This document outlines requirements for a federal contract to manufacture a Zero Thrust Propulsor (ZTP2). The contractor shall procure materials, manufacture and balance one ZTP2 in accordance with the provided drawings. The contractor must also provide project management services and support review meetings with the Government. Deliverables include the finished ZTP2, certification documentation to be delivered in advance, and meeting minutes. The pre-solicitation notice relates to Solicitation No. N00167-19-R-0009 to develop propulsor demonstration hardware for the Department of the Navy Naval Sea Systems Command. This indefinite delivery indefinite quantity cost-plus-fixed-fee completion contract will have a five year ordering period and NAICS code 336611 with a size standard of 1250 employees. Interested parties can view the solicitation and provide comments on the draft documents, identifying their business size and capability to meet requirements.
Sample 3 ZTP
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sample Task 3 Requirements for Zero Thrust Propulsor (ZTP2)
References:
(a) ZTP2 Drawing, 8541632 Rev B
Statement of Work:
Manufacturing/Balancing: The vendor shall manufacture and balance one ZTP2 in accordance with drawing reference (a).
Project Management: The vendor shall provide project management and engineering services to develop project schedules and budgets, and maintain them over the course of the Period of
Performance proposed by the offeror. The vendor shall support project review with the Government as defined below, and provide meeting minutes and action items within three business days of each review.
Material Procurement: The vendor shall procure the material necessary to manufacture the Zero
Thrust Propulsor (ZTP2) in accordance with reference (a). Fasteners shall be procured according the requirements of reference (a).
Inspection: In-process and final dimensional inspections and non-destructive testing shall be performed in accordance with reference (a).
Packaging/Delivery: The finished part shall be packaged for shipping according to the requirements of
(a). Loose items shall be labeled and packed per reference (a). The shipping container shall include a complete list of all container contents. The vendor shall ship the completed ZTP2 to NSWCCD, 9500
MacArthur Blvd, West Bethesda, MD, 20817.
Deliverables:
a) One machined and balanced ZTP2
b) The material certification, inspection, and balancing requirements are identified on the drawings, references (a). Advance copy of certification package shall be provided to the government 10 days prior to government acceptance of the hardware (CDRL A007).
Reviews:
A review meeting shall be held at the manufacturer’s site at the start of ZTP2 manufacturing. The meeting shall address the complete manufacturing plan and schedule.
A follow-on review meeting shall be held approximately every three months, and as necessary to support emerging issues.