N0010426RK065.pdf

PDF 3 MB Posted

Attached to
SS67, MK 109 Mod 1 Canopy Jettison Rocket Motor (CJRM)
Solicitation number
N0010426RK065
Issued by

About this file

This is a sealed bid solicitation (RFP) issued by Naval Supply Systems Support (NAVSUP) for the procurement of SS67 MK 109 Mod 1 Canopy Jettison Rocket Motor (CJRM) units, which are explosive propellant-actuated devices used in F-18 aircraft emergency canopy ejection systems. The solicitation, N0010426RK065, was issued on March 31, 2026, with offers due by May 5, 2026, at 2:00 PM. The requirement includes first article testing (FAT) samples, lot acceptance testing samples, and production deliverables totaling 198 units for domestic use and 48 units for Foreign Military Sales (FMS) cases to Finland and Kuwait. The procurement is on a firm fixed-price basis with delivery schedules extending to 795 days after contract award, with an estimated FAT cost of $302,500.00 that will be added to evaluated offers. Offerors must comply with extensive technical specifications including MIL-DTL-85097E Amendment 1, detailed configuration management requirements, radiographic inspection protocols, energetic materials analysis, and ammunition data card submissions. The contract requires CMMC Level 2 (C3PAO) cybersecurity certification, compliance with DoD Manual 4145.26 for ammunition and explosives safety, and adherence to DFARS clauses regarding specialty metals, covered defense telecommunications equipment, and rights in technical data. Evaluation will be based on past performance (quality, timeliness, small business utilization), small business participation commitment, and price, with past performance weighted significantly more heavily than price. The Government reserves the right to award without discussion and requires proposals to address the Government-furnished percussion primers/ignition devices, maintain 20-year data retention, and provide unique item identification for all deliverables per DFARS 252.211-7003.

View the file

Other files

File Type Posted
Amendment 4 N0010426RK065.pdf PDF
Amendment 3 N0010426RK065.pdf PDF
Amendment 2 N0010426RK065.pdf PDF
SS67 GFP Attachment Rev_26RK065.xlsx XLSX spreadsheet
Amendment 1 N0010426RK065.pdf PDF
CDRLs_26RK065.pdf PDF
ADC SOW Rev Basic dated Jan 2018.pdf PDF
ADC MASTER Rev 16.pdf PDF
CADPAD Item Marking Instruction Ver 1.6.pdf PDF
RFV Form DD1694 Example Only dated 6_5_25.pdf PDF
SS67 GFP Attachment_26RK065.xlsx XLSX spreadsheet
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION

15A. NAME AND

ADDRESS

OF OFFEROR

SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.

RATING PAGE OF PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXTENSION

C. EMAIL ADDRESS

11. TABLE OF CONTENTS

(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION

A B C D E F G H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause Number 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)

DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE

UNITED STATES CODE AT:

10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.214 (c)

SEALED BID (IFB) INVITATION FOR BID

NEGOTIATED (RFP) REQUEST FOR

PROPOSAL

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

FMS Requirement

Section A - Solicitation/Contract Form

SS67

N0010426RK065

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

1. This item is a CSI - Critical Safety Item.

2. See Section L for proposal submission instructions. Electronic submission of an offer may be accomplished by attaching your offer to an email directed to stacey.l.romberger.civ@us.navy.mil.

Item Supplies/Service Quantity Unit Unit Price Amount

SS67

MK 109 Mod 1 Canopy Jettison Rocket Motor (CJRM)

NAVAIR DWG 1507AS201

Total Quantity for CLIN- 198 Information Only - This item is used in the following Systems /Configurations: F-18

National Stock Number: 1377014549321

0001AA

TECHNICAL DATA - See DD Form 1423, Exhibit A

National Stock Number: 1377014549321 Pricing Arrangement: Firm Fixed Price

1 Set

Additional Descriptive Data:

This item is NOT SEPARATELY PRICED (NSP).

0001AB

FIRST ARTICLE TEST SAMPLES

Consists of: 20 Each for testing and 1 Each for investigative purposes

Ownership Code: 3

National Stock Number: 1377014549321 Pricing Arrangement: Firm Fixed Price

20 Each

Additional Descriptive Data:

This item is NOT SEPARATELY PRICED (NSP).

0001AC

INVESTIGATIVE UNIT(S) (FAT):

Consists of: 20 Each for testing and 1 Each for investigative purposes

Ownership Code: 3

National Stock Number: 1377014549321 Pricing Arrangement: Firm Fixed Price

1 Each

Additional Descriptive Data:

This item is NOT SEPARATELY PRICED (NSP).

0001AD

FIRST ARTICLE TEST SAMPLES - C-BIT - C-BIT samples for each batch of propellant used in the First Article Test Samples IAW MIL-DTL-85097E Amd. 1

Ownership Code: 3

National Stock Number: 1377014549321 Pricing Arrangement: Firm Fixed Price

5 Each

Additional Descriptive Data:

This item is NOT SEPARATELY PRICED (NSP).

0001AE

FIRST ARTICLE TEST SAMPLES - GRAIN - Propellant grain samples for each batch of propellant used in the First Article Test Samples IAW MIL-DTL-85097E Amd. 1

Ownership Code: 3

National Stock Number: 1377014549321 Pricing Arrangement: Firm Fixed Price

2 Each

Additional Descriptive Data:

This item is NOT SEPARATELY PRICED (NSP).

0001AF

FIRST ARTICLE TEST SAMPLES - BLOCKS - Blocks of cured propellant from each batch of propellant used in the First Article Test Samples IAW MIL-DTL-85097E Amd. 1

Ownership Code: 3

National Stock Number: 1377014549321 Pricing Arrangement: Firm Fixed Price

4 Each

Additional Descriptive Data:

This item is NOT SEPARATELY PRICED (NSP).

PRODUCTION LOT TEST SAMPLES

Consists of: 1 Lot of 198 each net, plus an additional 21 each per lot for test. (20 each for test and 1 each for investigative purposes.)

0001AG

Ownership Code 3

National Stock Number: 1377014549321 Pricing Arrangement: Firm Fixed Price

20 Each

Additional Descriptive Data:

This item is NOT SEPARATELY PRICED (NSP).

0001AH

INVESTIGATIVE UNIT

Consists of: 1 Lot of 198 each net, plus an additional 21 each per lot for test. (20 each for test and 1 each for investigative purposes.)

Ownership Code 3

National Stock Number: 1377014549321 Pricing Arrangement: Firm Fixed Price

1 Each

Additional Descriptive Data:

This item is NOT SEPARATELY PRICED (NSP).

0001AJ

SS67

MK 109 Mod 1 Canopy Jettison Rocket Motor (CJRM)

NAVAIR DWG 1507AS201

FMS Case- FI-P-PAH / 26P02FI 006

Ownership Code 8

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

National Stock Number: 1377014549321 Pricing Arrangement: Firm Fixed Price

6 Each

0001AK

SS67

MK 109 Mod 1 Canopy Jettison Rocket Motor (CJRM)

NAVAIR DWG 1507AS201

FMS Case- KU-P-PAH / 26P03KU 038

Ownership Code 8

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

National Stock Number: 1377014549321 Pricing Arrangement: Firm Fixed Price

42 Each

SS67

MK 109 Mod 1 Canopy Jettison Rocket Motor (CJRM)

NAVAIR DWG 1507AS201

0001AL

FY26 PANMC F/A18

Ownership Code: 5

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

National Stock Number: 1377014549321 Pricing Arrangement: Firm Fixed Price

150 Each

Section C - Description/Specifications/Statement of Work

SECTION C - DESCRIPTION AND SPECIFICATIONS

NOTE 1: NON-ANTICIPATION OF INITIAL DEVIATIONS ON AWARDS

Offerors are reminded that any resultant contract will require performance in strict compliance with the specifications set forth therein, and that prices offered should not be predicated upon Contractor anticipation of Government authorization of deviations, even though such deviations may have been granted previously under other contracts for the same item.

NOTE 2: SPECIFICATIONS THAT DO NOT INDICATE SPECIFIC REVISION LEVELS ARE TO BE MADE TO THE REVISION LEVELS LISTED IN THE ASSIST DATABASE AT http://assist.daps.dla.mil IN EFFECT AT THE TIME OF SOLICITATION

ISSUANCE.

1. DATA LIST / PART NUMBERS / DRAWING NUMBERS:

CLIN DATA LIST / PART OR DRAWING NUMBERS REVISION REVISION DATE

0001 DL1507AS201, MK 109 MOD 1 CJRM P 1/13/2026

a. EXCEPTION to MIL-DTL-95097/13 (Approved ECP25-0013)

2. SPECIFICATIONS:

CLIN SPECIFICATIONS REVISION REVISION DATE

0001 MIL-DTL-85097 E Amdt. 1 07/2/2001

0001 MIL-DTL-85097/13(OS) C 04/20/2000

0001 DTL-WS-35787 (OS) NSWC/IH-EC-8 PROPELLANT (MOD 2, HTPB) N/R 09/27/2017

0001 NSWC IHD 510-174TD-005 (Liner, NSWC/IH-LINEC-8) - 08/04/1997

3. Obsolescence Alert Notice: The contractor shall notify the USG that a pending and/or emergent obsolescence issue exists by submitting a Obsolescence Alert Notice in accordance with DD1423, sequence number A001.

4. DMSMS Report: Diminishing Manufacturing Sources and Material Shortages (DMSMS) is the loss, or impending loss, of manufacturers or suppliers of items, raw materials or software. The obsolescence alert notice shall contain:

1. Contractor's Name

2. Contractor's Address

3. Contractor's Phone Number

4. Date of Notification

5. Contract Number

6. Obsolescence Alert Notice Number

7. Affected Equipment Title/Nomenclature

8. Part Number

9. National Stock Number, if applicable

10. Affected Assembly Title/Nomenclature

a. Part Number

b. National Stock Number, if applicable

11. Affected Subassembly/Element/Module Title/Nomenclature

a. Part number

b. National Stock Number, if applicable

12. Contractor's Statement of Impact

13. Contractor's Recommendation to Mitigate Obsolescence Issue/Problem, to include, as applicable:

a. Alternative Sources

b. Hardware Redesign

c. Out of Production Non-Recurring Engineering

14. Contractor's Cost Estimate to Mitigate Obsolescence Issue/Problem

The Contractor shall submit a DMSMS Health Assessment Report for approval/disapproval as specified in Contract Data Requirements List (CDRL) DD Form 1423, sequence number A002 and in accordance with Electronic Code of Federal Regulations (CFR) 48 CFR 2.101. Data delivered using the DMSMS Health Assessment Report will be used to support DMSMS management activities as a part of the Department of Defense (DoD) Total System Life Cycle Management responsibilities.

5. Project Planning Chart: The Contractor shall submit project planning charts for each production and first article test (FAT) lot for approval /disapproval as specified in Contract Data Requirements List (CDRL) DD Form 1423, sequence number A003. Submittal shall be 120 days after award and every 120 days thereafter until contract close-out actions are completed. The Project Planning Chart depicts the schedule and actual progress of work on a contract. This status or progress report shall illustrate the amount of work accomplished relative to the work schedule.

Additionally, the contractor shall conduct two project management reviews per year with the Government to detail project planning execution with the customer until contract close-out actions are completed. The content of the Project Planning Chart shall include:

1. Depiction of the actual and scheduled progress for each subdivision using horizontal lines and symbols. Actual progress will be noted by a percentage of the completion figure.

2. Subsequent additions to the work breakdown shall be made as they occur in contract work performance. Items shall not be deleted even though work may be cancelled or stopped before completion.

3. Description entry on the chart will be by task. Tasks are divided into subdivisions. Entries shall be complete and reflect all contract effort.

4. Milestone symbol. The triangle symbol will be white if the task has not been achieved. It shall be shaded if the task has been achieved.

5. Date released. Last date to which chart was posted.

6. Date revised. Date of subsequent contract modification.

7. Contractor name.

8. Contract title.

9. Contract number.

10. Purchase description number. Input NSN.

11. Security classification. Refer to Section I.

12. Delivery dates. Includes dates for all deliverable items.

13. Scheduled starting date. Date each subdivision of work is scheduled to start.

14. Actual starting date. Date each subdivision of work actually started.

15. Scheduled completion date. Date each subdivision of work is scheduled for completion.

16. Actual completion date. Date each subdivision of work actually was completed.

SECTION C - CONFIGURATION CONTROL: SAE EIA-649 (NAVY STOCK CLASS 1377)

1. Configuration Control - The Contractor shall maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration shall be provided to the Government in electronic format.

All contractor configuration changes that occurred between contract awards shall be submitted to the Government for approval within 45 days of contract award.

Any configuration changes after contract award shall be submitted within 45 days of contract award.

All configuration changes shall be submitted at least 60 days prior to Lot Acceptance Testing.

2. Variances - Requests for Variance (RFV) - RFVs shall be designated as Critical, Major, or Minor. The Contractor shall submit RFVs using RFV DD Form 1694 and shall include information as outlined in SAE EIA-649, Configuration Management Standard, and MIL-HDBK-61, Configuration Management Guidance, for additional guidance on preparation of RFVs.

Note: A copy of the required RFV Form DD Form 1694 is available at:

https://www.esd.whs.mil/Directives/forms/dd1500_1999/

Additional guidance for completion of RFV can be found at the Attachment "RFV Form DD1694 Example Only dated 02/21/2025". This attachment is incorporated by reference with the same force and effect as if contained herein.

The Contractor's assigned RFV number shall use the following numbering format:

a. The last seven alpha-numeric characters of the contract number followed by a dash ().

b. The letter "V", followed by consecutively assigned numeric characters beginning with 001.

Definitions of RFV Classifications: (See current SAE EIA 649 and MIL-HDBK-61, Configuration Management Guidance, for additional guidance on critical, major and minor classifications.)

Critical: Critical variances impact safety, health, environment, or other critical requirement. A departure from a requirement classified as critical in configuration documentation.

Major: Major variances have significant impacts such as performance or operational limits, structural strength, interchangeability, reliability, survivability, maintainability, durability of the item or repair parts, supportability, cost, effective use or operation, weight or size, or appearance. A departure from a requirement classified as major in configuration documentation.

Minor: Minor variances are issued when departure does not involve any of the factors listed for critical or major variance. Minor variances have little or no impact and are generally associated with non-functional factory defects that can be dispositioned locally as: "use as is" or "after suitable repair". A departure from a requirement classified as minor in configuration documentation.

3. Technical approval authority for RFVs and ECPs is NSWC IHD

4. Final approval of any ECP and/or RFV shall be in writing, by the Contracting Officer, NAVSUP Weapon Systems Support.

5. Contractors do not have Material Review Board (MRB) authority.

a. Authorization to accept "as-is" or repair any nonconformance is specifically retained by the Contracting Officer. The contractor's MRB shall not make any use "as-is" or "repair" disposition on any nonconformance, and the MRB recommendations shall be submitted per paragraph four (4) above.

b. Authorization to rework the lot prior to submission to the Government for inspection and acceptance is allowed for all parts, subassemblies, and even the end item that undergoes in-process screening for defects. Such rework under the direction of the contractor must ensure all parts meet the requirements of the Technical Data Package (TDP) and/or detailed specification.

c. Authorization to rework the lot after submission to the Government for inspection and acceptance is specifically retained by the contracting officer. The MRB recommendations shall be submitted per paragraph six (6) below. Rework of a lot to correct a deficiency after it has been presented to the Government may require the lot number and all the associated records to be changed, per the requirements of MIL-STD-1168.

If the contractor recommends, through an internal MRB, to process non-conforming parts, subassemblies, or the end item for use "as-is" or "repaired", then the contractor will be required to submit a Request for Variance (RFV) to the Government for disposition. If a non-conformance is discovered, which results in a failure of the item to meet the requirements of the TDP or detailed specification after the lot has been presented to the Government, then the contractor will be required to provide to the Government documentation such as RFVs, Discrepancy Reports (DR) related to contractor's MRBs, and/or rework procedures used to correct the deficiency (if applicable).

6. Rework and Repair are defined as follows:

a. Rework: The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

b. Repair: The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

SECTION C - IDENTIFICATION OF COVERED DEFENSE INFORMATION (In Reference to 252.204-7012)

1. In accordance with the DFARS clause at 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, the Contractor shall provide adequate security for all government and contractor owned Technical Data Packages (TDPs), drawings and item detail specifications on all covered defense information systems that support the performance of work under this contract.

Requirements Section C Requirement Description - SS67 MK 109 Mod 1 Canopy Jettison Rocket Motor (CJRM) is a solid propellant rocket motor that ejects the canopy during emergency aircrew ejection from the F-18 aircraft.

Section D - Packaging and Marking

SECTION D - UID CAD/PAD ITEM MARKING INFORMATION

Unless otherwise specified in the Technical Data Package (TDP), CAD/PAD items meet the Human Readable Information (HRSI) marking shall requirements of paragraph 3.1 of the attachment " . The Machine Readable Information (MRI) Data CAD/PAD Item Marking Instruction Version 1.6" Construct, paragraph 3.2, and Placement of Unique Identification (UID), paragraph 4, are mandatory requirements.

NOTE: UID marking is for investigative units (also known as retains). UID under the WAWF DD250s is not required for REQUIRED reporting investigative units.

SECTION D - PACKING, MARKING, AND TRANSPORTATION

1. Preservation, packaging, packing, and marking be in accordance with MIL-STD-129, MIL-STD-2073, CFR 49 171-178, MIL-STD-130, shall DLAR 4145.41, and Section Five (5) of Specification MIL-DTL-85097E (OS).

2. Packaging and packing for production lots, first article samples and lot acceptance samples be IAW the following by item: shall

CLIN QUP IAW

0001 1 Per Box MIL-DTL-85097E1

NOTE: Quantity per Unit Pack (QUP) is defined as the first tie, wrap, or container applied to a single item, or a quantity thereof, or to a group of items of a single stock number, preserved or unpreserved, which constitutes a complete or identifiable package.

3. Labels for Human Readable Information (HRI) and Machine Readable Information (MRI) meet the requirements for a Grade A, Style 2, shall Composition (b) label as specified in MIL-PRF-61002. The performance requirements for solvent and detergent resistance are not required. The label should be the pressure sensitive adhesive type.

4. Human Readable Information (HRI) markings be applied to ammunition, explosives containers and units loads IAW the applicable shall provisions of MIL-STD-129.

a. At a minimum, inner container markings for CLIN 0001 include: shall

National Stock Number and (DoD) Code: ) (see Section "B" for applicable CLIN

Item Nomenclature: (see Section "B" for applicable CLIN)

Item Assembly Drawing Number: ) (see Section "B" for applicable CLIN

Quantity: As Applicable

Lot Number: IAW MIL-STD-1168

Serial Number: Required ( x ) N/A ( )

b. At a minimum, outer container markings for CLIN 0001 include: shall

National Stock Number and (DoD) Code: ) (see Section "B" for applicable CLIN

Item Nomenclature: (see section "B" for applicable CLIN)

Item Assembly Drawing Number: ) (see Section "B" for applicable CLIN

Quantity: As Applicable

Lot Number: IAW MIL-STD-1168

Serial Number: Required ( x) N/A ( )

Gross Weight and Cube: As Applicable

DoD Contract Number: As Applicable

POP Markings: (see Section "D" - Packaging, Marking and Transportation paragraph 6a - below.)

UN Proper Shipping Name, UN Number, Hazard Class, Compatibility Code, Net Explosive Weight, and EX Number: (see TABLE 1 below for )applicable CLIN

CAA: USG DOT 'EX NUMBER'

( )see TABLE 1 EX NUMBER COLUMN below for applicable CLIN Example CAA: USG DOT 880832

Table 1: United Nations Shipping/Storage Information

CLIN NUM UN Proper Shipping Name UN Number Hazard Class COMPA. Code Net Explosive WT (lbs) EX Number

0001 Rocket Motor 0186 1.3 C 1.01 lbs 1999100217

5. Machine Readable Information (MRI) markings be applied to ammunition, explosive containers and unit loads IAW the following coded shall elements of data from MIL-STD-129. MRI labels able to be read and interpreted by automatic bar code reading devices (scanners). MRI shall markings contain the minimum data elements identified below:shall

a. Inner container:

(N) National Stock Number: (see Section "B" for applicable CLIN)

(4R) Department of Defense identification code (DODIC): (see Section "B" for applicable CLIN)

(1P) Item Assembly Drawing Number: (see Section "B" for applicable CLIN)

(1T) Lot Number: IAW MIL-STD-1168

(S) Serial Number: Required ( x) N/A ( )

b. Outer container:

(N) National Stock Number: (see Section "B" for applicable CLIN)

(4R) Department of Defense identification code (DODIC): (see Section "B" for applicable CLIN)

(1P) Item Assembly Drawing Number: (see Section "B" for applicable CLIN)

(7Q) Quantity: As Applicable

(1T) Lot Number: IAW MIL-STD-1168

(S) Serial Number: Required (x) N/A ( )

NOTE: The parenthesis surrounding the data elements are NOT encoded in the 2D(PDF417) bar code.

6. Shipment of hazardous material (which includes devices containing energetic and explosive material) is subject to the requirements of Title 49, Code of Federal Regulations (CFR), the International Maritime Organization's International Maritime Dangerous Goods (IMDG) Code, and the International Civil Aviation Organization (ICAO) Technical Instructions for the safe transport of hazardous goods. The make all contractor shall shipments of hazardous material in packaging approved by Performance Oriented Packaging (POP) testing within its recertification period. If packaging used exceeds a single periodic retest period as regulated in 49 CFR 178.601 or comes from multiple manufacturers, multiple or additional POP Test Reports covering all periods of manufacture/manufacturers are required.

6a. For special packaging instructions (SPI) of USAF origin, the inquire about receiving a copy of the latest DOD performed POP contractor may test. Inquiry be in writing to the contracting officer a minimum of 30 days prior to need.shall

NOTE: Foreign Military Sales (FMS) Shipments: As applicable, all outer containers should be clearly marked with the FMS Case Designation, Requisition Number and Project Code, and Country Specific EX Numbers for NOA required shipments- See Section "F" for proper identification.

7. Traceable seals are required for all ammunition and ordnance items, including inert configuration items. Traceable seals provide an indication of security, integrity and certification of material serviceability. Traceable seals ensure that the ammunition, ordnance and/or inert item is not pilfered or tampered with after being placed in each shipping container at the time of packaging. The shipping container will normally be the outer container.

The Contractor ensure one of the below traceable seals are properly affixed depending on the type of shipping container.shall

a. Type 1 TRACEABLE SEALS (WIRE SEALS): Type 1 seals are the preferred seals for containers having provisions or means for application of the seals, e.g., metal, plastic, fiberglass, or wood containers with lids or hinged covers, latches, brackets or flanges. A Type 1 seal is, typically, a wire length with an aluminum disk or pellet which is crimped or crushed using a die which imprints a "U.S." symbol on one side of the disk/pellet with an individual's traceable serial number on the reverse side of the disk/pellet.

b. Type 2 SEALS (LABEL SEALS): Type 2 seals are the preferred seals for fiberboard or Styrofoam containers or for metal, plastic, fiberglass or wood containers that will not readily accept Type 1 seals. Type 2 seals are, typically, nonmetallic labels with pressure sensitive backing. They may be pre-printed, stamped or marked with a "U.S." symbol. Type 2 seals be applied such that the label must be cut shall or defaced in order to open a container. Adhesives adhere well enough to prevent peeling during shipping conditions and well enough shall to prevent lifting and replacement of the label. Particular consideration be given to label seals required to adhere to wood and shall fiberboard surfaces.

8. Restrictions Involving Non-Manufactured Wood Packaging (NMWP) and Pallets (per Defense Logistics Agency Directive subpart 47.305-1(c) (90): " wooden pallets and wood containers produced of non-manufactured wood be constructed from Heat Treated (HT to 56 degrees All shall Centigrade for 30 minutes) material and certified by an accredited agency recognized by the American Lumber Standards Committee (ALSC) in accordance with Non-manufactured Wood Packing Policy and Non-manufactured Wood Packing Enforcement Regulations, both dated May 30, 2001."

SECTION D - PALLETIZATION

Production Lot units be palletized in accordance MIL-STD-1322, MIL-STD-1322-1000, MIL-STD-129, MIL-STD-130, and CFR 49 171-178 shall with the following exception:

a. Edge protectors be used under all strapping. shall

Section E - Inspection and Acceptance

SECTION E - PRODUCTION LOT TEST SAMPLES (NSWC IHD TESTING)

1. Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001AA Technical Data See DD1423 See DD1423 See DD1423 See DD1423

0001AB First Article Testing Contractor Government Destination Government

0001AC FAT Investigative Units Contractor Government Destination Government

0001AD First Article Testing - C-Bits Contractor Government Destination Government

0001AE First Article Testing - Grains Contractor Government Destination Government

0001AF First Article Testing - Blocks Contractor Government Destination Government

0001AG Lot Acceptance Testing Contractor Government Destination Government

0001AH LAT Investigative Units Contractor Government Destination Government

0001AJ-0001AL Production Units Contractor Government Contractor Government

If supplies will be packaged at a location different from the offeror address indicated on the solicitation, the offeror shall provide the name and street address of the packaging location:

Packaging House

Address

2. Test samples are required from each production lot. A production lot shall consist of the net deliverable quantity plus additional units for lot test samples and any retains for investigative purposes (if applicable) as detailed in section B. The performance, tests, and/or other characteristics, which the sample units must meet, shall be in accordance with the requirements of Section C of this contract (unless following the exception noted in paragraph 3 below).

3. The contractor is allowed to pre-select no more than 30% of the required production lot test samples per lot which have minor external cosmetic defects such as nicks, dings, scratches, paint blemishes, plating blemishes, and small burrs. These units can be used as pre-selected production lot test

The selection of the samples as long as the defects do not create an interference with the form, fit, or function of the unit and/or test fixture.

production lot test samples shall be noted in a discrepancy report (DR) identifying the item part number, DODIC, contract, lot number, serial numbers of the pre-selected units, and the cosmetic defects of each serial number. A copy of the DR shall be submitted to the Contracting Officer. A second copy of the DR shall be submitted to DCMA/QAR when presenting the production lot for random selection of the remaining lot test samples as stated in paragraph 4 below. The contractor shall also annotate the DR number in the remarks section of the ADC for the applicable production lot. This clause is only applicable to the production lot test samples and the external cosmetic defects mentioned above. If additional units with minor external cosmetic defects are part of the deliverable lot and the contractor would like for the government to accept those units "as is", then a RFV shall be submitted to the Contracting Officer for the determination of disposition for those non-compliant deliverable units.

4. The production lot(s) must be manufactured and presented to the Government Quality Assurance Representative (QAR) with all applicable documentation. The documentation (WAWF-RRs and Ammunition Data Card printed from WARP) accompanying the production lot shall contain the contract number, item, lot number identification, DODIC, NSN, and serial numbers. The production lot test samples shall be selected, at random (unless following the exception noted in paragraph 3 above), from each production lot, by the QAR. The retains are considered part of the production lot test samples and shall also be selected, at random, from each production lot, by the QAR and identified as such.

NOTE: Sample units removed for testing from different lots shall not be commingled.

5. After the selection of the production lot samples and all required data, the samples shall be furnished and shipped by the Contractor to the testing activity set forth in within 15 calendar days of selection at no additional charge to the Government. The production lot test samples shall not Section F be considered received until all data necessary to evaluate the samples is received. (This data includes, but is not limited to, radiographic requirements specified in Section E - Inspection and Acceptance, Ammunition Data Card from WARP, and WAWF-RR.)

6. The following activity will conduct production lot testing: Naval Surface Warfare Center Indian Head Division

7. -Disposition of Production Lot Test Samples

The production lot samples might be subject to Non-Destructive Test (NDT) depending on the requirements delineated by the TDP and/or item specification specified in section C.

NOTE: If a test failure occurs during the Non-Destructive Test (NDT) phase of LAT, the engineering activity is authorize to continue with the remainder NDT series prior halting test (i.e. resistance failure and leak test still remains).

The production lot test samples are also subjected to destructive testing. These units cannot be used to meet fleet support requirements. Samples tested will not be returned to the Contractor. However, in the event there is a failure, or samples are rejected for some other reason, the Contractor may request the return of the affected samples and/or the entire production lot samples for disposition/examination and/or investigation. The written request to return rejected samples and/or the entire production lot samples shall be received by the Contracting Officer within fifteen (15) calendar days after notification of rejection. Any samples returned will be at the Contractor's expense.

8. All other contractual requirements, such as acceptance, shipment, and payment will not be accomplished until the production lot test samples have been tested, approved, and released for service use. The Contractor shall not make shipment of the production lot until receipt of written notification of approval by the Contracting Officer and final approval of the Material Inspection Receiving Report in Wide Area Workflow (WAWF).

9. The only valid and contractually binding notification of production lot approval, conditional approval, or disapproval shall be in writing and issued by the Contracting Officer. This notification shall be made to the Contractor, within sixty (60) calendar days, after receipt of the production lot test samples, all required CDRLs and all necessary data by the Government Testing Activity. Any CDRLs provided by the Contractor deemed to be inaccurate and/or incomplete after engineering review will automatically reset the notification of production lot approval, conditional approval, or disapproval. Upon receipt of written notice accepting a production lot, shipment shall be made as soon as possible and no later than fifteen (15) calendar days after receipt of such notice.

a. Any notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.

b. A notice of conditional approval shall state any further action required by the Contractor.

c. A notice of disapproval shall cite reasons for such. In the event of a failure, the Contractor shall submit a Failure Analysis and Corrective Action Report (DD Form 1423, sequence number, ) with all associated costs and expenses to be borne solely by the Contractor. A004 "Failure" is defined as follows:

(i) Any of the test samples failing to meet the requirements of the specification and/or drawing,

(ii) Any of the test samples fracturing and/or exhibiting any cracks post-firing, unless specifically designed to do so,

(iii) A non-ignition or failure to fire.

10. At a minimum, the following is required:

a. Failure date

b. Failed part number (e.g. national stock number (NSN), logistics control number, work unit code)

c. Test or mission being performed when the failure occurred(LAT/FAT)

d. Failure symptoms and description of detection or diagnosis methods (e.g. Built In Test)

e. Failure effects (e.g. none, degradation, abort)

f. Repair action (e.g. remove/replace)

g. Failure mode description

h. Failure mechanism/cause of failure

i. Contributing factors, including multiple factor interactions, or secondary effects of the failure

j. Corrective action required to mitigate the failure mode, including:

- Identification of the failure mode

- The recommended process or process control changes, when the failure cause is due to workmanship defects

- Proposals for retrofit of all equipment already delivered or assembled, including recommended effectivity, in accordance with the contract

- Disposition of all defective material and material rendered obsolete because of any necessary redesign, to assure their exclusion from production items

- Identification of previous functional and environmental qualification tests, if any, invalidated by the corrective action changes and recommendation of those tests that should be repeated, in accordance with the terms of the contract, to demonstrate the corrective action's effectiveness.

11. If the production lot test sample is disapproved by the Government, the Contractor may be required, at the option of the Government and at the Contractor's sole cost and expense, to submit an additional production lot test sample(s) for test. After each notification by the Contracting Officer to submit an additional production lot test sample(s), the Contractor shall, at no additional cost to the Government, make any necessary changes, modifications, or repairs to the production lot or the Government QAR may be required to select another test sample for testing. Such additional test sample(s) shall be furnished to the Government under the terms and conditions and within the time specified in the notification. The Government shall take action on this test sample(s) within sixty (60) calendar days after receipt. The cost of each additional approval, and all costs and expenses related to such test(s) shall be borne solely by the Contractor.

Retest Cost for Item 0001 is: $55,102.70. (NOTE: Test costs are based on actual rates in effect at the time of issuance of the solicitation. In the The Government reserves the right to require an equitable decrease of the event of a test failure, actual cost at the time of retest will be assessed.)

contract price for any extension of the delivery schedule necessitated by additional tests.

12. If the Contractor fails to deliver any production lot test sample(s) within the time or times specified, or if the Contracting Officer disapproves any of the required CDRLs, the contract may be deemed to have failed to make delivery within the meaning of the "Default" clause of this contract, and this contract may be subject to termination for default. In such an event, failure of the Government to terminate this contract for default shall not relieve the Contractor of the responsibility to meet the delivery schedule for production quantities.

SECTION E - CAD/PAD INSPECTION AND ACCEPTANCE

1. Inspection and acceptance shall be in accordance with MIL-DTL-85097E(OS), MIL-DTL-85097/13(OS), DTL-WS-35787, NSWC IHEODTD 510-174TD-005, and DL 1507AS201

2. The Government reserves the right to invoke the requirement for First Article Testing (FAT) if there is a change in process, facilities, materials, equipment, or production of the item. "Process" is defined as the steps or tasks that are performed to create a product. An example of a process change that could invoke FAT is implementation of a new production line. "Facilities" is defined as location or buildings where the process(es) are performed to manufacture a product. A contractor may have several buildings already approved for manufacture of the item that do not require notice if already approved. "Materials" is defined as all the raw ingredients that are used in the manufacturing of the item. An example of a material change that could invoke FAT is a new energetic material supplier, which will need to meet the requirements of the applicable specification. "Equipment" is defined as all the tools used to manufacture a product. An example of an equipment change that could invoke FAT is a machine upgrade that changes energetic material processing technique. "Production" is defined as to make, manufacture, or create a product. An example of a production change that could invoke FAT is a revised method to manufacture delay composition. FAT can also be invoked if two years or more have passed since the item was last manufactured, or if the item has developed a manufacturing or performance related issue that can affect form, fit, or function such as changes to technical requirements, performance, interoperability, supportability, maintainability, or safety.

If there is a desire to have predetermination of a potential change to the process, facilities, materials, equipment, or production of the item, a proposal describing the change and any supporting documentation should be written in a formal letter and provided to the Contracting Officer. The Contracting Officer will provide the letter with the supporting documentation of the proposed changes to the cognizant engineering activity. A formal response on the determination of whether an FAT is required may be provided within fifteen (15) business days after receipt from the Contracting Officer.

Note: The examples provided above are not meant to be all inclusive. The Government shall have the final decision if FAT is invoked based on the proposed change submitted by the contractor as well as the Technical Data Package and/or item specification incorporated by reference in Section C.

3. The Contractor shall provide and maintain a quality program acceptable to the Government and modeled on ISO 9001:2015 or an equivalent quality system. If the quality program is not modeled on ISO 9001:2015 the offeror/prospective Contractor shall indicate the quality system proposed along with how it is equivalent, under separate letter submitted with the offer/proposal.

ISO 9001:2015 Other

This quality system along with program specific production documentation shall be made available for review by the Government's representative upon request, at the Contractor's facility at no cost to the Government.

4. Due to the critical nature and safety application of these items, the Contractor and the QAR are cautioned that it is mandatory to ensure the correct identification and nomenclature are assigned for all items and shipping containers prior to shipment including CAGE codes. CAD/PAD Devices are exempt from MIL-STD-129 shelf life markings on packaging; however, they shall have a minimum of 85% of the shelf life remaining at time of delivery. Any delivery from a contractor not having at least 85% shelf-life remaining shall be considered non-conforming.

NOTE: The shelf life for CLIN 0001 is: 12 years and 0 months.

5. Radiographic equipment and procedures shall meet the standards stipulated in the latest revision specification ASTM E1742. Neutron radiography (N-rays), when required for a specific item, shall meet the requirements of ASTM E748 and ASTM E545.

6. Radiographers shall be certified level II or III and qualified in accordance with the requirements described in specification NAS 410.

7. Radiographic Test Technique (RTT) shall include variables which affect the exposure, such as x-ray source, kV or MeV (voltage), mA (current), SFD (Source to Film Distance), or SDD (Source to Detector Distance), exposure time, and film type/detector, and include a diagram or photo of the test setup.

8. Radiographic Test Technique for X-rays and N-rays, as applicable, shall be submitted with the First Article Test (FAT) samples to the activity cited below. If there is no FAT requirement, the radiographic test technique for X-rays and N-rays, as applicable, shall be submitted to the activity below as described in paragraphs 8a and 8b herein.

**(NO EXPLOSIVES TO BE SENT TO THIS ADDRESS)**

NSWC IHD

CAD/PAD DIVISION BLDG 1557

ATTN: AMS Per Section H

4393 BENSON ROAD

INDIAN HEAD MD 20640-5092

a. Test technique information for is specified in section 6 of ASTM E1742, refer to Contract Data Requirement List ALL radiographs (CDRL) DD Form 1423 sequence number . The radiographic images shall display a number of units representative of a production lot.A005 Units shall be positioned on the radiographic plate at the areas of minimum and maximum geometric distortion.

9. Notification of approval of the RTT shall be provided via Wide Area Workflow (WAWF). Written notification of rejection will be provided by the Contracting Officer. Approval of the RTT must be received prior to performing radiographic inspection of the production lot units. The Contractor shall then follow the approved technique to produce subsequent radiographs in accordance with the approved RTT. Any change in the approved radiographic technique or equipment requires submittal and approval of new RTT at the Contractor's expense.

a. There is hereby created an option for the Government to waive the requirement for submission of a RTT. The Contractor may only request a waiver for the submission of the RTT as long as the Cognizant Engineering Organization (CEO), which is NSWC IHD, has an approved RTT on file from a previous contract, and the x-ray equipment or RTT has not changed since the referenced contract. The following information shall be furnished by the Contractor when submitting the waiver for RTT:

Approved by ____________________________

Date of approval __________________

Contract number under which RTT was approved ________________________________

b. If the submission of the RTT is waived, the previously approved technique shall apply to the contract.

c. If the Contractor requests waiver of submission of the RTT after time of award, an offer of adequate consideration shall accompany the request. In order to fulfill contractual requirements, the Contractor must submit acceptable radiographs. Radiographs should be reviewed by a Level II or Level III certified radiographer in accordance with NAS 410. A radiographic report, including a list of serial numbers inspected, serial numbers rejected, and reason(s) for rejection will be submitted with the radiographs. Radiographs not conforming to the requirements specified herein will not be accepted by NSWC IHD. Disposition of nonconforming radiographs will be by mutual agreement of the parties.

10. In order to fulfill contractual requirements, the Contractor shall submit acceptable radiographs for each Contract Line Item. Radiographs shall be of an image quality to effectively inspect for acceptable assembly of components and defects. Radiographs should be reviewed by a Level II or Level III certified radiographer in accordance with NAS 410. Radiographs not conforming to the requirements specified herein will not be accepted by NSWC IHD. Disposition of nonconforming radiographs will be by mutual agreement of the parties.

11. Representative Quality Indicators (RQI) are recommended to be used on radiographic film or digital images for all CAD/PAD devices. The RQI (also known as a defect standard) contains a known defect (i.e. missing explosive charge, missing O-rings, etc.) placed next to a good unit for comparison, to aid in interpretation. Radiographic test technique shall include RQI to be used and RQI placement.

Propellant grains on PAD devices should be radiographed on film separately from the fully assembled unit even if the final assembly is radiographed using an approved digital radiographic technique. Image Quality Indicators (IQIs) on the radiographic film or digital image must also be used for radiographs of propellant grains for all PAD devices. The penetrometer to be used on the propellant grain radiographs must be made of Magnesium, which is radiographically similar to the propellant. The thickness of the penetrometer must be 2% of the total propellant thickness. The placement of the penetrometer(s) shall be on the part nearest the edge of the film cassette, at the outer edge of the cone of radiation. This allows for the measurement of the image quality or contract sensitivity at the area of maximum geometric sharpness. The penetrometer sensitivity must be 2-2T unless otherwise noted in the drawings or specification for the item being procured.

12. The Contractor shall submit radiographs as marked (X) below:

X-RAYS ( per applicable spec ) N-RAYS ( per ASTM E748 ) Sample / LOT Description

X First Article Sample

X Lot Acceptance Test Samples

X Production Lot Units

Explosive Sub-Assemblies (i.e., NON-GFP CTGS, Booster Sleeves, etc.)

Radiographs of Production Lot Units shall include Lot Acceptance Testing (LAT) samples.

13. Neutron radiographs (N-rays) shall be produced using film (conventional techniques). Radiographs (X-ray) shall be produced using non-film (digital) techniques such as Digital Detector Array (DDA), or Computed Radiography (CR), with the understanding that the Contractor must be qualified and given prior approval to use digital radiography by NSWC IHD. A qualification plan must be submitted to the Level III Radiographer at NSWC IHD for review prior to qualification of the digital x-ray system. Once the qualification plan has been reviewed and approved, the Level III Radiographer at NSWC IHD will conduct a site visit (i.e. audit) to witness the qualification of the digital x-ray system. The results of the tests performed during the digital x-ray system qualification will be documented in a qualification plan, which will be submitted to the Level III Radiographer at NSWC IHD. At a minimum, the qualification plan shall include information such as the type of system (Make/Model of DDA or CR system, x-ray sources etc.), as well as the specific types of tests (performance checks, as described in the ASTM standards) to be performed to verify the performance of the system. The tests are described in the appropriate ASTM standards (i.e. ASTM E2445 and ASTM E2033 for CR, and ASTM E2737 and ASTM E2698 for DDA systems). An official approval letter will then be issued by the Commanding Officer, NSWC IHD, which authorizes the use of the digital system. Follow up audits at regular intervals of every five years may be conducted to assure the long term stability and performance of the digital x-ray system. If digital radiographs are submitted, they shall be in the form of raw data that is Digital Imaging and Communication in Nondestructive Evaluation (DICONDE) compliant. In addition to the raw DICONDE data, 16 bit Tagged Image Format (TIF) images of the digital radiographs must be submitted.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .