About this file

Attachment L-1 - Basic Pricing Data

View the file

Other files

File Type Posted
N00033-12-R-2002_A0002.doc DOC document
Attachment_C_GFE_List.pdf PDF
Attachment_L-1_Basic_Pricing_Data.xls XLS spreadsheet
N00033-12-R-2002_A0001.doc DOC document
Attachment_L-2_Crew_Complement_Form.xls XLS spreadsheet
Attachment_L-5_Insurance_Affirmation.doc DOC document
Attachment_E_Mission_Essential_Contractor_Services.pdf PDF
Attachment_C_GFE_List.pdf PDF
Attachment_L-2_Crew_Complement_Form.xls XLS spreadsheet
Attachment_D-1_WD_2010-0147_Rev1.pdf PDF
N00033-12-R-2002.doc DOC document
Attachment_D-2_WD_2010-0148_Rev1.pdf PDF
Attachment_B_EDI_TP_Agreement.docx DOCX document
Attachment_L-3_Past_Performance_Datasheet.doc DOC document
Attachment_A_DD254.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Firm Period

Vessel:RFP: N00033-12-R-2002
Performance Period:Firm Period365days
Unless otherwise specified by the Offeror, the costs and profit identified below will be assumed to be:
(a) allocable to the services of the Vessel under this Charter
(b) in US dollars
(c) for evaluation purposes, paid for 365 days in the base performance period, and for 365 days in option one
(d) unchanging over each period of this Charter.
COST PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$0.00
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$0.00
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$0.00
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit
33Total daily costs$0.00

&C&"Times New Roman,Bold"&10Attachment B: Basic Pricing Data

&CFOR OFFICIAL USE ONLY

NOT TO BE RELEASED UNDER FOIA -- NOT TO BECOME A PART OF ANY CONTRACT DOCUMENT

Option 1

Vessel:RFP: N00033-12-R-2002
Performance Period:Option Period One365days
Unless otherwise specified by the Offeror, the costs and profit identified below will be assumed to be:
(a) allocable to the services of the Vessel under this Charter
(b) in US dollars
(c) for evaluation purposes, paid for 365 days in the base performance period, and for 365 days in option one
(d) unchanging over each period of this Charter.
COST PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$0.00
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$0.00
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$0.00
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit
33Total daily costs$0.00

&C&"Times New Roman,Bold"&10Attachment B: Basic Pricing Data

&CFOR OFFICIAL USE ONLY

NOT TO BE RELEASED UNDER FOIA -- NOT TO BECOME A PART OF ANY CONTRACT DOCUMENT

File details come from the government source that posted it. Updated .