18RWP44_0002_att.xls
XLS spreadsheet 83 KB Posted
- Solicitation number
- N0016418RWP44
About this file
This document provides details regarding a forthcoming solicitation for radar antenna system and component overhauls, repairs, coatings, shipboard installations, and technical support services. The Naval Surface Warfare Center, Crane Division intends to issue a request for proposal and award an indefinite delivery indefinite quantity firm fixed price contract with a minimum of one each of several contract line items including evaluations, overhauls, installation kits, and technical services for MK-82 Directors and AN/SPG-62 Reflector systems for United States Navy and foreign military sales assets. The contract would have a five year period of performance with an estimated maximum value of $35 million. The solicitation is expected to be issued on July 16, 2018 with a proposal due date of September 14, 2018. Offerors must be registered in the System for Award Management and Joint Certification Program to receive controlled attachments related to the opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 18RWP44_0003_sol.pdf | ||
| 18RWP44_0002_sol.pdf | ||
| 18RWP44_0001_att.pdf | ||
| 18RWP44_0001.pdf | ||
| 18RWP44_sol.pdf | ||
| 18RWP44_ATT1.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Note 1: Labor Categories should be mapped using column A for contractor labor categories and column B for corresponding Government labor categories found in the provided Government estimated level of effort. If proposing actual employees, the employee name should be listed in column A. If proposing labor category bid rates, the labor category should be listed in column A. |
| Note 2: All calculations must be shown using Excel formulas. No hard entered data is permitted where calculations are performed. |
| Note 3: Complete the Labor Rates worksheet. If proposing individual employees the information should be provided based on the employees direct labor rates. If proposing bid rate/composite rate, the information should be provided for each labor category. |
| Note 4: Complete LOE Breakdown indicating the breakout of hours by prime/subcontractor by labor category |
| Note 5: Complete Overtime Breakdown indicating the proposed prime and subcontractors burdened OT by year. |
| Note 6: Prime contractor shall verify with each subcontractor that the amount included in the Prime contractor proposal matches each subcontractor cost summary that will be provided to the NSWC Crane Contract Specialist. |
Cost Summary
| SOLICITATION NO. N0016418RWP44 | DATED: 9/18/2018 | ||||||||||||||||||
| Prime Offeror Name: | |||||||||||||||||||
| Total for All Years | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | ||||||||||||||
| Cost Elements | Corresponding Government Labor Category | Place of Performance | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| Prime Contractor Labor Cost | |||||||||||||||||||
| Prime Contractor Direct Labor | |||||||||||||||||||
| Individual Employee/Labor Category 1 | Contrator Site | ||||||||||||||||||
| Gov't Site | |||||||||||||||||||
| OT Contractor Site | |||||||||||||||||||
| OT Gov't Site | |||||||||||||||||||
| Individual Employee/Labor Category 2 | Contrator Site | ||||||||||||||||||
| Gov't Site | |||||||||||||||||||
| OT Contractor Site | |||||||||||||||||||
| OT Gov't Site | |||||||||||||||||||
| Etc. | |||||||||||||||||||
| Total Direct Labor Cost | |||||||||||||||||||
| Prime Contractor Indirect Labor Cost | |||||||||||||||||||
| Indirect Cost 1 ( %) | |||||||||||||||||||
| Indirect Cost 2 ( %) | |||||||||||||||||||
| Indirect Cost 3 ( %) | |||||||||||||||||||
| Etc. | |||||||||||||||||||
| Total Indirect Labor Cost | |||||||||||||||||||
| Total Direct and Indirect Labor cost | |||||||||||||||||||
| COM | |||||||||||||||||||
| Total Prime Contractor Labor Cost | |||||||||||||||||||
| Subcontractor Labor Cost (no ODC) | |||||||||||||||||||
| Subcontractor proposed cost and fee | |||||||||||||||||||
| Subcontractor 1 Cost | |||||||||||||||||||
| Subcontractor 1 Fee | |||||||||||||||||||
| Subcontractor 2 Cost | |||||||||||||||||||
| Subcontractor 2 Fee | |||||||||||||||||||
| Etc. | |||||||||||||||||||
| Total proposed subcontractor labor cost and fee | |||||||||||||||||||
| Prime contractor pass through (not applied to subcontractor fee) | |||||||||||||||||||
| Handling ( %) | |||||||||||||||||||
| G&A ( %) | |||||||||||||||||||
| Other (if any) | |||||||||||||||||||
| Total pass through (not including fee) | |||||||||||||||||||
| Total Subcontractor Cost including pass through | |||||||||||||||||||
| Total Labor Cost (Prime and Subcontractor Labor) | |||||||||||||||||||
| Fee on Labor | |||||||||||||||||||
| Prime Contractor Fee for Prime Contractor Labor | |||||||||||||||||||
| Prime Contractor Fee for Subcontractor Labor * | |||||||||||||||||||
| Total Fee (for Prime and Subcontractor Labor) | |||||||||||||||||||
| Total Labor Cost (including fee) | |||||||||||||||||||
| Other Direct Costs - Prime | |||||||||||||||||||
| Prime Travel | |||||||||||||||||||
| Prime Material | |||||||||||||||||||
| Any adders to ODCs such as G&A (cost only - no fee) | |||||||||||||||||||
| Other Direct Costs - Sub-Contractor | |||||||||||||||||||
| Sub-Contractor Travel | |||||||||||||||||||
| Subcontractor 1 | |||||||||||||||||||
| Subcontractor 2 | |||||||||||||||||||
| Etc. | |||||||||||||||||||
| Sub-Contractor Material | |||||||||||||||||||
| Subcontractor 1 | |||||||||||||||||||
| Subcontractor 2 | |||||||||||||||||||
| Etc. | |||||||||||||||||||
| Any adders to ODCs such as G&A (cost only - no fee) to Subcontractor ODC | |||||||||||||||||||
| Total ODCs | |||||||||||||||||||
| Total CPFF all CLINs (Labor and ODCs) |
Labor Rates
| Indirect Rates | Fee | ||||||||||
| Fringe % Rate | OH % Rate | G&A % Rate | Other % (specify) Rate | Fee % Rate | |||||||
| Insert rates specific to company: | 20.00% | 60.00% | 10.00% | 0.00% | 7.00% | ||||||
| Employee Name (if applicable) | Labor Category | DL rate | Fringe $ | OH $ | G&A $ | Other $ | Sub-total $ | Fee $ | Total Burdened Rate | Total WY Hours (e.g., 1880, 1920, 2080) | FTE $ |
| John Doe - SAMPLE | Sr. Engineer | $55.00 | $11.00 | $33.00 | $9.90 | $108.90 | $7.62 | $116.52 | 1880 | $219,063.24 | |
| Add rows as needed |
LOE Breakdown Government Estimated LOE Labor Categories Prime Hours Sub 1 Hours Sub 2 Hours Etc. Total Proposed Hours Government Estimated LOE Hours Delta ∆
Overtime
| YEAR 1 | YEAR 2 | YEAR 3 | YEAR 4 | YEAR 5 | |
| Prime Proposed Burdened OT | |||||
| Sub-contractor 1 Proposed Burdened OT | |||||
| Sub-contractor 2 Proposed Burdened OT | |||||
| Sub-contractor 3 Proposed Burdened OT | |||||
| Etc. | |||||
| Total Proposed Burdened OT |
File details come from the government source that posted it. Updated .