: Elements, Organization, and Design.

[NOTE: All NISO American National Standards are available as free, downloadable pdf(s) at http://www.niso.org/standards/index.html. NISO standards can also be purchased in hardcopy form from NISO Press Fulfillment, P. O. Box 451, Annapolis Junction, MD 20701-0451 USA. Telephone U.S. and Canada: (877) 736-6476; Outside the U.S. and Canada: 301-362-6904 fax: 301-206-9789.]

H-4 ORGANIZATIONAL CONFLICT OF INTEREST

(a) Definitions.

The term “contractor” includes the Contractor and its employees, affiliates, marketing consultants (if any), consultants, and subcontractors at all tiers.

“Organizational Conflict of Interest” (“OCI”) means that because of other activities or relationships with other persons, a person is unable or potentially unable to render impartial assistance or advice to the Government, or the person’s objectivity in performing the contract work is or might be otherwise impaired, or a person has an unfair competitive advantage. FAR 2.101. An OCI may result when (1) activities or relationships create an actual or potential conflict of interest related to the performance of the Statement of Work (SOW) of this Contract; or, (2) when the nature of the SOW on this Contract creates an actual or potential conflict of interest with respect to the Contractor in relation to a future acquisition.

“Marketing consultant,” means any independent contractor who furnishes advice, information, direction, or assistance to an offeror or any other contractor in support of the preparation or submission of an offer for a Government contract by that offeror. An independent contractor is not a marketing consultant when rendering—

(1) Services excluded in FAR Subpart 37.2; (2) Routine engineering and technical services (such as installation, operation, or maintenance of systems, equipment, software, components, or facilities); (3) Routine legal, actuarial, auditing, and accounting services; and (4) Training services.

(b) In accordance with the guidance in FAR Subpart 9.5, the Contracting Officer has determined that potentially significant organizational conflicts of interest (OCIs) could result if the Contractor is allowed to participate (at any level) in future Federal Government acquisitions that include requirements that may be established or affected by the performance of the Statement of Work (SOW) by the Contractor under this Contract.

(c) It is understood and agreed that the Contractor may be ineligible (unless expressly exempted as provided in FAR Part 9.5) to act as a prime contractor, subcontractor, or consultant or subcontractor to any prime contractor or subcontractor at any tier, for any future requirements (for services, systems, or components of systems) procured by any Federal Government activity where the Contractor, in performance of the SOW under this Contract, has provided or is providing support (as described in FAR 9.505-1 through 9.505-4) that establishes or affects future requirements or may affect the future competition.

(d) The contracting officer responsible for securing future requirements, in his/her sole discretion, may make a determination to exempt the Contractor from ineligibility as described in subparagraph (c) above provided the Contractor submits an acceptable mitigation plan.

(1) Items for consideration in a mitigation plan include the following: identification of the organizational conflict(s) of interest; a reporting and tracking system; an organizational conflict of interest compliance/enforcement plan, to include employee training and sanctions, in the event of unauthorized disclosure of sensitive information; a plan for organizational segregation (e.g., separate reporting chains); data security measures; and, non-disclosure agreements.

(2) The Government's determination regarding the adequacy of the mitigation plan or the possibility of mitigation is a unilateral decision made solely at the discretion of the Government and is not subject to the Disputes clause of the contract. The Government may terminate the contract for default if the Contractor fails to implement and follow the procedures contained in any approved mitigation plan.

(3) Nothing contained herein shall preclude the contracting officer in future Federal Government acquisitions from making his/her own determination as to whether an OCI exists and whether any such OCI has been successfully mitigated.

(e) The Contractor shall apply this clause to any subcontractors or consultants who: have access to proprietary information received or generated in the performance of this Contract; and/or, who participate in the development of data, or participate in any other activity related to this Contract which is subject to the terms of this clause at the prime contractor level.

(f) The Contactor agrees that it and its subcontractors at all levels shall use reasonable diligence in protecting proprietary data/information that is received or generated in performance of this Contract in accordance with this clause and any other clause of this Contract pertaining to the nondisclosure of information. The Contractor further agrees that neither it nor its subcontractors will willfully disclose proprietary data/information that is received or generated in the performance of this Contract without the prior permission of the Contracting Officer, and that proprietary information shall not be duplicated, used or disclosed, in whole or part, for any purpose other than to accomplish the work required by the Contract.

(g) The Contractor and its Subcontractors at all levels shall inform their employees that they are required to comply with the applicable requirements and restrictions contained in: restrictive markings applicable to data/information that they receive or generate in the performance of this Contract; FAR Subpart 9.5 pertaining to actual or potential OCIs; FAR 3.104 pertaining to requirements and restrictions under the Procurement Integrity Act; and, Defense FAR Supplement (DFARS) 252.204-7000 pertaining to “Disclosure of Information.”

(h) The Contractor agrees to enter into written agreements with all companies whose proprietary data it shall have access to and to protect such data from unauthorized use or disclosure as long as it remains proprietary. The Contractor shall furnish to the Contracting Officer copies of these written agreements. The Contractor agrees to protect the proprietary data and rights of other organizations disclosed to the Contractor during performance of this Contract with the same caution that a reasonably prudent Contractor would use to safeguard its own highly valuable property. The Contractor agrees to refrain from using proprietary information for any purpose other than that for which it was furnished.

(i) The Contractor shall not distribute reports, data or information of any nature received or arising from its performance under this Contract, except as provided by this Contract or as may be directed by the Contracting Officer.

(j) The Contractor agrees that if in the performance of this Contract it discovers a potential OCI, a prompt and full disclosure shall be made in writing to the Contracting Officer. This disclosure shall include a description of the actions the Contractor has taken, or proposes to take, to avoid or mitigate such conflicts.

H-5 SPECIAL CONTRACT REQUIREMENT REGARDING NON-DISCLOSURE OF INFORMATION

Data includes all data, information and software, regardless of the medium (e.g. electronic or paper) and/or format in which the data exists, and includes data which is derived from, based on, incorporates, includes or refers to such data. In the course of performing this Contract, the Contractor may be or may have been given access to: Source Selection Information [as defined in Federal Acquisition Regulation (FAR) 3.104]; data that has been assigned (or data that is generated by the Contractor that should be assigned) a contractually required or other Government distribution control (such as a Distribution Statement prescribed in DoD Directive 5230.24);

and/or data that has been given a restrictive legend by the source of the data such as “business sensitive,” “proprietary,” “confidential,” or word(s) with similar meaning that impose limits on the use and distribution of the data (see for example FAR 52.215-1(e)). All such data with limitations on use and distribution are collectively referred to herein as “protected data.”

This Special Contract Requirement supplements and implements Defense FAR Supplement (DFARS) 252.204- 7000, “DISCLOSURE OF INFORMATION.” As a condition to receiving access to protected data, the Contractor shall: (1) prior to having access to protected data, obtain the agreement of the source of the protected data to permit access by the Contractor to such protected data; (2) use the protected data solely for the purpose of performing duties under this Contract unless otherwise permitted by the source of the protected data; (3) not disclose, release, reproduce or otherwise provide or make available the protected data, or any portion thereof, to any employee of the Contractor unless and until such employee has been informed of the restrictions on use and distribution of the protected data and agreed in writing to conform with the applicable restrictions; (4) not disclose, release, reproduce or otherwise provide or make available the protected data, or any portion thereof, to any non-Government person or entity (including, but not limited to, affiliates, subcontractors, successors and assignees of the Contractor), unless the Contracting Officer and the source of the protected data have given prior written approval (which shall be conditioned upon the person receiving the protected data having been informed of the restrictions on use and distribution of the protected data and having agreed in writing to conform with the applicable restrictions; (5) establish and execute safeguards to prevent the unauthorized use or distribution of protected data.

Any unauthorized use, disclosure or release of protected data may result in substantial criminal, civil and/or administrative penalties to the Contractor or to the individual who violates a restriction on use or distribution of protected data. Any agreement with another company regarding access to that company’s protected data shall not create any limitation on the Government or its employees with regard to such data. A copy of each executed company and individual non-disclosure agreement relating to this Contract shall be provided to the Contracting Officer’s Representative (COR).

Appropriate restrictive legends will be included by the Contractor on any copies and reproductions made of all or any part of the protected data and any data that is derived from, based upon, incorporates, includes or refers to the protected data. When the Contractor’s need for such protected data ends, the protected data shall be returned promptly to the source of the protected data with notice to the COR. However, the obligation not to use, disclose, release, reproduce or otherwise provide or make available such protected data, or any portion thereof, shall continue, even after completion of the Contract, for so long as required by the terms of any agreement pertaining to the protected data between the Contractor and the source of the protected data, or (in the case of Government information) for so long as required by applicable law and regulation. Any actual or suspected unauthorized use, disclosure, release, or reproduction of protected data or violation of this agreement, of which the company or any employee is or may become aware, shall be reported promptly (within one business day after discovery and confirmation) to the Contracting Officer’s Representative (COR).

H-6 LEVEL OF EFFORT TASK ORDERS

(a) In the performance of each term form task order issued under this contract, the Contractor agrees to provide the level of effort specified in the task order and in accordance with this provision.

(b) It is understood and agreed that the rate of direct labor hours expended each month may fluctuate in pursuit of the technical objective, provided such fluctuation does not result in the use of the total hours of effort prior to the expiration of the term of the task order. The Contractor is required to notify the Contracting Officer when 85% of the total level of effort of the task order has been expended.

(c) If, during the term of the task order, the Contractor finds it necessary to accelerate the expenditure of direct labor under the task order to such an extent that the total hours of effort specified would be used prior to the expiration of the term, the Contractor shall notify the Contracting Officer in writing setting forth the acceleration required, the probable benefits which would result, and an offer to undertake the acceleration at no increase in the estimated cost or fixed fee together with an offer setting forth a proposed level of effort, cost breakdown, and proposed fixed-fee for continuation of the work until expiration of the term of the task order. If the maximum amount specified in the contract is not adequate to accommodate the anticipated accelerated expenditure of direct labor, the Contractor shall also include in its offer a proposed increase of the maximum amount, cost breakdown, and proposed fixed-fee for the increase. The offer shall provide that the work proposed will be subject to the terms and conditions of this contract and any additions or changes required by current law, regulations, or directives, and that the offer, with a written notice of acceptance by the Contracting Officer, shall constitute a binding contract. The Contractor shall not accelerate any effort until receipt of such written approval by the Contracting Officer. Any agreement to accelerate will be formalized by modification of the order and, if necessary, the contract.

(d) The Contracting Officer may, by written order, direct the Contractor to accelerate the expenditure of direct labor under a task order such that the labor hours of effort specified therein would be used prior to the expiration of the term. This order shall specify the acceleration required and the resulting revised term.

The Contractor shall acknowledge this order within ten days of receipt.

(f) If the total level of effort specified in each task order is not provided by the Contractor during the term of the task order, the Contracting Officer shall either (i) reduce the fixed fee of the task order as follows:

Fee Reduction = Fixed Fee x (Required LOE Hours - Expended LOE Hours)

Required LOE Hours or (ii) subject to the provisions of the clause of this contract entitled "Limitation of Cost," require the Contractor to continue to perform the work until the total number of hours of direct labor specified in the task order shall have been expended, at no increase in the fixed fee of the task order.

(g) In the event the Government fails to fully fund the task order in a timely manner, the term of the task order may be extended accordingly with no change to cost or fee. If the Government fails to fully fund the task order, the fee will be adjusted in direct proportion to that effort which was performed.

(h) Notwithstanding any of the provisions of the above paragraphs, the Contractor may furnish labor hours up to five percent in excess of the total direct labor hours specified in the task order provided that the additional effort is furnished within the term hereof, and provided further that no increase in the estimated cost or fixed-fee is required, and no adjustment in the fixed-fee shall be made provided that the Contractor has delivered at least 95% of the level of effort specified in the task order.

(i) It is understood that the mix of labor categories provided by the Contractor under the task order, as well as the distribution of effort among those categories, may vary considerably from the initial mix and distribution of effort, which was estimated by the Government or proposed by the Contractor.

(j) Nothing herein shall be construed to alter or waive any of the rights or obligations of either party pursuant to the Clause entitled "Limitation of Costs" or "Limitation of Funds," either of which incorporated herein applies to each task order under this contract.

Section I Contract Clauses

I-1 FAR 52.252-2 – CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.

Also, the full text of a clause may be accessed electronically at this/these addresses:

http://farsite.hill.af.mil/farsite.html https://www.acquisition.gov

52.202-1 Definitions NOV 2013 52.203-3 Gratuities…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .