UPDATED_SOW_Prototype_R7_Boom_Crane_System_Task_Statement_Modified.pdf
PDF 84 KB Posted
- Solicitation number
- N00167-16-T-0096
About this file
Updated Statement of Work for a new requirement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| UPDATED_SOW.pdf | ||
| Prototype_R7_Boom_Crane_System_Task_Statement_v2.pdf | ||
| Drawings_2.pdf | ||
| PR_1300576190_Solicitation_N00167-16-T-0096-Crane_Maintenance.pdf | ||
| Drawings_1.pdf | ||
| Drawings_3.pdf | ||
| R7_Crane.pptx | PPTX presentation | |
| Prototype_R7_Boom_Crane_System_Task_Statement_(Statement_of_Work).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prototype R7 Boom Crane Assembly
SECTION 1.0 – ADMINISTRATIVE INFORMATION
1.1 Introduction
The United States Marine Corps (USMC) is looking to improve the coating system used on the R7 crane installation. The R7 crane installation is on the external of the Assault Amphibious Vehicle (AAV) Recovery Variant (R7) and is staged in a highly corrosive environment. The physical geometry of the primary boom assembly and telescoping boom assembly, makes it extremely difficult to refurbish (i.e. abrasively blast and re-coat). Typically, when the AAV R7 comes in with a corroded crane installation, the standard practice is to remove it, disassemble, identify items that can be salvaged and to produce a new primary boom assembly and telescoping boom assembly. This process adds significant cost to the process and can be substantially reduced if an improved coating system is used on the R7 crane, increasing its service life.
This statement of work will describe the necessary tasks required to provide one prototype boom assembly, in accordance with drawing 7010547, with the exception of changes made as described in Section 1.3.
1.2 Government Furnished Equipment (GFE)
As a part of this effort, the selected vendor will be provided the following government furnished equipment (GFE), as Federal Condition Code D (Serviceable/Test Modification). The description of federal condition codes is found in the referenced document under section 6.0. The selected vendor shall provide all other items required to perform the necessary work and deliver the boom assembly
(DWG 7010547).
Items part of the Boom Assembly (DWG 7010547)
Item 8, Qty 1 – Telescope Pin, Front – DWG 5424071, Item 11, Qty 1 – Telescope Pin, Rear - DWG 5424072
Item 20, Qty 1 - Single Telescoping Cylinder Assembly - DWG 5424081
Item 23, Qty 1 - Lift Support Pin - DWG 5424080
1.3 Work Statement
The selected vendor shall perform the work described in this section. Outsourcing any part of the described work is acceptable. The following process shall be followed:
1.) The selected vendor shall deliver a completed boom assembly (DWG 7010547), in conformance to all drawing requirements, with the following modifications and finishing requirements performed to lower level assemblies, Item 12, Primary Boom Assembly (DWG 7010530) and Item 21, Single Telescoping Boom Assembly (DWG 7010548).
a. Primary Boom Assembly (DWG 7010530)
i. Item 20 (DWG 7010541) – Modify component per drawing supplied by NSWC
(DWG 7010541_MOD), adding qty. 4, two inch diameter holes in locations specified on the drawing.
ii. Prior to performing the finishing requirements of note 4, apply MIL-DTL-53084, Primer, Electrodeposition, Chemical Agent Resistant coating in accordance with requirements of DWG 2584542, section 3.3.1.2. Ensure all cleaning operations are performed with manufacturer’s recommendations and MIL-DTL-53072.
Upon application of MIL-DTL-53084 primer, apply the following coating system:
1. MIL-DTL-53022 or MIL-DTL-53030, in accordance with DWG 2584542, section 3.3.1.2.
2. MIL-DTL-64159 over MIL-DTL-53030 or MIL-DTL-53039 over MIL-DTL- 53022, in accordance with DWG 2584542, section 3.3.2.
b. Single Telescoping Boom Assembly (DWG 7010548)
i. On lower level assembly, item 3, telescope boom assembly (DWG 7010546), prior to performing the finishing requirements of note 4, apply MIL-DTL-53084, Primer, Electrodeposition, Chemical Agent Resistant coating in accordance with requirements of DWG 2584542, section 3.3.1.2. Ensure all cleaning operations are performed with manufacturer’s recommendations and MIL-DTL-53072 – Chemical Agent Resistant Coating (CARC) System Application Procedures and Quality Control Inspection. Upon application of MIL-DTL-53084 primer, apply the following coating system:
1. MIL-DTL-53022 or MIL-DTL-53030, in accordance with DWG 2584542, section 3.3.1.2.
2. MIL-DTL-64159 over MIL-DTL-53030, or MIL-DTL-53039 over MIL-DTL- 53022 in accordance with DWG 2584542, section 3.3.2.
2.) Upon completion of finishing operations of Item 12, Primary Boom Assembly (DWG 7010530) and Item 21, Single Telescoping Boom Assembly (DWG 7010548), the selected vendor shall complete the assembly required to provide a complete boom assembly, in accordance with DWG 7010547. The boom assembly (DWG 7010547) shall conform to Federal Condition Code D (Serviceable/Test Modification). The assembly shall include item 8, Telescope Pin, Front (DWG 5424071), item 11 Telescope Pin, Rear (DWG 5424072), item 20, Single Telescoping Cylinder Assembly (DWG 5424081) and item 23, Lift Support Pin (DWG 5424080), prototype parts provided as GFE, as specified in Section 1.2.
3.) The boom assembly (DWG 7010547) shall be visually inspected by NSWCCD personnel at vendor’s location prior to delivery.
4.) The completed boom assembly (DWG 7010547) shall be inspected, packaged and shipped to VSE Corporation, 17253 Center Dr, Ruther Glen, VA 22546, where testing and integration will occur. All freight charges shall be paid by the selected vendor.
5.) The selected vendor shall provide up to 40 hours of integration support after delivery, providing technical expertise as needed.
SECTION 3.0 – TECHNICAL DATA REQUIREMENTS
3.1 Deliverable(s)
The selected vendor shall deliver all coating quality assurance data to NSWCCD, upon final delivery the Boom Assembly (DWG 7010547). The selected vendor shall also deliver detailed photographs of the assemblies prior to and post each coating operation.
SECTION 4.0 – DELIVERY AND PERFORMANCE
4.1 Place of Performance
All work shall be performed at a location of vendors choosing and the Government’s maintenance facility, VSE Corporation, 17253 Center Dr, Ruther Glen, VA..
4.2 Period of Performance
The vendor shall complete all work prior to 30 November, 2016, or a date agreed to by both NSWCCD and the selected vendor.
4.3 Place of Delivery
The vendor shall deliver the boom assembly (DWG 7010547) to VSE Corporation, 17253 Center Dr, Ruther Glen, VA 22546
SECTION 5.0 – INSPECTION AND ACCEPTANCE
The inspection and acceptance of the reports and items shall be made by technical representatives of NSWCCD, Code 613, Corrosion and Coatings Engineering Branch, at the vender’s location. The following quality control data pertaining to the coating system shall be supplied:
- Surface profile readings in accordance with ASTM D4417, prior to application of MIL-DTL-53084 primer.
- Dry Film Thickness (DFT) readings in accordance with SSPC PA-2, after each coating application described in Section 1.3
SECTION 5.0 – REFERENCES
1.) Federal Condition Codes:
http://www2.dla.mil/j6/dlmso/elibrary/manuals/milstrap/word/029_AP2.05%20_FederalCondit ionCodes_CH4.doc
2.) MIL-DTL-53084: Primer, Electrodeposition, Chemical Agent Resistant 3.) MIL-DTL-53072: Chemical Agent Resistant Coating (Carc) System Application Procedures And
Quality Control Inspection http://www2.dla.mil/j6/dlmso/elibrary/manuals/milstrap/word/029_AP2.05%20_FederalConditionCodes_CH4.doc http://www2.dla.mil/j6/dlmso/elibrary/manuals/milstrap/word/029_AP2.05%20_FederalConditionCodes_CH4.doc
4.) MIL-DTL-53022: Primer, Epoxy Coating, Corrosion Inhibiting Lead And Chromate Free 5.) MIL-DTL-53030: Primer Coating, Epoxy, Water Based, Lead And Chromate Free 6.) MIL-DTL-64159: Camouflage Coating, Water Dispersible Aliphatic Polyurethane, Chemical Agent
Resistant 7.) MIL-DTL-53039: Coating, Aliphatic Polyurethane, Single Component, Chemical Agent Resistant.
File details come from the government source that posted it. Updated .