About this file

This document provides details on a forthcoming federal contract solicitation for radar antenna system overhauls, repairs, coatings, installations and technical support services. The single five-year IDIQ contract will be awarded by the Naval Surface Warfare Center Crane Division to support overhauls and services for multiple radar antenna systems including AN/SPS-48, AN/SPS-49, AN/SPS-67(V)1, AN/SPS-40, AN/SPS-73, AN/SPS-67(V)3/5, AN/SPQ-9B, AN/SPS-55, AN/SPS-75, and AN/SPS-77 assets for the U.S. Navy, U.S. Coast Guard and foreign militaries. Anticipated CLINs include evaluations, standard overhauls, labor, materials, data and ODCs. The estimated IDIQ minimum is one of each evaluation CLIN and the IDIQ maximum is $51 million over five years. The solicitation is expected to issue on April 5, 2018 with a July 6, 2018 response date. Offerors must be registered in SAM and JCP and have a secret facility clearance to be considered for award.

18RWP40_0003

View the file

Other files

File Type Posted
18RWP40_sol_003_att1.PDF PDF
18RWP40_sol_0002.pdf PDF
18RWP40_0002_att1.pdf PDF
18RWP40_ATTACHMENTS.zip ZIP file
18RWP40_sol_0001.pdf PDF
18RWP40_sol_att.zip ZIP file
18RWP40_sol.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Provide a list of questions received from industry and the Government's responses;

2. Provide an updated GFP attachment (Attachment 02);

3. Attach (Attachments 12 thru 17) test procedure documents for informational purposes only. Attachments 12-17 are being provided only to those businesses w ho requested and are in receipt of the CD(s).

See Summary of Changes.

1. CONTRACT ID CODE PAGE OF PAGES

S 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Jun-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0016418RWP40

X 9B. DATED (SEE ITEM 11)

05-Apr-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Jun-2018

CODE

NAVAL SURFACE WARFARE CENTER CRANE DIV

A. QUEEN (812-854-5905)

BDLG 121

300 HWY 361

CRANE IN 47522-5001

N00164 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0016418RWP40

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A CDRLs A001-A017 17 27-FEB-2018 Attachment 01 DD254 3 07-FEB-2018 Attachment 02 Government Furnished

Property

5 02-APR-2018

Attachment 03 QASP 3 28-MAR-2018 Attachment 04 Wage Determination 15-

4822 (Rev.-6)

11 28-MAR-2018

Attachment 05 Prime Cost Summary Format

5 26-APR-2018

Attachment 06 Past Performance Questionnaire

2 28-MAR-2018

Attachment 07 Government Furnished Information (Schedule C)

14-MAY-2018

Attachment 08 Estimated Level of Effort 2 16-MAY-2018 Attachment 09 Staffing Plan 1 28-MAR-2018 Attachment 10 SF 1408 2 01-JAN-2014 Attachment 11 Informational Purposes

Only-Average Historical Overhauls

1 30-MAY-2018

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A CDRLs A001-A017 17 27-FEB-2018 Attachment 01 DD254 3 07-FEB-2018 Attachment 02 Government Furnished

Property

5 22-JUN-2018

Attachment 03 QASP 3 28-MAR-2018 Attachment 04 Wage Determination 15-

4822 (Rev.-6)

11 28-MAR-2018

Attachment 05 Prime Cost Summary Format

5 26-APR-2018

Attachment 06 Past Performance Questionnaire

2 28-MAR-2018

Attachment 07 Government Furnished Information (Schedule C)

14-MAY-2018

Attachment 08 Estimated Level of Effort 2 16-MAY-2018

Attachment 09 Staffing Plan 1 28-MAR-2018 Attachment 10 SF 1408 2 01-JAN-2014 Attachment 11 Informational Purposes

Only-Average Historical Overhauls

1 30-MAY-2018

Attachment 12 89 TPA 09 3653 SPS-48 Ped ATP

50 19-JUN-2017

Attachment 13 89 TPA 09 8469 Test Procedure

33 16-FEB-2015

Attachment 14 89 WIS 14 9343 SPS-49 Bearing Monitor

23 12-JAN-2015

Attachment 15 89 WIS 17 9416 Flatness Check

21 18-JUL-2017

Attachment 16 12255-8843-

010001REVC SPS-49

Ped ATP

46 11-AUG-2011

Attachment 17 Borescope Procedure - 12255-8843-950043

34 16-FEB-2015

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been added by full text:

QUESTIONS AND RESPONSES

1:

Question: The eCraft job descriptions within NUWC list both "typical education" and "typical experience" for each level under each LCAT. Please confirm that the stated typical education and experience are "desired" education/experience levels as opposed to required levels (ie: degree in chemistry vs technical degree; 4 years of experience in lieu of a Masters degree?)

Response: Minimum Level job descriptions state hard education requirements, i.e. Bachelor’s degree; advanced level job descriptions allow for a masters or a certain number of years in experience.

2:

Question: Please confirm that the government will accept experience in lieu of advanced degree "typical requirements" within the eCraft NUWC labor descriptions? (ie: 4 years of experience in lieu of a Masters degree?)

Response: Minimum Level job descriptions state hard education requirements, i.e. Bachelor’s degree; advanced level job descriptions allow for a masters or a certain number of years in experience.

3:

Question: SPS‐48 Process 12255‐8843‐960004, para 5.3.3.1.2 requires the use of a "government‐approved vendor" for processing the arrays. If the vendor has the certifications required by the RFP, is that sufficient to be "government approved" or is there a further approval process? Can the customer please provide a list of approved vendors for this process and any others that require specific approvals?

Response: It is sufficient. Contract awardee will process arrays.

4:

Question: SPS‐49 Pedestal Overhaul procedure 89 TRP 04 6576, is paragraph 4.5.5, acceptance test, performed at the contractor or government facility? If performed at the contractor facility, please confirm that the SPS‐49 Antenna Test Set, PN AS‐3263, will be provided as GFE (Not on current GFE list)

Response: Is performed at government facility.

5:

Question: In the SPS‐49 Rotary Coupler Repair and Test procedure, 89 TRP 04 6574, There is an equipment list referenced (Table 2); please confirm that the equipment listed will be provided as GFE.

Response: No items in in this table will be provided. Contractor will provide the items needed in Table II. VSWR testing is performed by Government (Par. 4.2.5, 4.3.5, and 4.4.5).

6:

Question: In the SPS‐48 Antenna Overhaul and Repair procedure, 12255‐8843‐960004 para 5.5.8, several miscellaneous pieces of RF test equipment are called out (para 5.5.8.3.1) Please confirm these items will be provided as GFE (not currently listed in GFE list attached to RFP).

Response: Items identified in Table A-1 will be used at the contractor facility and government facility. These items will be provided as needed to perform testing. The Government will transfer this equipment between locations as we complete testing. At this time, we don’t have any spares.

Item 68. Cable – Coax 30ft, Storm, A94245360, Qty. 2 Item 69. Waveguide/Coax Adapter Diamond Antenna,37-450, Qty. 2 Item 73. Port Extension Diamond Antenna, 472, Qty. 95

7:

Question: SPS‐67 Overhaul and Acceptance Test procedure, 89 TRP 09 7815 para 4.7 calls out a mock‐up pedestal, which is not listed on the current GFE list. Please confirm that this mock‐up will be provided as GFE.

Response: Mock up pedestal will be provided. Added to GFE listing.

8:

Question: Please provide drawing/specifications for the power and space requirements for the GFE test equipment.

Response: Power requirements are defined in drawings and procedures. Space requirements are specified in the

SOW.

9:

Question: Please confirm that all associated software/licenses will be provided along with any test stations (for example, SPS‐48 Antenna Overhaul and Repair procedure, 12255‐8843‐960004 para 5.5.8, 5.5.9, 5.5.10, 5.5.18 &

5.5.24 calls out a test station, but does not mention test software)

Response: There shouldn’t be any need for software/licenses.

10:

Question: Is the power panel called out in SPS‐49 Pedestal Overhaul and Repair procedure, 89 TRP 04 6576 para

4.5.4 (which references 12255‐8843‐010001), the same power panel that is listed in the GFP list (p/n 80965701)?

Response: Power panel will not be provided. Part number 80965701 has been removed from GFP listing.

11:

Question: Is Equivalent general test equipment allowed as a substitute to listed equipment in the repair and acceptance GFI manuals?

Response: Yes.

12:

Question: SPS‐48 Pedestal Overhaul and Repair procedure, para 3.4.6.1, figure 2 workflow diagram does not match the sequence from the narrative (e.g. paragraphs 4.7, 4.8, and 4.9 do match). Please confirm that the text takes precedence over the block diagram.

Response: Confirmed; text takes precedence.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .