This solicitation seeks proposals for the production of a modernized AN/SRQ-4 Radio Terminal Set system. Offerors must provide production units that eliminate obsolete analog interfaces, meet cybersecurity requirements for Aegis Baseline 10 and beyond, and support Band Efficient - Common Data Link and Crypto Core Modernization. The five-year contract will include CLINs for development and production units, associated engineering services, and incidental materials. Questions are due by March 29, 2022, with proposals due on the date specified in the solicitation. The Naval Sea Systems Command will evaluate proposals and make the award. Offerors must meet all requirements for this full and open competitive solicitation.

View the file

Other files

File Type Posted
J-S2 BQ Round 4 dtd 27 April 2022.xlsx XLSX spreadsheet
J-S8 Contractor Award Information.docx DOCX document
N0002422R5206 Amendment 0003.pdf PDF
N0002422R5206 Amendment 0002.pdf PDF
Exhibit A - CDRLs (signed).pdf PDF
J-S2 BQ Round 2 dtd 15 April 2022.xlsx XLSX spreadsheet
J-S2 BQ Round 1.pdf PDF
N0002422R5206 Amendment 0001.pdf PDF
J-S2 Bidders Question Submittal Form.xlsx XLSX spreadsheet
J-S1 Contract-wide Staffing Plan.xlsx XLSX spreadsheet
Attachment J-6 CDRL Cross Reference Matrix.xlsx XLSX spreadsheet
N0002422R5206 SRQ-4 RFP 031522.pdf PDF
Attachment J-1 DD254.pdf PDF
Attachment J-2 GFP List.xlsx XLSX spreadsheet
Attachment J-3 GFI List.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Question Number:Question Source: (RFP, attachment #, GFI title, etc.)Page number and paragraph header from source:Question:RFP Update?Answer
1RFP1Line 9 indicates the RFP is due 29 March 2022. SAM.gov states 15 April 2022. We assume the latter is correct, but can the government clarify?Yes29 April 2022 is the updated proposal submission deadline. See Amendment 0001.
2RFP80CLIN 1002AA is listed as ADC. Should this be AOE?YesYes. CLIN 1002AA should be AOE. See Amendment 0001
3RFP123 (Section 3.2.1.1.1)The RFP states that the Staffing plan "shall include all labor category personnel (by name - both prime and subcontractors) known at the time of proposal submission." Is the subcontractor personnel staffing information requested in the management volume required for "Major Subcontractors" only?NoYes, Major Subcontractors only.
4RFP Section BSection B Notes, page 29, Note FSection B specifying CLIN details notes quantity of 13 for CLIN 0001, 1001, 2001, 3001, and 4001, but Note F describes a stated maximum quantity of three for 0001 and 1001, and maximum quantity of 11 for 2001 and 3001. Please clarify the quantities to populate in Note F.YesNote F has been revised. See Amendment 0001.
5RFP Section BSection B Notes, page 30, Note GSection B specifying CLIN details notes quantity of 13 for CLIN 1006, 2006, 3006, and 4006, but Note G describes a stated maximum quantity of give all stated CLINs. Please clarify the quantities to populate in Note G.YesNote G has been revised. See Amendment 0001.
6RFPPage 106CLIN 0006 is stated as an option, but there is no timeframe given for the latest option exercise date after date of contract (ADC). Please clarify the ADC timeframe for CLIN 0006Yes18 months After Date of Contract. See Amendment 0001.
7RFPPage 79Page 79 references that CLIN 0002AA has a ceiling quantity of 12,247 hours for a 24 month POP, consistent with the hours in CLIN 1002AA which is for 12 months. Please confirm the ceiling hours provided in CLIN 0002AAYesCLIN 0002AA has a ceiling quantity of 12,247 hours for a 12 month period of performance. See Amendment 0001.
8RFPPage 117The RFP consistently uses "subcontractor" and "Subcontractor" when delineating requirements for a response, but the only clarifications made are regarding "Major subcontractors" and "minor subcontractors." When "subcontractor" is used by itself without adjective, are we to assume that is only referring to "Major subcontractors" or all subcontractors regardless of major/minor classification?NoWhen "subcontractor" is used by itself it refers to all subcontractors regardless of major/minor classification.
9RFPPage 117, Page 131Please clarify the definition of "minor subcontractor." Page 117 defines a "minor subcontractor" as all subcontractors that do not meet the definition of major subcontractor. Please confirm that all subcontractors, including FFP subcontractors, would be required to provide hours and cost detail sufficient to populate the Prime Offeror's Total Cost/Price Buildup Spreadsheet as referenced on Page 131, including detail by individual to populate the Prime Offeror's Staffing Plan. Is it also the expectation that minor subcontractor hours count against the ceiling for CLIN's X002 and X008?NoFor the purposes of this solicitation, major subcontractors are defined as any cost-reimbursement subcontractor

proposed to perform 10% or more of the cumulative hours under CLINs X002 and X008. Subcontractors that do not meet this definition are not considered a major subcontractor. Minor subcontractor hours count against the ceiling for CLINs X002 and X008. Please refer to H-216-H002 LEVEL OF EFFORT--ALTERNATE I (NAVSEA) (OCT 2018); Section L: 3.3.4; and Section M: 2.4.1.5 for further information.

10 RFP Page 107 Please provide latest copies of the J-5 RTS Specification, J-4 TDP, and SCG #02-235.4 MH-60R MMH Security Classification Guide No Please refer to Section 1.3 - Availability of Attachments and GFI and follow the instructions to request attachments and GFI.

No SCG is required to be sent.

11RFPPage 107Is J-S6 supposed to be a contractor format or is there a template for inputs to assist in calculating the TEP? The attachment referenced on the RFP is not included on the SAM.gov listing.YesAttachment J-S6 to be contractor format. See Amendment 0001.
12Attachment J-6Attachment J-6 does not include expected formats/DID information. Will the government be providing an Exhibit A DD-1423 or is contractor format acceptable?YesThe Government will provide Exhibit A – Contract Data Requirements List (CDRL) DD Form 1423. See Amendment 0002.
13RFP Section CPage 50Are MAM and OBRP kits required as deliverable assets for each RTS system delivered? i.e. each RTS delivered under CLIN X001 and X006 would include both a MAM and OBRP kit.YesOne MAM kit is required for each RTS system delivered on CLINs X001 and X006, MAM kits are ordered and delivered on CLINs X001 and X006. One OBRP kit is required for each RTS system delivered on CLINs X001 and X006, ORBPS are ordered and delivered on CLIN X005. See Amendment 0002.
14RFP Section CPage 50Are MAM and OBRP kits required with the First Article Unit (CLIN 0007)NoMAM and OBRP kits are not required with CLIN 0007.
1503_Attachment J-5 SRQ-4 Specification.pdfParagraph 3.1Are OR-209 rack, shock isolators, and ship-run cabling to be provided by a ship installation activity, or is this equipment to be provided by offeror?YesThe rack and shock isolators are to be provided by the offeror. Ship-run cabling will be provided by the ship yard installing the system. See Amendment 0002.
16RFP Section C SOWSOW Paragraphs 5.1.2-5.1.4, 5.1.6The SOW currently states that ESS, acceptance tests, serializing hardware and nomenclature, and the As Built Configuration List are all SEPM expenses. Is that the intent? Recommend these costs be within X001, X006, and 0007 as they are a part of the process to manufacture, test, and deliver the AN/SRQ-4 (Ku) RTS SystemYesConcur with SOW Paragraphs 5.1.2, 5.1.3, 5.1.4, and 5.1.6 being part of X001, X006, and 0007. See Amendment 0002.
17RFPSection 3.2.1Bullet 7: The Offeror shall discuss how its production approach supports successful execution of the requirements in SRQ-4 SOW Section D paragraph 3.2 and its subparagraphs. - Paragraph 3.2 is about the ILS (covered at in Tech Vol), is this in error?YesThis is an error. It is should say paragraph 5.0 and its subparagraphs. See Amendment 0002.
18RFPSection 3.2.1.3Bullet 5: The Offeror shall describe the availability of the facilities to conduct testing of RF equipment to satisfy the requirements of SRQ-4 SOW Section C paragraph 6.0. Paragraph 6.0 is about Security, is this mapped incorrectly?YesThis is an error. It is should say paragraph 4.0 and 5.0 and their subparagraphs. See Amendment 0002.
1903_Attachment J-5 SRQ-4 Specification.pdf3.2.1.19.19, 3.2.1.19.19.1, 3.6.1.2.12.1, 3.6.1.5Several "Error! Reference source not found" comments exist in the Word to PDF conversion of the spec. Will the government be providing a Word or updated version with these corrected?NoWill provide an updated version fixing the errors. See version C.1 of the Spec. See Amendment 0002.
2003_Attachment J-5 SRQ-4 Specification.pdf3.2.1.19.14Section indicates interface specifics for Acoustic Channels. This is in disagreement with figures SRQ-49 and SRQ-51. Should this analog interface be eliminated?NoNo, this interface is not eliminated and is still present.
21ICD 45105ICD 45105-0002ICD appears to be in conflict with the PIDS Diagrams SRQ-49 and SRQ-51 and PIDS content, i.e. Legacy Analog Interfaces are represented in the ICD, but most references to these interfaces have been eliminated from the PIDS. Is the ICD in error?NoThe ICD is not in error. The ICD is the current configuration for reference. The PIDS will take preference over the ICDs.
22ICD 45105ICD 45105-0002, -0008ICD includes Control Monitor, but all references to this device have been eliminated in the PIDS. Is the ICD in error?NoThe ICD is not in error. The ICD is the current configuration for reference. The PIDS will take preference over the ICDs.
2303_Attachment J-5 SRQ-4 Specification.pdf3.2.4.2.2, 3.7.3Sections refer to Sensor modes 1, 2, and 3. Is this in error? (references to ASW, ASST, and Mixed modes have been eliminated)NoSee version C.1 of the Spec.
2403_Attachment J-5 SRQ-4 Specification.pdf3.6.1.2Is reference to WRN-6 RS-422 interface in error, or should the system still support WRN-6?NoSee version C.1 of the Spec.
2503_Attachment J-5 SRQ-4 Specification.pdf3.6.1.2.11Section includes specific interface information for Acoustic Analog signals. Is this in error?NoSee version C.1 of the Spec.
2603_Attachment J-5 SRQ-4 Specification.pdf3.6.1.2.12.1Section includes specific ISAR Radar Video output information. Is this in error?NoSee version C.1 of the Spec.
2703_Attachment J-5 SRQ-4 Specification.pdf3.6.1.2.12.2-4Sections include specific analog Radar interface information. Is this in error?NoSee version C.1 of the Spec.
28ICD 45105-000326Several Cables in the Cable running sheets are indicated as "Optional". For example, R-SI(361). Are any of the optional cables required?NoThe ICD is not in error. The ICD is the current configuration for reference. The PIDS will take preference over the ICDs.
2903_Attachment J-5 SRQ-4 Specification.pdf3.2.1.19.18Narrowband CDL Red Egress Panel interface is not reflected in figures SRQ-49 and SRQ-51. Is this interface required?NoThe Narrowband CDL Red Egress Panel interface is not required. The solicitation will be amended to delete this requirement. See version C.1 of the Spec.
30ICD 45105-0003Sheet 3, note 12

Sheet 3, page 29-30

Sheet 3, page 32-34ICD includes references to Fiber Optic interfaces, but there are no indications of such interfaces in the 03_Attachment J-5 SRQ-4 Specification. Are fiber optic interfaces required?NoThe requirement for fiber optic interfaces is covered under requirement SRQ-1039.
31RFPpage 95Given the current environment with work at home situations due to COVID, is the government’s intent to enforce the limitation in section (i) of clause H-216-H002 with respect to only 10% of hours worked at an alternative worksite?NoAside from classified work, manufacturing, and testing related efforts that require a specific facility, we don’t see any issue with giving relief to the 10%.
32RFPpage 125Please confirm that clause H-216-H002 only applies to LOE CLINs X002 and X008. If so, how does the average rate of 341 hours per week called out in section (d) relate to the labor mix outlined in section 3.2.1.1.2 of Section L (p. 125). The required number of hours in Section L would result in a greater spend rate per week than 341 hours per week on CLINs 0002 and 0008. For the intended purposes of this clause, will the first year (CLIN 0008) hours be treated as an acceleration to accomplish the related development and test scope?NoClause H-216-H002 only applies to LOE CLINs X002 and X008. The average rate of approximately 341 hours per week can be calculated by taking the sum of all LOE hours (88,641 hours) and dividing by 260 weeks (52 weeks * 5 years). The rate per week is an average and can be accelerated as needed.
33RFP3.2.1.2, page 127Does the requirement of the IMS include details on all CLINS or just the CPFF CLINs? Is it restricted to CLINs exercised ADC? Given the variable nature of the production FFP CLINS, if required, is there an assumed "most likely" award date/quantity to use for the baseline schedule?NoAll CLINs are to be included in the IMS. Minumin quanity is 10. Notional contract award date of September 30, 2022.
34PID Spec 20080613SRQ REV CPg 12; 1.0 ScopeA general document question in response to "The modification eliminates legacy analog interfaces, replaces the obsolete KGV-135A…" etc. Many paragraphs were found to what appear to be describing Legacy analog interfaces.
Can we assume that references to legacy analog interfaces are no longer valid?NoAll legacy analog interfaces are removed except for the voice requirement. See version C.1 of the Spec.
35PID Spec 20080613SRQ REV CPg 15; 2.1.2 - Other DocumentsIs PMA299-07000 the same as SAU7000 messages?NoYes, the PMA299-07000 is the same as SAU7000.
36PID Spec 20080613SRQ REV CPg 16; 3.0 Requirements:
The AN/SRQ-4(Ku) shall transfer the various types of data uplink and downlink simultaneously within the distortion limits specified herein, and to the ranges, operational conditions, environments, accuracies, and data formats required while installed in ship platforms. (SRQ-2009)General Requirements question: If data is passed from aircraft to ship using Ethernet PMA299-07000 messages for sensor data as they do on CVN, how does this impact the data flow?NoPlease refer to the SAU7000 IDS.
37PID Spec 20080613SRQ REV CPg 20; 3.2.1.1.1 Waveform DefinitionGeneral Waveform question: All these Waveform Definitions are all covered in the CDL waveform spec up to at least Rev F. These are all verified by JTIC.
Is JTIC certification sufficient to meet these requirements?NoJITC certification alone is not sufficient. JITC certification is in addition to the CDL requirements.
38PID Spec 20080613SRQ REV CPg 30; 3.2.1.9.4 (subpara g) SRQ-4 Ku Directional Antenna.

g. Shall be 40.5 dBi minimum at receive frequencies Pg 26; 3.2.1.8 Range It is stated here that the directional antenna Shall be 40.5 dBi minimum. But on page 26, 3.2.1.8 Range, it shows a requirement for 100nm "The DTS shall perform beyond 100 nm up to its 0 dB fade margin point ".

Which requirement takes precedence? Antenna dB performance, or actual range performance?NoThe 100 nm range takes precedence. The antenna gain value is determined by the link margins at 100 nm for all waveforms based on transmitter power and receiver sensitivity.
39PID Spec 20080613SRQ REV CPg 32; 3.2.1.10.1.3 Video Data
Video data is now via Ethernet IP packets via multicast video. Is the requirement for this system to decode the video data, or is that function performed at the shipboard system level?NoThe SRQ-4 acts as a pass through system and the shipboard system will decode the MPEG 2 data. Please refer to the PMA299-07000 IDS. See version C.1 of the Spec.
40PID Spec 20080613SRQ REV CPg 32; 3.2.1.10.1.1 and 10.1.2 Radar and ISAR data.
Both paragraphs state system shall be capable with receiving and outputting data in accordance to PMA299-07000. Does this require legacy analog interface support?NoNo, the only analog interface is voice.
41PID Spec 20080613SRQ REV CPg 35; 3.2.1.19.4.2 GPNTS Attitude Inputs.If a technical solution is available which doesn't require the GPNTS, can those interfaces be removed from the architecture?YesA GPNTS-free solution is highly discouraged due to likely inability to maintain and establish link as well as meeting other requirements. A GPNTS-free solution can be proposed but could increase risks to maintaining and establishing link. See amendment 0002.
42PID Spec 20080613SRQ REV Cpg 38; 3.2.1.19.14 Outputs to ISSSIs this an analog/legacy requirement now supported by Ethernet connections?NoThis section is an error and will be removed from the specifications. See version C.1 of the Spec.
43PID Spec 20080613SRQ REV CPg 59; 3.6.1 Receiver-Transmitter (RT) Processor GroupIs the equipment to follow this exact description, or can a different rack design be allowed?NoA different rack is allowed as long as it meets remaining SRQ-4 specifications, meets the ICD envelope and all space, weight, power, cooling, and shock requirements.
44PID Spec 20080613SRQ REV CPg 60; 3.6.1.2 Multiplexer AssyIs the RS-422 interface still a requirement to the WRN-6? Or is that Ethernet now via GPNTS?NoThis section is an error and will be removed from the specifications. See version C.1 of the Spec.
45PID Spec 20080613SRQ REV CPg 61; 3.6.1.2.11 Acoustic Channels.Is this analog interface a requirement or is it included in the Ethernet traffic?NoThis section is an error and will be removed from the specifications. See version C.1 of the Spec.
46PID Spec 20080613SRQ REV CPg 62; 3.6.1.2.12 Radar Decoding and Reconstruction (and subparagraphs)Is this analog interface a requirement or is it included in the Ethernet traffic?NoThis section is an error and will be removed from the specifications. See version C.1 of the Spec.
47PID Spec 20080613SRQ REV CPg 63; 3.6.2.6 Waveguide SwitchWould an alternative option for RF switching be acceptable instead of a waveguide switch?NoAn alternative option for RF switching is allowed as long as it meets remaining SRQ-4 specifications, meets the Interface Control Documents envelope and all space, weight, power, cooling, and shock requirements.
48PID Spec 20080613SRQ REV CGeneral question not specific to specIs the SRQ-4 mission controller software GFE or should it be provided as part of the system solution?NoThe SRQ-4 will be controlled by the AEGIS Display System terminal. This software is currently under development.
4903_Attachment J-5 SRQ-4 Specification.pdf3.1.3 a, page 8Reference made to Audio System: AN/USQ-155(V). Please provide ICD for this new system.NoWe don’t have this Interface Control Document available at this time. However, it is not required as long as all audio requirements on the spec are met.
5003_Attachment J-5 SRQ-4 Specification.pdf3.1.3 h, page 8Spec makes reference to "Combat Systems cybersecurity management service. Will the Navy provide this application/software to enable the offeror to perform integration testing?NoWe can't provide this software at this time. The software is currently in development.
51RFP, Amendment 1page 27Are hard copies of the Attachment J-S1 - Contract Wide Staffing Plan and Attachment J-S6 Total Cost/Price Build Up Spreadsheet submittals required or just soft copies of the Excel files?YesSoft copies/electronic copies of the Staffing Plan and Cost/Price Build Up Spreadsheet is sufficient. See amendment 0002.
52RFP, Amendment 1page 27The RFP does not appear to ask/require BOE data as part of the submittal. Is this correct?YesBOE is required. The RFP Section 3.3.4.1 has been updated. See amendment 0002.
53RFP- Section B

- B-216-H006 Fee Table

- Delivery Information

- 3.2.1.1.2The RFP references hours for the X008 CLIN's, in particular CLIN 1008 and 2008 in the areas cited. Within Section B, Delivery Information, and 3.2.1.1.2, the hours for CLIN 1008 are 1,000 and 2008 and 2,036, but in B-216-H006 those values are flipped. Please clarify the intended ceiling hours for 1008 and 2008.YesThe hours in Section B, Delivery Information, and 3.2.1.1.2 are correct. The RFP will be updated to reflect this in B-216-H006. See amendment 0002.
54RFP- Page 48

- Section C

- 4.1.56 (FAIT)Is the intent to have activities under 4.1.56 applied to CLIN 0007, rather than CLIN X008?NoNo, the intent is for the acitviites in 4.1.56 to be covered under X008.
55RFP, Amendment 1Page 8, Section 3.1.9Will tailoring of EIA-649-1 be allowed/provided?NoYes, tailoring of EIA-649-1 will be allowed with Government concurrence.
56RFP, Amendment 2- Page 27

- Section L

- 2.1 Proposal Structure, Format, and Page Counts Concerning the answer RFP update provided for question 51, it appears the intent is for NO PAPER COPIES of the proposal to be delivered, however Section 2.1 Table (page 27 of Amendment 2) still shows two columns with quantities for ‘Paper Original’ and ‘Paper Duplicates’. For the avoidance of doubt, can the government confirm that there are no physical paper documents required and that all documents will be delivered electronically via the updated instructions provided in Section 2.4 of Amendment 2? Yes Yes, the intent is to only have an electronic copy via the updated Section 2.4 on Amendment 0002. Section 2.1 is updated to remove columns "Paper Original" and "Paper Duplicates". See amendment 0003.

&"Times New Roman,Regular"&10N00024-22-R-5206 &"Times New Roman,Regular"&10Bidder's Question Submittal Form &"Times New Roman,Regular"&10Attachment J-S2

&"Times New Roman,Regular"&10&P of &N

Sheet2

Sheet3

File details come from the government source that posted it. Updated .