This is an amendment to a solicitation for the kitting, acquisition, management, warehousing, and delivery of parts/materials used to overhaul multiple radar antenna systems and fire control systems. The amendment addresses questions from industry, updates drawings for various systems including the SPS 67v1 and 3, SPQ 9B, SPS 73, SPS48, and SPS49. It adds missing specifications and parts lists attachments. The required response date is extended from September 14 to September 30, 2021. Drawings and specifications are included for numerous systems in updated attachments to the solicitation issued by the Naval Surface Warfare Center Crane Division on behalf of the Department of the Navy Naval Sea Systems Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 21RWP74_0004_sol.pdf | ||
| 21RWP74_0003_sol.pdf | ||
| 21RWP74_sol_0001.pdf | ||
| 21RWP74_sol.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to address questions that w ere posed by Industry, update the draw ing packages for the SPS 67v1 and 3, SPQ 9B, SPS 73, SPS48, and SPS49, add Attachment 10 Misc Specifications, and Attachment 11 Parts Lists that w ere missing.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Sep-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0016421RWP74
X 9B. DATED (SEE ITEM 11)
30-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Sep-2021
CODE
NAVAL SURFACE WARFARE CENTER CRANE DIV
C. BIEL (812-854-8530)
BLDG 121
300 HWY 361
CRANE IN 47421-5002
N00164 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0016421RWP74
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 2 Q & A
Amendment 2:
1) Question: Requesting 15 to 30 day extension in order to process the information once the drawings are provided by NSWC Crane.
Answer: At this time, the Government will extend the Solicitation date from September 14, 2021 at 3:00 pm EST to September 30, 2021 at 3:00 pm EST.
2) Question: The response NSWC Crane recently provided to industry in Amendment 0001 to Question 14 indicated that Pneu Devices was the OEM of record for the parts listed. Pneu Devices is no longer in business, nor do they have an active CAGE code. Will NSWC Crane allow these parts to be included under the DMSMS CLIN in order to allow the proper time and resources to address mitigation plans?
Answer: Yes, these will fall under CLIN 85, DMSMS Services.
3) Question: Are there NSN, NiiN, or the Manufacturer that will allow industry to address pricing the correct part? These numbers point to several parts but not the material required for this program. Additionally, the same is true for Boresight parts 37503-2004-1 and 37503-2004- 2, and band-pass filter 411200.
Answer:
7790D OpticPlanet INC (SPS-67(V)3) 4-1034-1 Spira Manufacturing Company (SPQ-9B) 4-1034-2 Spira Manufacturing Company (SPQ-9B) 4-1032-3 Spira Manufacturing Company (SPQ-9B) 411200 Coleman Microwave (SPQ-9B) 37503-2004-1 Drawing in One Drive and Attached (SPS-67(V)3) 37503-2004-2 Drawing in One Drive and Attached (SPS-67(V)3)
4) Question: All parts lists (PL) associated with the SP-49 Drawings are missing. Each individual; drawing that requires a separate PL are listed on top-level drawings supplied with the RFP. The list includes but is not limited to any other SPS-49, SPS-48, SPS-67, SPS-73, and SPQ-9B PL required.
Answer: Part lists have been included as Attachment 11 to the Solicitation.
5) Question: Specifications listed appear to be missing from the TDP download provided for the solicitation.
Answer: Specifications have been included as Attachment 10, to the Solicitation.
Currently unable to provide, working on providing Spec #403 from B561-2N-2, Paint Index 255347, Paint
Spec 388-1001, Photo Negative Number 60-14779A (if Raytheon logo is required), 348161 (Raytheon PO Code Letter Instruction
5) Question: Drawings listed below appear to be missing from the TDP download provided for the solicitation.
Answer: See Table 1 list below with responses.
Table 1:
Missing Drawings System: Response:
6868159 (gr_6868159_b) SPQ-9B Added to updated Attachment 177348 SPS-67(V)3 Added to updated Attachment 177349 SPS-67(V)3 Added to updated Attachment 177350 SPS-67(V)3 Added to updated Attachment 7443651 SPS-48 Added to updated Attachment 124378 SPS-48 looking into this 80969901 SPS-48 Added to updated Attachment GS81-003-1 SPS-48 Added to updated Attachment GS81-003-2 SPS-48 Added to updated Attachment 912061-1 SPS-49 Added to updated Attachment G127353-1 SPS-49 Added to updated Attachment 6869283 (gr_6869283_f) SPQ-9B Added to updated Attachment 6868168 (gr_6868168_a) SPQ-9B Added to updated Attachment 911116-1 SPS-49 Added to updated Attachment 1068973
Removed
952116 Drawing for 89731-701 SPS-49 Added to updated Attachment 912102-4 SPS-49 Added to updated Attachment 912102-5 SPS-49 Added to updated Attachment 912162-8 SPS-49 Added to updated Attachment 912164-37 SPS-49 Added to updated Attachment 912164-38 SPS-49 Added to updated Attachment 912164-47 SPS-49 Added to updated Attachment 912164-48 SPS-49 Added to updated Attachment 914049-1 SPS-49 Added to updated Attachment
494796-903 SPS-67(V)1 Currently do not have a drawing for this. Drawing is being made.
569020-12 SPS-67(V)1 looking into this 494550 SPS-67(V)1 looking into this 177394 SPS-67(V)3 Added to updated Attachment 177282 SPS-67(V)3 Added to updated Attachment 80964001 SPS-67(V)3 Added to updated Attachment 177311 SPS-67(V)3 Added to updated Attachment 177387 SPS-67(V)3 Added to updated Attachment 177312 SPS-67(V)3 Added to updated Attachment 177313 SPS-67(V)3 Added to updated Attachment 177314 SPS-67(V)3 Added to updated Attachment 177315 SPS-67(V)3 Added to updated Attachment 177316 SPS-67(V)3 Added to updated Attachment 177317 SPS-67(V)3 Added to updated Attachment 177318 SPS-67(V)3 Added to updated Attachment 177320 SPS-67(V)3 Added to updated Attachment 177407 SPS-67(V)3 Added to updated Attachment 177409 SPS-67(V)3 Added to updated Attachment 177324-2 SPS-67(V)3 Added to updated Attachment 177322 SPS-67(V)3 Added to updated Attachment 177408 SPS-67(V)3 Added to updated Attachment 177412 SPS-67(V)3 Added to updated Attachment 177319 SPS-67(V)3 Added to updated Attachment 177336 SPS-67(V)3 Added to updated Attachment 147229 SPS-67(V)3 Added to updated Attachment 177337 SPS-67(V)3 Added to updated Attachment 177388 SPS-67(V)3 Added to updated Attachment 177089 SPS-67(V)3 Added to updated Attachment 177276 SPS-67(V)3 Added to updated Attachment 177213 SPS-67(V)3 Added to updated Attachment 177214 SPS-67(V)3 Added to updated Attachment 177215 SPS-67(V)3 Added to updated Attachment 177710 SPS-67(V)3 Added to updated Attachment 177285 SPS-67(V)3 Added to updated Attachment 177272 SPS-67(V)3 Added to updated Attachment 177218 SPS-67(V)3 Added to updated Attachment 177291 ---> 83001709 (as identified in Appendix 2)
SPS-67(V)3 Added to updated Attachment
177284 SPS-67(V)3 Added to updated Attachment 177367 SPS-67(V)3 Added to updated Attachment
177390 SPS-67(V)3 Added to updated Attachment 177275 SPS-67(V)3 Added to updated Attachment 177260-1 SPS-67(V)3 Added to updated Attachment 177726 SPS-67(V)3 Added to updated Attachment 177319 SPS-67(V)3 Added to updated Attachment 196621 SPS-48 Added to updated Attachment 196933 SPS-48 Added to updated Attachment 214-1043 SPS-49 Added to updated Attachment 214-1176 SPS-49 Added to updated Attachment 222-1067 SPS-49 Added to updated Attachment 236-1126 SPS-49 Added to updated Attachment 388-1001_49956_D SPS-49 Added to updated Attachment 124378_001 Azimuth Tag Rev B SPS-49 Added to updated Attachment 177219 SPS-67(V) Added to updated Attachment 177267 SPS-67(V) Added to updated Attachment 177266 SPS-67(V) Added to updated Attachment 177269 DWG SPS-67(V) Added to updated Attachment 177270 SPS-67(V) Added to updated Attachment 177271 SPS-67(V) Added to updated Attachment 177277 DWG SPS-67(V) Added to updated Attachment 177308 DWG SPS-67(V) Added to updated Attachment 177340 SPS-67(V) Added to updated Attachment 177347 SPS-67(V) Added to updated Attachment 177351 SPS-67(V) Added to updated Attachment 177361 SPS-67(V) Added to updated Attachment 177364 SPS-67(V) Added to updated Attachment 177374 SPS-67(V) Added to updated Attachment 177377 SPS-67(V) Added to updated Attachment 177391 SPS-67(V) Added to updated Attachment 177420 SPS-67(V) Added to updated Attachment 177521 DWG SPS-67(V) Added to updated Attachment 177522 SPS-67(V) Added to updated Attachment 177523 SPS-67(V) Added to updated Attachment 177524 SPS-67(V) Added to updated Attachment 177579 SPS-67(V) Added to updated Attachment 177580 SPS-67(V) Added to updated Attachment 177587 SPS-67(V) Added to updated Attachment 177588 SPS-67(V) Added to updated Attachment 177748 SPS-67(V) Added to updated Attachment 177747 SPS-67(V) Added to updated Attachment 177750 SPS-67(V) Added to updated Attachment
192274 DWG SPS-49 Added to updated Attachment 192274_49956_- SPS-49 Added to updated Attachment 320026 DWG SPS-49 Added to updated Attachment 569020-01 SPS-49 Added to updated Attachment 713798 SPS-49 Added to updated Attachment 895821_1 DWG SPS-49 Added to updated Attachment 895822 SPS-49 Added to updated Attachment 912119 DWG SPS-49 Added to updated Attachment 912155_1 SPS-49 Added to updated Attachment 912164 SPS-49 Added to updated Attachment 913493 DWG SPS-49 Added to updated Attachment 913761 DWG SPS-49 Added to updated Attachment 914401_1 DWG SPS-49 Added to updated Attachment 1078038 DWG SPS-49 Added to updated Attachment 6868375 DWG (called out by DWG 6868357) requested 6868375-6 & -7
SPQ-9B DWG 6868375 should cover 6868375-6 & -7, PL are incl./Added to updated Attachment
2895578 DWG SPS-49 Added to updated Attachment 80965501 DWG SPS-67(V) Added to updated Attachment 80970201 DWG SPS-67(V) Added to updated Attachment 80970202 DWG SPS-67(V) Added to updated Attachment 80970203 DWG SPS-67(V) Added to updated Attachment 80970204 SPS-67(V) Added to updated Attachment 80995801 DWG SPS-49 Added to updated Attachment 80995801 SPS-49 Added to updated Attachment 80997101 DWG SPS-73 Added to updated Attachment A561-2E-3 REV A CHAIN ASSY SPS-67(V) Added to updated Attachment A561-2N-4 REV A RETAINER SPS-67(V) Added to updated Attachment
A561-2N-5 REV A CAPTIVE
SCREW
SPS-67(V) Added to updated Attachment
B561-2D-1 Rev C SPS-67(V) Added to updated Attachment B561-2D-3 REVA GASKET SPS-67(V) Added to updated Attachment B561-2Q-2 REV C PANEL SPS-67(V) Added to updated Attachment B561-2Q-3 GASKET SPS-67(V) Added to updated Attachment C561-2D-2 REV C TOP COVER SPS-67(V) Added to updated Attachment C561-2P-2 REV G PANEL SPS-67(V) Added to updated Attachment C561-2Q-1 Rev N SPS-67(V) Added to updated Attachment GPS49-109_61 SPS-49 Added to updated Attachment GS93-104_001 SPS-49 Added to updated Attachment GSM 140 SPS-49 Added to updated Attachment WL6868263 SPQ-9B Added to updated Attachment wl6868449 SPQ-9B Added to updated Attachment 10300051 SPS-49 trying to locate-contacted PHD 713783 SPS-49 trying to locate-contacted PHD 714463 SPS-49 trying to locate-contacted PHD G294457 SPS-49 trying to locate-contacted PHD 912516-1 (DWG & PL) SPS-49 trying to locate-contacted PHD 912147 SPS-49 trying to locate-contacted PHD 83001812 no drawing available
177767 SPS-67(V) Added to updated Attachment 37503-2004 (covers 37503-2004-1 & -2)
SPS-67(V) Added to updated Attachment
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 14-Sep-2021 03:00 PM to 30-Sep-2021 03:00 PM.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A CDRLs A001-A006 6 19-JUL-2021 Attachment 1 Past Performance
Questionnaire
2 30-JUN-2021
Attachment 2 Apendix A Rev 1 82 16-AUG-2021 Attachment 3 CLIN 0083 Misc. Parts
Pricing Matrix
29 15-JUL-2021
Attachment 4 SPQ 9B Drawing Package 385 30-JUN-2021 Attachment 5 SPS 67v1 Drawing
Package
38 30-JUN-2021
Attachment 6 SPS 67v3 5 Drawing Package
91 30-JUN-2021
Attachment 7 SPS 48 Drawing Package Rev 1
101 13-AUG-2021
Attachment 8 SPS 49 Drawing Package Rev 1
613 13-AUG-2021
Attachment 9 SPS 73 Drawing Package 4 16-JUL-2021 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A CDRLs A001-A006 6 19-JUL-2021 Attachment 01 Past Performance
Questionnaire
2 30-JUN-2021
Attachment 02 Apendix A Rev 1 82 16-AUG-2021 Attachment 03 CLIN 0083 Misc. Parts
Pricing Matrix
29 15-JUL-2021
Attachment 04 SPQ 9B Drawing Package Rev 1
403 09-SEP-2021
Attachment 05 SPS 67v1 Drawing Package Rev 1
48 09-SEP-2021
Attachment 06 SPS 67v3 5 Drawing Package Rev 1
268 09-SEP-2021
Attachment 07 SPS 48 Drawing Package Rev 2
109 09-SEP-2021
Attachment 08 SPS 49 Drawing Package Rev 2
753 09-SEP-2021
Attachment 09 SPS 73 Drawing Package Rev 1
5 09-SEP-2021
Attachment 10 Misc Specifications 122 09-SEP-2021 Attachment 11 Parts Lists 251 09-SEP-2021
(End of Summary of Changes)