TACTICAL VEHICLE MAINTENANCE
Solicitation number
N0016418RJV22
Issued by

About this file

18RJV22_sol_0001

View the file

Other files

File Type Posted
18RJV22_0005.pdf PDF
18RJV22__0004.pdf PDF
18RJV22__0004_att1.xlsx XLSX spreadsheet
18RJV22_sol_0002.pdf PDF
18RJV22_0003.pdf PDF
18RJV22_0002_att1.xlsx XLSX spreadsheet
18RJV22_0001_att1.zip ZIP file
18RJV22_sol_att.zip ZIP file
18RJV22_sol.pdf PDF
18RJV22_syn_0001_att.zip ZIP file
18RJV22_syn_att.zip ZIP file
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This solicitation is amended for the follow ing:

1) Add NSWC Crane Bearcat Hour Meter Installation Procedure as an applicable document to the SOW.

2) Add Attachment 7 NSWC Crane Bearcat Hour Meter Installation Procedure to the solicitation.

3) Attachment 1, Amendment 01 is to replace Attachment 1 in its entirety. Within Attachment 1, the follow ing has been added:

Hydroboost and Hours Meter to CLIN Structure under CLIN 0004.

Hybroboost and Hours Meter to Bearcat Refurbishment List.

Suggested Source column to the Bearcat Refurbishment List.

All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 06-Jul-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0016418RJV22

X 9B. DATED (SEE ITEM 11)

15-Jun-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Jul-2018

CODE

NAVAL SURFACE WARFARE CENTER CRANE DIV

E. WITTMER (812-854-5908)

BLDG 121

300 HWY 361

CRANE IN 47522-5001

N00164 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0016418RJV22

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 4.0 - CLAUSES & OTHER FULL TEXT INFORMATION

SUMMARY OF CHANGES

SECTION 1.0 - SCHEDULE/INSPECTION & ACCEPTANCE/DELIVERY

The following have been modified:

SOW

Statement of Work Vehicle Maintenance Contract

Ground Mobility Engineering Branch (JXVM)

1.0 SCOPE

Maintenance and up to, and including refurbishment and Inspect or Repair Only As Necessary (IROAN) will be performed on but not limited to the following vehicles:

Bearcats, High Mobility Multi-Wheeled Vehicles (HMMWV), Logistics Vehicle System Replacement (LVSR), 7-Ton Trucks , Joint Light Tactical Vehicle (JLTV), Aircraft Rescue Fire Fighting (ARFF), and Tactical Trailer. The proposed Period of Performance (POP) for this contract is 5 years. The estimated quantity of vehicles is as follows:

Year 1 Year 2 Year 3 Year 4 Year 5 Bearcat 10 10 10 10 10

HMMWV 6 6 6 6 6

LVSR 1 1 1 1 1

7-Ton Truck 1 1 1 1 1

JLTV 1 1 1 1 1

ARFF 1 1 1 1 1

Tactical Trailer 3 3 3 3 3 Ballistic Glass Replacement 10 10 10 10 10

1.1 Background

Historically, Naval Facilities (NAVFAC) Engineering Command has supported all echelons of maintenance for the tactical vehicles affiliated with Command, Control, Communications, Computers, Cybersecurity, Intelligence, Surveillance, and Reconnaissance (C5ISR) Integration Division programs at NSWC Crane. A memorandum released by NAVFAC on 22-Sep-2016 stated that all tactical vehicle support would cease in Fiscal Year (FY) 17. This discontinuation of support leaves the C5ISR Division with a gap in capabilities that the Division’s customers have relied upon for many years. The intent of this contract will be to fill this gap on all current and future tactical vehicle platforms. The vehicles that are currently being supported are produced by AM General, Lenco (Bearcat integrator), Ford Motor Company (F550 Bearcat chassis/drivetrain), Caterpillar (Engines in larger vehicles).

2.0 APPLICABLE DOCUMENTS

2.1 Government Documents

NAVMC 10284 Limited Technical Inspection (LTI) – Motor Transport process and checklist DoD 4160.21-M Defense Material Disposition Manual NRL/MR/6350 14-9501 Repair Methods for Delaminated Transparent Armor Bearcat Refurbishment List HMMWV Refurbishment List NSWC Crane Bearcat Hour Meter Installation Procedure

3.0 REQUIREMENTS

3.1 Vehicle Transportation

The Government will ship the majority of vehicles to the Contractor. For the remaining vehicles, the Contractor shall provide transportation from or perform maintenance activities at a SeaPort-e Contractor’s facility in Bedford, IN or NSWC Crane. The Government will notify the Contractor of those vehicles requiring transportation or onsite maintenance via the funding of an order for transportation and/or a LTI.

3.2 Joint Limited Technical Inspection (LTI)

The Contractor shall schedule the funded LTI with the Government to occur within 4 working days after receipt of the vehicle or funding of the LTI. The Contractor shall not perform an LTI or any other evaluation without a Government Representative present. This limited technical inspection shall be completed in accordance with NAVMC 10284 Limited Technical Inspection (LTI) and will allow the Contractor to look at the vehicle and to gain an initial impression of the current state of the vehicle. The Joint LTI will also drastically reduce any discrepancies with the condition of the vehicle between the Contractor and the Government. The time allowed for the Joint (LTI) shall be a maximum of 2 hours.

A001 – Joint LTI Report NAVMC 10284 Limited Technical Inspection (LTI) –

Motor Transport process and checklist

3.3 Repair Cost Estimate

The Contractor shall have 1 business day after the LTI to prepare an estimate for the repair of the vehicle. Repairs will either be firm fixed price or on a time and materials basis.

No repair work shall commence until the COR has approved the repair cost estimate and a modification to apply funding has been issued.

A002 – Repair Cost Estimate (Contractor format)

3.3.1 Chemical Agent Resistant Coating (CARC) Application

The vehicles that are being repaired may require the application of CARC Paint to repair areas of the vehicle that were damaged upon receipt or were damaged (intentionally or unintentionally) during the repair of the vehicle.

The Contractor shall have the capability to perform small repairs up to and including painting an entire vehicle.

3.3.2 Ballistic Glass Re-lamination/Replacement

The Bearcats and the M1116 HMMWV both contain ballistic glass. Over time, this ballistic glass will de-laminate causing the glass to be unsafe for use due to lack of visibility. In order to correct this issue, NSWC Crane has been re-laminating the glass through the use of a process developed by the Naval Research Laboratory (Repair Methods for Delaminated Transparent Armor NRL/MR/6350—14-9501). This process involves the use of an autoclave to apply a prescribed pressure and heat to the glass over a period of time. This re-lamination process has previously been completed by Indy Performance Composites (IPC).

The contractor shall be provided the instruction for this re-lamination and have the ability to re-laminate the glass or the ability to sub-contract this effort. In the event that the ballistic glass is unable to be re-laminated, the Contractor shall buy new replacement ballistic glass.

3.3.3 IROAN

The IROAN process is defined as a maintenance technique which determines the minimum repairs necessary to restore equipment, components, or assemblies to prescribed serviceability standards by utilizing all diagnostic equipment and test procedures in order to minimize unnecessary disassembly and parts replacement. The IROAN process never adds any new capability to the vehicle; it only returns the vehicle to a fully functioning vehicle in its most current documented configuration.

The turnaround time for IROANs shall be no more than 10 weeks from the date of the LTI.

3.3.4 Refurbishment / Remanufacture

Similar to the IROAN process, the refurbishment process shall restore equipment, components, or assemblies to prescribed serviceability standards in their most current documented configuration. The Bearcat Refurbishment List and HMMWV Refurbishment List state items that shall be restored to the most current documented configurations for

Bearcats and HMMWVs, respectively. The turnaround time allocated for refurbishment shall be no more than 10 weeks from the date of the LTI.

3.3.5 Standard Maintenance

The following maintenance procedures will be fixed price for each type of vehicle listed in this SOW: oil/oil filter change, belt replacement, tire change/replacement, transmission fluid change, differential oil change, fuel filter change, and grease all Zerk fittings.

3.4 Post Repair Inspection

The Contractor shall provide a post repair inspection checklist at the conclusion of the vehicle repair. This report may be in the Contractor’s format and will vary depending on the level of repair that the vehicle required. At a minimum, the report shall contain the following information: Vehicle serial number, vehicle mileage, vehicle hours (if available), date of inspection, parts inspected, inspection method (visual, driving, gauge reading, etc.) and result of inspection, miles vehicle was driven after repair.

The Government will perform a post repair inspection of the vehicle at the Contractor facility. Should an item that was listed as repaired be found to be faulty, the Requiring Technical Authority (RTA) of this contract along with the Contractor representative shall work through the Contracting Officer’s Representative (COR) in order to resolve the issue.

If within 30 days of vehicle delivery to the Government, the vehicle requires transportation back to the Contractor due to the vehicle malfunctioning in the same way that was recorded in the Joint LTI, the Contractor shall not be reimbursed for the transportation or the repair.

A003 – Post Repair Inspection Checklist

3.5 Vehicle Return Transportation

Once the vehicle repair has been completed, the Contractor shall be responsible for arranging transportation of the vehicles to the Government facility.

Transportation of the vehicle back to the Government facility must be able to be completed in 72 hours (transportation estimate to Kings Bay, GA; Silverdale, WA; Bedford, IN; and NSWC Crane).

3.6 Travel

The Contractor may be required to travel to a location other than NSWC Crane in part to assist the government in assessing vehicles prior to shipment. This would be done in an effort to be able to select vehicles that are in the best condition, therefore making them the most cost effective candidates for use and/or repair.

Due to the size of some tactical vehicles, it may be necessary for the Contractor to also perform maintenance and/or repairs at locations other the Contractor’s facility.

4.0 GOVERNMENT FURNISHED EQUIPMENT, MATERIAL, AND

INFORMATION

The Government shall provide the following items that are critical to accomplishment of the tasking in this SOW:

4.1 Government Furnished Equipment (GFE)

Vehicle Automated Diagnostic Equipment (VADS)

4.2 Government Furnished Information

Ballistic Glass Re-Lamination Instruction Vehicle Technical Manual (TM) as required

5.0 DATA DELIVERABLES

Paragraph CDRL Data Description

3.2 A001 Joint Limited Technical Inspection Report

3.3 A002 Repair Cost Estimate (Contractor Format)

3.4 A003 Post Repair Inspection Checklist

6.0 SPECIAL CONSIDERATIONS

6.1 Security

While the vehicle is at the Contractor’s place of business, the vehicle will need to be secured. The ideal situation would be that the vehicle is contained in an access controlled lot. If this is not available, securing the vehicles independently is acceptable. Securing the vehicles can be done by locking the doors (if locks are present) or placing padlocks on the doors.

6.2 Government Personnel in Contractor Workspace

Some of the vehicles are at NSWC Crane for the purpose of receiving Engineering Change Proposals (ECPs) in addition to the vehicle maintenance to be provided by the Contractor. Depending on the complexity, NSWC Crane personnel may train Contractor personnel to perform the ECPs. This would occur at the Contractor facility. It may also be necessary for NSWC Crane personnel to perform the ECPs at the Contractor facility. The extent of this work is unknown.

SECTION 4.0 - CLAUSES & OTHER FULL TEXT INFORMATION

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 CLIN Structure for

Pricing and Delivery

8 15-JUN-2018

Proposal Attachment 2 LTI Process and Checklist 2 15-JUN-2018 Attachment 3 Defense Material

Disposition Manual

92 15-JUN-2018

Attachment 4 Repair Methods for Delaminated Transparent Armor

49 15-JUN-2018

Attachment 5 CDRLS A001-A003 9 15-JUN-2018 Attachment 6 QASP 9 15-JUN-2018 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 CLIN Structure for

Pricing and Delivery Proposal Amendment 0

11 05-JUL-2018

Attachment 2 LTI Process and Checklist 2 15-JUN-2018 Attachment 3 Defense Material

Disposition Manual

92 15-JUN-2018

Attachment 4 Repair Methods for Delaminated Transparent Armor

49 15-JUN-2018

Attachment 5 CDRLS A001-A003 9 15-JUN-2018 Attachment 6 QASP 9 15-JUN-2018 Attachment 7 NSWC Crane Bearcat

Hours Meter Installation Procedure

5 05-JUL-2018

(End of Summary of Changes)