This document is an Amendment of Solicitation (Standard Form 30) for a Department of the Navy solicitation regarding a Canopy Jettison Rocket Motor (CJRM). The amendment provides six questions and answers clarifying technical details about the procurement, including lot size requirements, testing procedures, and production specifications outlined in MIL-DTL-85097E military specification.
Key technical clarifications include: the government allows lot sizes up to 500 units, with a specific sampling requirement of 27 units for the 362-unit order; testing will be exclusively performed by NSWC IHD (Naval Surface Warfare Center, Indian Head Division); First Article Inspection (FAI) samples must use the same mixer as production lots; and the solicitation will proceed even if there are potential technical challenges with the propellant formulation. The drawing TDP 510-174TD-005 for the LINER will be uploaded to SAM.gov, and the government indicates the solicitation and award will not be delayed for qualification discussions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section B - Supplies or Services & Prices or Costs
Miscellaneous text in this section has been modified to:
Solicitation Questions and Answers:
Question 1:
1. Q: TDP 510-174TD-005 for LINER, NSWC/IH-LINEC-8 is missing.
A: Drawing update will be uploaded to SAM.gov
Question 2:
2. Q: Does the request for 365 units from one lot imply approval for lot size in excess of 300 units, IAW MIL-DTL-85097E, para 4.6.1?
A: Table III of MIL-DTL-85097 provides lot acceptance sampling requirements based on lot size. The government does not limit the number of units per lot, as long as it does not exceed 500 units. For a deliverable quantity of 362 units, the required sample size is 27 units, per Table III. The vendor must produce a total of 389 units. The deliverable quantity may be split into multiple lots if needed, but this will affect the LAT sample size.
Question 3:
3. Q: Will testing in MIL-DTL-85097E, para. 4.5.3 be performed exclusively by NSWC IHD, or is Offeror expected to perform any of this testing (e.g. in parallel to NSWC IHD)?
A: Testing per MIL-DTL-85097E is conducted exclusively by NSWC IHD. The vendor is only required to submit sufficient samples for IHD to perform all required tests.
Question 4:
4. Q: What is expected for MIL-DTL-85097E, para 4.5.2? Is this the motor case and propellant only?
A: Just the motor case and the propellant to perform the testing.
Question 5:
. Q: Can test samples for the FAI be provided from a smaller mixer than the full production lot?
A: FAI samples must be sufficient to perform all required tests specified in MIL-DTL-85097. The same mixer used for mixing propellant in production lots shall be used for producing the FAI propellant.
Question 6:
6. Q: Formulation looks like it will have technical challenges due FEAA and lack of acetyl acetone. Do you have additional technical data or is there technical point of contact we can discuss this with?
A: If there are further questions they will need submitted for review during the solicitation period. The solicitation and resultant award will not be held for qualification.
N0010425RK0440001
| IDCode: J |
| Page: 1 |
| Pages: 2 |
| AmendNo: 0001 |
| EffDate: 10 Jul 2025 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N00104 |
| AdmCode: |
| IssuedBy: NAVSUP WEAPON SYSTEMS SUPPORT MECH |
P O BOX 2020, 5450 CARLISLE PIKE
MECHANICSBURG, PA 17050-0788
UNITED STATES
ASHLEY LEONARD, Email: ashley.l.leonard4.civ@us.navy.mil Telephone: 7176051686 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N0010425RK044 |
| SolDate: 04 Jun 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: |
Section B - Questions submitted in response to this solicitation are answered.
| ContNameTitle: |
| CoNameTitle: Ashley Leonard |
| ContDate: |
| CODate: 10 Jul 2025 |