N00024-23-R-2101-U0001_Conformed.docx

DOCX document 169 KB Posted

Attached to
In-Service Carriers Refueling and Complex Overhaul (RCOH) Fire Watch Support - Request for Proposal (RFP)
Solicitation number
N00024-23-R-2101
Issued by

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002423R2101

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0001

135,200
Hours

Fire Watch Support

CPFF

FOB: Destination

PSC CD: 1905

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0002

60,000
Hours
OPTION
Fire Watch Support - Surge Hours

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0101

135,200
Hours
OPTION
Fire Watch Support

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0102

70,000
Hours
OPTION
Fire Watch Support - Surge Hours

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0201

135,200
Hours
OPTION
Fire Watch Support

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0202

90,000
Hours
OPTION
Fire Watch Support - Surge Hours

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0301

135,200
Hours
OPTION
Fire Watch Support

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0302

70,000
Hours
OPTION
Fire Watch Support - Surge Hours

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0401

135,200
Hours
OPTION
Fire Watch Support

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 0402

70,000
Hours
OPTION
Fire Watch Support - Surge Hours

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 1000

1
Lot

Data

COST

Data for CLINs 0001 and 0003 (and, if options are exercised, CLINs 0002-0402, 0101-0401 and 0103-0403)

ESTIMATED COST

CLAUSES INCORPORATED BY FULL TEXT

5152.225-5910 CONTRACTOR HEALTH AND SAFETY (DEC 2011)

(a) Contractors shall comply with National Electrical Code (NEC) 2008 for repairs and upgrades to existing construction and NEC 2011 standards shall apply for new construction, contract specifications, and MIL Standards/Regulations. All infrastructure to include, but not limited to, living quarters, showers, and restrooms shall be installed and maintained in compliance with these standards and must be properly supported and staffed to ensure perpetual Code compliance, prevent hazards and to quickly correct any hazards to maximize safety of those who use or work at the infrastructure.

(b) For existing employee living quarters the contractor shall provide maintenance, conduct repairs, and perform upgrades in compliance with NEC 2008 standards. For new employee living quarters, the contractor shall provide maintenance, conduct repairs, and make upgrades in compliance with NEC 2011 standards. The government has the authority to enter and inspect contractor employee living quarters at any time to ensure the prime contractor is complying with safety compliance standards.

(c) The contractor shall correct all deficiencies within a reasonable amount of time of becoming aware of the deficiency either by notice from the government or a third party, or by self-discovery of the deficiency by the contractor. Further guidance can be found on:

UFC: http://www.wbdg.org/ccb.browse_cat.php?o=29&c=4 NFPA 70: http://www.nfpa.org NESC: http://www.standards.ieee.org/nesc

(End of Clause)

B-216-H006 FEE TABLE (NAVSEA) (MAR 2019)

Labor CLIN
Labor Hours
Cost Per Hour*
Fee Rate Per Hour*
Loaded Hourly Rate

*The offeror shall divide the proposed fee for each CLIN by the quantity of labor hours indicated to complete the table. Fee is calculated based on cost less FCCOM; if FCCOM is proposed, necessary columns may be added.

In the event of any inconsistency between the above table and the CLIN pricing, the CLIN pricing shall take precedence.

(End of text)

B-232-H005 PAYMENTS OF FEE(S) (LEVEL OF EFFORT)--ALTERNATE I (NAVSEA) (OCT 2018)

(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts.

(b) The Government shall make payments to the Contractor, subject to and per the clause in this contract entitled "Fixed Fee" (FAR 52.216-8) or "Incentive Fee", (FAR 52.216-10), as applicable. Such payments shall be submitted by and payable to the Contractor pursuant to the clause of this contract entitled "Allowable Cost and Payment" (FAR 52.216-7), subject to the withholding terms and conditions of the "Fixed Fee" or "Incentive Fee" clause, as applicable. Fee paid per hour shall be based on total fee dollars divided by total hours to be provided. Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract.

B-232-H006 LIMITATION OF COST OR LIMITATION OF FUNDS CLARIFICATION (NAVSEA) (OCT 2018)

The clause entitled "Limitation of Cost" (FAR 52.232-20) or "Limitation of Funds" (FAR 52.232-22), as appropriate, shall apply separately and independently to each separately identified estimated cost.

Section C - Descriptions and Specifications

STATEMENT OF WORK

1.0 SCOPE OF WORK

This Statement of Work (SOW) defines the Fire Watch Support efforts necessary to support the Refueling Complex Overhaul (RCOH) on USS John C. Stennis (CVN 74) and (if Options are exercised) USS Harry S. Truman (CVN 75), located at Huntington Ingalls Industries – Newport News Shipbuilding (HII-NNS), Newport News, VA.

The Contractor shall provide Fire Watch personnel that currently have, or can obtain, the necessary security clearance to be eligible to obtain a badge from HII-NNS (See Paragraph 5.0). The Contractor shall follow the RCOH Fire Watch Strategy, RCOH-055 (latest revision) sections applicable to the use of 3rd party Contractors to augment Ship’s Force. The current revision of this strategy is provided as Attachment (1).

The supplies and services to be furnished hereunder shall be manufactured or performed in accordance with the following descriptions and specifications. All Level of Effort (LOE) tasks to be performed under this contract shall be the subject of Technical Instructions (TIs) issued to the Contractor in accordance with C-242-H003 TECHNICAL INSTRUCTIONS (NAVSEA) (OCT 2018).

2.0 BACKGROUND

The USS John C. Stennis (CVN 74) is currently undergoing a RCOH. USS Harry S. Truman (CVN 75) is scheduled to begin RCOH in May of 2025. This Fire Watch Support effort is intended to supplement current Fire Watch Support efforts performed by CVN 74 and (if Options are exercised) CVN 75 Ship’s Force in accordance with Attachment (1).

3.0 APPLICABLE DOCUMENTS

All applicable tasking, process, performance, execution, and documentation within this contract shall be in accordance with the documents/references/attachments listed below. In the event of a conflict between the documents/references/attachments listed below, the Contractor shall contact the Government and the Government will adjudicate on a case-by-case basis.

The following documents form a basis for the work to be performed under this CSOW:

Document
Number/Title
Date
Location
Attachment (1)
RCOH Fire Watch Strategy, RCOH-055

Section J Attachment

Reference (1)
NNS Non-Employee Access Badge Request (NN 9327 (REV 19))
N/A
https://supplier.huntingtoningalls.com/sourcing/access-badging-requirements/
General Specifications for Overhaul of Surface Ships (GSO), Rev 9
GSO, Section 045, Care of Ship During Overhaul
Apr 2016
https://navsea.navy.deps.mil/hq/s

urfmepp/gso/default.aspx

Category I and II NAVSEA STANDARD ITEMS (NSI)

009-01 General Criteria; accomplish
01 Oct 2021
https://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish
01 Oct 2021
009-08 Fire Protection and Fire Prevention; accomplish
01 Oct 2021
009-60 Schedule and Associated Reports for CNO Availabilities; provide and manage
01 Oct 2021
009-74 Occupational, Safety and Health Plan; accomplish
01 Oct 2021
009-120 Fact Finding and Critique of Unplanned Event; manage
01 Oct 2021

4.0 REQUIREMENTS

4.1 Fire Watch Support (CLIN 0001 and, if Options are exercised, CLINs 0101, 0201, 0301 and 0401)

The Contractor shall be responsible for executing Fire Watch Support on CVN 74 and (if Options are exercised) CVN 75, in accordance with RCOH Fire Watch Strategy, RCOH-055 (Attachment (1)).

On CVN 74 and (if Options are exercised) CVN 75, the Contractor shall manage and execute Fire Watch Support for “hot work” which is defined as all flame heating, welding, torch cutting, brazing, carbon arc gouging, or any work, which produces heat, by any means, of 400 degrees Fahrenheit (204 degrees C) or more. In the presence of flammables or flammable atmospheres, hot work includes other ignition sources such as spark or arc producing tools or equipment, static discharges, friction, impact, open flames or embers, and non-explosion proof lights, fixtures, motors or equipment.

Contractor personnel shall report with their own Personnel Protective Equipment in accordance with paragraph 5.2 of Attachment (1), RCOH Fire Watch Strategy, RCOH-055.

All Contractor personnel shall complete the following training requirements prior to performing any Fire Watch support:

a. Fire Watch training requirements as specified in OSHA 29 CFR 1915, subpart P, “Fire Protection in Shipyard Employment”

b. Harness with fall protection per OSHA 29 CFR 1915.159, para (d)

c. Respirators per OSHA 29 CFR 1910.134, para (k)

d. The Contractor should convey “Safe Confined and Enclosed Space Entry information” to its employees, as explained in C.2.9.1(1).

e. HII-NNS Fire Protection and Protective Covering (half-day training session provided by HII-NNS locally on the ship after the Fire Watch personnel have reported to the shipyard).

Provide qualified fire watches for Hex-a-chrome welding operations. 25% of fire watch work force should maintain this qualification.

The Contractor shall submit training and certification documentation (CDRL A002) for all Fire Watch personnel to the On Site Installation Coordinator (OSIC) and the Navy Contracting Officer Representative (COR) for review and approval prior to the individual performing work onboard CVN 74 and (if Options are Exercised) CVN 75. The Contractor shall make all training records available for periodic inspection by the Navy COR to ensure these are current.

Fire Watch Support is Level of Effort and shall be executed through the use of TIs issued pursuant to C-242-H003 TECHNICAL INSTRUCTIONS (NAVSEA) (OCT 2018). Specific locations, requirements, performance standards, and deliverables will be identified under TIs, as required. Fire Watch Support may include anything included in RCOH Fire Watch Strategy, RCOH-055 (Attachment (1)). Examples of such support include, but are not limited to the following:

a. The Contractor shall provide Fire Watch support for all shifts as required by Ship’s Force and laid out in the Fire Watch requirements projection IAW Attachment (1), Section 4.1.2. Weekend work may be required and will be executed through the use of TIs issued pursuant to C-242-H003 TECHNICAL INSTRUCTIONS (NAVSEA) (OCT 2018).

b. The Contractor shall provide on-site supervision to dispatch the Fire Watches, track time and provide support in the event personnel do not report as required. The on-site supervisor shall:

1) Provide on-site monitoring of assigned Fire Watches and submit a weekly usage report (CDRL A001). The report shall be submitted by 1200 hours on the Monday following a week of performance. The report shall provide a list of actual hours worked on which shift (1st, 2nd, or 3rd shift.).

2) Ensure that all safety equipment is in place and being properly used.

3) Coordinate Fire Watch support with the authority for which the support is being provided.

4) Coordinate with the hot worker’s operator/supervisor as to the physical placement of Fire Watches.

5) Brief the OSIC daily prior to 0900 on work progress including number of personnel on board and status of ongoing work.

c. The Contractor shall notify the OSIC of any change or reassignment of on-site supervisors assigned to perform the work hereunder.

d. In support of general fire prevention and safety efforts, the Contractor shall provide “Bag and Drag/General Housecleaning” and “Spotter” duties as assigned by the onsite supervisor. Bag and Drag/General Housecleaning duties include the removal of industrial debris and/or trash removal. During ship clean-up days, when not tasked with Fire Watch duties, the Contractor shall support clean-up efforts throughout the ship. Spotter duties include coordinating pedestrian traffic with vehicular traffic to maintain pedestrian safety, typically performed at the head or foot of the ship’s ramp.

e. The Contractor shall support and participate in any fact finding sessions, investigations, and knowledge sharing events related to overall fire safety and/or fire safety issues or concerns with Contractor’s fire watch jobs, as requested by Supervisor of Shipbuilding, Newport News (SUPSHIPNN).

4.2 Fire Watch Support – Surge Hours (if Options are exercised, CLINs 0002, 0102, 0202, 0302 and 0402)

The Surge Hours CLIN series includes the same scope of work as stated in Section 4.1 for the execution of Fire Watch Support on CVN 74 and (if Options are exercised) CVN 75, in accordance with RCOH Fire Watch Strategy, RCOH-055. The surge labor hours align to periods of CVN 74 - CVN 75 RCOH overlap and periods of heavy fire watch usage.

Surge Hours will only be exercised by the Government if the overall shipboard demand for fire watches exceeds the base CLIN. The Surge CLIN will not be invoked if the shipboard requirements do not warrant the need for additional fire watches. This Surge CLIN could be invoked at any time during the CLIN period of performance.

4.3 Data (CLIN 1000)

The data to be furnished hereunder shall be prepared in accordance with Exhibit A, DD Form 1423, attached hereto. Specific requirements, performance standards, data deliverables, and dates will be identified under TIs.

5.0 SECURITY REQUIREMENTS

Contractor personnel shall have and wear contractor identification badges at all times when onboard CVN 74 and (if Options are exercised) CVN 75 and at the HII-NNS Shipyard, and must go through the procedures outlined in Reference (1), along with providing their background check paperwork to SUPSHIPNN security office, to be included on the CVN 74 and (if Options are exercised) CVN 75 visitor authorization lists. The Contractor shall flow down all personnel badge requirements to all subcontractor employees. If an individual is not listed as “official personnel,” on the CVN 74 or (if Options are exercised) the CVN 75 visitor authorization list, he or she shall not go onboard CVN 74 or (if Options are exercised) CVN 75.

Contractor personnel shall not have access to Government classified information to perform Fire Watch Support.

C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)

(a) Department means the Department of the Navy.

(b) Commander, Naval Sea Systems Command means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.

(c) References to The Federal Acquisition Regulation (FAR) All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(d) National Stock Numbers Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit nonsignificant number.

(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.

C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA) (OCT 2018)

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

C-211-H001 ACCESS TO THE VESSEL(S) (NAVSEA) (OCT 2018)

Officers, employees and associates of other prime Contractors with the Government and their subcontractors, shall, as authorized by the Supervisor, have, at all reasonable times, admission to the plant, access to the vessel(s) where and as required, and be permitted, within the plant and on the vessel(s) required, to perform and fulfill their respective obligations to the Government. The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Supervisor to be given admission to the plant and access to the vessel(s) for office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of the respective responsibilities involved, and reasonable to their performance.

C-211-H004 HEAVY WEATHER PLAN (NAVSEA) (OCT 2018)

(a) In order to ensure that Naval vessel(s), material and Government property are protected during destructive weather such as gales, storms, hurricanes, high winds, heavy snow, ice and high water, the Contractor is required to have a written Heavy Weather Plan (HWP) which assigns responsibilities and prescribes actions to be taken on the approach of and during heavy weather conditions as delineated in NAVSEA Standard Item (SI) 009-69 dated 18 November 2016. A copy of Standard Item (SI) 009-69 can be obtained from via the internet by going to: http://www.navsea.navy.mil/Home/RMC/CNRMC/OurPrograms/SSRAC/NSI/ and selecting the NAVSEA Standard Items (NSI) tab then select the applicable FY standard item link and then select SI 009-69. In accordance with SI 009-69, the Contractor shall furnish to the cognizant Regional Maintenance Center (RMC), a copy of such HWP, and shall make such changes in the plan as the RMC considers necessary and reasonable to protect and care for vessel(s), material and Government property.

(b) In the event the RMC directs the Contractor to implement the HWP pursuant to SI 009-69 the Contractor may submit to the Contracting Officer a request for reimbursement for costs resulting from such actions together with any documentation that the Contracting Officer may reasonably require. The Government shall reimburse the Contractor for all reasonable, allowable and allocable costs resulting from the Contractor's implementation of the HWP based on such Government direction.

C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018)

(a) Definitions.

(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).

(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.

(b) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.

None

C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)

The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

C-211-H020 PROTECTION OF THE VESSEL (NAVSEA) (MAR 2019)

(a) The Contractor shall exercise reasonable care, as agreed upon with the Supervisor, to protect the vessel from fire, and shall maintain a system of inspection over the activities of its welders, burners, riveters, painters, pipe fitters, and similar workers, and of its subcontractors, particularly where such activities are undertaken in the vicinity of the vessel's magazines, fuel oil tanks, or store rooms containing inflammable materials. All ammunition, fuel oil, motor fuels, and cleaning fluids shall have been offloaded and the tanks cleaned, except as may be mutually agreed upon between the Contractor and the Supervisor prior to work on the vessel by the Contractor. Fire hose lines shall be maintained by the Contractor ready for immediate use on the vessel at all times while the vessel is berthed alongside the Contractor's pier or in dry dock. All tanks under alteration or repair shall be cleaned, washed, and steamed out or otherwise made safe to the extent necessary, and the Contractor shall furnish the vessel's Gas Free Officer and the Supervisor with a "Gas Chemists' Certificate" before any hot work is done. The Contractor shall maintain a fire watch aboard the vessel in areas where the Contractor is working. All other fire watches aboard the vessel shall be the responsibility of the Government.

(b) Except as otherwise provided in contractually invoked technical specifications or NAVSEA furnished directives, while the vessel is at the Contractor's plant and when the temperature becomes as low as thirtyfive degrees Fahrenheit, the Contractor shall assist the Government when requested in keeping all pipelines, fixtures, traps, tanks, and other receptacles on the vessel drained to avoid damage from freezing, or if this is not practicable, the vessel shall be kept heated to prevent such damage. The vessel's stern tube and propeller hubs shall be protected by the Contractor from frost damage by applied heat through the use of a salamander or other proper means.

(c) The work shall, whenever practicable, be performed in such manner as not to interfere with the work performed by military personnel attached to the vessel, and provisions shall be made so that personnel assigned shall have access to the vessel at all times, it being understood that such personnel will not unduly interfere with the work of the Contractor's workmen.

(d) The Contractor shall at all times keep the site of the work on the vessel free from accumulation of waste material or rubbish caused by its employees, or the work performed by the Contractor in accordance with this contract, and at the completion of such work shall remove all rubbish from and about the site of the work, and shall leave the work in its immediate vicinity "broom clean", unless more exactly specified by the Supervisor.

(End of Text)

C-222-H001 ACCESS TO THE VESSELS BY NON-U.S. CITIZENS (NAVSEA) (APR 2019)

(a) No person not known to be a U.S. citizen shall be eligible for access to naval vessels, work sites and adjacent areas when said vessels are under construction, conversion, overhaul, or repair, except upon a finding by COMNAVSEA or his designated representative that such access should be permitted in the best interest of the United States. The Contractor shall establish procedures to comply with this requirement and NAVSEAINST 5510.2D.

(b) If the Contractor desires to employ non-U.S. citizens in the performance of work under this contract or agreement that requires access as specified in paragraph (a) of this requirement, approval must be obtained prior to access for each contract or agreement where such access is required. To request such approval for non-U.S. citizens of friendly countries, the Contractor shall submit to the cognizant Contract Administration Office (CAO), an Access Control Plan (ACP) which shall contain as a minimum, the following information:

(1) Badge or Pass oriented identification, access, and movement control system for non-U.S. citizen employees with the badge or pass to be worn or displayed on outer garments at all times while on the Contractor's facilities and when performing work aboard ship.

(i) Badges must be of such design and appearance that permits easy recognition to facilitate quick and positive identification.

(ii) Access authorization and limitations for the bearer must be clearly established and in accordance with applicable security regulations and instructions.

(iii) A control system, which provides rigid accountability procedures for handling lost, damaged, forgotten or no longer required badges, must be established.

(iv) A badge or pass check must be performed at all points of entry to the Contractor's facilities or by a site supervisor for work performed on vessels outside the Contractor's plant.

(2) Contractor's plan for ascertaining citizenship and for screening employees for security risk.

(3) Data reflecting the number, nationality, and positions held by non-U.S. citizen employees, including procedures to update data as non-U.S. citizen employee data changes, and pass to cognizant CAO.

(4) Contractor's plan for ensuring subcontractor compliance with the provisions of the Contractor's ACP.

(5) These conditions and controls are intended to serve as guidelines representing the minimum requirements of an acceptable ACP. They are not meant to restrict the Contractor in any way from imposing additional controls necessary to tailor these requirements to a specific facility.

(c) To request approval for non-U.S. citizens of hostile and/or communist-controlled countries (listed in Department of Defense Industrial Security Manual, DOD 5220.22-M or available from cognizant CAO), Contractor shall include in the ACP the following employee data: name, place of birth, citizenship (if different from place of birth), date of entry to U.S., extenuating circumstances (if any) concerning immigration to U.S., number of years employed by Contractor, position, and stated intent concerning U.S. citizenship. COMNAVSEA or his designated representative will make individual determinations for desirability of access for the above group. Approval of ACP's for access of non-U.S. citizens of friendly countries will not be delayed for approval of non-U.S. citizens of hostile communist-controlled countries. Until approval is received, Contractor must deny access to vessels for employees who are non-U.S. citizens of hostile and/or communist-controlled countries.

(d) The Contractor shall fully comply with approved ACPs. Noncompliance by the Contractor or subcontractor serves to cancel any authorization previously granted, in which case the Contractor shall be precluded from the continued use of non-U.S. citizens on this contract or agreement until such time as the compliance with an approved ACP is demonstrated and upon a determination by the CAO that the Government's interests are protected. Further, the Government reserves the right to cancel previously granted authority when such cancellation is determined to be in the Government's best interest. Use of non-U.S. citizens, without an approved ACP or when a previous authorization has been canceled, will be considered a violation of security regulations. Upon confirmation by the CAO of such violation, this contract, agreement or any job order issued under this agreement may be terminated or default in accordance with the clause entitled "Default (Fixed-Price Supply and Service)" (FAR 52.249-8), "Default (Fixed-Price Research and Development)" (FAR 52.249-9) or "Termination (Cost Reimbursement)" (FAR 52.249-6), as applicable.

(e) Prime Contractors have full responsibility for the proper administration of the approved ACP for all work performed under this contract or agreement, regardless of the location of the vessel, and must ensure compliance by all subcontractors, technical representatives and other persons granted access to U.S. Navy vessels, adjacent areas, and work sites.

(f) In the event the Contractor does not intend to employ non-U.S. citizens in the performance of the work under this contract, but has non-U.S. citizen employees, such employees must be precluded from access to the vessel and its work site and those shops where work on the vessel's equipment is being performed. The ACP must spell out how non-U.S. citizens are excluded from access to contract work areas.

(g) The same restriction as in paragraph (f) above applies to other non-U.S. citizens who have access to the Contractor's facilities (e.g., for accomplishing facility improvements, from foreign crewed vessels within its facility, etc.) except that, with respect to access to the vessel and worksite, the restrictions shall not apply to uniformed U.S. Navy personnel who are non-U.S. citizens and who are either assigned to the ship or require access to the ship to perform their duties.

C-223-H002 SAFETY, HEALTH AND FIRE REQUIREMENTS FOR SHIP REPAIR (NAVSEA) (JAN 2019)

(a) Attention of the Contractor is directed to the Occupational Safety and Health Act of 1970 (29 USC 651-678), and to the Safety and Health Regulations for Ship Repairing (29 CFR 1915), promulgated under Public Law 85-742, amending Section 41 of the Longshoremen's and Harbor Workers' Compensation Act (33 USC 941), and adopted by the Department of Labor as occupational safety or health standards under Section 6(a) of the Occupational Safety and Health Act of 1970 (See 29 CFR 1910.13). These regulations apply to all ship repair and related work, as defined in the regulations performed under this contract on the navigable waters of the United States including any dry dock and marine railway. Nothing contained in this contract shall be construed as relieving the Contractor from any obligations which it may have for compliance with the aforesaid regulations.

(b) SAFETY INSPECTOR/FIRE MARSHAL: In addition to the safety standards provided in the specifications, the contractor is responsible for providing an experienced Safety Inspector/Fire Marshal who will accomplish daily inspections of the Contractor's entire work area on the ship, together with the Contracting Office’s Safety Representative. This Inspector or Fire Marshal shall not be one of the Contractor's supervisors or superintendents normally assigned to the ship and shall be identified in the contractor’s approved Safety Plan.

(c) PERSONAL PROTECTIVE EQUIPMENT: Whenever work is performed aboard U.S. Naval Ships or vessels at piers or dry docks of a Naval Shipyard or Naval Station, Contractor employees (including management personnel) shall have and use at all times the following personal protective equipment:

(1) Protective hard hats that meet the following specifications:

(i) Protective helmets purchased after July 5, 1994 shall comply with ANSI Z89.1-1986, "American National Standard for Personnel Protection-Protective Headwear for Industrial Workers-Requirements," or shall be demonstrated by the Contractor to be equally effective.

(ii) Protective helmets purchased before July 5, 1994 shall comply with ANSI Standard "American National Standard Safety requirements for Industrial Head Protection," Z89.1-1969, or shall be demonstrated by the employer to be equally effective. [Ref. 29 CFR 1910.135 Head Protection]

(2) Approved type Plano or prescription glasses meeting the following specifications:

(i) Protective eye and face devices purchased after July 5, 1994 shall comply with ANSI standard Z87.1-1989, "American National Standard Practice for Occupational and Educational Eye and Face Protection", or shall be demonstrated by the employer to be equally effective.

(ii) Protective eye and face devices purchased before July 5, 1994 shall comply with ANSI "USA standard for Occupational and Educational Eye and Face Protection", Z87.1-1968, or shall be demonstrated by the employer to be equally effective. [Ref. 29 CRF 1910.133 Protective eye and face devices.]

(3) Safety toe shoes, with built-in protective toe box that meet the following specifications:

(i) Protective footwear purchased after July 5, 1994 shall comply with ANSI Standard Z41-1991, "American National Standard for Personal Protection-Protective Footwear", or shall be demonstrated by the employer to be equally effective.

(ii) Protective footwear purchased before July 5, 1994 shall comply with the ANSI standard "USA Standard for Men's Safety Toe Footwear", Z41.1 1967, or shall be demonstrated by the employer to be equally effective [Ref. 29 CFR 1910.136 Protective eye and face devices.]

C-223-W002 ON-SITE SAFETY REQUIREMENTS (NAVSEA) (OCT 2018)

(a) The contractor shall ensure that each contractor employee reads any necessary safety documents within 30 days of commencing performance at any Government facility. Required safety documents can be obtained from the respective safety office. Contractors shall notify the Safety office points of contact below to report completion of the required training via email. The email shall include the contractor employee’s name, work site, and contract number.

(b) It is expected that contractor employees will have received training from their employer on hazards associated with the areas in which they will be working and know what to do in order to protect themselves. Contractors are required to adhere to the requirements of 29 CFR 1910, 29 CFR 1926 and applicable state and local requirements while in Government spaces. The contractor shall ensure that all on-site contractor work at the Government facility is in accordance with any local safety instructions as provided via the COR. The contractor shall report all work-related injuries/illnesses that occurred while working at the Government site to the COR.

(c) Contractors whose employees perform work within Government spaces in excess of 1000 hours per calendar quarter during a calendar year shall submit the data elements on OSHA Form 300A, Summary of Work Related Injuries and Illnesses, for those employees to the safety office, via the COR by 15 January for the previous calendar year, even if no work related injuries or illnesses occurred. If a contractor’s injury/illness rates are above the Bureau of Labor Statistics industry standards, a safety assessment may be performed by the Safety Office to determine if any administrative or engineering controls can be utilized to prevent further injuries/illnesses, or if any additional Personal Protective Equipment or training will be required.

(d) Any contractor employee exhibiting unsafe behavior may be removed from the Government site. Such removal shall not relieve the contractor from meeting its contractual obligations and shall not be considered an excusable delay as defined in FAR 52.249-14.

(e) The Safety Office points of contacts are as follows:

SUPSHIP NEWPORT NEWS [insert name and code]

C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)

The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A, attached hereto.

C-228-H001 INDEMNIFICATION FOR ACCESS TO VESSEL (NAVSEA) (DEC 2018)

Notwithstanding any provision in the "Access to Vessel" clause (DFARS 252.217- 7011), or any other clause of the contract, the Contractor agrees to allow officers, employees, and associates of the Government, or other prime contractors with the Government and their subcontractors, and officers, employees, and associates of offerors on other contemplated work, admission to the Contractor's facilities and access to the vessel without any further request for indemnification from any party, which has not been previously included in the contract price.

C-233-H002 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT--ALTERNATE I (NAVSEA) (JUL 2019)

(a) For the purposes of this requirement, the term “change” includes not only a change that is made pursuant to a written order designated as a “change order” but also (i) an engineering change proposed by the Government or the Contractor pursuant to other requirements of this contract and (ii) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment under the “Changes” clause or any other article or requirement of this contract.

(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect of a change made pursuant to a written order designated as a “change order” or in respect of a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect of any other act or omission to act on the part of the Government, the proposal supporting such request shall include the following information for each individual item or element of the request:

(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of identifiable components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work. Items of identifiable raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;

(2) Description of work necessary to undo work already completed which has been deleted by the change;

(3) Description of work which is substituted or added by the change. A list of identifiable components and equipment (not bulk materials or items) involved, should be included. Separate descriptions are to be furnished for design work and production work;

(4) Description of interference and inefficiencies in performing the change;

(5) Description of disruption attributable solely to the change; which description shall include the following information:

(i) Description of each identifiable element of disruption and how work has been, or may be, disrupted;

(ii) The calendar period of time during which disruption occurred, or may occur;

(iii) Area(s) of the Contractor’s operations where disruption occurred, or may occur;

(iv) Trade(s) or functions disrupted, with a breakdown of manhours and material for each trade or function;

(v) Scheduling of trades before, during, and after period of disruption insofar as such scheduling may relate to or be affected by the estimated disruption;

(vi) Description of any measures taken to lessen the disruptive effect of the change;

(6) Delay in delivery attributable solely to the change;

(7) Other work or increased costs attributable to the change;

(8) Supplementing the foregoing, a narrative statement of the nature of the alleged Government act or omission, when the alleged Government act or omission occurred, and the “causal” relationship between the alleged Government act or omission and the claimed consequences thereof, cross-referenced to the detailed information provided as required above.

(c) Each proposal submitted in accordance with this requirement shall include a copy of the Contractor's ship's labor budget at the cost level in effect as of the date the event began, the cost incurred at the cost level as of the same date, and the proposed effect of the change at the cost class level.

(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in subparagraphs (b)(1) through (b)(8) above, or that the Contractor may not reasonably be able to furnish complete information on all of the factors listed in subparagraph (b)(1) through (b)(8) above. Accordingly, the Contractor is only required to set forth in its request for equitable adjustment information with respect to those factors which are relevant to the individual request for equitable adjustment, or in the level of detail which is reasonably available to the Contractor.

(e) In addition to any information required under paragraph (b) above, each proposal submitted in support of a claim for equitable adjustment, under any requirement of this contract, in an amount which requires certified cost or pricing data, shall contain such cost or pricing data as the Contracting Officer shall require with respect to each individual claim item, and shall be in sufficient detail to permit the Contracting Officer to crossreference the claimed increased costs, or delay in delivery, or both, as appropriate, with the information submitted pursuant to subparagraphs (b)(1) through (b)(8) hereof.

C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018)

(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

C-242-H002 POST AWARD MEETING (NAVSEA) (OCT 2018)

(a) A post-award meeting with the successful offeror will be conducted within 30 days after award of the contract award. The meeting will be held at the address below:

Location/Address: [ * ]

(b) The contractor will be given 10 working days notice prior to the date of the meeting by the Contracting Officer.

(c) The requirement for a post-award meeting shall in no event constitute grounds for excusable delay by the contractor in performance of any provisions in the [contract / task order].

(d) The post-award meeting will include, but is not limited to, the establishment of work level points of contact, determining the administration strategy, roles and responsibilities, and ensure prompt payment and close out. Specific topics shall be mutually agreed to prior to the meeting.

[ * ] To be specified at [contract / task order] award.

C-242-H003 TECHNICAL INSTRUCTIONS (NAVSEA) (OCT 2018)

(a) Performance of the work hereunder may be subject to written technical instructions signed by the Contracting Officer and the Contracting Officer's Representative specified in Section G of this contract. As used herein, technical instructions are defined to include the following:

(1) Directions to the Contractor which suggest pursuit of certain lines of inquiry, shift work emphasis, fill in details or otherwise serve to accomplish the contractual statement of work.

(2) Guidelines to the Contractor which assist in the interpretation of drawings, specifications or technical portions of work description.

(b) Technical instructions must be within the general scope of work stated in the contract. Technical instructions may not be used to: (1) assign additional work under the contract; (2) direct a change as defined in the "CHANGES" clause of this contract; (3) increase or decrease the contract price or estimated contract amount (including fee), as applicable, the level of effort, or the time required for contract performance; or (4) change any of the terms, conditions or specifications of the contract.

(c) If, in the opinion of the Contractor, any technical instruction calls for effort outside the scope of the contract or is inconsistent with this requirement, the Contractor shall notify the Contracting Officer in writing within ten (10) working days after the receipt of any such instruction. The Contractor shall not proceed with the work affected by the technical instruction unless and until the Contractor is notified by the Contracting Officer that the technical instruction is within the scope of this contract.

(d) Nothing in the foregoing paragraph shall be construed to excuse the Contractor from performing that portion of the contractual work statement which is not affected by the disputed technical instruction.

C-243-H002 NOTIFICATION OF CHANGES (NAVSEA) (MAY 2019)

(a) Definitions. As used in this requirement, the term "Contracting Officer" does not include any representative of the Contracting Officer whether or not such representative is acting within the scope of his authority nor does it include any other individuals or activities that in any way communicate with the Contractor. As used in this requirement, the term "conduct" includes both actions and failures to act, and includes the furnishing of, or the failure to furnish, any item under any provision of this contract.

(b) Notice. The primary purpose of this requirement is to obtain prompt reporting of any conduct which the Contractor considers would constitute or would require a change to this contract. The parties acknowledge that proper administration of this contract requires that potential changes be identified and resolved as they arise. Therefore, except for changes identified as such in writing and signed by the Contracting Officer, the Contractor shall notify the Contracting Officer of any conduct which the Contractor considers would constitute or would require a change to this contract. Such notice shall be provided promptly, and in any event within thirty (30) calendar days from the date the Contractor identifies any such conduct. The Notice shall be written and shall state, on the basis of the most accurate information available to the Contractor:

(1) The date, nature, and circumstances of the conduct regarded as a change;

(2) The name, function, and activity of the individuals directly involved in or knowledgeable about such conduct;

(3) The identification of any documents and the substance of any oral communication involved in such conduct;

(4) The particular elements of contract performance for which the Contractor might seek an equitable adjustment under this requirement, including:

(i) What ship(s) have been or might be affected by the alleged change;

(ii) To the extent practicable, labor or materials or both which have been or might be added, deleted, or wasted by the alleged change;

(iii) To the extent practicable, the Contractor's preliminary order of magnitude estimate of cost and schedule impact, including what delay and disruption in the manner and sequence…