This cost element table provides templates for offerors to propose cost information for contract line item numbers under solicitation N0002423R6211 for the AN/BLQ-10 Electronic Warfare System. The templates include sections for direct labor costs by labor category and seniority level, indirect costs including overhead and G&A, cost of money, target fees, and total estimated costs for the base period from 2024-2029 and nine option periods from 2029-2034. Offerors are to populate the templates with direct labor hours and rates by year. The Navy seeks pricing for engineering support, material and travel support, and IDIQ orders for AN/BLQ-10 shipsets with various contract types including CPIF, FFP, and FPIF.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

PROPOSAL SUMMARY
CLINDESCRIPTIONHOURSCOSTFEE/ PROFITTOTALNOTES
CLIN 0001Engineering Support0$0$0$0Amounts will calculate from 'CLIN 0001' tab
CLIN 0002Material and Travel SupportN/A$29,958,000N/A$29,958,000
CLIN 0003IDIQ Orders AN/BLQ-10 Shipsets - CPIFN/A$218,486,000Offeror to complete target fee fill-in below (Cell B19).
CLIN 0004IDIQ Orders AN/BLQ-10 Shipsets - FFPN/A$31,848,000Offeror to complete profit fill-in below (Cell B20).
CLIN 0005IDIQ Orders AN/BLQ-10 Shipsets - FPIFN/A$43,509,000Offeror to complete target profit fill-in below (Cell B21)
CLIN 0006Data - NSPN/AN/AN/AN/ANot Separately Priced (NSP)
CLIN 0007Data Rights-Buy OutN/A$0N/A$0Offeror to enter FFP in Cost (Cell D9) - If Applicaple
CLIN 1001Engineering Support0$0$0$0Amounts will calculate from 'CLIN 1001' tab
CLIN 1002Material and Travel SupportN/A$47,013,000N/A$47,013,000
CLIN 1003IDIQ Orders AN/BLQ-10 Shipsets - CPIFN/A$130,096,000Offeror to complete target fee fill-in below (Cell B22)
CLIN 1004IDIQ Orders AN/BLQ-10 Shipsets - FFPN/A$63,697,000Offeror to complete profit fill-in below (Cell B23)
CLIN 1005IDIQ Orders AN/BLQ-10 Shipsets - FPIFN/A$166,547,000Offeror to complete target profit fill-in below (Cell B24)
TOTAL0$731,154,000$0$76,971,000
FEE / PROFIT FILL-INS
CLIN 0003
CLIN 0004
CLIN 0005
CLIN 1003
CLIN 1004
CLIN 1005
DESCRIPTIONMultiplierCostProfitTotal PriceNotes
Sample Task #3 Scenario5ERROR:#VALUE!Offeror to insert the cost (in cell D27) for the FFP Sample Task #3 Pricing. Profit Percentage will align with CLIN 0004. This is the only cost/price information the Offeror needs to provide for the Sample Task #3
Note: Offerors may add additional tabs as necessary to support the existing tabs. This workbook may be modified slightly as provided for in the workbook. The Offeror is responsible for ensuring that all formulas are correct and intact.

&"Times New Roman,Regular"N00024-18-R-6200 JS-3 Cost Element Table

CLIN 0001

COST ELEMENTYEAR 1YEAR 2YEAR 3YEAR 4YEAR 5TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.000$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.000$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.000$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.000$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.000$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.000$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.000$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.000$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.000$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.000$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.000$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.000$0.000$0.000$0.00
Fringe$0.00$0.00$0.00$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.000$0.000$0.000$0.000$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the Year 1-5 sheets. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

Year 1

COST ELEMENT20242025YEAR 1 TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Fringe$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the CLIN 0001 sheet. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

Year 2

COST ELEMENT20252026YEAR 2 TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Fringe$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the CLIN 0001 sheet. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

Year 3

COST ELEMENT20262027YEAR 3 TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Fringe$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the CLIN 0001 sheet. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

Year 4

COST ELEMENT20272028YEAR 4 TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Fringe$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the CLIN 0001 sheet. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

Year 5

COST ELEMENT20282029YEAR 5 TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Fringe$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the CLIN 0001 sheet. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

CLIN 1001

COST ELEMENTYEAR 6YEAR 7YEAR 8YEAR 9YEAR 10TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.000$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.000$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.000$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.000$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.000$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.000$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.000$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.000$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.000$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.000$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.000$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.000$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.000$0.000$0.000$0.00
Fringe$0.00$0.00$0.00$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.000$0.000$0.000$0.000$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the Year 6-10 sheets. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

Year 6

COST ELEMENT20292030YEAR 6 TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Fringe$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the CLIN 1001 sheet. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

Year 7

COST ELEMENT20302031YEAR 7 TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Fringe$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the CLIN 1001 sheet. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

Year 8

COST ELEMENT20312032YEAR 8 TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Fringe$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the CLIN 1001 sheet. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

Year 9

COST ELEMENT20322033YEAR 9 TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Fringe$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the CLIN 1001 sheet. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

Year 10

COST ELEMENT20332034YEAR 10 TOTAL
DIRECT LABORSubcontractor (Y/N) (List company)Seniority Level
(Place X)(a) Base/Hours(b) Rate(a X b) Total $(a) Base/Hours(b) Rate(a X b) Total $Total HoursTotal Cost
JRMIDSR
Program Management (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Administrative (estimated at 10% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering (estimated at 60% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Labor Category 3}0$0.000$0.000$0.00
{Labor Category 4}0$0.000$0.000$0.00
{Labor Category 5}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Engineering Technicians (estimated at 20% of total CLIN hours){Labor Category 1}0$0.000$0.000$0.00
{Labor Category 2}0$0.000$0.000$0.00
{Add more rows as necessary}0$0.000$0.000$0.00
Total Labor0$0.000$0.000$0.00
Fringe$0.00$0.00$0.00
{Add more rows as necessary}$0.00$0.00$0.00
TOTAL DIRECT LABOR0$0.00$0.000$0.00
INDIRECT COSTS(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Overhead
General and Administrative
{Add more rows as necessary}
TOTAL INDIRECT COSTS$ - 0$ - 0$ - 0

TOTAL COST LESS COM AND FEE $ - 0 $ - 0 $ - 0

COST OF MONEY(a) Base/Pool(b) Rate(a X b) Total $(a) Base/Pool(b) Rate(a X b) Total $Total Base/PoolTotal Cost
Cost of Money
{Add more rows as necessary}
TOTAL COM
ESTIMATED COST (w/ COM)$ - 0$ - 0$ - 0
TARGET FEE$ - 0$ - 0$ - 0
TOTAL ESTIMATED COST + TARGET FEE$ - 0$ - 0$ - 0
NOTE: This sheet is not linked to the CLIN 1001 sheet. Please link as appropriate. Offerors may add rows or otherwise make minor updates to the format of this worksheet as necessary to accurately propose cost information.

JS-3 Cost Element Table

File details come from the government source that posted it. Updated .