Draft_Sections_B,_E,_and_F_for_Bearing_Support_Structure_RFI.pdf

PDF 62 KB Posted

Attached to
Columbia Class Bearing Support Structure
Solicitation number
N00167-19-R-0006
Issued by

About this file

This document contains a draft statement of work and solicitation sections for a bearing support structure requirement. The Naval Surface Warfare Center, Carderock Division is seeking sources to fulfill the bearing support structure need for the Columbia Class submarine program. Interested offerors are requested to provide their business size, capability statement, and any barriers to proposing in a response not exceeding ten pages. The draft solicitation includes contract line items for bearing support structures to be delivered in years one, four, and five, with related incentive fees and travel costs. Inspection and acceptance will occur at origin and destination. Responses to this sources sought notice will assist the government in revising the draft documents but will not result in an award or feedback to respondents.

Draft Sections B, E, and F

View the file

Other files

File Type Posted
Industry_Day_Questions.pdf PDF
Draft_L&M_CLB_BSS_RFI.pdf PDF
Draft_-_SOW_CLB_BSS_RFI.pdf PDF
BSS_Industry_Questions_Gov't_Response_Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Draft CLIN Structure for Bearing Support Structure

Section B

CLIN Supplies Quantity Unit Cost Target Fee Total 0001AA Bearing

Support Structure Year 1

1 EA TBD TBD TBD

0002AA Incentive Fee

Bearing Support Structure Year 1

1 LO $0.00

*Share Ratio of 50/50. If an underrun occurs, the

Offeror’s Target fee will increase by 50% of the underrun amount. If an overrun occurs, the Offeror’s fee will reduce by 50% of the overrun amount.

TBD

0003AA Incentive Fee

Bearing Support Structure Year 1

1 LO $0.00 **Target fee will be increased by 1% for each month of early delivery (maximum of 5%) and decreased by 1% for each month of late delivery (maximum of 5% but Government may seek additional consideration if a delay of more than 5 months)

TBD

1001AA Bearing Support Structure Year 4

1 EA TBD TBD TBD

1002AA Incentive Fee

Bearing Support Structure Year 4

1 LO TBD *Share Ratio of 50/50. If an underrun occurs, the

Offeror’s Target fee will increase by 50% of the underrun amount. If an overrun occurs, the Offeror’s fee will reduce by 50% of the overrun amount.

TBD

1003AA Incentive Fee

Bearing Support Structure Year 4

1 LO TBD **Target fee will be increased by 1% for each month of early delivery (maximum of 5%) and decreased by 1% for each month of late delivery (maximum of 5% but

TBD

Government may seek additional consideration if a delay of more than 5 months)

2001AA Bearing Support Structure Year 5

1 EA TBD TBD TBD

2002AA Incentive Fee

Bearing Support Structure Year 5

1 LO TBD *Share Ratio of 50/50. If an underrun occurs, the

Offeror’s Target fee will increase by 50% of the underrun amount. If an overrun occurs, the Offeror’s fee will reduce by 50% of the overrun amount.

TBD

2003AA Incentive Fee

Bearing Support Structure Year 5

1 LO TBD **Target fee will be increased by 1% for each month of early delivery (maximum of 5%) and decreased by 1% for each month of late delivery (maximum of 5% but Government may seek additional consideration if a delay of more than 5 months)

TBD

**Government will only order 2 Bearing Support Structures in total. The initial order will be placed at time of contract award. The second order will be placed in either Year 4 or Year 5. The Offerors shall price out a Bearing Support Structure for both Years 4 and 5. The ceiling of the contract will be determined by adding the proposed value for Year 1 and Year 5 Bearing Support Structures (including travel).

CLIN Supplies Quantity Unit Cost Total 0004AA Bearing

Support Structure

Year 1 Travel

1 LO TBD TBD

1004AA Bearing Support Structure

Year 4 Travel

1 LO TBD TBD

2004AA Bearing Support

1 LO TBD TBD

Structure Year 5 Travel

0005AA Data Deliverables

(Data Deliverables in accordance with DD 1423s attached to this document)

NSP

Section E

Inspection: Origin

Acceptance: Destination

Inspection shall be performed by the Government at Origin by the Contracting Officer Representative (COR), DCMA, or another Government representative. The Offeror shall ship the Bearing Support Structure to the Naval Foundry and Propeller Center (NFPC) in Philadelphia, PA after Government inspection. The Government shall conduct an inspection to make sure that the Bearing Support Structure was not damaged during shipping. After the inspection is complete, the Government shall accept at Destination.

Section F

CLIN Quantity Delivery Schedule 0001AA & 0002AA 1 25 months after the start date but no later than 01 October

1001AA & 1002AA 1 24 months after the start date 2001AA & 2002AA 1 24 months after the start date

File details come from the government source that posted it. Updated .