This document provides details regarding a forthcoming solicitation for radar antenna system and component overhauls, repairs, coatings, shipboard installations, and technical support services. The Naval Surface Warfare Center, Crane Division intends to issue a request for proposal and award an indefinite delivery indefinite quantity firm fixed price contract with a minimum of one each of several contract line items including evaluations, overhauls, installation kits, and technical services for MK-82 Directors and AN/SPG-62 Reflector systems for United States Navy and foreign military sales assets. The contract would have a five year period of performance with an estimated maximum value of $35 million. The solicitation is expected to be issued on July 16, 2018 with a proposal due date of September 14, 2018. Offerors must be registered in the System for Award Management and Joint Certification Program to receive controlled attachments related to the opportunity.

View the file

Other files

File Type Posted
18RWP44_0003_sol.pdf PDF
18RWP44_0002_sol.pdf PDF
18RWP44_0001_att.pdf PDF
18RWP44_0001.pdf PDF
18RWP44_sol.pdf PDF
18RWP44_ATT1.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Note 1: Labor Categories should be mapped using column A for contractor labor categories and column B for corresponding Government labor categories found in the provided Government estimated level of effort. If proposing actual employees, the employee name should be listed in column A. If proposing labor category bid rates, the labor category should be listed in column A.
Note 2: All calculations must be shown using Excel formulas. No hard entered data is permitted where calculations are performed.
Note 3: Complete the Labor Rates worksheet. If proposing individual employees the information should be provided based on the employees direct labor rates. If proposing bid rate/composite rate, the information should be provided for each labor category.
Note 4: Complete LOE Breakdown indicating the breakout of hours by prime/subcontractor by labor category
Note 5: Complete Overtime Breakdown indicating the proposed prime and subcontractors burdened OT by year.
Note 6: Prime contractor shall verify with each subcontractor that the amount included in the Prime contractor proposal matches each subcontractor cost summary that will be provided to the NSWC Crane Contract Specialist.

Cost Summary

SOLICITATION NO. N0016418RWP44DATED: 9/18/2018
Prime Offeror Name:
Total for All YearsYear 1Year 2Year 3Year 4Year 5
Cost ElementsCorresponding Government Labor CategoryPlace of PerformanceHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Individual Employee/Labor Category 1Contrator Site
Gov't Site
OT Contractor Site
OT Gov't Site
Individual Employee/Labor Category 2Contrator Site
Gov't Site
OT Contractor Site
OT Gov't Site
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Indirect Cost 1 ( %)
Indirect Cost 2 ( %)
Indirect Cost 3 ( %)
Etc.
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost (no ODC)
Subcontractor proposed cost and fee
Subcontractor 1 Cost
Subcontractor 1 Fee
Subcontractor 2 Cost
Subcontractor 2 Fee
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not applied to subcontractor fee)
Handling ( %)
G&A ( %)
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through
Total Labor Cost (Prime and Subcontractor Labor)
Fee on Labor
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor *
Total Fee (for Prime and Subcontractor Labor)
Total Labor Cost (including fee)
Other Direct Costs - Prime
Prime Travel
Prime Material
Any adders to ODCs such as G&A (cost only - no fee)
Other Direct Costs - Sub-Contractor
Sub-Contractor Travel
Subcontractor 1
Subcontractor 2
Etc.
Sub-Contractor Material
Subcontractor 1
Subcontractor 2
Etc.
Any adders to ODCs such as G&A (cost only - no fee) to Subcontractor ODC
Total ODCs
Total CPFF all CLINs (Labor and ODCs)

Labor Rates

Indirect RatesFee
Fringe % RateOH % RateG&A % RateOther % (specify) RateFee % Rate
Insert rates specific to company:20.00%60.00%10.00%0.00%7.00%
Employee Name (if applicable)Labor CategoryDL rateFringe $OH $G&A $Other $Sub-total $Fee $Total Burdened RateTotal WY Hours (e.g., 1880, 1920, 2080)FTE $
John Doe - SAMPLESr. Engineer$55.00$11.00$33.00$9.90$108.90$7.62$116.521880$219,063.24
Add rows as needed

LOE Breakdown Government Estimated LOE Labor Categories Prime Hours Sub 1 Hours Sub 2 Hours Etc. Total Proposed Hours Government Estimated LOE Hours Delta ∆

Overtime

YEAR 1YEAR 2YEAR 3YEAR 4YEAR 5
Prime Proposed Burdened OT
Sub-contractor 1 Proposed Burdened OT
Sub-contractor 2 Proposed Burdened OT
Sub-contractor 3 Proposed Burdened OT
Etc.
Total Proposed Burdened OT

File details come from the government source that posted it. Updated .