Attachments updated.xlsx

XLSX spreadsheet 88 KB Posted

Attached to
8(a) Custodial NSWC Carderock Federal contract opportunity
Solicitation number
N0016723R0014
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document outlines a federal contract solicitation for custodial services at multiple government facilities. The solicitation seeks recurring custodial services at buildings located at Naval Surface Warfare Center Carderock Division, Naval District Washington, and Naval Facilities Engineering Command. Services include space cleaning, floor care, restroom services, group shower/locker room cleaning, and building perimeter services. The base period of performance is three months from July 2023 through September 2023. The solicitation is set aside for 8(a) small businesses and issued by the Department of the Navy Naval Sea Systems Command. Recurring and nonrecurring services are solicited for multiple buildings at Carderock, NDW, and NAVFAC sites. The solicitation includes separate CLINs for each location and service type.

View the file

Other files for this federal contract opportunity

Other files attached to 8(a) Custodial NSWC Carderock, newest first.
File Type Posted
Memo to File for Solicitation Cancellation N40016723R0014.pdf PDF
N0016723R00140003.pdf PDF
NJS JV - Carderock Naval Base - CBA - February 2021 to 2024 Fully Executed.pdf PDF
NJS - Carderock Naval Services Warfare Center 2022 Addendum A Fully Executed.pdf PDF
Carderock -Addendum B (002).pdf PDF
ATTACHMENT 10 updated.xlsx XLSX spreadsheet
N0016723R00140002.pdf PDF
west-bethesda-map.pdf PDF
CARDEROCK CUSTODIAL Site Visit Sign-up.xlsx XLSX spreadsheet
WD 2015-4269 8-3.pdf PDF
N0016723R00140001.pdf PDF
Attachments.xlsx XLSX spreadsheet
PPI Responses 8-14.pdf PDF
Pre-Proposal Inquiry.xls.xlsx XLSX spreadsheet
ATTACHMENT 10.xlsx XLSX spreadsheet
PPQ.docx DOCX document
N0016723R0014 8(a) Custodial.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

att 1_Carderock Bldgs CLIN0001

NAVAL SURFACE WARFARE CENTER CARDEROCK DIVISION
CUSTODIAL INVENTORY CARDEROCK
BuildingFloor No.Room No.FunctionFloor TypeArea (SF)Service ClassSC ASC BSC CSC D
1BasementB132Fitness CenterVinyl covered foam pad2635A2,635000
1BasementGeneral Admin AreaTile2,931C002,9310
1BasementGeneral Admin AreaCarpet1,682C001,6820
1BasementFloorConcrete2,515C002,5150
1BasementStairwaysConcrete575C005750
1BasementB127Restroom - WomenTile236A236000
1BasementB131Locker Room - WomenTile605A605000
1BasementRestroom - MenTile250C002500
1BasementLocker Room - MenTile750A750000
11st FloorGeneral Admin AreaTile123C001230
11st FloorGeneral Admin AreaCarpet144C001440
11st FloorRestroom - MenTile242C002420
11st FloorCoffee Mess AreaTile15B01500
11st FloorWalkwayConcrete500C005000
1Mezz West EndGeneral Admin AreaTile628C006280
1Mezz West EndGeneral Admin AreaCarpet2,631C002,6310
1Mezz West EndLobbyTile400C004000
1Mezz West EndRestroomsTile132C001320
1Mezz West EndStairwaysConcrete890C008900
1Mezz East EndGeneral Admin AreaTile367C003670
1Mezz East EndGeneral Admin AreaCarpet1,045C001,0450
1Mezz East EndStairwaysConcrete250C002500
12nd FloorGeneral Admin AreaTile1,000B01,00000
12rd Floor212General Admin AreaCarpet700C007000
12rd Floor208General Admin AreaCarpet868C008680
12rd Floor209General Admin AreaCarpet250C002500
12nd FloorFormal Training AreasCarpet5,682B05,68200
12nd FloorLobbyCarpet900B090000
12nd FloorVending AreaTile15B01500
12nd FloorVending Machine AreaTile30B03000
12nd FloorCoffee Mess AreaTile15B01500
12nd FloorRestroom - MenTile410C004100
12nd FloorLocker Room - MenTile210C002100
12nd FloorStairwaysConcrete250C002500
12nd FloorRestroomTile450C004500
12nd Floor MezzGeneral Admin. AreaTile1,000C001,0000
12nd Floor MezzGeneral Admin. AreaCarpet7,500C007,5000
12nd Floor MezzLobbyCarpet900C009000
12nd Floor MezzStairwayMetal250C002500
13rd FloorGeneral Admin AreaCarpet2,000C002,0000
13rd FloorGeneral Admin AreaTile1,000C001,0000
13rd FloorRestroomTile400C004000
2BasementOperations & ProductionTile7,873C007,8730
2BasementGeneral Admin AreaCarpet1,671C001,6710
2BasementLobbyTile250C002500
2BasementRestroom - WomenTile210C002100
2BasementB207Nursing RoomCarpet100C001000
2BasementStairwaysConcrete235C002350
2BasementEntrance/ExitTile150C001500
21st FloorCommand Head QuartersCarpet1,028A1,028000
21st FloorRestroomTile193A193000
21st FloorGeneral Admin AreaTile388A388000
21st FloorGeneral Admin AreaCarpet4,356A4,356000
21st Floor113Kichen - Coffee MessTile15A15000
21st FloorHallwayTerrazzo5,031A5,031000
21st FloorLobbyCarpet600A600000
21st FloorRestroomCeramic324C003240
21st FloorStairwaysTerrazzo450C004500
21st FloorEntrance/ExitConcrete575C005750
22nd FloorGeneral Admin AreaTile3,127C003,1270
22nd Floor202Coffee Mess AreaTile15B01500
22nd Floor206Coffee Mess AreaTile15B01500
22nd Floor313Coffee Mess AreaTile15B01500
22nd FloorStairwaysTerrazzo784C007840
22nd FloorHallwayTile975C009750
22nd FloorRestroom - WomenTile348C003480
22nd FloorStairwaysTerrazzo450C004500
23rd FloorGeneral Admin AreaTile4,739C004,7390
23rd FloorGeneral Admin AreaCarpet3,826C003,8260
23rd FloorStairwaysTerrazzo467C004670
23rd FloorHallwayTile565C005650
23rd FloorRestroomsTile241C002410
23rd FloorStairwaysTerrazzo450C004500
3BasementOperations & ProductionTile4,028C004,0280
3BasementWalkwaysConcrete1,547C001,5470
3Basement10Coffee Mess AreaTile30B03000
3BasementStairwaysConcrete250C002500
3BasementStairwaysConcrete235C002350
31st FloorGeneral Admin. AreaTile4,770C004,7700
31st FloorGeneral Admin. AreaCarpet5,716C005,7160
31st FloorHallwayConcrete2,685C002,6850
31st FloorLobbyTile600C006000
31st Floor108-BCoffee Mess AreaTile15B01500
31st Floor110Coffee Mess AreaTile15B01500
31st Floor151Coffee Mess AreaTile15B01500
31st FloorRestroomsTile266C002660
31st FloorStairwaysConcrete450C004500
31st FloorEntrance/ExitConcrete475C004750
3MezzWalkwaysTile100C001000
3MezzGeneral Admin. AreaCarpet3,432C003,4320
3Mezz100-MCoffee Mess AreaTile15B01500
3MezzLandingTile85C00850
3MezzStairwaysTile150C001500
32nd FloorGeneral Admin. AreaTile5,011C005,0110
32nd FloorGeneral Admin. AreaCarpet10,292C0010,2920
32nd FloorLobbyTile915C009150
32nd Floor208Coffee Mess AreaTile15B01500
32nd Floor220Coffee Mess AreaTile15B01500
32nd Floor248Coffee Mess AreaTile15B01500
32nd Floor249Coffee Mess AreaTile15B01500
32nd FloorRestroomsTile477C004770
32nd FloorStairwaysConcrete375C003750
33rd FloorGeneral Admin. AreaTile3,424C003,4240
33rd FloorGeneral Admin. AreaCarpet11,739C0011,7390
33rd Floor306Coffee Mess AreaTile15B01500
33rd Floor324Coffee Mess AreaTile15B01500
33rd Floor351Coffee Mess AreaTile15B01500
33rd Floor355Coffee Mess AreaTile15B01500
33rd Floor358Coffee Mess AreaTile15B01500
33rd FloorLobbyTile565C005650
33rd FloorRestroomsTile477C004770
33rd FloorStairwaysConcrete375C003750
4West Fitting RoomGeneral Admin. AreaTile641C006410
4West Fitting RoomOperations & ProductionConcrete2,655C002,6550
4J BasinWalkwayConcrete11,328C0011,3280
4J BasinRestroom - UnisexTile80C00800
4EBasementB01OfficeTile288C002880
4EBasementB02AOfficeTile515C005150
4EBasementB02AKitchen - Coffee MessTile278B027800
4EBasementB03, B04General Admin AreaTile780C007800
4EBasementB39AOperations & ProductionConcrete1134C001,1340
4EBasementB32General Admin AreaConcrete319C003190
4EBasementWalkwayConcrete6,336C006,3360
4EBasementStairwaysConcrete575C005750
4E1st FloorOperations & ProductionTile3,935C003,9350
4E1st FloorGeneral Admin AreaCarpet4,358C004,3580
4E1st FloorWalkwayConcrete11,413C0011,4130
4E1st FloorStairwaysConcrete250C002500
4E1st Floor109Kichen - Coffee MessTile115B011500
4E1st FloorRestroomsTile672C006720
4E1st FloorStairwaysConcrete255C002550
4EMezzSouthGeneral Admin AreaTile1199C001,1990
4E2nd Floor200C3..01Coffee Mess AreaTile150B015000
4E2nd Floor205.02Coffee Mess AreaConcrete146B014600
4E2nd FloorSouthGeneral Admin AreaCarpet5,099C005,0990
4E2nd FloorNorthGeneral Admin AreaCarpet1,734C001,7340
4E2nd FloorNorthOperations & ProductionConcrete1,578C001,5780
4E2nd FloorSouthHallwayTile1003C001,0030
4E2nd FloorSouthRestroomsTile184C001840
4E2nd FloorStairwaysMetal300C003000
4E3rd FloorOffice SuiteCarpet1415C001,4150
51st FloorOperations & ProductionTile305C003050
51st FloorEntrance/ExitCeramic655C006550
51st FloorHallwayConcrete500C005000
51st FloorStairway/RampWood1,500C001,5000
51st FloorStairwayMetal250C002500
51st FloorEntrance/ExitCeramic150C001500
52nd FloorOperations & ProductionTile1,341C001,3410
52nd FloorStairwayMetal250C002500
53rd FloorOperations & ProductionTile365C003650
53rd FloorOperations & ProductionWood976C009760
53rd FloorStairwayWood150C001500
53rd FloorKitchen Coffee/Lunch RmTile50B05000
71st FloorGeneral Admin AreaTile4,829C004,8290
71st FloorGeneral Admin AreaCarpet5,333C005,3330
71st FloorHi BayOperations & ProductionConcrete2,485C002,4850
71st FloorWalkwayWood1,468C001,4680
71st FloorLobbyTile325C003250
71st FloorRestroomsTile195C001950
71st FloorStairwayConcrete250C002500
71st FloorVendingSnack Area & Vending MachinesTile50B05000
71st Floor109KitchenetteTile80B08000
71st FloorEntrance/ExitConcrete275C002750
72nd FloorGeneral Admin. AreaTile2,164C002,1640
72nd FloorGeneral Admin. AreaCarpet8,147C008,1470
72nd FloorHallwayTile675C006750
72nd Floor223Coffee Mess AreaTile15B01500
72nd FloorRestroomsTile527C005270
72nd FloorStairwayConcrete450C004500
91st FloorGeneral Admin. AreaCarpet2,082C002,0820
91st FloorHallwayLobby, hallways, metal catwalk & mach rm stairsTile1030C001,0300
91st FloorHallwayCoffee Mess AreaTile40B04000
91st Floor135RestroomsTile223C002230
91st Floor136RestroomsTile260C002600
91st FloorHallwayMain Entrance/ExitTile174C001740
92nd FloorM139Locker Room - MenConcrete840B084000
92nd FloorStairwayConcrete250C002500
92nd FloorM137Locker Room/Lunch AreaTile300B030000
92nd FloorM137General Admin. AreaCarpet427C004270
10BasementGeneral Admin. AreaTile1,112C001,1120
10BasementGeneral Admin. AreaCarpet315C003150
10BasementKitchenetteTile50B05000
10BasementHallwayTile250C002500
10BasementRestroom - MenTile90C00900
10BasementExtrance/ExitTile100C001000
101st FloorOperations & ProductionTile1,250C001,2500
101st FloorExtrance/ExitTile100C001000
102nd FloorGeneral Admin AreaCarpet609C006090
102nd FloorRestroom - UnisexTile75C00750
102nd FloorExterior StairwayMetal175C001750
141st FloorGeneral Admin AreaCarpet605C006050
141st FloorEntrance/ExitConcrete75C00750
151st Floor WestGeneral Admin AreaTile11,522C0011,5220
151st Floor WestGeneral Admin AreaCarpet3,108C003,1080
151st Floor WestLobbyTile1,200C001,2000
151st Floor WestRestroomsTile125C001250
151st Floor West`Entrance/ExitConcrete175C001750
151st FloorHallwayCoffee Mess AreaTile50B05000
151st Floor100Designated Wet AreaTile15B01500
151st Floor106Designated Wet AreaTile15B01500
151st Floor115Designated Wet AreaTile15B01500
151st Floor121Designated Wet AreaTile15B01500
151st Floor124Designated Wet AreaTile15B01500
151st Floor131Designated Wet AreaTile15B01500
151st Floor EastHallwayTile50C00500
151st Floor EastGeneral Admin AreaCarpet2,325C002,3250
151st Floor EastLobbyTile200C002000
151st Floor EastRestroomsTile175C001750
151st Floor EastStairwayConcrete250C002500
151st Floor EastEntrance/ExitConcrete100C001000
152nd Floor EastLobbyTile100C001000
152nd Floor EastGeneral Admin AreaCarpet2,325C002,3250
152nd Floor EastRestroomsTile175C001750
152nd Floor EastStairwayConcrete250C002500
16BasementOperations & ProductionTile1,047C001,0470
16BasementOperations & ProductionConcrete2,700C002,7000
16BasementRestroom - UnisexTile40C00400
16BasementStairwayConcrete250C002500
161st FloorGeneral Admin AreaTile2,035C002,0350
161st FloorGeneral Admin AreaCarpet1,408C001,4080
161st FloorLobbyTile300C003000
161st FloorRestroomsTile240C002400
161st FloorStairwayConcrete250C002500
161st FloorEntrance/ExitConcrete175C001750
162nd FloorGeneral Admin AreaTile1,659C001,6590
162nd FloorGeneral Admin AreaCarpet4,080C004,0800
162nd FloorHallwayTile350C003500
162nd FloorRestroomsTile200C002000
162nd FloorStairwayConcrete250C002500
162nd FloorDesignated Wet AreaTile50B05000
163rd FloorControl RoomTile754C007540
163rd FloorOperations & ProductionCarpet3,710C003,7100
163rd FloorStairwayConcrete150C001500
17Basement WestGeneral Admin. AreaCarpet771C007710
17Basement WestHallwayConcrete1,935C001,9350
17Basement WestRestroom - UnisexTile75C00750
17Basement WestStairwayTile550C005500
171st Floor WestGeneral Admin AreaTile324C003240
171st Floor WestGeneral Admin AreaCarpet9,099C009,0990
171st Floor WestLobbyTile375C003750
171st Floor WestHallwayTile627C006270
171st Floor WestRestroomsTile365C003650
171st Floor WestRestroom - UnisexTile27C00270
171st Floor WestEntrance/ExitConcrete750C007500
171st Floor WestVendingSnack Area & Vending MachinesTile50B05000
171st Floor WestHallwayDesignated Wet AreaTile20B02000
172nd Floor WestMain HallwayTile1,624C001,6240
172nd Floor WestGeneral Admin AreaCarpet8,137C008,1370
172nd Floor WestLobbyTile400C004000
172nd Floor WestRestroomsTile574C005740
172nd Floor WestStairwayConcrete250C002500
172nd Floor WestHallwayTile20B02000
172nd Floor WestHallwayTile20B02000
172nd Floor WestHallwayTile20B02000
17Basement EastGeneral Admin AreaTile1,736C001,7360
17Basement EastGeneral Admin AreaCarpet1,308C001,3080
17Basement EastLobbyCeramic1,219C001,2190
17Basement EastHallwayTile380B038000
17Basement EastRestroomsTile455C004550
17Basement EastStairwayConcrete175C001750
171st Floor EastGeneral Admin AreaCarpet4,413C004,4130
171st Floor EastGeneral Admin AreaTile1,824C001,8240
171st Floor EastLobbyCarpet1,514C001,5140
171st Floor EastHallwayCarpet380C003800
171st Floor EastHallwayCarpet20B02000
171st Floor EastRestroomsCeramic215C002150
171st Floor EastStairwayTile175C001750
171st Floor EastEntrance/ExitConcrete270C002700
172nd Floor EastGeneral Admin AreaTile400C004000
172nd Floor EastGeneral Admin AreaCarpet5,495C005,4950
172nd Floor EastKitchenetteCarpet30B03000
172nd Floor EastHallwayTile1,187C001,1870
172nd Floor EastGeneral Admin AreaTile200C002000
172nd Floor EastLobbyCarpet284C002840
172nd Floor EastStairwayTile150C001500
18BasementStairways (3)Concrete1000D0001,000
181st FloorHallways, Common areasOperations & ProductionConcrete31,529C0031,5290
181st Floor115KitchenetteTile138C001380
181st FloorGeneral Admin AreasTile7,675C007,6750
181st FloorGeneral Admin AreasCarpet7,000C007,0000
181st Floor141Operations & ProductionTile3,700C003,7000
181st Floor102Operations & ProductionConcrete1,200C001,2000
181st Floor1WR2RestroomsTile182C001820
181st Floor1MR2RestroomsTile160C001600
181st Floor1WR1RestroomsTile112C001120
181st Floor1WR1ARestroomsTile34C00340
181st Floor1MR1RestroomsTile174C001740
181st Floor1MR1ALocker Room - MenTile204C002040
181st FloorStairwayConcrete200C002000
181st FloorControl Room StairsMetal100C001000
181st Floor108S5Annex StairwayTile150C001500
181st FloorEntrance/ExitConcrete300C003000
182nd Floor112S4Control Room StairsMetal150C001500
182nd FloorAnnex StairwayTile100C001000
182nd Floor204Coffee Mess AreaTile20B02000
182nd Floor201Coffee Mess AreaTile20B02000
182nd Floor241Coffee Mess AreaTile20B02000
182nd FloorGeneral Admin AreasTile1,575C001,5750
182nd FloorGeneral Admin AreasCarpet5,336C005,3360
182nd FloorStairwayMetal275C002750
19Basement A WingRestroom - UnisexTile180C001800
19Basement A WingStairwaysConcrete475C004750
19Basement A WingLunch Room/Coffee MessTile20B02000
19Basement B WingOperations & ProductionTile1,915C001,9150
19Basement B WingOperations & ProductionConcrete2,506C002,5060
19Basement B WingGeneral Admin AreaCarpet909C009090
19Basement B WingHallwayConcrete750C007500
19Basement B WingStairwaysConcrete375C003750
19Basement C WingVending Machine/Lunch RoomTile2,545B02,54500
19Basement C WingStairwaysConcrete250C002500
19Basement C WingVending Machine/Lunch RoomTile100B010000
191st Floor A WingGeneral Admin AreaTile2,736C002,7360
191st Floor A WingGeneral Admin AreaCarpet5,819C005,8190
191st Floor A WingLobbyTerrazzo900C009000
191st Floor A WingHallwayTile1,190C001,1900
191st Floor A WingRestroomsTile200C002000
191st Floor A WingRestroom - MenTile300C003000
191st Floor A WingRestroom - UnisexTile21C00210
191st Floor A WingStairwaysConcrete475C004750
191st Floor A WingEntrance/ExitConcrete1,000C001,0000
191st Floor A WingRestroom - WomenTile300C003000
191st Floor A WingRestroom - MenTile45C00450
191st Floor B WingGeneral Admin AreaTile2,873C002,8730
191st Floor B WingGeneral Admin AreaCarpet9,087C009,0870
191st Floor B WingLobbyTile2,300C002,3000
191st Floor B WingRestrooomsTile300C003000
191st Floor B WingVending AreaTile20B02000
191st Floor B WingLocker Room - MenTile275C002750
191st Floor B WingStairwaysConcrete485C004850
191st Floor B WingEntrance/ExitConcrete600C006000
192nd Floor A WingGeneral Admin AreaTile3,706C003,7060
192nd Floor A WingGeneral Admin AreaCarpet3,866C003,8660
192nd Floor A WingHallwayTile1,190C001,1900
192nd Floor A WingRestroom - MenTile300C003000
192nd Floor A WingStairwaysConcrete475C004750
192nd Floor B WingHallwayTile929C009290
192nd Floor B WingGeneral Admin AreaCarpet10,701C0010,7010
192nd Floor B WingLobbyTile2,300C002,3000
192nd Floor B WingRestroom - WomenTile250C002500
192rd Floor B WingNursing Room within Womens RestroomTile50C00500
192nd Floor B WingStairwaysConcrete450C004500
192nd Floor C WingGeneral Admin AreaTile1,152C001,1520
192nd Floor C WingLobbyTerrazzo268C002680
192nd Floor C WingStairwaysConcrete275C002750
19Mezz C Bay LabGeneral Admin AreaTile1,200C001,2000
19Mezz C Bay LabStairwaysMetal175C001750
19A BayA151Industrial Test AreaConcrete5901D0005,901
19B BayB161Industrial Test AreaConcrete4362D0004,362
19C BayC100Industrial Test AreaConcrete9870D0009,870
211st FloorGeneral Admin. AreaTile2,454C002,4540
211st FloorOperations & ProductionConcrete2,190C002,1900
211st FloorGeneral Admin AreaCarpet500C005000
211st FloorLobbyTile330B033000
211st FloorRestroomsTile240C002400
211st FloorEntrance/ExitConcrete350C003500
211st FloorShopDesignated Wet Area/Coffee MessTile20B02000
211st FloorClinicDesignated Wet AreaTile20B02000
221st FloorGeneral Admin. AreaTile987C009870
221st FloorGeneral Admin. AreaCarpet1,112C001,1120
221st FloorLobbyTile150C001500
221st FloorRestroomsTile120C001200
221st FloorRestroom - PrivateTile35B03500
221st FloorEntrance/ExitConcrete175C001750
291st FloorGeneral Admin AreaTile3,520C003,5200
291st FloorEntrance/ExitConcrete225C002250
291st FloorEntrance/ExitConcrete50C00500
291st FloorDesignated Wet Area/Coffee MessTile20B02000
291st FloorRestroomsTile160C001600
311st FloorOperations & ProductionTile3,560C003,5600
311st FloorRestroomsTile400C004000
311st FloorEntrance/ExitConcrete75C00750
311st FloorEntranceDesignated Wet AreaTile20B02000
311st FloorInteriorDesignated Wet AreaTile20B02000
401st Floor100Exterior Area AuditoriumConcrete100A100000
401st Floor101AuditoriumCarpet3,121A3,121000
401st Floor102Vestibule AuditoriumTerrazzo102A102000
401st Floor102ALobbyCarpet1,026A1,026000
401st FloorStairway 3Composition312C003120
401st Floor103StageWOOD529C005290
401st Floor105Green RoomCarpet150A150000
401st Floor106AEntrance AreaConcrete375A375000
401st Floor106BEntrance EastTerrazzo53A53000
401st Floor107Main Entrance LobbyTerrazzo3,104A3,104000
401st Floor108Entrance WestTerrazzo120A120000
401st FloorStairway 1Composition312C003120
401st Floor109Conference RoomCarpet2,035A2,035000
401st Floor110Conference RoomCarpet702A702000
401st Floor111Conference RoomCarpet1,048A1,048000
401st FloorHallwayCarpet888A888000
401st Floor112Guest Services AreaCarpet668A668000
401st Floor114Security ITCarpet470A470000
401st Floor115Security Admin AreaCarpet461A461000
401st Floor116Check InCarpet299A299000
401st Floor100C2AtriumTerrazzo1,131A1,131000
401st Floor100 E1Elevator 1Tile38C00380
401st Floor100 E2Elevator 2Tile38C00380
401st Floor117CEntranct VestibuleTerrazzo59A59000
401st Floor117DExterior EntranceConcrete75A75000
401st FloorStairwell 2Composition312C003120
401st Floor120Restroom - MenTile224C002240
401st Floor121Restroom - WomenTile337C003370
401st Floor122Cafeteria - Dining areaTerrazzo5,464A5,464000
401st Floor123Cafeteria - Food PrepTile2,100A2,100000
401st Floor124Cafeteria - Food PrepTile626A626000
401st Floor126Cafeteria - Walk inConcrete132C001320
401st Floor127Cafeteria - Walk inConcrete132C001320
401st Floor128Cafeteria - PantryTile128C001280
401st Floor129Cafeteria - OfficeTile73C00730
401st Floor130Cafeteria - Food PrepTile224C002240
401st Floor131Cafeteria - JanitorialTile70C00700
401st Floor132Cafeteria - StorageTile140C001400
401st Floor133Cafeteria - LockerTile116C001160
401st Floor134RestroomTile91C00910
401st Floor135Cafeteria - Captains DiningCarpet485A485000
401st Floor100C1Cafeteria - CorridorTile/Carpet1,165C001,1650
402nd Floor201Projection RoomCarpet401A401000
402nd FloorStairwell 1Composition312C003120
402nd Floor202Balcony AuditoriumCarpet1,890A1,890000
402nd FloorStairwell 3Composition312C003120
402nd Floor204Conference RoomCarpet624A624000
402nd Floor201C1LobbyCarpet1,920A1,920000
402nd Floor206Conference RoomCarpet2,278A2,278000
402nd Floor207Conference RoomCarpet730A730000
402nd Floor208Conference RoomCarpet1,184A1,184000
402nd Floor200C2HallwayCarpet629A629000
402nd FloorStairway 2Composition312C003120
402nd Floor210Conference RoomCarpet832A832000
402nd Floor211Conference RoomCarpet920A920000
402nd Floor212Break away Room 1Carpet285A285000
402nd Floor213Break away Room 2Carpet288A288000
402nd Floor214Janitors ClosetTileN/AN/A0000
402nd Floor216Restroom - MenTile219C002190
402nd Floor217Restroom - WomenTile243C002430

41 1st Floor Operations & Production Tile 100 C 0 0 100 0

601st FloorOperations & ProductionTile6,345C006,3450
601st FloorCommand VIP AreasCarpet10,530C0010,5300
601st FloorStairwayTerrazzo400B040000
601st FloorAtrium FloorTerrazzo10,900B010,90000
601st FloorOperations & ProductionBonded9,600C009,6000
601st FloorLobbyTerrazzo1,275B01,27500
601st FloorRestroomsTile625C006250
601st FloorRestroomsTile1,000C001,0000
601st Floor100M1Nursing RoomCarpet109C001090
601st FloorLocker Room - MenTile500C005000
601st FloorLocker Room - WomenTile525C005250
601st FloorSouthStairwayConcrete with non-slip rubber covering375C003750
601st FloorNorthStairwayConcrete with non-slip rubber covering375C003750
601st FloorEntrance/ExitConcrete1,250C001,2500
601st FloorLunch Room/Coffee Mess AreaTile200B020000
601st FloorKitchenTile25B02500
602nd FloorOperations & ProductionTile6,345C006,3450
602nd FloorGeneral Admin AreaCarpet11,105C0011,1050
602nd FloorStairwayTerrazzo400B040000
602nd FloorHallwayTerrazzo6,500C006,5000
602nd FloorOperations & ProductionBonded10,900C0010,9000
602nd FloorGeneral Admin AreaTerrazzo1,500C001,5000
602nd FloorRestroomsTile455C004550
602nd FloorRestroomsTile455C004550
602nd FloorSouthStairwayConcrete with non-slip rubber covering375C003750
602nd FloorNorthStairwayConcrete with non-slip rubber covering375C003750
602nd FloorLunch Room/Coffee Mess AreaTile200B020000
603rd FloorOperations & ProductionTile6,345C006,3450
603rd FloorGeneral Admin AreaCarpet11,105C0011,1050
603rd FloorStairwayTerrazzo400B040000
603rd FloorHallwayTerrazzo6,500C006,5000
603rd FloorOperations & ProductionBonded10,900C0010,9000
603rd FloorGeneral Admin AreaTerrazzo1,500C001,5000
603rd FloorRestroomsTile455C004550
603rd FloorRestroomsTile455C004550
603rd FloorSouthStairwayConcrete with non-slip rubber covering375C003750
603rd FloorNorthStairwayConcrete with non-slip rubber covering375C003750
603rd FloorLunch Room/Coffee Mess AreaTile200B020000
604th FloorSouthStairwayConcrete with non-slip rubber covering375C003750
604thFloorNorthStairwayConcrete with non-slip rubber covering375C003750
604th Floor403Fitness CenterCarpet387A387000
611st FloorGeneral Admin AreaTile615C006150
611st FloorOperations & ProductionConcrete3,650C003,6500
611st FloorOfficeTile15B01500
611st FloorLobbyConcrete175C001750
611st FloorRestroom - UnisexTile75C00750
611st FloorEntrance/ExitConcrete125C001250
801st FloorGeneral Admin AreaTile3,692C003,6920
801st FloorOperations & ProductionConcrete3,328C003,3280
801st FloorLobbyTile250C002500
801st FloorRestroomsTile200C002000
801st FloorStairwayConcrete200C002000
801st FloorEntrance/ExitConcrete275C002750
801st Floor103Designated Wet Area/Coffee MessTile15B01500
801st Floor105Designated Wet Area/Coffee MessTile25B02500
801st Floor113Designated Wet Area/Coffee MessTile15B01500
801st Floor119Designated Wet Area/Coffee MessTile15B01500
802nd FloorGeneral Admin AreaTile6,025C006,0250
802nd FloorGeneral Admin AreaConcrete100C001000
802nd FloorLobbyTile250C002500
802nd FloorRestroomsTile400C004000
802nd FloorStairwayConcrete200C002000
802nd Floor201Designated Wet Area/Coffee MessTile15B01500
802nd Floor202Designated Wet Area/Coffee MessTile15B01500
802nd Floor214Designated Wet Area/Coffee MessTile15B01500
802nd Floor217Designated Wet Area/Coffee MessTile15B01500
802nd Floor218Designated Wet Area/Coffee MessTile15B01500
803rd FloorGeneral Admin AreaTile6,795C006,7950
803rd FloorGeneral Admin AreaConcrete100C001000
803rd FloorLobbyTile250C002500
803rd FloorRestrooomsTile200C002000
803rd FloorStairwayConcrete200C002000
803rd Floor304Designated Wet AreaTile15B01500
803rd Floor313Designated Wet AreaTile15B01500
803rd FloorDesignated Wet AreaTile25B02500
803rd Floor316Designated Wet AreaTile15B01500
811st FloorOperations & ProductionTile175C001750
811st FloorRestroom - UnisexTile125C001250
811st FloorEntrance/ExitConcrete100C001000
1001st FloorGeneral Admin. AreaTile709C007090
1001st FloorEntrance/ExitTile30C00300
1001st FloorRestroomsTile180C001800
1001st FloorLocker RoomTile100C001000
1041st FloorRestroomsTile112A112000
1041st FloorEntrance/ExitConcrete75C00750
1041st FloorGeneral Admin/Wet AreaCarpet25A25000
1041st Floor100, 101, 101A, 105AOfficesCarpet987C009870
1081st FloorRestroom - UnisexTile150C001500
1081st FloorEntrance/ExitConcrete25C00250
109MezzanineM00C1CorridorCarpet126C001260
109MezzanineM02OperationsCarpet492C004920
109MezzanineM01OperationsCarpet456C004560

110 1st Floor Restrooms Tile 33 C 0 0 33 0

1161st FloorGeneral Admin AreaCarpet680C006800
1161st FloorOperations & ProductionConcrete600C006000
1161st FloorRestroom - UnisexTile65C00650
1161st FloorEntrance/ExitConcrete100C001000
125A1st FloorRestroom - UnisexTile107C001070
125A1st FloorEntrance/ExitConcrete53C00530
125A1st FloorLunch RoomTile313B031300
1261st FloorRestroomTile18B01800
1261st Floor102OfficeTile205B020500
1291st FloorOperations & ProductionTile297C002970
1291st FloorOperations & ProductionConcrete2,768C0027680
1291st FloorRestroom - MenTile60B06000
1291st FloorLunch RoomTile150B015000
1291st FloorCoffee Mess AreaTile25B02500
1291st FloorDesignated Wet AreaTile100B010000
1291st FloorEntrance/ExitConcrete100C001000
1431st FloorGeneral Admin AreaCarpet1311C001,3110
1431st FloorOperations & ProductionConcrete3,523C003,5230
1431st FloorRestroomsTile163C001630
1431st FloorEntrance/ExitConcrete50C00500
1431st Floor108Coffee Mess AreaTile269B026900
Q1st FloorRestrooomsTile690C006900
Q1st FloorConference RoomCarpet577A577000
Q1st FloorGeneral Admin. AreaCarpet8013C008,0130
Q1st FloorKitchen - Coffee MessTile88B08800
Q1st FloorEntry roomTile77C00770

TOTAL 715,144

Building No.Service Class Totals (SF)
ABCD
14,2267,65731,4930
211,6114527,8100
3022558,4390
40014,7040
4E068943,3420
50506,4420
7014527,1230
901,1804,4460
100504,0760
14006800
15014022,0800
1605019,5980
17056047,2830
1806060,2941,000
1902,68563,55320,133
2103705,7340
220352,5440
290203,9550
310404,0350
4036,64305,7710
41001000
6038714,000108,0040
610154,6400
80021522,4650
81004000
100001,0190
10413701,0620
108001750
109001,0740
11000330
116001,4450
125A03131600
126022300
12903353,1650
14302695,0470
Q577888,7800
Total53,58129,459610,97121,133

Attachment 1 att 1_NDW Bldgs CLIN0002

NAVAL SURFACE WARFARE CENTER CARDEROCK DIVISION
CUSTODIAL INVENTORY NDW
BuildingFloor No.Room No.FunctionFloor TypeArea (SF)Service ClassSC ASC BSC CSC D
20BasementOperationsTile236B023600
20BasementOperationsCarpet200B020000
20BasementStairwayConcrete100B010000
201st FloorHallwayTile751B075100
201st FloorGeneral Admin AreaCarpet875B087500
201st FloorLobbyCarpet450B045000
201st FloorRestroomsTile100B010000
201st FloorEntrance/ExitConcrete475B047500
201st FloorEntranceDesignated Wet AreaTile20B02000
201st FloorEntranceDesignated Wet AreaTile15B01500
201st Floor114KitchenetteTile75B07500
20Outside VendingDesignated Wet AreaTile15B01500
301st FloorGeneral Admin AreaTile597B059700
301st FloorGeneral Admin AreaCarpet2,648B0264800
301st FloorLobbyTile245B024500
301st FloorRestroomsTile315B031500
301st FloorEntrance/ExitConcrete75B07500
301st FloorKitchenDesignated Wet Area/CMTile20B02000
521st FloorRestroomTile63B06300
521st FloorOfficesCarpet400B040000
521st FloorCommon AreaCarpet281B028100
521st FloorHallwayTile234B023400
521st FloorKitchenTile118B011800
1011st FloorLobbyTile180C001800
1011st FloorRestroomsTile342C003420
1011st FloorEntrance/ExitConcrete75C00750
1521st FloorRestroomTile88B08800
1521st FloorLaundry RoomTile105B010500
1521st FloorExercise RoomCarpet377B037700
1521st FloorCommon AreaCarpet304B030400
1521st FloorSleeping QuartersCarpet548B054800
155Guard StationGeneral Admin AreaTile125B012500
155Guard StationEntrance/ExitConcrete25B02500
155Guard StationGate #3RestroomTile30B03000
178Guard StationGeneral Admin AreaTile70B07000
178Guard StationGate #2Designated Wet AreaTile25B02500
178Guard StationEntrance/ExitConcrete25B02500
Total SF10,627
Building No.Service Class Totals (SF)
ABCD
200331200
300390000
520109600
101005970
1520142200
155018000
178012000
Total010,0305970

att 1_NAVFAC Bldgs CLIN0003

NAVAL SURFACE WARFARE CENTER CARDEROCK DIVISION
CUSTODIAL INVENTORY NAVFAC
BuildingFloor No.Room No.FunctionFloor TypeArea (SF)Service ClassSC ASC BSC CSC D
61st FloorGeneral Admin AreaTile80C00800
61st FloorOperations & ProductionConcrete85C00850
61st FloorEntrance/ExitConcrete100C001000
61st FloorRestroom - MenTile275B027500
61st FloorLocker Room - MenTile700B070000
6MezzLocker Room/ Wet AreaTile100B010000
Total SF1,340
Building No.Service Class Totals (SF)
ABCD
6010752650
Total01,0752650

att 1_Class of Service Defined

FREQUENCY BY SERVICE CLASS
Spec ItemWork ItemABCD
Space Cleaning
3.2.1.1Emptying Waste ContainersD2WWW
3.2.1.2Emptying Recycling Containers2WWWM
3.2.1.3Low Area Cleaning2MM4Y0
3.2.1.4Kitchenette, Lunch and Break Room Cleaning, KitchensDDDD
3.2.1.5High Area Cleaning2YYY0
3.2.1.6Interior Window Cleaning2Y2Y2Y0
Exterior Window Cleaning2Y2Y2Y0
3.2.1.7Window Blinds Cleaning2Y2Y00
3.2.1.8Entrance Cleaning2WWM0
3.2.1.9Interior Glass Surfaces Cleaning2MM4Y0
3.2.1.10Drinking Fountains CleaningDDD3W
Floor Care
3.2.2.1Sweeping and Dust Mopping2WW2MM
3.2.2.2Vacuuming Carpets and Rugs2WW2MM
3.2.2.3Cleaning Walk-off MatsDDWW
3.2.2.4Spray Cleaning and BuffingM6Y4Y2Y
3.2.2.5Damp MoppingW2MM4Y
3.2.2.6Stripping, Coating, and Buffing4Y2Y2YY
3.2.2.7Carpet and Rug Deep Cleaning2YYY/2Y/2
Restroom Services
3.2.3.1Restroom CleaningSSSD
3.2.3.2Restroom ServicingSSSD
Group Shower/Locker Rooms
3.2.4Damp Mop/Disinfect FloorsDDDD
3.2.4Machine Clean/Scrub and Disinfect Floors2M2M2M2M
3.2.4Restrooms - Cleaned and DisinfectedDDDD
3.2.4Restrooms - Consumables Restocked and Wasted EmptiedDDDD
3.2.4Showers - Clean and Disinfect Horizontal SurfacesDDDD
3.2.4Showers - Clean and Disinfect Vertical SurfacesMMMM
3.2.4Spot Clean Locker Surfaces, Doors, and HardwareDDDD
Building Perimeter Services
3.2.6.1Debris Removal2WWM0
3.2.6.2Emptying Perimeter Waste Containers2WW2M2M
KEY
SOnce per shift
DDaily
2WTwo times per week
WOne time per week
2MTwo times per month
MOne time per month
6YSix times per year
4YFour times per year
3YThree times per year
2YTwo times per year
YOne time per year
M/18One time every 18 months
Y/2One time every two years

att 2_Perimeter Services Carder

NAVAL SURFACE WARFARE CENTER CARDEROCK DIVISION
PERIMETER SERVICES Carderock Buildings
BuildingFunctionService Class
1PERIMETER SERVICESA
2PERIMETER SERVICESA
3PERIMETER SERVICESA
4PERIMETER SERVICESB
4EPERIMETER SERVICESB
5PERIMETER SERVICESB
7PERIMETER SERVICESB
9PERIMETER SERVICESB
10PERIMETER SERVICESB
14PERIMETER SERVICESB
15PERIMETER SERVICESB
16PERIMETER SERVICESB
17PERIMETER SERVICESB
18PERIMETER SERVICESB
19PERIMETER SERVICESB
21PERIMETER SERVICESB
22PERIMETER SERVICESB
29PERIMETER SERVICESB
31PERIMETER SERVICESB
40PERIMETER SERVICESB
41PERIMETER SERVICESB
60PERIMETER SERVICESB
61PERIMETER SERVICESB
80PERIMETER SERVICESB
81PERIMETER SERVICESB
100PERIMETER SERVICESB
104PERIMETER SERVICESB
108PERIMETER SERVICESB
109PERIMETER SERVICESB
110PERIMETER SERVICESB
116PERIMETER SERVICESB
125APERIMETER SERVICESB
126PERIMETER SERVICESB
129PERIMETER SERVICESB
143PERIMETER SERVICESB
QPERIMETER SERVICESB

Attachment 2 att 2_Perimeter Services NDW

NAVAL SURFACE WARFARE CENTER CARDEROCK DIVISION
PERIMETER SERVICE NDW Buildings
BuildingFunctionService Class
20PERIMETER SERVICESB
30PERIMETER SERVICESB
52PERIMETER SERVICESB
101PERIMETER SERVICESB
152PERIMETER SERVICESB
155PERIMETER SERVICESB
178PERIMETER SERVICESB

att 2_Perimeter Services NAVFAC

NAVAL SURFACE WARFARE CENTER CARDEROCK DIVISION
PERIMETER SERVICE NAVFAC Buildings
BuildingFunctionService Class
6PERIMETER SERVICESB

Att 3_Key Personnel

KEY PERSONNEL
Custodial
Labor CategoryQTYSkill Sets and Experience
Project Manager (Part Time)1The PM shall have at least five (5) years of experience in managing a workforce providing services on contracts of similar size, scope and complexity.
Quality Manager (Part Time)1The Quality Manager shall have at least five (5) years of experience in preparing and enforcing QMS programs on contracts of similar size, scope and complexity.
Site Safety and Health Officer (SSHO) (Part Time)1The SSHO shall have completed five (5) years of satisfactory experience in preparing and enforcing safety programs on contracts of similar size and complexity in the past or three (3) years experience if he possesses a Certified Safety Professional (CSP) or safety and health degree. The SSHO shall have completed the OSHA 30-hour construction safety class or equivalent and maintain competency through 24 hours of formal safety and health related coursework every four (4) years.
Environmental/Energy Manager (Part Time)1The Environmental/Energy Manager shall have a minimum two (2) years experience with environmental procedures similar to those of this contract; familiarity with Environmental Management Systems (EMSs); and knowledge of environmental regulations and federal energy laws and policy (including energy and water reduction requirements and renewable energy requirements) that are applicable to operations similar to those of this contract.

Attachment 3

CLINS

CLIN/SLINPOPQuantityUnitDescription
Base Year0001Carderock Recurring01JUL2023 to 30SEP20233MonthsFFP - Bldgs: 1, 2, 3, 4, 4E, 5, 7, 9, 10, 14, 15, 16, 17, 18, 19, 21, 22, 29, 31, 40, 41, 60, 61, 80, 81, 100, 104, 108, 109, 110, 116, 125A, 126, 129, 143, and Q.
0002 NDW Recurring01JUL2023 to 30SEP20233MonthsFFP - Bldgs: 20, 30, 52, 101, 152, 155, and 178.
0003 NAVFAC Recurring01JUL2023 to 30SEP20233MonthsFFP - Bldgs: 6
0004 Carderock NonRecurring01JUL2023 to 30SEP20233MonthsNonrecurring Services - Bldgs: 1, 2, 3, 4, 4E, 5, 7, 9, 10, 14, 15, 16, 17, 18, 19, 21, 22, 29, 31, 40, 41, 60, 61, 80, 81, 100, 104, 108, 110, 116, 125A, 126, 129, 143, and Q.
0005 NDW NonRecurring01JUL2023 to 30SEP20233MonthsNonrecurring Services - Bldgs: 20, 30, 52, 101, 152, 155, and 178.
0006 NAVFAC NonRecurring01JUL2023 to 30SEP20233MonthsNonrecurring Services - Bldgs: 6

File details come from the government source that posted it. Updated .