Exhibit A - CDRLs.pdf
PDF 139 KB Posted
- Attached to
- Solicitation N0003918R0006 (NILE ISS)
- Solicitation number
- N00039-18-R-0006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 07_Subcontractor_Pricing_ModelR1.xls | XLS spreadsheet | |
| ATTACHMENT 01a_NILE ISS4 PWS.pdf | ||
| Synopsis Edited 11 Dec 2017.pdf | ||
| Attachment 06_Prime_Pricing_Model.xls | XLS spreadsheet | |
| N0003918R0006-0001.pdf | ||
| Attachment 3 - QASP.pdf | ||
| NILE ISS4 NDA (US Companies) POSTED 12 OCT 2017.pdf | ||
| Attachment 2 - DD254.pdf | ||
| Attachment 09_PPQ_N0003918R0006.doc | DOC document | |
| Attachment 04 - Desired Personnel Qualifications.pdf | ||
| ATTACHMENT 01d - PTDL3_PWS.pdf | ||
| ATTACHMENT 01b -PTDL1_PWS.pdf | ||
| Attachment 08_Relevant_Experience_Form.doc | DOC document | |
| Attachment 05_ N00039-13-C-0035_SGFP Data Input Spreadsheet_.pdf | ||
| List of Reference Documents.xlsx | XLSX spreadsheet | |
| N0003918R0006-0002.pdf | ||
| ISS CDRL A002 Attachment 1To Exhibit A.xlsx | XLSX spreadsheet | |
| Synopsis Q&A 20 Oct 2017.pdf | ||
| N0003918R0006 RELEASED 20 NOV 2017.pdf | ||
| ATTACHMENT 01c - PTDL2_PWS.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0003917R0049
CONTRACT DATA REQUIREMENTS LISTS
As Referenced in EXHIBIT A for the
NATO IMPROVED LINK ELEVEN (NILE) IN-SERVICE SUPPORT 4 (ISS4)
CONTRACT
Prepared by
DEPARTMENT OF THE NAVY
PROGRAM EXECUTIVE OFFICER, COMMAND, CONTROL, COMMUNICATIONS,
COMPUTERS AND INTELLIGENCE
PMW 150
San Diego, California
CDRL TITLE DID
PWS
REFERENCE
A001 Project Management Plan (PMP) DI-MGMT-81797 5.1.3.2
A002 Contractor’s Progress, Status and Management Report
DI-MGMT-80227,
DI-MGMT-80368A
5.1.3.3
A003 Test Plans/Procedures/Reports
DI-IPSC-81439A,
DI-IPSC-81440A
5.1.2.1.2
A004 Configuration Management Information System (CMIS) 5.1.3.11.3.1
A005 Meetings Agendas and Minutes
DI-ADMN-81249A,
DI-ADMN-81250A
A006 Technical Documentation (WPs, CPs, PCRs, FRs, etc.)
A007 SNC Software Test Description (STD) DI-IPSC-81439A 5.1.1.5
A008 SNC Software Test Report (STR) DI-IPSC-81440A 5.1.1.5
A009 SNC Software Version Description (SVD) DI-IPSC-81442A 5.1.1.2
A010 SNC Source and Executable Software (SES) 5.1.1.2
A011 SNC/NRS BCR Technical Data Package (TDP), Including STMs and L22 Guidebook
5.1.1.3, 5.1.1.4
A012 NRS Software Test Description (STD) DI-IPSC-81439A 5.1.1.5
A013 NRS Software Test Report (STR) DI-IPSC-81440A 5.1.1.5
A014 NRS Software Version Description (SVD) DI-IPSC-81442A 5.1.1.2
A015 NRS Source and Executable Software (SES) 5.1.1.2
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract |PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
X001, X003 A TDP TM OTHER
D. SYSTEM ITEM E. CONTRACT/PR NO. F. CONTRACTOR
NILE ISS 4 N0003917R0049
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A001 Project Management Plan (PMP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-81797 PWS Para 5.1.3.2 PEO C4I - PMW 150/NILE PMO
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT *BLOCK 16 See *BLOCK
16. Annually.
*BLOCK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
*BLOCK 16 *BLOCK 16 Reg Repro
16. REMARKS NILE PMO 1 1 0
*BLOCK 9: Distribution limited to the Ministries of Defense (MoDs) of France, Germany, Italy, Spain, United Kingdom, National Defense Headquarters of Canada, the United States Department of Defense and their respective contractors/industry suppliers. Other requests for this document must be referred to the NILE Project Management Office (PMO).
*BLOCK 10, 11, 12 and 13: Submit update to the Government-provided draft PMP (including SDP, CMP, ISP and Security Manual) NLT 30 calendar DACA. Government comments will be provided within 30 calendar days. Final due NLT 7 calendar DARGC. Subsequent reviews required annually.
Submit electronically in accordance with the PWS.
-“CMP” = Configuration Management Plan -“DACA” = Days After Contract Award -“DARGC” = Days After Receipt of Government Comments -“ISP” = Integrated Support Plan -“NLT” = No Later Than -“SDP” = Software Development Plan
15. Total 1 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
S. Nye, NILE PMO E. Hollenbeck, COR
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 3 of 17
Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.
X001 A TDP TM OTHER
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A002 Contractor’s Progress, Status and Management Report
Monthly Status Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-80227/DI-MGMT-80368A PWS Para 5.1.3.3 PEO C4I - PMW 150/NILE PMO
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT *BLOCK 16 Monthly *BLOCK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
*BLOCK 16 *BLOCK 16 Reg Repro
16. REMARKS NILE PMO 1 1 0
The MSR shall be submitted electronically and consist of two parts. The first part shall be based on the Excel format of CDRL attachment 1 with all cells populated. The second part shall be provided in Word format and shall consist of a narrative addressing, at a minimum:
a. Performance Status – Significant accomplishments and progress made during the affected reporting period by PWS paragraph. Also identify significant challenges or risks encountered that impact the successful delivery of required services.
b. Schedule Status – Schedule for and status of all deliverables in Microsoft Project 2010 (or later). The schedule shall reflect the tasks, dates (baseline, forecast, and actual (monthly and cumulative)), external and internal dependences and relationships necessary to support accurate forecasts of contract milestone delivery dates by both the contractor and the Government. If any efforts are not on schedule, indicate the reason for the delay and provide a revised completion/delivery date.
c. Financial Status – Identify at a summary level and by PWS paragraph the total amount planned by appropriation, total amount received to date by appropriation, planned vs actual burn rate by appropriation and Estimate at Completion (EAC) in addition to the reporting requirements identified in Attachment 1. This description does not waive the requirement for formal Limitation of Funds/Cost notifications, when warranted.
d. Personnel Status/Staffing Plan – Identify by name, labor category, fully burdened labor rate, labor hours planned for each employee charging to the contract task order by PWS paragraph and the actual cumulative total to date per Attachment 1.
e. Cybersecurity Workforce (CSWF) Report - in accordance with the requirements detailed within the PWS that includes, but is not limited to, reporting on the security status, Information Assurance training and certification status of all contractor and subcontractor personnel.
f. Travel/ODC Status – Identify any travel accomplished with sufficient detail to support costs listed in Attachment 1. Additionally, provide a detailed description of the ODCs authorized at time of award and ODCs incurred to date.
Additional details shall be reported as required by the NILE PMO throughout the PoP.
*BLOCK 9: Distribution limited to the Ministries of Defense (MoDs) of France, Germany, Italy, Spain, United Kingdom, National Defense Headquarters of Canada, the United States Department of Defense and their respective contractors/industry suppliers. Other requests for this document must be referred to the NILE Project Management Office (PMO).
BLOCK 11, 12, and 13: The Contractor shall deliver the initial MSR 30 calendar DACA.
Subsequent submissions due NLT 15 calendar days after the end of the prior month. No Government response to the MSR within 30 calendar days after submission constitutes approval.
Submit electronically in accordance with the PWS.
Contracting Officer
1 1 0
Contracting Specialist
1 1 0
15. Total 3 3
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 4 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.
X001, X004 A TDP TM OTHER
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A003 Test Plans/Procedures/Reports
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-IPSC-81439A/DI-IPSC-81440A PWS Para 5.1.2.1.2 PEO C4I - PMW 150/NILE PMO
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NO *BLOCK 16 *BLOCK 16 *BLOCK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
*BLOCK 16 *BLOCK 16 Reg Repro
16. REMARKS NILE PMO 1 1
Test Plans shall address, at a minimum, the following topics: Objectives, Test Description, Responsibilities, Resources, Requirements and Schedule. Test Procedures shall address, at a minimum, the following topics: Scope, Test Description, Test configuration, Scenario Definition, and Test Execution. Test Reports shall address, at a minimum, the following topics: Scope, Test Results and Conclusions.
*BLOCK 9: Distribution limited to the Ministries of Defense (MoDs) of France, Germany, Italy, Spain, United Kingdom, National Defense Headquarters of Canada, the United States Department of Defense and their respective contractors/industry suppliers. Other requests for this document must be referred to the NILE Project Management Office (PMO).
*BLOCK 10, 11, 12, and 13: A draft copy of the Test Plan/Test Procedure shall be delivered NLT 30 calendar days before the test event. The Government review period will be 10 calendar days. The Contractor shall have 5 calendar DARGC to deliver the Final Document.
A draft copy of the Test Report shall be delivered NLT 20 calendar days after the test event. The Government review period will be 10 calendar days. The Contractor shall have 3 calendar DARGC to deliver the Final Document.
Submit electronically in accordance with the PWS.
-“DARGC” = Days After Receipt of Government Comments
15. Total 1 1
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 5 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A004 Configuration Management Information System
(CMIS)
Subsystem Segment Specification
(SSS)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
PWS Para 5.1.3.11.3.1 PEO C4I - PMW 150/NILE PMO
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NO *BLOCK 16 *BLOCK 16 *BLOCK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
*BLOCK 16 *BLOCK 16 Reg Repro
16. REMARKS NILE PMO 1 1 7
*BLOCK 9: Distribution limited to the Ministries of Defense (MoDs) of France, Germany, Italy, Spain, United Kingdom, National Defense Headquarters of Canada, the United States Department of Defense and their respective contractors/industry suppliers. Other requests for this document must be referred to the NILE Project Management Office (PMO).
Note: In future, FMS Nations who have paid their levies, may be given access to CMIS information. In such instances, the NILE PMO will provide the distribution statement.
*BLOCK 10, 11, 12, and 13: A draft version of the CMIS shall be delivered 30 calendar DACA. The Government review period will be 15 calendar days. The Contractor shall thereupon have 10 calendar days to put in place the final version of the tool incorporating comments. The CMIS shall be capable of producing Microsoft ACCESS compatible output and shall be continuously available to the Government online through a secure website.
In addition to maintain CMIS on the secure website, formal CMIS output updates in e-format shall be delivered before every in-person NILE CCB Meeting (typically every 6 months, in May and November of each year).
-“DACA” = Days After Contract Award
FMS Nations As req’d
15. Total 1 1 7
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 6 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.
X001 A TDP TM OTHER
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A005 Meetings Agendas and Minutes
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-ADMN-81249B/DI-ADMN-81250B PWS Para 5 PEO C4I - PMW 150/NILE PMO
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NO *BLOCK 16 *BLOCK 16 *BLOCK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
*BLOCK 16 *BLOCK 16 Reg Repro
16. REMARKS NILE PMO 1 1 0
*BLOCK 9: Distribution limited to the Ministries of Defense (MoDs) of France, Germany, Italy, Spain, United Kingdom, National Defense Headquarters of Canada, the United States Department of Defense and their respective contractors/industry suppliers. Other requests for this document must be referred to the NILE Project Management Office (PMO).
*BLOCK 10, 11, 12, and 13: Draft copies of the Agenda shall be delivered NLT 10 calendar days before meetings. The Government review period will be 3 calendar days. The Contractor shall have 5 calendar DARGC to deliver the Final Agenda.
Draft copies of the Minutes shall be delivered NLT 5 calendar days after the meeting. The Government review period will be 5 calendar days. The Contractor shall have 5 calendar DARGC to deliver the Final Minutes.
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 7 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.
X001, X003, X004 A TDP TM OTHER
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A006 Technical Documentation (WPs, CPs, PCRs, FRs, etc.)
PWS Para 5 PEO C4I - PMW 150/NILE PMO
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NO *BLOCK 16 *BLOCK 16 *BLOCK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
*BLOCK 16 *BLOCK 16 Reg Repro
16. REMARKS NILE PMO 1 1 0
*BLOCK 9: Distribution limited to the Ministries of Defense (MoDs) of France, Germany, Italy, Spain, United Kingdom, National Defense Headquarters of Canada, the United States Department of Defense and their respective contractors/industry suppliers. Other requests for this document must be referred to the NILE Project Management Office (PMO).
*BLOCK 10, 11, 12, and 13: Draft copies of the documents (WPs, CPs, PCRs, FRs analysis) shall be delivered 14 calendar days after completion of the analysis of the issue. The Government review period will be 20 calendar days. The Contractor shall have 14 calendar DARGC to deliver the Final document.
-“CP” = Change Proposal
-“FR” = Feedback Report -“NLT” = No Later Than -“PCR” = Problem Change Report -“WP” = White Paper
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 8 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A007 SNC Software Test Description (STD)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-IPSC-81439A PWS Para 5.1.1.5 PEO C4I - PMW 150/NILE PMO
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT *BLOCK 16 *BLOCK 16 *BLOCK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
*BLOCK 16 *BLOCK 16 Reg Repro
16. REMARKS NILE PMO 1 1 0
*BLOCK 9: Distribution limited to the Ministries of Defense (MoDs) of France, Germany, Italy, Spain, United Kingdom, National Defense Headquarters of Canada, the United States Department of Defense and their respective contractors/industry suppliers. Other requests for this document must be referred to the NILE Project Management Office (PMO).
*BLOCK 10, 11, 12, and 13: Submit update to the Government-provided STD NLT 30 calendar DACA. Government comments will be provided within 30 calendar days. Final due NLT 7 calendar DARGC.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 9 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A008 SNC Software Test Report (STR)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-IPSC-81440A PWS Para 5.1.1.5 PEO C4I - PMW 150/NILE PMO
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT *BLOCK 16 *BLOCK 16 *BLOCK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
*BLOCK 16 *BLOCK 16 Reg Repro
16. REMARKS NILE PMO 1 1 0
*BLOCK 9: Distribution limited to the Ministries of Defense (MoDs) of France, Germany, Italy, Spain, United Kingdom, National Defense Headquarters of Canada, the United States Department of Defense and their respective contractors/industry suppliers. Other requests for this document must be referred to the NILE Project Management Office (PMO).
*BLOCK 10, 11, 12, and 13: A copy of the STRs shall be delivered NLT 15 calendar days after completion of the NRS SW Acceptance Tests.
Government comments will be provided within 30 calendar days. Final due NLT 7 calendar DARGC.
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 10 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A009 SNC Software Version Description (SVD)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-IPSC-81442A PWS Para 5.1.1.2 PEO C4I - PMW 150/NILE PMO
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT *BLOCK 16 *BLOCK 16 *BLOCK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
*BLOCK 16 *BLOCK 16 Reg Repro
16. REMARKS NILE PMO 1 1 0
*BLOCK 9: Distribution limited to the Ministries of Defense (MoDs) of France, Germany, Italy, Spain, United Kingdom, National Defense Headquarters of Canada, the United States Department of Defense and their respective contractors/industry suppliers. Other requests for this document must be referred to the NILE Project Management Office (PMO).
*BLOCK 10, 11, 12, and 13: A copy of the SVD shall be delivered 30 calendar days after completion of each SNC SW Acceptance Test.
Government comments will be provided within 30 calendar days. Final due NLT 7 calendar DARGC.
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 11 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A010 SNC Source and Executable Software (SES)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
PWS Para 5.1.1.2 PEO C4I - PMW 150/NILE PMO
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT *BLOCK 16 *BLOCK 16 *BLOCK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
*BLOCK 16 *BLOCK 16 Reg Repro
16. REMARKS NILE PMO 1 1 7
*BLOCK 9: Distribution limited to the Ministries of Defense (MoDs) of France, Germany, Italy, Spain, United Kingdom, National Defense Headquarters of Canada, the United States Department of Defense and their respective contractors/industry suppliers. Other requests for this document must be referred to the NILE Project Management Office (PMO).
*BLOCK 10, 11, 12, and 13: A copy of the Source and Executable files on CD-ROM shall be delivered NLT 30 calendar days after each SNC SW Acceptance Test.
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 12 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A011 SNC/NRS BCR Technical Data Package (TDP), Including STMs and L22 Guidebook
PWS Para 5.1.1.3, 5.1.1.4 PEO C4I - PMW 150/NILE PMO
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT *BLOCK 16 *BLOCK 16 *BLOCK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
*BLOCK 16 *BLOCK 16 Reg Repro
16. REMARKS NILE PMO 1 1 7
*BLOCK 9: Distribution limited to the Ministries of Defense (MoDs) of France, Germany, Italy, Spain, United Kingdom, National Defense Headquarters of Canada, the United States Department of Defense and their respective contractors/industry suppliers. Other requests for this document must be referred to the NILE Project Management Office (PMO).
*BLOCK 10, 11, 12, and 13: An updated TDP shall be delivered on completion of each Block Cycle. A draft copy of the documents shall be delivered 30 calendar days after completion of SW Acceptance Tests. The Government comments will be provided within 20 calendar days. Final due
NLT 14 DARGC.
Link 22 Guidebook: the Link 22 Guidebook is in three versions as described in PWS paragraph 5.1.1.4.
Updated baseline of the above mentioned documents shall be delivered on CD-ROM at the completion of each Block Cycle.
-“NLT” = No Later Than
-“STM” = System Technical Manuals
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 13 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A012 NRS Software Test Description (STD)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-IPSC-81439A PWS Para 5.1.1.5 PEO C4I - PMW 150/NILE PMO
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT *BLOCK 16 *BLOCK 16 *BLOCK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
*BLOCK 16 *BLOCK 16 Reg Repro
16. REMARKS NILE PMO 1 1 0
*BLOCK 9: Distribution limited to the Ministries of Defense (MoDs) of France, Germany, Italy, Spain, United Kingdom, National Defense Headquarters of Canada, the United States Department of Defense and their respective contractors/industry suppliers. Other requests for this document must be referred to the NILE Project Management Office (PMO).
*BLOCK 10, 11, 12, and 13: Submit update to the Government-provided NRS NLT 30 calendar DACA. Government comments will be provided within 30 calendar days. Final due NLT 7 calendar DARGC.
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 14 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A013 NRS Software Test Report (STR)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-IPSC-81440A PWS Para 5.1.1.5 PEO C4I – PMW 150/NILE PMO
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT *BLOCK 16 ASREQ
See Item 16
*BLOCK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
*BLOCK 16 *BLOCK 16 Reg Repro
16. REMARKS NILE PMO 1 1 0
*BLOCK 9: Distribution limited to the Ministries of Defense (MoDs) of France, Germany, Italy, Spain, United Kingdom, National Defense Headquarters of Canada, the United States Department of Defense and their respective contractors/industry suppliers. Other requests for this document must be referred to the NILE Project Management Office (PMO).
*BLOCK 10, 11, 12, and 13: A copy of the STRs shall be delivered NLT 15 calendar days after completion of the NRS SW Acceptance Tests.
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 15 of 17 Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A014 NRS Software Version Description (SVD)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-IPSC-81442A PWS Para 5.1.1.2 PEO C4I – PMW 150/NILE PMO
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT *BLOCK 16 *BLOCK 16 *BLOCK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
*BLOCK 16 *BLOCK 16 Reg Repro
16. REMARKS NILE PMO 1 1 0
*BLOCK 9: Distribution limited to the Ministries of Defense (MoDs) of France, Germany, Italy, Spain, United Kingdom, National Defense Headquarters of Canada, the United States Department of Defense and their respective contractors/industry suppliers. Other requests for this document must be referred to the NILE Project Management Office (PMO).
*BLOCK 10, 11, 12, and 13: A copy of the SVD shall be delivered 30 calendar days after completion of each NRS SW Acceptance Test.
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 16 of 17 Pages
Form Approved
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding thus burden estimate or any other aspect of this collection o f information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget. Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract PR No. listed in Block E.
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A015 NRS Source and Executable Software (SES)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
PWS Para 5.1.1.2 PEO C4I – PMW 150/NILE PMO
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT *BLOCK 16 *BLOCK 16 *BLOCK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE DRAFT FINAL
*BLOCK 16 *BLOCK 16 Reg Repro
16. REMARKS NILE PMO 1 1 7
*BLOCK 9: Distribution limited to the Ministries of Defense (MoDs) of France, Germany, Italy, Spain, United Kingdom, National Defense Headquarters of Canada, the United States Department of Defense and their respective contractors/industry suppliers. Other requests for this document must be referred to the NILE Project Management Office (PMO).
*BLOCK 10, 11, 12, and 13: The Contractor shall deliver the Source and Executable files on CD-ROM NLT 30 calendar days after each NRS SW Acceptance Test.
DD FORM 1423-1, JUN 90 (EG) Previous editions are obsolete Page 17 of 17 Pages
File details come from the government source that posted it.