Government Answers to Offerors Questions - N00024-23-R-6211-9.05.23.pdf

PDF 213 KB Posted

Attached to
AN/BLQ-10 Electronic Warfare System Solicitation
Solicitation number
N0002423R6211
Issued by

About this file

This document provides answers from the Navy to questions from offerors regarding solicitation N0002423R6211 for the AN/BLQ-10 Electronic Warfare System. The solicitation is for TI-26, TI-28 and TI-30 upgrades and requires the contractor to provide an electronic warfare system, integrated logistics support including maintenance of technical manuals and training events. Questions covered topics such as additional blocks for the DD254 form, provision of Microsoft Word versions of specifications, assumptions about interfaces and cables, use of foldout pages, and whether the contractor is responsible for integrated logistics support content and delivery of training materials. The solicitation closes on an unspecified date with inspection and acceptance to occur at origin for CLINs 0001 and 1001.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question Number DATE Page #

Section/ Paragraph

Question Proposed Action/Change Government Answers

1 8/15/2023 Attachment J-4 DD

Blocks 7 - 8 of the

DD 254

What should an offeror do if the DD form 254 does not allow for additional blocks 7 & 8s to be filled in when an offeror has multiple performance locations?

Provide an updated DD Form 254 that allows additional fill ins or allow offerors to provide a separate document with the DD 254 with the necessary blocks 7 & 8 information.

Offerors shall fill in what they can on the DD 254 for blocks 6-8 and provide the necessary information of blocks 7 - 8 for additional locations in a separate document. So Offerors shall provide the DD 254 form filled in and if an offeror has additional subcontractors (block 7) or additional performance locations (block 8) they shall provide a separate document with the necessary information for those additions as if offerors were able to fill it in on the DD 254.

2 8/21/2023 137 Section

L/Paragraph 1.3.1

Can the the Government provide a Microsoft Word version of the classified spec?

Provide a Microsoft Word version of the classified spec.

The Government will provide a Microsoft Word version of the classified spec to all offerors who request the classified Government GFI, but this is being provided as a reference only, and offerors should refer to the signed PDF copy as the official version.

3 8/24/2023 137 Section

L/Paragraph 1.3.2

Please confirm the following assumptions:

Assume that all STEB fiber interfaces are coming in through FOCS as there are no new cables supporting this capability identified in the TI-26 Virginia Class GFI provided with the proposal. Additionally assume that the STEB I/O panel in the Internal Countermeasure Launcher (ICL) Room that was crossed out in the TI-26 ES Virginia Class GFI will be included in the GFI provided by another subsystem.

Request the following referenced documents be provided:

• No 130: Payload Design Document & Interface Control Document (ICD) STEB-

PDD-002

• No 131: Requirements for Submarine Tethered Expendable Buoy STEB-REQ-00 identified in the TI-26 Virginia Class GFI provided with the proposal. Additionally assume that the STEB I/O panel in the Internal Countermeasure Launcher (ICL) Room that was crossed out in the TI-26 ES Virginia Class GFI will be included in the GFI provided by another subsystem.

These documents are referenced in the System Performance Spec but not included in the GFI library.

Navy confirms assumptions and provides requested GFI

The assumption is confirmed.

No. 130 was uploaded in the TDL on Friday 8/25/23.

No. 131 should be on the CD that was part of the classified transmittal.

4 8/24/2023 137 Section

L/Paragraph 1.3.2

Was R-CI2A/W00202 DF VIDEO cable intentionally removed from the TI-26 Virginia Class GFI? This is the COAX cable that brings the Imaging Mast MB DF Video and HB DF Video from Bay 9 down to the ESM Room on legacy systems and is used in MTI, LPPM and Type 20 (HB DF Video) mast configurations

Navy confirms removal of cable or update GFI to include the cable

The DF Video cable was removed for BLK-VI NCON (not TI-26+ MOD) to address compliance with ship’s specification 304 with regards to low smoke requirements, and that it is expected to be provided over fiber. An analysis was performed that if that does not hold true that the conduit between CSES1-09 and ESM-S could support routing the RF lines.

5 8/24/2023 140 Section

L/Paragraph 1.7.1

Are fold out pages permitted for diagrams, charts, or graphic material?

Navy confirms if fold out pages are allowed

Fold out pages may be used for diagrams, charts, or graphic material only and may not exceed 11 inches by 17 inches. Fold out pages may only include narrative sufficient to describe the diagram, chart, or graphic material and must be single-sided. Each single-sided fold out counts as 1 page. This will be added to Section L

1.7.1 in an upcoming Amendment.

6 8/24/2023 140 Section L

/Paragraph 1.7.1

Can Arial Narrow font, no smaller than size 8, be used within tables, diagrams, pictorial charts, or graphic material? Arial Narrow fonts can be more legible in these cases.

Navy confirms if Arial Narrow can be used

No, please see Section L 1.7.1 - Text within tables, diagrams, pictorial charts, or graphic material shall use Times New Roman font, no smaller than size 8.

7 9/5/2023 137 Section

L/Paragraph 1.3.2

Please confirm the following assumption:

Assume that any required SubSTAR ship cables will be provided to Electric Boat in an updated GFI package including the directional antenna connection to Junction Box Unit J20 and the serial connections to J9 and J19 in accordance with System Specification reference 132: SubSTAR Antenna Group Electronics Module (EM) ICD. There are no ship cables supporting these interfaces in the provided TI-26 ES Virginia Class GFI.

Navy confirms assumptions and updates

GFI

Confirmed.

8 9/5/2023 84 Section E / E-246-

H019

Clause states "The Contractor shall at no additional cost to the Government make any necessary changes, modifications, or corrections to the PTD." The contract type for CLINs 0001 & 1001 are CPIF so the Contractor is allowed to recover costs for all work performed within funding limits.

This text should be removed from the model contract.

This text will not be removed and the Contractor shall comply with it.

9 9/5/2023 84 Section E / E-246-

H014 & E-246- H015

Both clauses state inspection and acceptance by COR for CLINs 0001 & 1001. That conflicts with Section E on page 83, which states inspection and acceptance is at Origin.

Update Section E for CLINs 0001 & 1001 to “Destination”

No update is needed. However, it is possible certain Delivery Orders will have a different inspection and acceptance location and will state Destination. That information will be provided with the applicable Delivery Order.

10 9/5/2023 87 Section E / E-246-

W004

Para (b) states "Final inspection and acceptance will be made by the Receiving Activity after installation/check out/testing of the supplies." That conflicts with Section E on page 83 which states inspection and acceptance is at Origin at which time DCMA processes a DD250 in

WAWF.

Remove the 2nd sentence of para (b) No update is needed since the Receiving Activity will perform final inspection and acceptance at Origin.

11 9/5/2023 52 Section

C/Paragraph 3.8.3

Will the contractor maintain and deliver a complete IETM or does the contractor provide inputs to Government controlled IETM content?

Clarification The contractor is responsible for maintaining and delivering a complete IETM.

12 9/5/2023 52 Section

C/Paragraph 3.8.5

Will the contractor maintain and deliver training materials or does the contractor provide inputs to Government controlled training content?

Clarification For the training events held at the contractor facilities, the contractor is required to maintain and deliver that training. There are also instances where input is required to other Government controlled training content.

13 9/5/2023 52 Section

C/Paragraph 3.8.5.2

Are the training events to be conducted at contractor facilities or Government locations?

Clarification The training events are mainly held at the contractor facilities with some at Government locations as needed.