AMENDMENT 0004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 13RGR34_0007.pdf | ||
| 13RGR34_0006.pdf | ||
| 13RGR34_0005.pdf | ||
| 13RGR34_0003.pdf | ||
| 13RGR34_0002.pdf | ||
| 13RGR34_NECO_documents.zip | ZIP file | |
| N0016413RGR34_13RGR34_syn.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to answ er industry questions and update Section J attachments to include SPS-49 draw ings and SPS-67(V)1 draw ings and extend the proposal due date to 21 August 2013, 2:00PM local time. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
U 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Aug-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00164-13-R-GR34
X 9B. DATED (SEE ITEM 11)
05-Jun-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Aug-2013
CODE
NAVAL SURFACE WARFARE CENTER CRANE DIV
E. FLEETWOOD (812-854-1557)
BLDG. 3168 CODE CXMR
300 HIGHWAY 361
CRANE IN 47522-5001
N00164 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00164-13-R-GR34
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 14-Aug-2013 02:00 PM to 21-Aug-2013 02:00 PM.
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been added by full text:
INDUSTRY QUESTIONS/ANSWERS 3
Question 1: The drawings referenced in Amendment 0003 were not available via www.FBO.gov as of 08/01/13.
Can the Government please advise when the drawings will be made available?
Answer 1: The drawings are currently being uploaded as attachment(s).
Question 2: Assuming the drawings referenced are uploaded as of the date of the submission of this question the extended due date does not allow a sufficient time frame to allow the offeror to obtain adequate pricing based upon the additional drawings. May the offeror develop and submit the pricing associated with these drawings based upon its engineering estimates?
Answer 2: All offerors should propose in accordance with its own approved Estimating System.
Question 3: The clarification to SOW paragraph 3.9.13 states, “The contractor shall also provide repair and refurbishment of subcomponents removed from the antenna systems, as directed by TO.” SOW paragraph 3.9 states, “The contractor shall provide labor only for shipboard installations, removal, testing, and repair for USN and FMS assets.” Does the language in SOW paragraph 3.9.13 supersede the verbiage in paragraph 3.9?
Answer 3: The language in SOW paragraph 3.9.13 supersedes the verbiage in paragraph 3.9. The LPD-17 requires additional steps.
Question 4: Is the additional verbiage in SOW paragraph 3.9.13 expected to be performed within the allotted (26,012) hours specified for CLIN 0029?
Answer 4: Yes. There is no change to Exhibit J.
Question 5: Will additional categories be permitted for overhaul services at the contractor site in support of CLIN 0029?
Answer 5: As previously stated in Amendment 0001, Industry Questions/Answers, Answer #7:
If the offeror believes that other labor categories not provided herein are required for the LOE associated with the performance of this CLIN, please provide the labor categories, number of hours, and proposed rates. Stay within the LOE estimated.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
HQ J-2-0002 CONTRACT LANGUAGE FOR SECTION J
The following document(s), exhibit(s), and other attachment(s) form a part of this contract:
Exhibit A, Appendix A, Parts & Inspection Supplement – AN/SPS-48, 40, page(s);
Exhibit B, Appendix B, Parts & Inspection Supplement – AN/SPS-49, 39, page(s);
Exhibit C, Appendix C, Parts & Inspection Supplement – MK-82, 58, page(s);
Exhibit D, Appendix D, Parts & Inspection Supplement – AN/SPS-67(V)1, 14, page(s);
Exhibit E, Appendix E, Parts & Inspection Supplement – Restoration Work Flow For Established Systems, 1, page(s);
Exhibit F, Appendix F, Parts & Inspection Supplement – Government Furnished Property, Materials, and Equipment, 12, page(s);
Exhibit G, Quality Assurance Surveillance Plan (QASP) – 10 page(s) Exhibit H, Government Furnished Information, NAVSEA 4340/2 (REV. 6-90) – 4 page(s) Exhibit J, CLINs 0029, 0030, 0031 and 0032 Cost Proposal Spreadsheet – 4 page(s) Exhibit K, How to Acquire a TDMIS Account through NSDSA – 5 page(s) Exhibit L, Contract Data Requirements List, DD Form 1423 – CDRL A001 – A016, 16, page(s);
CDRL A001 1 Page 2 July 2013 DID Number: DI-MGMT-80227 DID Title: Contractor's Progress, Status and Management Report
CDRL A002 1 Page 2 July 2013 DID Number: DI-ADMN-81250A DID Title: Conference Minutes
CDRL A003 1 Page 2 July 2013 DID Number: DI-ADMN-81249A DID Title: Conference Agenda
CDRL A004 1 Page 2 July 2013 DID Number: DI-CMAN-80639C DID Title: Engineering Change Proposal (ECP)
CDRL A005 1 Page 2 July 2013 DID Number: DI-MISC-81259A DID Title: Value Engineering Study Proposal
CDRL A006 1 Page 2 July 2013 DID Number: Request for Deviation (RFD) DID Title: DI-CMAN-80640C
CDRL A007 1 Page 2 July 2013 DID Number: DI-MISC-80508B DID Title: Technical Report-Study/Services Subtitle: Repair Part Status
CDRL A008 1 Page 2 July 2013 DID Number: DI-MISC-80508B DID Title: Technical Report-Study/Services Subtitle: GFE/GFP Report
CDRL A009 Deleted CDRL Deleted
CDRL A010 Deleted CDRL Deleted
CDRL A011 1 Page 2 July 2013
DID Number: DI-MISC-80508B DID Title: Technical Report-Study/Services Subtitle: AN/SPS-48 Repair
CDRL A012 1 Page 2 July 2013 DID Number: DI-MISC-80508B DID Title: Technical Report-Study/Services Subtitle: AN/SPS-49 Repair
CDRL A013 1 Page 2 July 2013 DID Number: DI-MISC-80508B DID Title: Technical Report-Study/Services Subtitle: MK-82 Director Repair
CDRL A014 1 Page 2 July 2013 DID Number: DI-MISC-80508B DID Title: Technical Report-Study/Services Subtitle: AN/SPS-67(V)1 Repair
CDRL A015 1 Page 2 July 2013 DID Number: DI-MISC-80508B DID Title: Technical Report-Study/Services Subtitle: Production Report
CDRL A016 1 Page 2 July 2013 DID Number: DI-FNCL-80331A DID Title: Funds and Man-Hours Expenditure Report Subtitle: Task Order Funding Notification Letter
Attachment “1” - Contract Security Classification Specification, DD Form 254 – 2, page(s);
Attachment “2” - Procedures, Instructions, and Drawings –
AN/SPS-40 Page(s) Date 89 TRP 11 6622 AN/SPS-40 Reflector
Overhaul and Repair Procedure
86 Page(s) 22-Oct-12
SE 212-RB-PRO-010 NAVSEA Overhaul and Restoration Procedure for AN/SPS-40 Requirements
739 Page(s) 31-Aug-87
AN/SPS-48
12255-8843-960004 REV B AN/SPS-48E Antenna
Overhaul and Repair Procedure
200 Page(s) 1/17/2013
89 TRP 04 3621 REV A AN/SPS-48 Pedestal Assembly Repair and Overhaul Procedure
120 Page(s) 16-Jan-13
89 WIS 04 3613 AN/SPS-48E Antenna Lifting and Transportation Procedure
33 Page(s) 21-Dec-10
89 TRP 03 3607 REV D AN/SPS-48 Serpentine Assembly Procedure
46 Page(s) 16-Jan-13
89 TRP 03 3608 REV D AN/SPS-48 Serpentine Rework Procedure
42 Page(s) 17-Jan-13
SE213-UE-MDB-010 Overhaul Repair Manual for Pedestal, Radar Set, ITT
343 Page(s) 1-Dec-95
12255-8843-950026 AN/SPS-48 Antenna Space Probe Test Procedure
41 Page(s) 5-May-11
89 WIS 12 3698 DRAFT AN/SPS-48 Antenna Choke Manufacturing Process Work Instruction
21 Page(s) 20-Dec-12
89 TRP 04 3622 REV A AN/SPS-48 Motor Overhaul Procedure
27 Page(s) 10-Jan-13
89 TRP 04 3624 REV A AN/SPS-48 Pedestal Gearbox Overhaul and Repair
57 Page(s) 10-Jan-13
89 TRP 04 3626 AN/SPS-48 Lubrication Pump Repair and Overhaul Procedure
51 Page(s) 13-Jun-11
89 TRP 04 3625 AN/SPS-48 Data Takeoff Repair and Overhaul Procedure
36 Page(s) 5-Dec-12
89 TRP 04 3623 AN/SPS-48 Motor Brake Repair and Overhaul
33 Page(s) 7-Dec-12
AN/SPS-48 Drawings
AN/SPS-49
89 TRP 09 8471 REV B AN/SPS-49 Reflector
Overhaul Procedure 37 Page(s) 15-Jan-13
89 TRP 04 6576 REV D AN/SPS-49 Pedestal Overhaul and Repair Procedure
153 Page(s) 30-Apr-12
89 TRP 05 6583 AN/SPS-49 Pedestal Disassembly Procedure
77 Page(s) 13-Apr-09
89 TRP 04 6587 REV B AN/SPS-49 Pedestal Wiring 86 Page(s) 14-Jan-13
89 TRP 04 6586 REV B AN/SPS-49 Tapping and Stenciling
33 Page(s) 8-Sep-09
89 TRP 05 8414 REV B AN/SPS-49 Motor Generator Overhaul and Repair
60 Page(s) 15-Nov-08
12255-8843-010001 REV C AN/SPS-49 Depot Alignment and Test
46 Page(s) 12-Jul-11
SE110-A2-MMD-10 Overhaul & Repair Manual for Antenna, SPS-49, Vol I
414 Page(s) 1-Jun-90
SE110-A2-MMD-20 Overhaul & Repair Manual for Antenna, SPS-49, Vol II
591 Page(s) 1-Jun-90
Drawing 51-2404 AN/SPS-49 High Voltage Power Supply Transformer
2 Page(s) 6-Nov-73
SE212-V5-SUP-010/AN/SPS-49(V)5 AN/SPS-49 Rotary Joint Mod Field Change 1 (For Dual IFF Pedestal)
38 Page(s) 1-Jan-99
SE212-V9-SUP-010/AN/SPS-49A(V)1 AN/SPS-49 Rotary Joint Mod Field Change 1 (For Dual IFF Pedestal)
42 Page(s) 1-Apr-00
AN/SPS-49 Drawings
AN/SPS-55
None None Page(s)
AN/SPS-67(V)1
89 TRP 09 7815 REV A AN/SPS-67 (V) 1 Overhaul and Acceptance Test Procedure
125 Page(s) 16-Jan-13
0967-156-3040 NAVSHIPS Tech Manual for Antenna Assemblies AS-
936()/SPS-10B
152 Page(s) 15-Apr-70
AN/SPS-67(V)1 drawings
AN/SPS-67(V)3/5
None None
AN/SPG-62
89 TRP 04 7602 REV B AN/SPG-62 Overhaul and
Repair Procedure 127 Page(s) 20-Mar-06
TW272-AH-PRO-060
**(See Attachment 6)
AEGIS AS-3444/SPG-62,
Composite Coating System and Refinishing Procedure
MK-82 Page(s) 89 TRP 10 9114 REV A MK-82 AEGIS Director
Overhaul and Repair Procedure
220 Page(s) 16-Jan-13
89 TPA 11 9215 Factory Acceptance Test Procedure
172 Page(s) 26-Sep-12
89 TPA 11 9221 Collimation Procedure 55 Page(s) 19-Sep-12 89 TRP 11 9161 Elevation Head Overhaul and Repair Procedure 120 Page(s) 19-Sep-12
89 TRP 11 9162 Train Base Overhaul and Repair Procedure
142 Page(s) 19-Sep-12
TW272-AE-PRO-110
**(See Attachment 6)
FCS MK-99 Metal Surface Refurbishment Procedures and Logbook 63394A18
MK-82 Drawings
Instructions NSWC Crane Instruction 12570.1 Deployment Process for
OCONUS Travel Requirements
11 Page(s) 26-Sep-11
89 TRP 129240 is the Physical Repair Procedure contained within each system and not a separate document
(End of Summary of Changes)