MSR Budget
| Prime Company Name | Period Covered by this Report | PoP Start |
| 1-Aug-18 | ||
| Customer Supported | TO Contracting Officer | PoP End |
| 31-Jul-19 |
| Selex Cost | ||||||||||||||
| Actual Cost | Wrap Cost | |||||||||||||
| Contract # | TDL | CLIN | This Period - Labor Hours | This Period Labor Cost | This Period - Fee | This Period - ODCs & Travel | This Per. - Total Cost plus Fee | Cum - Labor Hours | Cum - Labor Cost | Cum - Fee | Cum - Travel & ODC | Cum - Total Cost plus Fee | Funds Remaining | |
| N0003917R0049 | TDL1 | 0001 | ||||||||||||
| N0003917R0049 | TDL1 | 0002 | ||||||||||||
| N0003917R0049 | TDL1 | 0004 | ||||||||||||
| N0003917R0049 | TDL1 | 0005 | ||||||||||||
| Total | Base Yr | |||||||||||||
| Total | Contract |
| Actual Cost Selex | ||||||||||||||
| Contract # | Cat | CLIN | This Period - Labor Hours | This Period Labor Cost | NG Fee | Selex Fee | Burden | This Per. - Total Cost plus Fee | Cum - Labor Hours | Cum - Labor Cost | NG Fee | Selex Fee | Burden | Cum - Total Cost plus Fee |
| N00039-13-C-0035 | Cat 1 | 0001 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 854 | $ 132,277 | $ 13,228 | $ 11,905 | $ 144,182 | ||
| N00039-13-C-0035 | Cat 2 | 0001 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 352 | $ 40,597 | $ 4,060 | $ 3,654 | $ 44,251 | ||
| N00039-13-C-0035 | Cat 1 | 1001 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1,840 | $ 309,131 | $ 30,913.14 | $ 26,687 | $ 335,819 | ||
| N00039-13-C-0035 | Cat 2 | 1001 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 1,378 | $ 170,129 | $ 17,013 | $ 14,687 | $ 184,816 | ||
| Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 3,218 | $ 479,260 | $ 47,926 | $ 41,374 | $ 520,634 | |||||
| Cat 1 | 2001 | - 0 | $ - 0 |
Khan, Mallia (IS): Khan, Mallia (IS):
Prime not burden $ - 0 $ - 0 $ - 0 $ - 0 1,656 $ 284,324 Khan, Mallia (IS): Khan, Mallia (IS):
Prime Selex cost only no fee $ 28,432 $ 25,589 $ 11,173.92 Khan, Mallia (IS): Khan, Mallia (IS):
| Wrap rate is updated to 3.93% which is MPS rate of 3.25% and G&A is 20.97% | $ 321,087 | ||||||||||||||
| Cat 2 | 2001 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 152 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| Total | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | 1,808 | 284,324 | 28,432 | $ 25,589 | $ 11,174 | $ 321,087 | |||
| Cat 1 | 3001 | 168 | $ 28,985 |
Khan, Mallia (IS): Khan, Mallia (IS):
Prime not burden $ 2,898.50 $ 2,609 $ 1,362 $ 32,956 896 $ 151,992 Khan, Mallia (IS): Khan, Mallia (IS):
Prime Selex cost only no fee $ 15,199 $ 13,679 $ 6,343.74 Khan, Mallia (IS): Khan, Mallia (IS):
Wrap rate is updated to 3.93% which is MPS rate of 3.25% and G&A is 20.97% Khan, Mallia (IS): Khan, Mallia (IS):
Prime not burden Khan, Mallia (IS): Khan, Mallia (IS):
| Prime not burden | $ 172,015 | |||||||||||||
| Cat 2 | 3001 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 168 | 28,985 | 2,899 | 2,609 | 1,362 | 32,956 | 896 | 151,992 | 15,199 | $ 13,679 | $ 6,344 | $ 172,015 |
| Budget | ||||||||||||||
| Contract # | TO # SPIIN | CLIN | This Period - Labor Hours | This Period Cost | This Period - Fee | This Period - ODCs & Travel | This Per. - Total Cost plus Fee | Cum - Labor Hours | Cum - Labor Cost | Cum - Fee | Cum - Travel & ODC | Cum - Total Cost plus Fee | Total Funding | Total Funding Hours |
| N0003917R0049 | TDL1 | 0001 | ||||||||||||
| N0003917R0049 | TDL1 | 0002 | ||||||||||||
| N0003917R0049 | TDL1 | 0004 | ||||||||||||
| N0003917R0049 | TDL1 | 0005 | ||||||||||||
| Total |
Actuals Summary
| Prime Company Name | Period Covered by this Report | PoP Start |
| 1-Aug-18 | ||
| Customer Supported | TO Contracting Officer | PoP End |
| 31-Jul-19 |
| Cost by SLIN | |||||||||
| CLIN/SLIN | Color of Money | ACRN | COST FUNDED | FEE FUNDED | TOTAL FUNDING | Cum. Cost | Cum. Fee | Cumulative | |
| Total | Remaining w Fee | Fee Witholding | Fee Withhold |
Threshold
| 0001/01 | 1 | AA |
| 0001/02 | 2 | AB |
| 0001/03 | 2 | AE |
| 0002/01 | 2 | AB |
| 0002/02 | 2 | AE |
| 0004/01 | 3 | AC |
| 0004/02 | 3 | AD |
| 0005/01 | 3 | AC |
| Total Base Year | ||
| Color of Money | 1 = US (1 Year); 2 = NILE; 3 = PMW-130 |
| Funding by CLIN | Cost by CLIN | ||||||||||
| CLIN | Cost | Fee | Total Funding | Hours | Cost | Fee | Total | Fee 85% WH | Remaining with Fee | HRS | Hrs Ratio |
| 0001 | |||||||||||
| 0002 | |||||||||||
| 0004 | |||||||||||
| 0005 | |||||||||||
| Total Contract |
Invoice Summary
| Prime Company Name | Period Covered by this Report | PoP Start |
| 1-Aug-18 | ||
| Customer Supported | TO Contracting Officer | PoP End |
| 31-Jul-19 |
| Funding by SLIN | Cost by SLIN |
| CLIN/SLIN |
Nye, Stephen J FORNATL-UK CIV PEOC4I, 61550: Additional Sub Line Item Numbers (SLINs) will be unilaterally created by the Contracting Officer during performance of this Task Order to accommodate the multipe types of funds that will be used under this Order.
| Color of Money | ACRN | COST FUNDED | FEE FUNDED | TOTAL FUNDING | Cum. Cost | Cum. Fee | Cumulative | |
| Total | Cumulative | |||||||
| Invoice/Billing | Remaining | |||||||
| (Incl Fee Withhold) | Fee Witholding | Fee Withhold |
Threshold
| 0001/01 | 1 | AA | |
| 0001/02 | 2 | AB | |
| 0001/n | 3 | AE | |
| 0002/01 | 3 | AB | |
| 0002/n | 3 | AE | |
| 0004/01 | 2 | AC | |
| 0004/n | 2 | AD | |
| 0005/01 | 2 | AC | |
| Total Base Year | |||
| Color of Money | 1 = US (1 Year); 2 = FMS (Non-NILE); 3 = NILE |
| Funding by CLIN | Cost by CLIN | |||||||||||
| CLIN | Cost | Fee | Total Funding | Hours | Cost | Fee | Total | Fee 85% WH | Cum Invoice | Remaining | HRS | Hrs Ratio |
| 0001 | ||||||||||||
| 0002 | ||||||||||||
| 0004 | ||||||||||||
| 0005 | ||||||||||||
| Total |
Staffing Plan
| Prime Company Name | Period Covered by this Report | PoP Start |
| 1-Aug-18 | ||
| Customer Supported | TO Contracting Officer | PoP End |
| 31-Jul-19 |
| ERP | SECURITY CLEARANCE INFORMATION | CAC (3 years or Contact POP end, which ever occurs first) | SPAWAR BADGE (Annual ) | PRIVACY ACT TRAINING | FY12 SAAR | FY12 IA TRAINING | |||||||||||||||||||
| CLIN | NAME (Last, First) | ISS4 | LABOR CATEGORY | FULLY BURDENED LABOR RATE | TOTAL PLANNED HOURS | ACTUAL HOURS TO DATE | % USED TO DATE | APPROVED ACCESS | SECURITY CLEARANCE | INVESTIGATION TYPE | NACI EQUIV (YES OR NO) | DATE (MMDDYY) | COR CERTIFIED | TYPE I = INITIAL R = RENEWAL T=TERMINATED O=OTHER TA | DATE ISSUED | DATE EXPIRES | DATE ISSUED | DATE EXPIRES | ESCORT PRIVILEGE (Y or N) | DATE COMPLETED | DATE PLANNED | SUBMITTED | N/A | DATE COMPLETED | DATE PLANNED |
| 0001 | Sferra, Vincenzo | NILE ISS Follow On | Manager | 209.44 | 452 | 441 | 97.5% | N | |||||||||||||||||
| 0001 | Williams, Paul | NILE ISS Follow On | Sr Eng | 198.94 | 1229 | 1267 | 103.1% | N | |||||||||||||||||
| 0001 | Mueller, Debbie | NILE ISS Follow On | Sr Eng | 198.94 | 172 | 257 | 149.6% | N | |||||||||||||||||
| 0001 | Sidelnikov, Shannon | NILE ISS Follow On | Eng 2 | 83.63 | 1243 | 1469 | 118.2% | N | |||||||||||||||||
| 0001 | Tang, Anna | NILE ISS Follow On | Eng 2 | 83.63 | 1237 | 918 | 74.2% | N | |||||||||||||||||
| 0001 | Bowman, Jonathan | NILE ISS Follow On | Eng 2 | 83.63 | 1318 | 1213 | 92.0% | N | |||||||||||||||||
| 0001 | Anziano, Anthony | NILE ISS Follow On | Eng 1 | 69.75 | 1350 | 1506 | 111.6% | N | |||||||||||||||||
| Larry Huynh | N | ||||||||||||||||||||||||
| Intern | N | ||||||||||||||||||||||||
| 0001 | Herschleb, Georgia | NILE ISS Follow On | Admin 3 | 106.31 | 124 | 92 | 74.1% | N | |||||||||||||||||
| 0001 | Khan, Mallia | NILE ISS Follow On | Admin 3 | 106.31 | 241 | 276 | 114.5% | N | |||||||||||||||||
| 0001 | Nealon, Mary | NILE ISS Follow On | Admin 2 | 86.09 | 80 | 122 | 152.1% | N | |||||||||||||||||
| 0001 | Arellano, Paul | NILE ISS Follow On | Admin 3 | 106.31 | 8 | 5 | 62.5% | N | |||||||||||||||||
| 0001 | Casillas, Ricardo | NILE ISS Follow On | Admin 3 | 106.31 | 20 | 19 | 94.0% | N | |||||||||||||||||
| 0001 | Magnan, Julia | NILE ISS Follow On | Admin 2 | 86.09 | 8 | 8 | 96.3% | N | |||||||||||||||||
| 0001 | Unplanned Administrative | NILE ISS Follow On | Admin 3 | 111.36 | 70 | 80 | 114.3% | N | |||||||||||||||||
| 0001 | Unplanned Technical | NILE ISS Follow On | Eng 3 | 159.29 | 250 | 290 | 116.1% | N | |||||||||||||||||
| 0001 | Selex ES | NILE ISS Follow On | Category 1 | 154.7 | 858 | 854 | 99.5% | N | |||||||||||||||||
| 0001 | Selex ES | NILE ISS Follow On | Category 2 | 113.16 | 370 | 352 | 95.1% | N | |||||||||||||||||
| 1001 | Sferra, Vincenzo | NILE ISS Follow On | Manager | 209.44 | 485 | 517 | 106.7% | N | S | NACI | Y | 04/01/09 | Y | I | 04/04/11 | 04/04/14 | 04/01/11 | 03/31/12 | N | 04/10/11 | 04/02/11 | 04/30/11 | |||
| 1001 | Williams, Paul | NILE ISS Follow On | Sr Eng | 198.94 | 1665 | 1087 | 65.3% | N | TS | SBI | Y | 08/08/08 | Y | I | 04/04/11 | 04/04/14 | 04/01/11 | 03/31/12 | Y | 04/10/11 | 04/03/11 | 04/30/11 | |||
| 1001 | Mueller, Debbie | NILE ISS Follow On | Sr Eng | 198.94 | 614 | 738 | 120.1% | N | S | NACI | Y | 04/01/10 | Y | I | 04/04/11 | 04/04/14 | 04/01/11 | 03/31/12 | N | 04/10/11 | 04/02/11 | 04/30/11 | |||
| 1001 | Sidelnikov, Shannon | NILE ISS Follow On | Eng 3 | 103.79 | 1786 | 1445 | 80.9% | N | |||||||||||||||||
| 1001 | Tang, Anna | NILE ISS Follow On | Eng 2 | 83.63 | 1800 | 4 | 0.2% | N | TS | SBI | Y | 07/06/07 | Y | I | 04/04/11 | 04/04/14 | 04/01/11 | 03/31/12 | Y | 04/10/11 | 04/02/11 | 04/30/11 | |||
| 1001 | Bowman, Jonathan | NILE ISS Follow On | Eng 2 | 83.63 | 1469 | 1424 | 96.9% | N | |||||||||||||||||
| 1001 | Anziano, Anthony | NILE ISS Follow On | Eng 1 | 69.75 | 1878 | 1592 | 84.8% | N | |||||||||||||||||
| 1001 | Huynh, Larry | NILE ISS Follow On | Eng 1 | 69.75 | 1952 | 1890 | 96.8% | N | |||||||||||||||||
| 1001 | Nguyen, Khai | NILE ISS Follow On | Intern | 69.75 | 760 | 787 | 103.5% | N | |||||||||||||||||
| 1001 | Wright,David | NILE ISS Follow On | Eng 3 | 103.79 | 1416 | 784 | 55.4% | N | |||||||||||||||||
| 1001 | Casido, Ginet | NILE ISS Follow On | Eng 3 | 103.79 | 164 | 703 | 428.5% | N | |||||||||||||||||
| 1001 | Herschleb, Georgia | NILE ISS Follow On | Admin 3 | 106.31 | 124 | 134 | 107.7% | N | |||||||||||||||||
| 1001 | Khan, Mallia | NILE ISS Follow On | Admin 3 | 106.31 | 241 | 262 | 108.7% | N | S | NACI | Y | 04/01/10 | Y | I | 04/04/11 | 04/04/14 | 04/01/11 | 03/31/12 | N | 04/22/11 | 04/03/11 | 04/30/11 | |||
| 1001 | Cherry, Christine | NILE ISS Follow On | Admin 2 | 86.09 | 120 | 116 | 96.5% | N | |||||||||||||||||
| 1001 | Arellano, Paul | NILE ISS Follow On | Admin 3 | 106.31 | 120 | 27 | 22.1% | N | |||||||||||||||||
| 1001 | Casillas, Ricardo | NILE ISS Follow On | Admin 3 | 106.31 | 20 | 6 | 32.0% | N | |||||||||||||||||
| 1001 | Magnan, Julia | NILE ISS Follow On | Admin 2 | 86.09 | 8 | 5 | 56.3% | N | |||||||||||||||||
| 1001 | Unplanned Administrative | NILE ISS Follow On | Admin 3 | 111.36 | 80 | 130 | 162.5% | N | |||||||||||||||||
| 1001 | Unplanned Technical | NILE ISS Follow On | Eng 3 | 159.29 | 242 | 323 | 133.3% | N | |||||||||||||||||
| 1001 | Selex ES | NILE ISS Follow On | Category 1 | 160.32 | 1948 | 1840 | 94.5% | N | |||||||||||||||||
| 1001 | Selex ES | NILE ISS Follow On | Category 2 | 118.57 | 1296 | 1378 | 106.3% | N |
| 2001 | Sferra, Vincenzo | NILE ISS Follow On | Manager | 186.55 | 230 | 439 | 190.9% | N | S | NACI | Y | 04/01/09 | Y | I | 04/04/11 | 04/04/14 | 04/01/11 | 03/31/12 | N | 04/10/11 | 04/02/11 | 04/30/11 | |
| 2001 | Williams, Paul | NILE ISS Follow On | Sr Eng | 206.35 | 1880 | 2163 | 115.0% | N | TS | SBI | Y | 08/08/08 | Y | I | 04/04/11 | 04/04/14 | 04/01/11 | 03/31/12 | Y | 04/10/11 | 04/03/11 | 04/30/11 | |
| 2001 | Mueller, Debbie | NILE ISS Follow On | Sr Eng | 140.11 | 186 | 149 | 80.2% | N | S | NACI | Y | 04/01/10 | Y | I | 04/04/11 | 04/04/14 | 04/01/11 | 03/31/12 | N | 04/10/11 | 04/02/11 | 04/30/11 | |
| 2001 | Sidelnikov, Shannon/Jose/Chris | NILE ISS Follow On | Eng 3 | 105.32 | 1880 | 1511 | 80.3% | N | |||||||||||||||
| 2001 | Bowman, Jonathan | NILE ISS Follow On | Eng 2 | 105.32 | 1880 | 1927 | 102.5% | N | |||||||||||||||
| 2001 | Huynh, Larry | NILE ISS Follow On | Eng 1 | 77.68 | 1880 | 1682 | 89.4% | N | |||||||||||||||
| 2001 | Nguyen, Khai | NILE ISS Follow On | Intern | 77.68 | 1637 | 1882 | 115.0% | N | |||||||||||||||
| 2001 | Solis, Emilio | NILE ISS Follow On | Eng 3 | 105.32 | 840 | 189 | 22.5% | N | |||||||||||||||
| 2001 | Anna Tang | NILE ISS Follow On | Admin 3 | 105.32 | 1473 | 763 | 51.8% | N | |||||||||||||||
| 2001 | Engineer 5 | NILE ISS Follow On | Admin 2 | 206.35 | 1238 | 0 | 0.0% | N | |||||||||||||||
| 2001 | Herschleb, Georgia | NILE ISS Follow On | Admin 3 | 88.61 | 160 | 148 | 92.3% | N | |||||||||||||||
| 2001 | Khan, Mallia/ Sarah/ Jeremy | NILE ISS Follow On | Admin 3 | 88.61 | 320 | 588 | 183.9% | N | S | NACI | Y | 04/01/10 | Y | I | 04/04/11 | 04/04/14 | 04/01/11 | 03/31/12 | N | 04/22/11 | 04/03/11 | 04/30/11 | |
| 2001 | Cherry, Christine | NILE ISS Follow On | Admin 3 | 88.61 | 120 | 77 | 63.8% | N | |||||||||||||||
| 2001 | Arellano, Paul | NILE ISS Follow On | Admin 3 | 88.61 | 80 | 39 | 49.3% | N | |||||||||||||||
| 2001 | Unplanned Administrative | NILE ISS Follow On | Admin 3 | 88.61 | 120 | 347 | 289.5% | N | |||||||||||||||
| 2001 | Unplanned Technical/ PMs | NILE ISS Follow On | Eng 5 | 206.35 | 320 | 277 | 86.6% | N | |||||||||||||||
| 2001 | Selex ES | NILE ISS Follow On | Category 1 | 162.32 | 1276 | 1656 | 129.8% | N | |||||||||||||||
| 2001 | Selex ES | NILE ISS Follow On | Category 2 | 120.03 | 524 | 152 | 29.0% | N | |||||||||||||||
| 16044 | 13988.3 | ||||||||||||||||||||||
| 0001 | S | NACI | Y | 04/01/09 | Y | I | 04/04/11 | 04/04/14 | 04/01/11 | 03/31/12 | N | 04/10/11 | 04/02/11 | 04/30/11 | |||||||||
| 0001 | TS | SBI | Y | 08/08/08 | Y | I | 04/04/11 | 04/04/14 | 04/01/11 | 03/31/12 | Y | 04/10/11 | 04/03/11 | 04/30/11 | |||||||||
| 0001 | S | NACI | Y | 04/01/10 | Y | I | 04/04/11 | 04/04/14 | 04/01/11 | 03/31/12 | N | 04/10/11 | 04/02/11 | 04/30/11 | |||||||||
| 0001 | |||||||||||||||||||||||
| 0001 | |||||||||||||||||||||||
| 0001 | |||||||||||||||||||||||
| 0001 | |||||||||||||||||||||||
| 0001 | |||||||||||||||||||||||
| 0001 | |||||||||||||||||||||||
| 0001 | S | NACI | Y | 04/01/10 | Y | I | 04/04/11 | 04/04/14 | 04/01/11 | 03/31/12 | N | 04/22/11 | 04/03/11 | 04/30/11 | |||||||||
| 0001 | |||||||||||||||||||||||
| 0001 | |||||||||||||||||||||||
| 0001 | |||||||||||||||||||||||
| 0001 | |||||||||||||||||||||||
| 0001 | |||||||||||||||||||||||
| 0001 | |||||||||||||||||||||||
| 0 | 0.0 | ||||||||||||||||||||||
| 0004 | Sferra, Vincenzo | NILE ISS Follow On | Manager | 209.44 | 45 | 42 | 93.1% | N | |||||||||||||||
| 0004 | Williams, Paul | NILE ISS Follow On | Sr Eng | 198.94 | 435 | 161 | 36.9% | N | |||||||||||||||
| 0004 | Mueller, Debbie | NILE ISS Follow On | Sr Eng | 198.94 | 0 | 0 | 0.0% | N | |||||||||||||||
| 0004 | Sidelnikov, Shannon | NILE ISS Follow On | Eng 2 | 83.63 | 405 | 237 | 58.4% | N | |||||||||||||||
| 0004 | Tang, Anna | NILE ISS Follow On | Eng 2 | 83.63 | 417 | 237 | 56.8% | N | |||||||||||||||
| 0004 | Bowman, Jonathan | NILE ISS Follow On | Eng 2 | 83.63 | 391 | 234 | 59.9% | N | |||||||||||||||
| 0004 | Anziano, Anthony | NILE ISS Follow On | Eng 1 | 69.75 | 322 | 53 | 16.4% | N | |||||||||||||||
| 0004 | Herschleb, Georgia | NILE ISS Follow On | Admin 3 | 106.31 | 48 | 35 | 73.1% | N | |||||||||||||||
| 0004 | Khan, Mallia | NILE ISS Follow On | Admin 3 | 106.31 | 17 | 0 | 0.0% | N | |||||||||||||||
| 0004 | Nealon, Mary | NILE ISS Follow On | Admin 2 | 86.09 | 4 | 0 | 0.0% | N | |||||||||||||||
| 0004 | Arellano, Paul | NILE ISS Follow On | Admin 3 | 106.31 | 4 | 0 | 0.0% | N | |||||||||||||||
| 0004 | Unplanned Administrative | NILE ISS Follow On | Admin 3 | 106.31 | 10 | 13 | 131.0% | N | |||||||||||||||
| 0004 | Selex ES | NILE ISS Follow On | Category 1 | 152.88 | 48 | 0 | 0.0% | N | |||||||||||||||
| 0004 | Selex ES | NILE ISS Follow On | Category 2 | 113.16 | 0 | 0 | 0.0% | N | |||||||||||||||
| 1004 | Sferra, Vincenzo | NILE ISS Follow On | Manager | 209.44 | 30 | 14 | 47.0% | N | |||||||||||||||
| 1004 | Williams, Paul | NILE ISS Follow On | Sr Eng | 198.94 | 367 | 867 | 236.1% | N | |||||||||||||||
| 1004 | Mueller, Debbie | NILE ISS Follow On | Sr Eng | 198.94 | 0 | 1 | 0.0% | N | |||||||||||||||
| 1004 | Sidelnikov, Shannon | NILE ISS Follow On | Eng 3 | 103.79 | 206 | 378 | 183.7% | N | |||||||||||||||
| 1004 | Tang, Anna | NILE ISS Follow On | Eng 2 | 83.63 | 192 | 109 | 56.8% | N | |||||||||||||||
| 1004 | Bowman, Jonathan | NILE ISS Follow On | Eng 2 | 83.63 | 174 | 323 | 185.6% | N | |||||||||||||||
| 1004 | Anziano, Anthony | NILE ISS Follow On | Eng 1 | 69.75 | 114 | 12 | 10.5% | N | |||||||||||||||
| 1004 | Herschleb, Georgia | NILE ISS Follow On | Admin 3 | 106.31 | 40 | 0 | 0.0% | N | |||||||||||||||
| 1004 | Khan, Mallia | NILE ISS Follow On | Admin 3 | 106.31 | 16 | 0 | 0.0% | N | |||||||||||||||
| 1004 | Nealon, Mary | NILE ISS Follow On | Admin 2 | 86.09 | 4 | 0 | 0.0% | N | |||||||||||||||
| 1004 | Arellano, Paul | NILE ISS Follow On | Admin 3 | 106.31 | 4 | 0 | 0.0% | N | |||||||||||||||
| 1004 | Nguyen, Khai | NILE ISS Follow On | Intern | 69.75 | 0 | 0 | 0.0% | N | |||||||||||||||
| 1004 | Unplanned Administrative | NILE ISS Follow On | Admin 3 | 106.31 | 14 | 2 | 14.2% | N | |||||||||||||||
| 1004 | Selex ES | NILE ISS Follow On | Category 1 | 157.51 | 0 | 0 | 0.0% | N | |||||||||||||||
| 1004 | Selex ES | NILE ISS Follow On | Category 2 | 116.53 | 0 | 0 | 0.0% | N |
GWBS-E
SPAWAR Global Work Breakdown Structure (GWBS) ~ Mod E
1 Development (R&D) 2 Production
| 1.1 | Prime Mission Product Development | 2.1 | Prime Mission Product Production | ||
| 1.1.1 | Hardware (Dev) | 2.1.1 | Hardware (Prod) | ||
| 1.1.2 | Software (Dev) | 2.1.2 | Software (Prod) | ||
| 1.1.3 | Integration, Assembly and Test (PMP Dev) | 2.1.3 | Integration, Assembly and Test (PMP Prod) | ||
| 1.1.4 | Purchased Services (PMP Dev) | 2.1.4 | Purchased Services (PMP Prod) | ||
| 1.1.5 | Government Technical Oversight/IV&V of PMP (Dev) | 2.1.5 | Government Technical Oversight/IV&V of PMP (Prod) | ||
| 1.1.6 | Research & Development (S&T) | ||||
| 1.2 | Platform / Site Integration (Dev) | 2.2 | Platform / Site Integration (Prod) |
| 3 Common Elements | 4 O&M Support | ||||
| 4.1 | Mission Personnel | ||||
| 3.1 | Program Management | 4.2 | Unit Level Consumption | ||
| 3.1.1 | Acquisition Management | 4.2.1 | Cons. Matl. / Rep Parts / Supplies | ||
| 3.1.2 | Financial Management | 4.2.2 | Depot Level Repairables (DLRs) | ||
| 3.1.3 | Logistics Management | 4.2.3 | Other Unit Level Consumption | ||
| 3.1.4 | ADP Support | 4.3 | Intermediate Maint. | ||
| 3.1.5 | Contract Management | 4.3.1 | Maintenance | ||
| 3.1.6 | Travel | 4.3.2 | Cons. Matl. / Rep Parts | ||
| 3.1.7 | Cost Estimation and Analysis | 4.4 | Depot Maintenance | ||
| 3.1.8 | Legal | 4.4.1 | Overhaul and Rework | ||
| 3.1.9 | FMS - Pre-LOR | 4.4.2 | Field Changes | ||
| 3.1.10 | FMS - Case Development | 4.4.3 | Design and Planning Services | ||
| 3.1.11 | FMS - Case Execution | 4.4.4 | Outfitting and Spares | ||
| 3.1.12 | FMS - Case Closure | 4.4.5 | Cons. Matl. / Rep Parts | ||
| 3.1.13 | FMS - Business Sustaining | 4.5 | Contractor Services (Post Production ILS) | ||
| 3.2 | Systems Engineering | 4.5.1 | Interim Contractor Support | ||
| 3.2.1 | Studies & Design | 4.5.2 | Contractor Logistics Support | ||
| 3.2.2 | Architecture | 4.6 | Sustaining Support | ||
| 3.2.3 | Human Systems Integration | 4.6.1 | Software Maintenance | ||
| 3.2.4 | Technical Authority | 4.6.2 | Training (Sustainment) | ||
| 3.2.5 | Certification Authority | 4.6.3 | Publications (Sustainment) | ||
| 3.2.6 | Systems Engineering Management | 4.6.4 | Simulator Operations | ||
| 3.2.7 | Requirements Analysis | 4.6.5 | Site Operations / Site Support | ||
| 3.2.8 | Configuration Management | 4.6.6 | Support Equipment Replacement | ||
| 3.2.9 | Logistics Engineering | 4.7 | In Service Engineering Activity (ISEA) | ||
| 3.3 | System Test and Evaluation | 4.7.1 | Fleet Engineering Support | ||
| 3.3.1 | System DT&E | 4.7.2 | Config. Mgmt. & Product Eng. Support | ||
| 3.3.2 | System OT&E | 4.7.3 | Help Desk | ||
| 3.3.3 | System FOT&E | 4.7.4 | Maintenance Engineering Support | ||
| 3.4 | Platform / Site Activation / Installation | 4.7.5 | Performance & Maint. Data Analysis | ||
| 3.4.1 | Installation Planning | 4.7.6 | Life Cycle Test Support | ||
| 3.4.2 | Installation Design | 4.7.7 | Training & Manning | ||
| 3.4.3 | System Installation and Turnover | 4.8 | FSETS | ||
| 3.4.4 | Installation Policy and Process Development | 4.9 | Demilitarization and Disposal | ||
| 3.4.5 | Installation Process and Risk Assessment | ||||
| 3.5 | Data | ||||
| 3.5.1 | Technical Publications | 5 Management and Administration | |||
| 3.5.2 | Engineering Data | 5.1 | Command/PEO Management and Administration | ||
| 3.5.3 | Management Data | 5.1.1 | General Management | ||
| 3.5.4 | Logistics Mgmt Information | 5.1.2 | Small Business and Inspection Administration | ||
| 3.5.5 | Data Repository | 5.1.3 | Total Force Management | ||
| 3.5.6 | Integrated Data Environment (IDE) | 5.1.4 | Information Technology Management | ||
| 3.5.7 | Document and Content Management | 5.1.5 | Command Operations & Support | ||
| 3.6 | Initial Spares | 5.1.6 | Corporate Strategy | ||
| 3.7 | Support Equipment | 5.1.7 | Corporate Communications & Public Affairs | ||
| 3.7.1 | Peculiar Support Equipment | 5.1.8 | Special Programs Oversight & Compliance | ||
| 3.7.2 | Common Support Equipment | 5.1.9 | Legal - General Law | ||
| 3.8 | Facilities (PMP) | 5.1.10 | Command Representation | ||
| 3.8.1 | Construction/Conversion/Expan. (PMP Facilities) | 5.1.11 | Sponsor/Customer Coordination | ||
| 3.8.2 | Equipment Acq. / Modernization (PMP Facilities) | 5.1.12 | NMCI Seat Costs | ||
| 3.8.3 | Maintenance (PMP Facilities) | 5.2 | Witholds (External and Internal) | ||
| 3.8.4 | Experimentation (PMP Facilities) | 5.2.1 | External Witholds | ||
| 3.9 | Initial Training (Train the Trainer) | 5.2.2 | Internal Witholds | ||
| 3.9.1 | Initial Training Equipment | ||||
| 3.9.2 | Initial Training Services | ||||
| 3.9.3 | Training Facilities |
GWBS Definitions
| WBS | WBS Description | Definition | Examples |
| 1 | DEVELOPMENT | ||
| 1.1 | PRIME MISSION PRODUCT DEVELOPMENT | Efforts by the developer or modernizer to design, develop or modernize hardware and/or software used to accomplish the primary mission of the defense materiel item. This element is a roll-up of costs associated with lower levels. | Includes: |
- All technical and management activities associated with individual hardware/software elements.
- Integration, assembly, test and checkout associated with the overall PMP (if the electronic/automated software system comprises several PMPs, each will be listed separately at level 2).
- All whole and partial prime contractor, subcontractor, and vendor breadboards, brassboards, and qualification test units.
- The design and development of complete units (i.e., the prototype which satisfies the requirements of the applicable specification(s), regardless of end use).
Excludes:
- "Less than whole" units (i.e., test spares, etc.) consumed or planned to be consumed in support of system level tests.
1.1.1 Hardware (Dev) Hardware components designed, developed or modified for the specific product. Includes, with lower level sub-elements, the design engineering, program management, integration, and testing associated with those sub-elements. (As necessary, the program will, for their use, establish additional levels of indenture needed to accurately identify/describe the hardware required for the Prime Mission Product.) Includes:
- HW design and development and the PM, SE, IA&T for the designer or developer of the PMP, directly associated with lower level Hardware WBS elements. Performer (whether Contractor or Government Activity) for this element is responsible for providing discrete deliverables (i.e., PMP Design, PMP Models/Prototypes, EMD Units).
1.1.2 Software (Dev) Software that is specifically developed for the operations and maintenance or functional control of a computer system. Includes:
- SW design and development and the PM, SE, IA&T for the designer or developer of the PMP, directly associated with lower level Software WBS elements. Performer (whether contractor or Government Activity) for this element is responsible for providing discrete deliverables: (i.e., PMP S/W Design, PMP S/W Models/Prototypes, SLOC, S/W packages).
1.1.3 Integration, Assembly & Test (PMP Dev) "Pre-Delivery" integration, assembly and testing of the H/W and S/W of the Prime Mission Product. All technical and functional activities associated with the design and development of structures, equipment, parts, materials, and software required to assemble the level 3 equipment (hardware/software) elements into level 2 mission equipment (hardware/ software) as a whole and not directly part of any other individual level 3 element.
Includes, for example (for the whole level 2 system):
· the set up, conduct, and review of testing assembled components or subsystems prior to installation
· integration of software (including loading and verification of firmware)
Excludes:
(1) all systems engineering/program management and system test and evaluation which are associated with the complete system
(2) IA&T performed as part of the Installation process. (Use 3.4.3)
(3) Government IV&V and acceptance testing. (Use 1.1.5 or 2.1.5) Includes:
- The development of engineering layouts, determination of overall design characteristics, and determination of requirements of design review.
- Environmental stress screening and shock testing for entire system.
- Security testing for the entire system (if not part of formal test, DT)
NOTE: When an integration, assembly, test, and checkout element is utilized at lower levels of the work breakdown structure, it will be summarized into the next higher level equipment (hardware/software) work breakdown structure element and should never be summarized directly into a level 3 integration, assembly, test, and checkout element.
1.1.4 Purchased Services (PMP Dev) Procured services that are required for the proper operation of the system. Includes:
- Satellite transponder leases and SIPRNET access leases.
1.1.5 Government Technical Oversight/IV&V of PMP (Dev) Costs associated with Government personnel, or contractors representing the Government, overseeing system and subsystem integration, verification and validation efforts and acceptance testing. IV&V performed by Government representatives to demonstrate, according to the verification and validation plans, the physical, electrical, software, and other characteristics of the components to be developed, integrated and tested (i.e., contract specifications). Unit testing of hardware and independent verification and validation of software to ensure the components and any assemblies of them meet their requirements and function in the environment of their intended use. Technical Design Agent (TDA) services directly associated with a Prime Mission Product. High tech support that represents the program/project manager's "brain trust" that is capable of offering unbiased technical advice and who has no vested interest in the outcome of a product. Includes:
- Conduct of design verification testing, unit testing of hardware and independent verification and validation of software.
- Acceptance testing when applicable to development articles.
- TDA support related to design and development of PMP.
- Technical Reviews (i.e., ASR, SRR, SFR, SSR, PDR, CDR).
| 1.1.6 | Research and Development (S&T) | Costs associated with work performed in support of Research and Development (S&T). This element is a roll-up of costs associated with lower levels. | |
| 1.1.6.1 | Basic Research | Echelon 3 use only. R&D Budget Activity 1. Basic research is systematic study directed toward greater knowledge or understanding of the fundamental aspects of phenomena and of observable facts without specific applications towards processes or products in mind. It includes all scientific study and experimentation directed toward increasing fundamental knowledge and understanding in those fields of the physical, engineering, environmental, and life sciences related to long-term national security needs. It is farsighted high payoff research that provides the basis for technological progress. Basic research may lead to: (a) subsequent applied research and advanced technology developments in Defense-related technologies, and (b) new and improved military functional capabilities in areas such as communications, detection, tracking, surveillance, propulsion, mobility, guidance and control, navigation, energy conversion, materials and structures, and personnel support. Program elements in this category involve pre-Milestone A efforts. | Echelon 3 use only. |
| 1.1.6.2 | Applied Research | Echelon 3 use only. R&D Budget Activity 2. Applied research is systematic study to understand the means to meet a recognized and specific need. It is a systematic expansion and application of knowledge to develop useful materials, devices, and systems or methods. It may be oriented, ultimately, toward the design, development, and improvement of prototypes and new processes to meet general mission area requirements. Applied research may translate promising basic research into solutions for broadly defined military needs, short of system development. This type of effort may vary from systematic mission-directed research beyond that in Budget Activity 1 to sophisticated breadboard hardware, study, programming and planning efforts that establish the initial feasibility and practicality of proposed solutions to technological challenges. It includes studies, investigations, and non-system specific technology efforts. The dominant characteristic is that applied research is directed toward general military needs with a view toward developing and evaluating the feasibility and practicality of proposed solutions and determining their parameters. Applied Research precedes system specific technology investigations or development. Program control of the Applied Research program element is normally exercised by general level of effort. Program elements in this category involve pre-Milestone B efforts, also known as Concept and Technology Development phase tasks, such as concept exploration efforts and paper studies of alternative concepts for meeting a mission need. | Echelon 3 use only. |
| 1.1.6.3 | Advanced Technology Development | Echelon 3 use only. R&D Budget Activity 3. This budget activity includes development of subsystems and components and efforts to integrate subsystems and components into system prototypes for field experiments and/or tests in a simulated environment. ATD includes concept and technology demonstration of components and subsystems or system models. The models may be form, fit and function prototypes or scaled models that serve the same demonstration purpose. The results of this type of effort are proof of technological feasibility and assessment of subsystem and component operability and producibility rather than the development of hardware for service use. Projects in this category have a direct relevance to identified military needs. Advanced Technology Development demonstrates the general military utility or cost reduction potential of technology when applied to different types of military equipment or techniques. Program elements in this category involve pre-Milestone B efforts, such as system concept demonstration, joint and Service-specific experiments or Technology Demonstrations and generally have Technology Readiness Levels of 4, 5, or 6. Projects in this category do not necessarily lead to subsequent development or procurement phases, but should have the goal of moving out of Science and Technology (S&T) and into the acquisition process within the future years defense program (FYDP). Upon successful completion of projects that have military utility, the technology should be available for transition. | Echelon 3 use only. |
| 1.1.6.4 | Science and Technology | Advises senior leadership on strategic S&T planning; Identifies and promotes applicable new technology to provide transformational capability from labs, industry, and academia; Acts as honest broker to leverage investments and provide independent/objective test and evaluation; Addresses over-arching issues for integration and interoperability; Implements stronger practices to improve technology transition processes; Serves as a relationship manager to facilitate coordination on S&T development and transition issues | Echelon 3 use only. |
Includes: Labor costs for government and contractor personnel and travel costs for personnel supporting this effort.
1.2 Platform/Site Integration (Dev) Technical and engineering services to support the platform manufacturer or integrator with the integration and the installation of the Prime Mission Product into the host platform/vehicle. Includes integration of system with other systems, interoperability testing, integration testing with other systems
Excludes:
(1) Platform/site integration performed during the installation process;
(2) integration and testing of lower level hardware and software elements. Includes:
- The labor required to analyze, design, and develop the interfaces with other host vehicle subsystems.
- Drawing preparation and establishment of equipment requirements and specifications.
- Technical liaison and coordination with the military services, subcontractors, associated contractors, and test groups.
- EMI studies and interoperability testing (e.g. JITC, Exercises) for the entire system (if not part of formal test (DT, OT, FOT)).
Excludes:
- All integration effort not directly associated with the host vehicle and management liaison with the military services, subcontractors, and associated contractors.
| 2 | PRODUCTION | ||
| 2.1 | PRIME MISSION PRODUCT PRODUCTION | Efforts by the producer or modernizer to produce or modernize hardware and/or software used to accomplish the primary mission of the defense materiel item. This element is a roll-up of costs associated with lower levels. | Includes: |
- All integration, assembly, test and checkout, as well as all technical and management activities associated with individual hardware/software elements.
- Integration, assembly, test and checkout associated with the overall PMP. When the electronic/automated software system comprises several PMPs, each will be listed separately at level 2.
- The production of complete units (i.e., operationally configured units which satisfy the requirements of their applicable specification(s), regardless of end use).
- Factory special test equipment, special tooling, and production planning required to fabricate the PMP.
Excludes:
- "Less than whole" units (i.e., test spares, etc.) consumed or planned to be consumed in support of system level tests.
- Duplicate or modified factory special test equipment delivered to the government for depot repair.
(Should be included in the peculiar support equipment element.)
2.1.1 Hardware (Prod) Hardware components produced, procured or modified for the specific product. Includes, with lower level sub-elements, the production engineering, program management, integration, assembly and test associated with those sub-elements. (As necessary, the program will establish additional levels of indenture needed to accurately identify/describe the hardware required for the Prime Mission Product.) Includes:
- HW production and the PM, SE, IA&T for the producer of the PMP, directly associated with lower level Hardware WBS elements. Performer (whether Contractor or Government Activity) for this element is responsible for providing discrete deliverables (i.e., LRIP/FRP Units in specific quantities.)
2.1.2 Software (Prod) Software that is specifically produced, procured or modified for the operations and maintenance or functional control of a computer system. Includes, with lower level sub-elements, the production engineering, program management, integration, assembly and test associated with those sub-elements. (As necessary, the program will establish additional levels of indenture needed to accurately identify/describe the software required for the Prime Mission Product.) Includes:
- SW development and the PM, SE, IA&T for the producer of the PMP, directly associated with lower level Software WBS elements. Performer (whether Contracted or Government Activity) for this element is responsible for providing discrete deliverables (i.e., S/W packages).
2.1.3 Integration, Assembly & Test (PMP Prod) "Pre-Delivery" integration, assembly and testing of the H/W and S/W of the Prime Mission Product. All technical and functional activities associated with the production of structures, equipment, parts, materials, and software required to assemble the level 3 equipment (hardware/software) elements into level 2 mission equipment (hardware/ software) as a whole and not directly part of any other individual level 3 element.
Includes, for example (for the whole level 2 system):
· the set up, conduct, and review of testing assembled components or subsystems prior to installation
· integration of software (including loading and verification of firmware)
Excludes:
(1) all systems engineering/program management and system test and evaluation which are associated with the complete system
(2) IA&T performed as part of the Installation process. (Use 3.4.3)
(3) Government IV&V and acceptance testing. (Use 1.1.5 or 2.1.5) Includes:
- The set up, conduct, and review of testing assembled components or subsystems prior to installation.
- The detailed production design, producibility engineering planning (PEP), and manufacturing process capability, including the process design development and demonstration effort.
- Vendor (not Gov't) inspection activities related to receiving, factory and sub-vendor liaison.
- Quality planning and control.
- Tooling (initial production facilities, factory support equipment), including planning, design, and fabrication.
- Administrative engineering.
- The joining or mating and final assembly of level 3 equipment elements to form a complete prime mission product when the effort is performed at the manufacturing facility.
- Integration of software (including loading and verification of firmware).
- Environmental stress screening and shock testing for entire system.
- Security testing for the entire system (if not part of formal test, DT, OT, FOT).
NOTE: When an integration, assembly, test, and checkout element is utilized at lower levels of the work breakdown structure, it will be summarized into the next higher level equipment (hardware/software) work breakdown structure element and should never be summarized directly into a level 3 integration, assembly, test, and checkout element.
2.1.4 Purchased Services (PMP Prod) Procured services that are required for the proper operation of the system. Includes:
- Satellite transponder leases and SIPRNET access leases. NMCI program's deployment of PMP, which includes DISA Circuits (for operation of NMCI), NMCI Contracted Services and incentives (Program Costs, Excludes Command Seat Orders found in 5.1.12)
2.1.5 Government Technical Oversight/IV&V of PMP (Prod) Costs associated with Government personnel, or contractors representing the Government, overseeing system and subsystem integration, verification and validation efforts and acceptance testing. IV&V performed by Government representatives to demonstrate, according to the verification and validation plans, the physical, electrical, software, and other characteristics of the components to be produced and/or integrated (i.e., contract specifications). Unit testing of hardware and independent verification and validation of software to ensure the components and any assemblies of them meet their requirements and function in the environment of their intended use. Technical Design Agent (TDA) services directly associated with a Prime Mission Product. High tech support that represents the program/project manager's "brain trust" who is capable of offering unbiased technical advice and who has no vested interest in the outcome of a product. Includes:
- Acceptance testing of production units.
- TDA support related to Production of PMP
- Unit testing of hardware and independent verification and validation of software for production units.
- Technical Reviews & Audits (i.e., SVR, FCA/PCA).
2.2 Platform/Site Integration (Prod) Technical and engineering services to support the platform manufacturer or integrator with the integration and the installation of the Prime Mission Product into the host platform. Includes integration of system with other systems, interoperability testing, and integration testing with other systems.
Excludes:
(1) Platform/site integration performed during the installation process.
(2) Integration and testing of lower level hardware and software elements. Includes:
- The labor required to analyze, design, and develop the interfaces with other host vehicle subsystems.
- Drawing preparation and establishment of equipment requirements and specifications.
- Technical liaison and coordination with the military services subcontractors, associated contractors, and test groups.
- EMI studies and interoperability testing (e.g. JITC, Exercises) for the entire system (if not part of formal test, DT, OT, FOT).
Excludes:
· All integration effort not directly associated with the host vehicle and management liaison with the military services, subcontractors, and associated contractors.
| 3 | COMMON ELEMENTS | Elements common to all programs/projects. | Common WBS elements should be applied to the appropriate levels within the WBS which they support. In other words, if systems engineering is required to support a Level 3 WBS element, the System Engineering WBS element would appear at Level 4 of the WBS under the Level 3 element it supports. The intent is to understand the total effort associated with designing, developing, and producing a WBS element. |
| 3.1 | Program Management | Program costs directly associated with a specific system or product. These include efforts directly associated with the business and administrative planning, organizing, directing, coordinating, controlling, and approval actions designated to accomplish the program objectives. It includes administration, project controls, product effectiveness, data and configuration management, subcontract management and security management. This element is a roll-up of costs associated with lower levels. |
Includes:
- Cost, schedule, performance measurement management, warranty administration, contract management, data management, vendor liaison, subcontract management.
- Logistics tasks management and technical control, and the business management of the support elements. Planning and management of all the functions of logistics (maintenance support planning and support facilities planning; other support requirements determination; support equipment; supply support; packaging, handling, storage, and transportation; training system requirements determination; computer resource determination; organizational, intermediate, and depot maintenance determination management; and data management).
Excludes:
- Costs of the developer, producer or modernizer associated with elements 1.1.1/2.1.1, 1.1.2/2.1.2, 1.1.3/2.1.3 and 1.1.5/2.1.5.
| 3.1.1 | Acquisition Management | Acquisition management directly associated with the Prime Mission Product including milestone preparation and documentation, statutory and policy compliance, and schedule development. |
| Includes: |
- Schedule tracking, strategy development, milestone preparation and documentation, statutory requirements and policy compliance.
3.1.1.1 Acquisition Requirements and Compliance Documentation, Acquisition Reporting "Systems Acquisition" activities on DoD acquisition programs and the associated acquisition strategy. Development of background information and planning. Includes:
- Writing and/or coordinating program acquisition documentation.
3.1.1.2 Program Management Activities Program management efforts including cost, schedule, performance measurement management, warranty administration, contract/subcontract management, data management, vendor liaison, etc. Program execution. Risk management. Includes:
- Establishment of a risk management process that includes risk planning, risk assessment (identification and analysis), risk management, and risk monitoring to be integrated and continuously applied throughout the program.
- Development and maintenance of the Integrated Master Plan and Integrated Master Schedule, event driven plans that define major tasks and detailed schedules.
3.1.1.3 Cost/Schedule/Performance (EVM) Analysis Earned Value Management. Includes:
- Integrated Baseline Reviews & Support.
- Generating the monthly Cost Performance Reports (CPR) and Contract Funds Status Report (CSFR).
- Collection/analysis of costs for EVM calculations and tracking.
3.1.2 Financial Management Financial management including planning, programming, budgeting, and execution (PPBE), cost accounting and analysis. Includes:
- PPBE requirements; preparation and defense of budget, answers to budget drills, resolution of budget issues (controls, expenditures, meeting benchmarks), input into the POM process for funded/unfunded issues and offsets, spend plan management, execution tracking (preparing funding docs, tracking status - committed, obligated, expended), financial and managerial accounting, and resource management studies and analysis.
- Includes comptroller and other overhead/G&A financial management responsibilities.
- Includes all costs associated with the development, procurement, maintenance, systems/database administration, and license fees for Command/PEO wide financial systems and applications.
3.1.2.1 Accounting Compliance Reports & Products Functional operations involved in authorizing, recording, classifying, analyzing, and reporting financial information related to financing sources, gains, expenses, losses, transfers, assets, liabilities, equity, and internal controls Includes:
- Billing and payment documentation; funds and accounting approval documentation; unmatched disbursements/negative unliquidated disbursements (UMD/NULO) reconciliation (i.e., pay & payroll documents, Other Customer & FMS Funds Review/Approval/Documentation, Accounting Policy Analysis/Documentation/Fiscal Law opinion, Plant Property Asset Management documents, funds/accounting approval documentation, billing/payment documentation, DoN Financial Improvement Program/Clean Financials.
3.1.2.2 Budget/POM/PR Formulation, Presentation & Defense Development, submission and justification of the Budget and POM/PR submissions. Includes:
- All Budget exhibit development, review and defense; development and submission of all POM/PR materials and responses to actions associated with POM/PR guidance (i.e., serials, warning and planning orders, offsets and excursions); impact statements and reclamas associated with budget and POM process.
3.1.2.3 Funds Allocation & Execution Funds allocation, execution planning and actual execution of funds. Execution planning begins following initial submission of FMB Budget in July. Includes:
- Execution and prior year: control tracking, spend plan management and execution, preparation of funding documents and contract FAD sheets, and monitoring/tracking of commitments, obligations, and expenditures. Also includes responses to data calls and inquiries associated with execution of funds (i.e., Mid-Year Review, impact statements for control adjustments as required, and other data calls on execution year funds utilization).
- Execution allocation and execution includes establishment, allocation, tracking & reconciliation of program funding (i.e., Spend Plans). Execution monitoring includes tracking of commitments, obligations & expenditures.
3.1.2.4 Studies, Reporting, Analysis Data calls, responding to requests for information and resource data analysis. Includes:
- Financial management studies, reporting and analysis not directly supporting budget/POM/PR processes, including input to stakeholder/leadership briefs for Team SPAWAR resources, productivity and other cost trend analysis, and responses to financial data calls which apply across Team SPAWAR.
| 3.1.2.5 | DTS Administration | Comptroller administration of the Defense Travel System in accounting department. | Comptroller Use Only |
| 3.1.3 | Logistics Management | Logistics management directly associated with the Prime Mission Product to include activity to adequately perform supportability analysis and planning for each ILS element and develop logistics plans and reports. Specifically, develop logistics plans and reports to include Integrated Logistic Support Plan (ILSP), Logistic Resources Funding Summary (LRFS), User’s Logistic Support Summary (ULSS), Maintenance Plan, Depot Plan, Material Support Date (MSD) Transition Plan, Program Support Data (PSD), Configuration Management (CM) Plan, Training Planning Process Methodology (TRPPM), Navy Training Systems Plan (NTSP), Job Task Analysis ( JTA), Training System Installation Plan (TSIP), Computer Resources Life Cycle Management Plan (CRLCMP), Packaging, Handling, Storage and Transportation (PHS&T), Program Environmental, Health and Saftey (PEHSE), ILS Certification, Unique Identification (UID) Plan and Diminishing Manufacturing Sources and Material Shortages (DMSMS) Plan. | Includes: |
- Studies and Plans, ILSP, LRFS, Depot Plan, ULSS, TRPPM, NTSP, TSIP, Maintenance Plan, MSD Transition Planning, CRLCMP, PHS&T, Containers, PSD Development,CRLCMP, PESHE, ILS Certification, UID, DMSMS
| 3.1.3.1 | Logistics Management Policy | Provide logistics policy for the SPAWAR claimancy to ensure sustainable products are acquired and sustained per Fleet requirements. | |
| 3.1.3.2 | Logistics Management Assessment | Provide PEOs with an assessment at of whether acquisitions will meet sustainability goals after fielding, at IOC and FOC, whether PEO products continue to achieve required fleet operational availability per DoN requirements. | |
| 3.1.3.3 | Logistics Management Acquisition | Logistics management acquisition directly associated with the Prime Mission Product to include activities throughout the system development cycle to ensure the design and acquisition of cost-effective, supportable systems and to ensure that these systems are provided to the user with the necessary support infrastructure for achieving the user's peacetime and wartime readiness requirements. These activities include establishing logistics support concepts, analysis, data and resources in the development, coordination and management of Integrated Logistics Support (ILS) products and services. Specific integrated logistics support planning may include the following: Configuration Management/Status Accounting, Supply Support/Supply Management, System Training Planning and Implementation, Maintenance Engineering and Planning, Systems Integration/Engineering, Systems Operation and Maintenance Training and Technical Manuals, Reliability and Maintainability/System Safety assessments, and Cost/Schedule (Program) Control. Participate in conducting supportability studies, reliability and maintainability analyses, and assessments and remedial actions as required. Translate requirements to specifications and coordinate development of Integrated Logistics Support Plans (ILSP), Maintenance Concepts/Plans, Navy Training Support Pans (NTSP), Acquisition Management Plans, Logistics Requirements and Funding Summaries (LRFS), Program Support Data Sheets (PSD), Warranty Plans and Assessments, Logistics Support Systems Specifications, and Proposals. | Includes: |
- Studies and Plans, ILSP, LRFS, Depot Plan, ULSS, TRPPM, NTSP, TSIP, Maintenance Plan, MSD Transition Planning, CRLCMP, PHS&T, Containers, PSD Development,CRLCMP, PESHE, ILS Certification, UID, DMSMS
| 3.1.3.4 | PBL Business Case Analysis (BCA) | A PBL BCA is a decision making tool used to estimate the costs between alternative support strategies (i.e., traditional or existing vs. proposed alternative). The BCA compares the total estimated product support costs between the baseline support strategy and a proposed PBL support strategy to determine the best value means of supporting a system, subsystem, or component. | |
| 3.1.4 | ADP Support | ADP functions directly associated with a Prime Mission Product, including development, maintenance, and operations of applications used to support program/project execution objectives (to include Business and financial systems, as well as web-site operation/maintenance and webmaster support for Program office web sites for information collection and dissemination.) | Includes: |
- Program web sites, business financial systems.
| 3.1.5 | Contract Management | Contract management, including activities associated with Contract Preparation through Contract Award and Contract Management /Execution. | |
| Includes contract management directly associated with the Prime Mission Product and contract management in support of overhead/G&A requirements. | |||
| 3.1.5.1 | Planning | Defining requirements, performing market research, developing acquisition planning and strategy, conducting contract planning conference. | Includes: |
- Products that support planning for contract award or modification. May include Broad Area Announcements, Determination and Findings, FEDBIZOPP, market research findings, J&As.
3.1.5.2 Solicitation Preparing the solicitation; publicizing the planned procurement; amending the solicitation, as necessary; communicating with the offerors, as necessary; and receiving the offers. Includes:
- SOWs, SOOs, CDRLS, RFPs, security documentation, Small Business coordination, market research, wage determination, certified cost and pricing waivers, protest litigation, MOPAS.
3.1.5.3 Evaluation Evaluation of proposals received in response to solicitation; identification of the strengths, weaknesses, significant weaknesses, and deficiencies contained in the proposals; and providing a sound basis for the source selection authority (SSA) or procuring contracting officer (PCO) to make an informed and…