This document is an Amendment to Solicitation N0010423RK067 for Shielded Mild Detonating Cords.
The key details are:
- This amendment provides additional information to vendors after reviewing Amendment 0012 questions and answers. The closing date for this solicitation remains August 28, 2024 at 2:00 PM Eastern time.
- For the first article test, the contractor should follow the Design Verification test program with no interim withdrawals. The salt fog test should be 48 hours of exposure followed by 48 hours of drying. The vibration spectrum should be a minimum of 0.1 g2/Hz between 5-85 Hz, which only applies for the cockpit zone. The shock test should consist of 18 impact shocks in each of the three orthogonal axes.
- This procurement is restricted to Pacific Scientific Energetic Materials Company (California) and Rockwell Collins. A limited drawing package is available, but drawings are not available on CD. The items are explosive and a Safety Survey will be required.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 3.04_Amendment15_N0010423RK067.pdf | ||
| 3.04_Amendment14_N0010423RK067.pdf | ||
| N0010423RK067 0011.pdf | ||
| N0010423RK067 0010.pdf | ||
| 3.04_Amendment(8)_N0010423RK067.pdf | ||
| 3.04_Amendment(9)_N0010423RK067.pdf | ||
| 3.06_Amendment(8)_23RK067 - Vendor Exceptions IH response v2_N0010423RK067.xlsx | XLSX spreadsheet | |
| 3.04_Amendment(7)_N0010423RK067.pdf | ||
| 23RK067 Amendment 6.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0010423NB056
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. This amendment provides additional information for vendors after review ing Amendment 0012 questions and answ ers. See attached pages for more information.
2. The closing date for this solicitation remains as 28 August 2024 at 02:00 PM Eastern time.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Jul-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0010423RK067
X 9B. DATED (SEE ITEM 11)
13-Sep-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Jul-2024
CODE
NAVSUP WEAPON SYSTEMS SUPPORT
ANDREW WATSON CODE N772.10
5450 CARLISLE PIKE SUITE 410
MECHANICSBURG PA 17050-2411
N00104 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0010423RK067
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
The following items are applicable to this modification:
CONTINUATION PAGE
Q&A Amendment 13:
1. Question: MIL-D-21625G Section 4.8.4 states "In the design verification test program there shall be no interim withdrawals. In the service release test program six cartridges each shall be removed at 0800 on the third and fourth Monday." For the first article, are we following the design verification test program or the service release test program?
Answer: The Design Verification test program for no interim withdrawals should be followed.
2. Question: MIL-D-21625G Section 4.8.6 states "Sealed in cartridge actuated actuated devices shall be subjected to the salt fog test for 168 hours. Cartridges installed in cartridge actuated devices will be subjected to a 168 hour salt fog test when the cartridge actuated devices are tested in accordance with MIL-D-23615." For the first article, are we doing the salt fog test for 48 hours or 168 hours?
Answer: For FAT the contractor should perform a 48 hours of exposure followed by 48 hours of drying.
They can also increase the number of cycles to provide a higher degree of confidence but I’m not sure if that’s related to the 168 hours mentioned in the MIL-D-21625G spec.
3. Question: MIL-D-21625G Section 4.8.5 states "The minimum acceleration power spectral density (Wo) for cartridges mounted in the cockpit of jet aircraft shall be 0.10 g2/Hz shall be approved by the cognizant design agency." Can you confirm the vibration spectrum for this part?
Answer: Vibration Spectrum should be 0.1 g2/Hz minimum with an Frequency between 5-85 Hz.
See picture below. This spectrum profile only applies for cockpit zone.
4. Question: For the shock test, how many shock pulses in each axis?
Answer:
The test item shall be subjected to 18 impact shocks. The impact shock shall be applied in the following directions:
a. First orthogonal axis – three in each direction
b. Second orthogonal axis – three in each direction
c. Third orthogonal axis – three in each direction
After each shock inspect closely for any evidence of mechanical failure, and at the conclusion of each axis test a performance check shall be made.