N00167-17-R-0001-0002.pdf
PDF 475 KB Posted
- Attached to
- Southeast Alaska Acoustic Measurement Facility (SEAFAC) Operations and Maintenance Support Services
- Solicitation number
- N00167-17-R-0001
About this file
Amendment to update solicitation, add attachments, and extend the response time
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to: a) extend the date for Receipt of Proposals from 20 APR 2017, 2:00 PM Pacif ic Daylight Time to 27 APR
2017, 2:00 PM Pacif ic Daylight Time; b) attach attendees list and presentation from the Site Visit held on 28 Feb 2017; c) respond to questions submitted by industry and revise the solicitation accordingly ; d) add additional requirements to the Statement of Work; e) replace
A001 and A005 in Exhibit A; and f) incorporate eCRAFT requriements into the Statement of Work at Section C and the Instructions to
Offerors at Section L. Changes and additions to the solicitation are in red font.
Apart from the aforementioned, all other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 47
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Apr-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00167-17-R-0001
X 9B. DATED (SEE ITEM 11)
09-Feb-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Mar-2017
CODE
NAVAL SURFACE WARFARE CENTER CARDEROCK
CODE 0221, TERESA KELLY
904-542-1000, TERESA.KELLY@NAVY.MIL
9500 MACARTHUR BLVD
WEST BETHESDA MD 20817
N00167 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00167-17-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS AND ANSWERS
The Site Visit was conducted as scheduled on 28 February 2017. The list of participants and the Brief are hereby attached to this Amendment (0002).
Questions and Answers received in response to the Solicitation and Site visit are provided as follows:
1. Question: RFP – Section B Notes, first paragraph of Note (1), on page 5. Clause 52.211-8 TIME OF
DELIVERY (RFP page 29) and 252.216-7006 ORDERING (RFP page 51), plus Attachments 6, 7, and 11 all reference the period of performance as either 60 months or 5 years. Does the Government intend the “….over the total 66 months period of performance” addressed in Note 1 to actually read “….over the total 60 month period of performance”?
Answer: The clauses referenced above state that the ordering period is 60 months, however the period of performance is 66 months. Therefore, and order can be placed on the last day of the ordering and have a period of performance of 6 months. This is explained in Clause 52.216-22 “Indefinite Quantity” Paragraph (d) which states that the contractor may be required to make deliveries 180 days after the end of the Ordering Period designated in 252.216-7006. .
2. Question: RFP - Section B Notes, Note (2), on page 5. Does Note (2) preclude the prime from applying fee on a subcontractor’s fee?
Answer: RFP - Section B Notes, Note (2), on page 5 does not preclude the prime from applying fee on a subcontractor’s fee.
3. Question: RFP Section C, Clause HQ C-1-0001 ITEM(S) _0040_ - DATA REQUIREMENTS, on page 23;
Section E . Clause HQ-E-1-0001 INSPECTION AND ACCEPTANCE LANGUAGE FOR DATA, page 28;
and Section F, clause HQ F-2-0003 DATA DELIVERY LANGUAGE FOR SERVICES ONLY
PROCUREMENTS, page 29. The identified RFP Clauses all address DD Form 1432, and indicate it is to be attached to this solicitation. Please provide attachment DD Form 1423 Contract Data Requirements List.
Answer: The DD 1423 and associated Data Item Descriptions are included in this Amendment as Exhibit A.
4. Question: RFP Section C, Clause HQ C-1-0001 ITEM(S) _0040_ - DATA REQUIREMENTS, on page 23; and
Section J, clause HQ J-2-0002 CONTRACT LANGUAGE FOR SECTION J, page 53. The RFP clauses both address Contract Data Requirements A001-A005. Section J identifies these Exhibits to be attached to the solicitation. Please provide the Contract Data Requirements Exhibits A001 – A005.
Answer: The DD 1423 and associated Data Item Descriptions are included in this Amendment as Exhibit A.
5. Question: RFP Section C, Paragraph 3.2.1 on page 9. RFP States “The Contractor shall support audits of the above items”. Does the audit requirement apply to the Environmental Subsection?
Answer: The audit requirements apply to all three areas listed in the referenced paragraph 3.2.1 NSWCCD Site
Infrastructure: Buildings and Facilities, Waste Management and Environmental
6. Question: RFP Attachment 3 – Contract Security Classification Specification – DD Form 254. Upon award, should Attachment 3, block 8 (Actual Performance, Location) of DD Form 254 also include the Contractor
Facility?
Answer: If the actual performance is to be accomplished at the location identified in Block 6a of the DD Form
254, it should not be repeated in block 8a. Additional performance sites should be reflected in block 13 of the
DD Form 254.
7. Question: RFP - Section C, clause HQ C-1-0001 ITEM(S) _0040_ - DATA REQUIREMENTS, CDRL A005, page 23 of 100. Data Item Description (DID) DI-MISC-80358 for CDRL A005 was cancelled on 17 May 2016.
Request that the Government provide a new DID for CDRL A005.
Answer: CDRL A005 has been updated with DI-ADMN-80925 and is hereby included in Exhibit A.
8. Question: RFP - Section C, section number 3.4, Array Repair/Restoration. What is the Government estimate for the number of Array Repair/Restoration events during the period of performance? This information is necessary to determining the appropriate labor mix and distribution.
Answer: Up to three events over the entire period of performance of the contract. The SOW is revised via this
Amendment (0002).
9. Question: RFP - Section C, section number 12, Digital Delivery of Data, page 22 of 100; and clause HQ C-1-
0001 ITEM(S) _0040_ - DATA REQUIREMENTS, page 23 of 100. Recommend the Government issue DD
Form 1423 to reconcile the Section C.12 digital delivery of data requirements with those of the DIDs identified in clause HQ C-1-0001.
Answer: Section C.12 Digital Delivery of Data is hereby changed:
From:
“Delivery by the Contractor to the Government of certain technical data and other information is now frequently required to be made in digital form rather than in hardcopy form.”
To:
“Delivery by the Contractor to the Government of certain technical data and other information may be made in digital form rather than in hardcopy form.”
10. Question: RFP - Section L, section number 3.4 Volume IV – Factor 3, page 80 of 100. Should the reference to the Direct Labor Rate Substantiation Table in this section read Attachment 12 rather than Attachment 13?
Answer: Yes, this reference is corrected to read “Attachment 12” via this Amendment (0002).
11. Question: RFP - Section C, section number 4.3.2.2 Staffing Plan, subsection a., pages 86-87 of 100. Relative to the table defining Recommended Allocation of Total Direct Labor Hours Across Three Groups of Experience
Levels, is it possible to have a Mid-Level labor category that is filled by a person with greater than 15 years of relevant professional experience in their specific task area, based on position requirements (e.g. responsibilities, level of supervision required, level of independent responsibility, etc.)?
Answer: The Recommended Allocations of Total Direct Labor Hours identify only the recommended percentages of distribution. The Government is not stating/directing how an offeror shall propose. The Government is only stating what is recommended for this effort based on the Government Estimate..
12. Question: RFP - Section J, Attachments 4 and 6, page 53 of 100; Section L, section number 4.3.2.2 Staffing
Plan, pages 86 and 87 of 100. Section L, section number 4.3.2.2 Staffing Plan, subsection b. starts off reading:
"To accompany Section J, Attachment 4, the offeror’s staffing plan…". Section J identifies Attachment 4 as
"Wage Determination 05-2017 - Revision 21 dated 12/29/2015". Earlier, in the same section (4.3.2.2), the
Staffing Plan is identified as Attachment 6, identified in Section J as "Staffing Plan (No Cost)". Is subsection b.
supposed to read:: "To accompany Section J, Attachment 6, the offeror’s staffing plan…"?
Answer: Yes, this is corrected to read “Attachment 6” (Amendment 0002).
13. Question: RFP - Section J, Attachments 7 & 8, page 53 of 100; Section L, section number 4.3.2.2 Staffing Plan, subsection a., page 86 of 100. The seventh bulleted element under Section L, section number 4.3.2.2 Staffing
Plan, subsection a. reads: "Number of labor hours proposed for each base and option year, in accordance with
Section J, Attachment 8". Section J, Attachment 8, is entitled "Subcontracting Plan Review Sheet", and does not contain labor hours proposed for each base and option year. Section J, Attachment 7, entitled "Staffing Plan
(with Cost)", does contain the number of labor hours proposed for each base and option year. Should the seventh bulleted element under Section L, section number 4.3.2.2 Staffing Plan, subsection a. read: "Number of labor hours proposed for each base and option year, in accordance with Section J, Attachment 7"?
Answer: As this requirement has a five year ordering period, there is no Base and/or Option period under this RFP.
The number of labor hours are to be proposed for each year. The seventh bulleted element is corrected via
Amendment 0001 to read “Section J, Attachment 7”.
14. Question: RFP - Section L, section number 4.4.1 Recent and Relevant Past Performance Questionnaires, pages
89 and 90 of 100. Section 4.4.1 contains two sentences that read: "The contracts identified should demonstrate in-depth knowledge and successful implementation of contracts of similar scope and complexity to the solicitation. Similar scope and complexity means having performed most of the types of support efforts identified in the SOW and having provided at least 63,000 man-hours per year under a support services contract." As written, the last sentence implies that contractors and subcontractors cannot use contracts that did not provide at least 63,000 man-hours per year under a support services contract to justify past performance in support of this contract. This would be particularly limiting for small business subcontractors. Would the
Government consider rewording these two sentences to read: "The contracts identified should demonstrate in-depth knowledge and successful implementation of contracts of similar scope and complexity to the solicitation.
For purposes of evaluating similarity in scope and complexity, the identified contract should have performed most of the types of support efforts identified in the SOW and employed personnel totaling similar labor expenditure (63,000 man-hours per year) under a support services contract."?
Answer: The RFP is amended via this Amendment (0002) with the suggested language in Section L, paragraph
4.4.1
15. Question: RFP - Section I, Clause 52.216-19 ORDER LIMITATIONS, pages 45 and 46 of 100.
Paragraph (b) of this clause addresses maximum orders, indicating that the Contractor is not obligated to honor:
Any order for a single item in excess of $35,000,000;
Any order for a combination of items in excess of $35,000,000; or
A series of orders from the same ordering office within Five (5) days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.
Does this clause set a Not-to-Exceed limit of $35M on the total contract value?
Answer: RFP - Section I, Clause 52.216-19 ORDER LIMITATIONS does not set a Not-to-Exceed limit of $35M on the total contract value.
16. Question: Section L does not state Volume Number for the completed/signed Standard Form 33. Does it belong in Volume 1 along with fill-ins for Section H and K or does it belong in Volume IV with Section B?
Answer: The completed/signed Standard Form (SF) 33page 1 shall be submitted with the proposal Volume 1.
Section L has been updated via Amendment 0001.
17. Question: The second paragraph of section 3.3.5 Substitution of Vessels/Equipment of the scope of work states that if we have to substitute a vessel or equipment, it cannot result in additional cost to the government. This requirement is inappropriate in a cost plus contract where the cost of a substitute vessel, particularly on short notice, may very well be an increased cost that should be allowable under a cost reimbursement contract.
Answer: This paragraph is revised via this Amendment (0002) from:
Any vessel/equipment nominated as a substitute shall result in no additional cost to the Government, shall meet the same characteristics, and shall be similarly fitted and otherwise equal or superior in performance to the vessel/equipment for which it is being substituted. The use of the substituted vessel/ equipment shall result in no operational delay and shall not excuse failure to perform the requirements of the contract requirements.
To:
Any vessel/equipment nominated as a substitute shall result in no additional cost to the Government unless the
Contracting Officer provides prior written approval, shall meet the same characteristics, and shall be similarly fitted and otherwise equal or superior in performance to the vessel/equipment for which it is being substituted. The COR has no authority to approve additional costs. Any additional costs not approved in advance and in writing by the
Contracting Officer, will be unallowable. The use of the substituted vessel/ equipment shall result in no operational delay and shall not excuse failure to perform the requirements of the contract requirements.
18. Section 3.2.5 Operations Support states that Meal Service is to be provided. Is there a reason it is also not stated in Section 3.1 for Trial Support?
Answer: Meal Service is required during Operations, which is inclusive of Trial Support and Maintenance periods. This section has been clarified in the Statement of Work.
19. Section L, Paragraph 2.1, Proposals should be receive no later than 2:00 PM Pacific Standard Time. Should this not read “Pacific Daylight Time” since Daylight Savings’ time starts on March 12 2017?
Answer: This has revised to read “Pacific Daylight Time” via Amendment 0001.
20. Section L, Page 85 after the Senior Mechanical Engineer Desired Qualifications, the RFP states the Offeror shall provide “A minimum of five and a maximum of 10 resumes shall be submitted” Should this state four resume’s vice five”
Answer: This verbiage is revised to read “a minimum of four and a maximum of 10 resumes shall be submitted” via Amendment 0001
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK
TITLE: NSWCCD SEAFAC Operations and Maintenance Services
1 Scope
The Naval Surface Warfare Center, Carderock Division, Detachment Puget Sound (NSWCCD DET Puget Sound) requires site logistics, operations, technical integration services and program management assistance, in support of signature silencing programs for naval ships and undersea systems. The effort in this SOW falls under Product and
Service Codes (PSCs) R425 and AD24. In general, this work includes:
Operational and logistical support for full scale signature measurement trials and other signature assessment tests
Operation, maintenance, integration, installation and repair of facilities that are required to support the mission of performing acoustic measurement, testing and analysis at SEAFAC.
Special project support for full scale signature measurement trials and other signature assessment tests.
2 Background
The Signatures Department (Code 70) of the Naval Surface Warfare Center Carderock Division (NSWCCD) is responsible for development of stealth technology to support Navy surface ship and submarine program goals. As part of its mission, Code 70 develops, operates and maintains major acoustic research and development (R&D) facilities at the Southeast Alaska Acoustic Measurement Facility (SEAFAC).
Code 70 provides services and facilities to accomplish acoustic data acquisition and analysis in support of surface ship and submarine R&D projects funded by the Naval Sea Systems Command (NAVSEA), other Navy and
Department of Defense (DoD) sponsors, and non-Government organizations. Non-government organizations are efforts funded and conducted through the Work for Private Parties (WFPP) Act. Periodically, NSWCCD conducts acoustic trials on ships of the cruise ship industry and the University of Alaska-Fairbanks. The primary objective of the technical efforts described in this SOWis to support NAVSEA, NSWCCD and Code 70 signature measurement, integration, installation and assessment testing, acoustic stealth technology development, and related research programs.
SEAFAC is the primary acoustic measurement facility for Pacific Fleet submarines. SEAFAC has two major test sites – a static site where the test vessel is suspended at various depths for specific noise investigations and an underway site for performing noise investigations at various speed conditions and depths. SEAFAC was designed to measure and characterize the acoustic signatures of USS Los Angeles (SSN 688) and USS Ohio (SSBN 726) Class submarines. The SEAFAC Static Site was upgraded in 2006 with a High Gain Measurement System (HGMS) to assess the stealth of the USS Seawolf (SSN 21), USS Virginia (SSN 776) Class, and the soon to be constructed USS
Columbia (SSN-771) Class submarines. The SEAFAC Underway Site was upgraded in 2008 to measure and characterize submarine signatures through all operationally significant speed and depth combinations.
The majority (greater than 75%) of the work performed on this contract vehicle will be conducted at the SEAFAC acoustic measurement facility and the following description of work will reflect that. The Contractor may also be required to attend meetings at Bangor, WA.. Additionally, various tugs, barges, passenger and research vessels are required to support acoustic trial operations, integrations, installations and maintenance efforts at SEAFAC.
3 Task Requirements
The prospective contractor shall be a US owned company, and provide capable US Citizen personnel with qualifications, experience levels, security clearances, and necessary licenses, certifications, and training required by Federal, State and Local laws and regulations. Any required licenses, certifications, or proof of training shall be available upon request of the Government. Training necessary to ensure that personnel performing under this contract maintain the knowledge and skills to successfully perform the required functions is the responsibility of the Contractor. The specific tasks to be performed in support of NSWCCD Code 70 facilities and its detachments are provided in the subsequent paragraphs.
3.1 Trial Support
The Contractor shall perform the following trial support tasks in support of the SEAFAC.
Test & Operational Support: The contractor shall provide personnel and services to support R&D testing and operations of manned or unmanned underwater vehicles. Testing support includes the operation of the shore site and static site cranes (required licenses and certifications as applicable) , all GFE vessels, and the static site, underway site and tracking systems (See Section 3.2.2). The contractor shall also support the grooming (checkout, packaging and shipment) of the acoustic trial tracking transducers prior to each acoustic trial. There are approximately 15 acoustic trials planned per year of this contract.
Project Support: The contractor shall provide personnel and services to support those activities necessary for the logistic support of marine vessels and support equipment employed in research, development, test and evaluation
(RDT&E). The scope shall include activities relating to management and support of infrastructure preservation.
The contractor may be required to provide engineering, technical, integration, logistics and installations, material and related services to deliver and execute and/or assist with Project Support as outlined below:
Configure facilities test platforms
Develop, implement, and maintain configuration plans for facilities and equipment (CDRL A002)
Operate vessels and logistics equipment to support operations and material movement
Provide miscellaneous welding (licenses/certifications as applicable), metal fabrication, and machine shop support
Operation and maintenance of cable handling systems and rigging equipment
Design, fabricate, construct, assemble, integrate, and install components, devices and facility systems to support test projects.
Passenger Vessel Support: The contractor shall provide the necessary services to charter large and small passenger vessels to transfer scientists, engineers, liberty parties, and personnel from the City of Ketchikan and the Ketchikan
Airport to SEAFAC and back before, during and after all acoustic trials (see section 3.3).
Research Vessel Support: The contractor shall provide the necessary services to charter research vessels to conduct sonar calibrations, special tests, and other scientific research during all acoustic trials at SEAFAC (see section 3.3.
Diver Inspection Services.
The contractor shall provide certified commercial diver’s in support of inspection services to inspect, and document associated site in water structures and components. Most dive inspections will not exceed 130 feet in depth and either SCUBA or surface supplied air should be sufficient for these inspections. If special conditions are required
(i.e., deeper depths, more time at 130 feet), the contractor will provide a qualified commercial dive team to accomplish the mission which may include mixed gas diving. The Contractor shall also conduct work associated with security swims, buoys placement, barge inspections, sheave buoy inspections, corner buoy inspections, ground tackle inspections, underwater assembly and disassembly, rigging, welding/cutting, and recovery when required.
The contractor shall also conduct inspections of all sea shore interface zones, in water storage areas, sewer outfalls, cable interface zones, pier pilings and floats.
Diving operations shall be conducted in accordance with Occupational Safety and Health Administration
(OSHA) requirements set forth in 29 CFR 1910.401, Subpart T – Commercial Diving Operations, and 46 CFR Part
197 Subpart B – Commercial Diving Operations. The Contractor shall be responsible for dive safety and for developing and maintaining all required procedures, documentation, records, and qualifications as prescribed by applicable law and as specified in the NSWCCD Diving Instruction, CARDEROCKDIVINST 3150.5A Series and
Notices regarding contract diving operations.
The contractor shall obtain approval from the NSWCCD Command Diving Officer via the COR, prior to the commencement of each dive requirement.
Notification of scheduled dive service requirements for acoustic trial support and facility inspections will be provided no less than 30 days in advance of the required service.
3.2 NSWCCD Acoustic Measurement Facilities, Logistics and Operations
The contractor shall perform the following logistics and operations tasks in support of the NSWCCD acoustic measurement facilities and laboratories. Typically, the Signatures Department conducts 15 submarine underwater acoustic trials each year with a typical trial spanning a four day period. Operations continue 24 hours a day and include tracking all vessels and targets on the range, recording data according to the test plan, reducing data to meet trial objectives, and providing logistical support for the trial operations. Each trial is preceded by a two-day pretrial period where system operation is verified and following each trial there is a one-day demobilization period. The tasking in this section is other than trial support as describe in Section 3.1.
3.2.1 NSWCCD Site Infrastructure
Buildings and Facilities: The contractor shall provide the necessary personnel to inspect and maintain (regular and recurring) site structures and buildings prior to mission events to ensure all structures are suitable for conducting the mission. SEAFAC consists of six buildings (Range Operations Center, Administration, Utility, ClearSpan, Warehouse and Pier Locker). The Range Operations Center houses the acoustic lab, computer room, electronics lab, kitchen and common area, berthing and security. The Administration Building houses the Government and
Contractor Site Managers offices. The Utility Building house the HVAC, Backup Power System, Machine Shop, Fire Fighting System, and Water Supply Systems. The ClearSpan Building houses special project work or rolling stock as needed. The Warehouse houses the material handling equipment, recycling program and other spare parts and systems needed for acoustic trials. The Pier Locker is a waiting shelter that holds Personal Protective
Equipment (PPE), Personal Floatation Devices (PFD) and rain gear for operations on the pier. he contractor will make the appropriate repairs to ensure these mission events can be conducted safely and securely.
The contractor shall maintain the Fall Protection program in accordance with OSHA 29 CFR 1926.502 "Fall
Protection Systems Criteria and Practices"
The contractor shall act in accordance with OSHA 29 CFR 1910.146 “Permit-required confined spaces” when applicable spaces need to be accessed to perform inspection, mainteance or repairs”
This contract excludes renovation and construction of the site structures or buildings.
Waste Management: The contractor shall provide the necessary personnel to collect, remove and dispose of all solid and liquid wastes from the facility. All paper and wood products are to be separated from the solid wastes and incinerated. Liquid wastes might include hazardous materials such as waste oil, antifreeze, hydraulic oils, kitchen oils, and glycol. An oil burner and an oily waste burner are used for waste fuel, lubricating oils, solvents, oily rags, used absorbents, and other petroleum products. The contractor shall ensure that all recyclable materials are recycled.
All funds received from recycling shall be credited to the Government.
Environmental: The contractor shall provide ensure all necessary personnel are trained in Occupational Safety and
Health Administration (OSHA) requirements and be knowledgeable in hazardous material (and waste) storage, handling, spill response, and disposal procedures. Contractor personnel shall participate in semi-annual spill response drills. The contractor shall comply with all local, state, and federal safety and environmental laws.
The contractor shall support audits of the above items, at a schedule determined by NSWCCD Government Site
Director.
3.2.2 NSWCCD Site Measurement Systems
The contractor shall be responsible for operating, maintaining, inspecting, and repairing the following systems;
including implementing directed upgrades;
Static Site: The contractor shall provide the necessary personnel and services to operate and maintain the SEAFAC
Static Site measurement systems and physical hardware components. The measurement systems include the HGMS, deployment and handling equipment, and support systems. This support shall include direct operations of hardware and software. The physical hardware for the Static Site includes the barges, the sheave buoys, the corner buoys, the spanning wires, the barge interconnect cable, the suspension system, the suspension winches, the power subsystem and all related support equipment.
Underway Site: The contractor shall provide the necessary personnel and services to operate, maintain, repair, and improve the SEAFAC Underway Site measurement systems and physical hardware components. The contractor shall provide qualified technical personnel to support operations and maintenance of the underway HGMS array systems.
Tracking System: The contractor shall provide the necessary personnel and services to operate, maintain, and repair/replace the NSWC tracking and navigation systems, including the associated underwater communications, transducers and warning systems.
3.2.3 NSWC Site Systems and Equipment
Material Handling, Weight Handling, and Rigging Equipment: The contractor shall provide the necessary personnel to operate and maintain all material handling, weight handling, and rigging equipment. The contractor shall operate and maintain all cranes. The contractor shall provide qualified operators for material handling, weight handling, rigging equipment, and heavy equipment. Some items, cranes, vessels, forklifts, etc. have special qualifications required under various state and federal regulations, such as OSHA 29 CFR 1910 Safety and Health
Standards; OSHA 29 CFR 1918 Longshoring; and OSHA 29 CFR 1926.106 Working over or near water.
If applicable, the Contractor shall maintain all required licenses and certifications and shall be able to provide those licenses/certifications upon request of the Government. All weight handling systems and personnel shall be in compliance with Navy P-307 standards. The contractor shall support Navy audits to verify compliance. The following is a list of cranes and rolling stock that will be provided GFE to the contractor for maintenance:
ITEM TYPE CAPACITY (lb) LOCATION
Crane “A” Pedestal 20,000 Pier
Crane “B” JIB 20,000 Pier
Crane “C” Pedestal 27,600 Pier
Overhead Trolley Bridge 10,000 Utility Bldg.
Grove Mobile 30,000 Rolling Stock
Knuckle boom #1 Boom 6,000 IX-527
Knuckle boom #2 Boom 6,000 IX-528
IX-527-2 Barge Pedestal 3,600 IX-527
IX-528 Gantry
Barge
Gantry 4,000 IX-528
Electric Forklift Clark 6,000 Warehouse
Diesel Forklift Clark 6,600 Warehouse
See Section J, Attachment 2 for detailed information and photos.
Vessels and Vehicles: The contractor shall provide qualified small boat operators and mechanics for daily operations and each trial. The operators shall be able to operate any of the government-owned small boats for the transferring of personnel, material, and equipment and possess the applicable qualifications . If applicable, the
Contractor shall maintain all required licenses and certifications and shall be able to provide those licenses/certifications upon request of the Government . The contractor shall be responsible for the operation and maintenance of site vehicles. The following is a list of vessels and vehicles that will be provided GFE to the contractor for maintenance:
ITEM Name
35’ Research
Vessel
SeaArk
36’ Crew Boat SEAFAC II
28’ Crew Boat Seachaser
19’ Work Skiff Work Skiff #1
19’ Work Skiff Work Skiff #2
19’ Work Skiff Work Skiff #3
19’ Work Skiff Work Skiff #4
Electric Pickup GGTE Scout #1
Electric Pickup GGTE Scout #2
LMTV M-1078 5
ton troop carrier
N/A
GSA 15-
passenger van
N/A
See Section J, Attachment 2 for detailed information and photos.
Government Fleet Card Usage: Contractor personnel may be authorized to utilize the Government Fleet Card assigned to the Government owned vehicles listed above while performing under this contract. The Contractor must request authority via the Procuring Contracting Officer (PCO) from the Cognizant NAVSUP Authority to obtain proper authorizations to utilize the Fleet Card. The Contractor shall be required to take all mandatory training required to utilize the Fleet Card. The Contractor shall reimburse the Government for any unauthorized charges made by the contractor and/or its employees, subcontractors, representatives or agents.
Water Supply System: The contractor shall provide the necessary personnel to inspect site water supply systems prior to mission events to ensure the system is suitable for conducting the mission. The contractor shall make the appropriate repairs to ensure these mission events can be conducted safely and securely. The water supply system consists of one (1) 110,000 gallon tank with cistern pumping station, control systems, filters, UV light, ozone generator, and associated pumps/piping. The water supply system shall be maintained to meet Alaska Department of Enviornental Conservation (ADEC) drinking water standards. Monthly sampling is required and must be analyzed by ADEC approved lab.
Power Plant and Electrical System: The contractor shall provide the necessary personnel to inspect the site power plant and electrical systems prior to mission events to ensure the systems are suitable for conducting the mission.
The contractor shall make the appropriate repairs to ensure these mission events can be conducted safely and securely. The site power plant consists of a submarine cable, 1 MW substation with associated breakers, control monitors, ground fault detection, and tap changer. Siemens and miscellaneous manufacturers are housed in the substation; two (2) Caterpillar 3412, 500 HP generators produces 455 kW each and monitoring panels and an ASCO
7000 series automatic transfer switch.
Heating, Ventilation and Air Conditioning (HVAC): The contractor shall provide the necessary personnel to inspect site heating, ventilation and air conditioning systems prior to mission events to ensure the system is suitable for conducting the mission. The contractor will make the appropriate repairs to ensure these mission events can be conducted safely and securely. The HVAC system consists of two (2) Weil-McLain Model 88 commercial boilers for heating and domestic hot water, and two (2) heating pumps that circulate the heating water for Operations and
Utility Buildings. In two spaces in the Operations Building, the area is environmentally controlled. Two (2) Stulz
HVAC systems are installed (redundant design) to control the climate in each space. Stulz dry coolers are installed exterior to the operations building as part of the HVAC system. Pneumatic controls for temperature regulation and multiple circulation fans for air handling are located throughout the Operations Building. Local heat exchangers for bunkrooms, office spaces, and hallways are also installed throughout the Operations and Utility Buildings.
Fire Fighting System: The contractor shall provide the necessary personnel to inspect the site firefighting system prior to mission events to ensure the system is suitable for conducting the mission. The contractor shall make the appropriate repairs to ensure these mission events can be conducted safely and securely. The firefighting system consists of a Siemens System 3 installed to monitor fire detectors, pull stations, and sprinkler systems. It is tied into the alarm system. The sprinkler system is wet and must be tested along with the fire pump annually. Fire extinguishers are installed throughout the facility and must be inspected monthly. Fire system and extinguishers are to be inspected by fire inspector annually. The kitchen in the Operations Building contains a hood system above the range, griddle, deep fryer and ovens.
Communications and Electronics Systems: The contractor shall provide the necessary personnel to inspect the site communications and electronics systems prior to mission events to ensure the system is suitable for conducting the mission. The contractor shall make the appropriate repairs to ensure these mission events can be conducted safely and securely. The communications’ and electronic systems consist of UHF, VHF and Motorola hand held radios, a
Zetron communications interface panel, several Zetron patch panels and a Clearcom commutations system.
Sewage Treatment System: The contractor shall provide the necessary personnel and services to inspect the site sewage treatment systems prior to mission events to ensure the system is suitable for conducting the mission. The contractor will make the appropriate repairs to ensure these mission events can be conducted safely and securely.
The sewage treatment system has a FAST® system installed for treatment of septic before marine discharge.
Quarterly sampling of the system is required which includes pH, LDO (luminescent D, Total Suspended Solid (TSS)
Fecal coliform Biochemical Oxygen Demand (BOD), enterococci. A Discharge Monitoring Report is required every month and submitted to the government for review, signature, and submission to ADEC. The main tank is pumped annually to remove solid matter.
Fuel System: The contractor shall provide the necessary personnel and services to operate and maintain the site fuel system prior to mission events to ensure the system is suitable for conducting the mission. The contractor shall make the appropriate repairs to ensure these mission events can be conducted safely and securely. The fuel system consists of two (2) 7500-gallon diesel tanks and associated transfer pump and piping. The fuel system shall be maintained to meet 33 CFR 154.740 USCG fuel transfer facility. Two (2) 500-gallon diesel tanks, one (1) 500-gallon gasoline tank, and one (1) 100-gallon day tank for the backup generators. All tanks and piping are to be tested in accordance with 33 CFR 154.740 yearly.
Access and alarm system: The contractor shall provide the necessary personnel and services to operate and maintain the site access and alarm system prior to mission events to ensure the system is suitable for conducting the mission. The contractor shalll make the appropriate repairs to ensure these mission events can be conducted safely and securely. The access and alarm system consists of a Hirsch access system installed to control access to various spaces on site. It includes Model 8 controllers and scramble pads. The system also includes a Bosch alarm system installed to alert all personnel in the event of intrusion and provide annunciation and notification to responding personnel.
3.2.4 Emergency Services
During acoustic testing operations, the contractor shall provide personnel to affect repairs on any electronic or mechanical system that could cause delays or cancellation of the acoustic trial. The contractor shall provide on-call mechanical/electrical specialists during all acoustic trials. The on-call mechanical/electrical specialist shall be housed and fed on Back Island during all acoustic trials. The contractor shall be responsible for conducting emergency repairs to or recovery of any component of the acoustical measurement systems. Though hard to predict, historically one major event every three years is reasonable.
3.2.5 Operations Support
The contractor shall provide the necessary personnel and services for the following operations support:
Range Security: During acoustic trials, the contractor shall provide the necessary personnel to assist the Facility
Control Officer (FCO) in keeping the range and pier clear of all unauthorized vessels and personnel.
Sonar Calibration Support: During acoustic trials, the contractor shall provide the necessary personnel and services to support sonar calibration operations at the Static or Underway Sites. The FCO is the approving authority to commence Sonar Calibration operations. The contractor shall provide research vessels for this service (see section
3.3).
Electronic Equipment Installation: For each acoustic trial, electronic equipment (tracking system hardware, Clearcom’s, VHF Radio’s, etc.) shall be installed on the test vessel. The contractor shall provide the necessary personnel to assist in the installation of this equipment. Travel services (may be required) to installation ports such as submarine bases or other locations as specified in (CDRL A002) individual task orders.
Logistics: The contractor shall provide the necessary personnel and services to assist the site manager to provide logistics services in support of mission readiness at SEAFAC. The contractor shall ensure that supplies, materials, and personnel are delivered in time to meet operational schedules. This function includes shipping and receiving equipment, coordinating transportation for mission support personnel and visitors, and coordinating support services to the site. This support shall be continuous during trials or extended maintenance operations.
Charters: The contractor shall arrange and schedule all trial and non-trial vessel, aircraft, and vehicle charters for providing logistics, transportation of personnel, equipment, food, dry goods, and other support materials (see section
3.3).
Shipping and Receiving: The contractor shall provide the necessary services for the shipment and receipt of all materials, both classified and unclassified. The contractor shall provide the necessary services to charter a barge and tug to support the movement of large freight between Ketchikan, AK and SEAFAC (see section 3.3). The contractor shall maintain an inventory of all equipment at SEAFAC to assist the Government with its annual (OM&S) inventory of equipment. All items shipped shall use the Government Shipping account whenever possible.
General Security: The contractor shall provide support to the site director/security officer to maintain site security at SEAFAC. The contractor will assist to ensure that facility access is limited to authorize personnel and to perform fire watch duties during the normal workday. After hours, the SEAFAC security system, fire alarms, static site alarms, and other site alarms provide site security. The contractor shall support the site director/security officer to provide a team to receive and respond to alarms within two hours of notification. Any response actions will be coordinated with the site director/security officer. The support will be provided up to the point where intrusion is verified. After that point, site security and response shall be obtained from Alaska State Highway Patrol.
Visitor and Document Control: The contractor shall assist the Government in meeting the security requirements for the site. The contractor shall receive, accept, store, handle, package, and ship classified, pre- and post-trial, material. The contractor shall ensure that all security regulations regarding classified document and medium handling, storage, disposal and transportation, contractor personnel clearances, official visit requests, and site security are conducted in accordance with the DD 254 of this contract. (Section J, Attachment 3) The contractor shall be able to obtain the ability to handle Naval Nuclear Propulsion Information (NNPI) both physically and within information technology (IT) systems.
Meal Service: The contractor shall provide the necessary personnel or services to plan, procure, prepare, and provide three meals per day for personnel supporting trial activities, maintenance periods and other events.
The contractor shall provide additional “day cook” support, as required. Day cook support is defined as a meal service that does not include breakfast or overnight stays. The day cook periods are typically used for maintenance periods. Up to 60 personnel are expected during trials/mission events and up to 20 personnel during maintenance periods. For trial support, food must be made available for odd shifts. During all other times no meal services support will be required. The actual number of meal days will be stated in each applicable task order (TO) and up to 48 hours notification will be provided for other events as needed.
Janitorial Support: The contractor shall provide cleaning services in support of mission events which may include laundry and janitorial services. During acoustic trial periods, the facility will be kept clean, garbage containers emptied, and floors swept, mopped (daily). During non-trial periods, the facility shall be kept clean, garbage containers emptied, and floors swept, mopped, and protected (stripped and resurfaced – waxed) as needed as foot traffic and weather conditions dictate. Carpets shall be shampooed at least quarterly.
Grounds Maintenance: The contractor shall perform grounds keeping on the property to include snow and debris removal as needed, maintenance of the tarmac to include filling cracks as needed up to 3 times during the life of the contract, apply ice melt to trafficked areas as needed. The contractor shall keep a 20 ft.
perimeter around the facility fence line clear of vegetation above 6 inches off the ground and maintain a 40 ft.
wide foot path that follows the buried power lines across Back Island. The contractor shall be able to identify flora invasive to Back Island and receive approval from the Governement before handling and disposing of invasive species.
Program Management Support: The contractor shall provide the necessary personnel to provide a Program
Manager (PM) for this contract and it’s associated TO’s. A clear line of project authority shall exist among all organizational elements supporting this requirement. The contractor shall develop and implement a Management
Program to efficiently and effectively execute the requirements of this contract.
The contractor shall identify the PM who is responsible for accomplishment of all tasks required by this SOW and who is authorized to execute contract functions/actions on behalf of the company. The PM shall organize, plan, schedule, implement, control, analyze, and report on all elements of the contract. The PM shall have resources and authority to ensure efficient and timely program execution and shall be the contractor's focal point for all required program tasks. The contractor's PM shall be prepared at all times to present and discuss the status of contract activities, requirements, and issues.
The contractor’s PM shall be the primary point of contact for all work performed under the contract. The PM shall keep the COR informed of any performance issues, cost or financial concerns, and potential problems that, if unresolved, will adversely affect the contractor’s performance, schedule or costs, and take all appropriate measures to mitigate adverse impact to the TOs.
The contractor shall ensure that assignments are completed in a manner that is thorough and within schedule and document all accomplishments that are directly relevant to the individual TOs’ schedule(s).
The contractor personnel shall have the requisite skills, expertise, and experience required to perform the requirements of each TO to satisfy the quality requirements of this contract. The PM shall generate and publish the monthly technical, maintenance and progress reports in accordance with CDRLs A001, A002, A003, A004 and
A005). See each CDRL for the appropriate format for each report or document update. The Program Manager shall interface with the Contracting Officer’s Representative (COR) and Site Manager for all contract related tasks and efforts.
The contractor is responsible for the work requirements described in this contract. The contractor may use subcontractors to fulfill the requirements of the contract. The contractor shall review each subcontractor's technical progress on all assigned tasks and include such technical progress and status information in monthly Program Status
Reports.
3.3 Vessel Support Services
The contractor shall provide vessel support services for all requirements that cannot be satisfied with Government-owned, Government-controlled or time-chartered vessels to support activities conducted at SEAFAC. This effort requires at a minimum a total of four (4) U.S. Flag Tugs, one U.S. Flag Utility Boat, one U.S. Flag Barge, one U.S.
Flag landing craft and two U.S. Flag Crew Boats to provide range support and freight handling services for the
SEAFAC site in Ketchikan, AK. During the period of performance of this contract, miscellaneous freight handling and barge mooring equipment will also be required to support maintenance and operations tasks at SEAFAC. This effort will require the use of equipment including winches, fairleads, air compressors, welders, light towers, line spoolers, forklifts, generators, and a crane.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .