N00024-20-R-2210 Solicitation QA 28 May 2020.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
7 Meter Rigid Hull Inflatable Boats
Solicitation number
N00024-20-R-2210
Issued by

About this file

This document contains a solicitation for the U.S. Navy's 7 Meter Rigid Inflatable Boat program along with questions and answers from potential offerors. The Navy seeks to award an Indefinite Delivery/Indefinite Quantity contract to a small business for an estimated total of two hundred and seventy-eight 7m RIBs across three variants: standard, LPD-17, and SOLAS rescue boat. Responses are due by June 15, 2020 with no option to extend the deadline. The contract will provide the Technical Data Package and drawings. Questions cover topics such as pricing formats, equipment requirements and responsibilities, design reviews, and documentation needed from offerors regarding facilities and processes.

View the file

Other files

File Type Posted
Att_9_CLIN Pricing Rev 3 (9 June 2020).xlsx XLSX spreadsheet
N00024-20-R-2210 Amendment 5 6 June 20.pdf PDF
N00024-20-R-2210 Conformed Updated 6.5.2020.docx DOCX document
N00024-20-R-2210 Solicitation QA 5 June 2020.xlsx XLSX spreadsheet
N00024-20-R-2210 Solicitation QA 4 June 2020.xlsx XLSX spreadsheet
N00024-20-R-2210 U00004.docx DOCX document
N00024-20-R-2210 Conformed Through Amendment 4.docx DOCX document
N00024-20-R-2210 Solicitation QA 3 June 2020.xlsx XLSX spreadsheet
N00024-20-R-2210 U00003 Amendment final.docx DOCX document
N00024-20-R-2210 Solicitation QA 2 June 2020.xlsx XLSX spreadsheet
Att_8_- Technical Data Rights Assertion Rev1.doc DOC document
N00024-20-R-2210 U00003 Amendment.docx DOCX document
Att_9_CLIN Pricing Rev2.xlsx XLSX spreadsheet
Att_9_CLIN Pricing Rev1.xlsx XLSX spreadsheet
N00024-20-R-2210 Amendment 2 Revise Att 9 Battery Quantity.docx DOCX document
N00024-20-R-2210 Amendment 1.docx DOCX document
JA 7m Brand Name Redacted.pdf PDF
Att_17_7M Nondisclosure (NDA).docx DOCX document
Att_4_Warranty.docx DOCX document
Att_12_7m RIB Mk4 Steyr Engine Build Specification.pdf PDF
Att_9_CLIN Pricing.xlsx XLSX spreadsheet
N00024-20-R-2210 Questions and Answers.docx DOCX document
Att_15_7m RIB Mk4 SOLAS Approved Resin List.pdf PDF
Att_5_GFP.docx DOCX document
Att_8_Technical Data Rights Assertion.doc DOC document
Att_6_ UID.pdf PDF
N00024-20-R-2210.docx DOCX document
Att_14_Template for Bidders QA.doc DOC document
Att_10_Delivery Schedule.XLS XLS spreadsheet
Att_3_7m RIB Mk4 Initial Spares.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QA_ N00024-20-R-2210

No.TopicReferenceStatement Requiring ClarificationQuestionResponse
1ExtensionSAM Announcement, Amendment 0001, dated 22 May 2020

Responses are due to the Government 15 June 2020 at 2:00 PM ET. Due to mission requirements the Navy cannot extend the due date at this time.

Will a commensurate extension be considered?The Navy is not considering extensions at this time.
2Page Count LimitationSection L, Page 123 of 137, Para L-1.1.1. PROPOSAL SUBMISSION, L-1.1.1.1 CONTENTAn Offeror’s proposal shall consist of separate volumes as noted in the table below. Cover pages, title pages, table

of contents, cross reference tables, dividers, index tabs, etc. will not be counted as part of the page count limitation so long as they are inserted solely for the purpose of reading ease and locating sections of the proposal. Pages marked “This page intentionally left blank” will not be counted. Any supporting documentation including but not limited to drawings, analysis, and calculations will not be counted.

The above RFP Extract refers to a “page count limitation,” however, no page count limitation can be located within this RFP. Please provide guidance as to where a page count limitation would apply and where we can reference this requirementThere is no page count limitation in the solicitation.
3PricingATTACHMENT 9, Section B, CLIN Pricing SheetTabs: C1, Boat CLIN Price Breakout1 Please provide a definition of “Base Boat.” The base price when added and totaled with “Less item below” equates to the total price. Tab 1 suggests that the items to be filled out by the bidder is already included in the price (CLIN 0001). It suggests that the pricing format will increase the price of CLIN 0001 by the items identified in yellow.

2 Is the intent of the quantities identified on Tab 1 meant to represent the number of batteries required for each variant?

1. The purpose of the Boat CLIN Price Breakout spreadsheet is to give the Government a complete review of the proposed price. The base boat price should not include any of the items listed separately in the spreadsheet. The amount listed in the green "Total" cell calculates the complete cost of the boat by adding each priced element. (i.e. for CLIN 1001 the complete boat price will be the sum of cells B8-B20).

2. The quantities have been changed to represent the actual amount of batteries required. Per the 7m RIB Specification (Attachment 1), two (2) batteries shall be supplied for each 7m RIB and 7m RIB LPD 17 and (4) batteries shall be supplied for each 7m RIB SOLAS variant boat variant not receiving long term preservation.

4 Raw Water Pump Section 233, Page 57, Paragraph 233-3 233-3 Clutched Dry Run Seawater Pump The propulsion diesel engine shall be provided with a dry run seawater pump per the Engine Build Specification (Attachment 12), with the ability to clutch out or “disengage” the dry run seawater pump impeller for dry run capabilities. The dry run seawater pump shall have a momentary on/off switch labeled and located on the console per the drawings. An operation instruction label plate shall be located on the console near the dry run impeller switch. If a failure in the momentary switch were to occur, the seawater pump shall fail in the clutched-in or “engaged” position.

This water pump is not offered by Steyr Motors. Is this something that will need to be supplied by the boat builder?

Since the Clutch Dry Run Seawater Pump is required and it will not be supplied by Steyr Motors, will you be removing the Run dry impeller kit from the engine description in paragraph 233-1 (Run dry impeller kit)?

The Navy is currently working with Steyr and anticipates pricing for Specification Item 233-3, the “Clutched Dry Run Seawater Pump “ will be available in the next few weeks, prior to the June 15th proposal due date. Should the pricing not be available, the Navy anticipates issuing an amendment no later than June 9th. The amendment will direct contractors to submit pricing for the current engine absent the “Clutched Dry Run Seawater Pump” but inclusive of all elements to meet the requirements of the spec (i.e. label plate, switch on the console, installation, engineering, etc.). In the event that pricing is not available prior to the June 15th proposal due date, Contractors will submit their cost absent the “Clutched Dry Run Seawater Pump“ and the Navy will equally adjust each Contractor’s proposal based on estimated pricing from Steyr, when available.
5Raw Water PumpSection 233, Page 57, Paragraph 233-3233-3 Clutched Dry Run Seawater Pump

The propulsion diesel engine shall be provided with a dry run seawater pump per the Engine Build Specification (Attachment 12), with the ability to clutch out or “disengage” the dry run seawater pump impeller for dry run capabilities. The dry run seawater pump shall have a momentary on/off switch labeled and located on the console per the drawings. An operation instruction label plate shall be located on the console near the dry run impeller switch. If a failure in the momentary switch were to occur, the seawater pump shall fail in the clutched-in or “engaged” position.

In Section 233-3, the solicitation states, “The propulsion diesel engine shall be provided with a dry run seawater pump per the Engine Build Specification (Attachment 12).” In Attachment 12, the Clutch Dry Run Seawater Pump is listed as “TBD.” The engine manufacturer states that this in not available. Who is responsible for supplying this pump?

If the boat builder supplies the Clutch Dry Run Seawater Pump, who will be responsible for the warranty coverage on the engine should the pump cause an engine failure?

Will the specifications for the Clutch Dry Run Seawater Pump be supplied? What is the required voltage of the clutch?

The Navy is currently working with Steyr and anticipates pricing for Specification Item 233-3, the “Clutched Dry Run Seawater Pump “ will be available in the next few weeks, prior to the June 15th proposal due date. Should the pricing not be available, the Navy anticipates issuing an amendment no later than June 9th. The amendment will direct contractors to submit pricing for the current engine absent the “Clutched Dry Run Seawater Pump” but inclusive of all elements to meet the requirements of the spec (i.e. label plate, switch on the console, installation, engineering, etc.). In the event that pricing is not available prior to the June 15th proposal due date, Contractors will submit their cost absent the “Clutched Dry Run Seawater Pump“ and the Navy will equally adjust each Contractor’s proposal based on estimated pricing from Steyr, when available.
6Raw Water PumpSection 233, Page 57, Paragraph 233-3233-3 Clutched Dry Run Seawater Pump The propulsion diesel engine shall be provided with a dry run seawater pump per the Engine Build Specification (Attachment 12, see attached), with the ability to clutch out or “disengage” the dry run seawater pump impeller for dry run capabilities. The dry run seawater pump shall have a momentary on/off switch labeled and located on the console per the drawings. An operation instruction label plate shall be located on the console near the dry run impeller switch. If a failure in the momentary switch were to occur, the seawater pump shall fail in the clutched-in or “engaged” position.The Steyr Build specification does not list a clutch sea water pump. Is this an additional pump ? Can it be stringer mounted ?
The Navy is currently working with Steyr and anticipates pricing for Specification Item 233-3, the “Clutched Dry Run Seawater Pump “ will be available in the next few weeks, prior to the June 15th proposal due date. Should the pricing not be available, the Navy anticipates issuing an amendment no later than June 9th. The amendment will direct contractors to submit pricing for the current engine absent the “Clutched Dry Run Seawater Pump” but inclusive of all elements to meet the requirements of the spec (i.e. label plate, switch on the console, installation, engineering, etc.). In the event that pricing is not available prior to the June 15th proposal due date, Contractors will submit their cost absent the “Clutched Dry Run Seawater Pump“ and the Navy will equally adjust each Contractor’s proposal based on estimated pricing from Steyr, when available.
7PricingAttachment 9- Material Handling RateAttachment 9 – A Material Handling Rate is provided for Ordering Period 1-5.Is the Material Handling Rate the only rate to be used for material burdens throughout the life of the contract (i.e. one example is PIO/spares)?In accordance with Section G Clause entitled “ORDERS (FIXED-PRICE), the contractor shall provide labor and material to perform Engineering & Industrial Services over the life of the contract. The Government estimates performing Engineering & Industrial Services will require approximately 1,000 man-hours and $100,000 of material. These services are defined as any work authorized by the Contracting Officer that is required to support the 7m RIB program in any of the following areas: Design Engineering & Production Services, Testing Phase Support and Government Furnished Property (GFP) Integration & Support. Requirements under this CLIN might include, but are not limited to, the correction of problems with GFP, in scope changes to the configuration baseline, Government requirements identified during pre-delivery inspection, issue resolution support during Government testing, and the development of various engineering products. Examples of work that might be accomplished under this CLIN include equipment installation, rigging support, component replacement, minor design upgrades and subject matter expert technical assistance. The requirements associated with this CLIN are over and above those specified in other contract CLINs. Orders for this effort will be placed in accordance with the general requirements in Section H of this Contract entitled “ENGINEERING & INDUSTRIAL SERVICES.” The Contractor shall complete the table for fully loaded engineering and production rates under Section B.
8Initial Production BoatC-1.3. Design, Management, and Production, 42 of 137; Paragraph 4 / C-2 Part 2, C-2.1, 2.3, 2.5, 42-43 of 137.Initial Production of the 7m RIB, 7m LPD 17 variant, and 7m RIB SOLAS variant will result in one (1) boat each that will be delivered to the Government for initial testing and training for a period of approximately six (6) months.

CLIN 1001, CLIN 1003, CLIN 1004

Is the Government’s plan to order one of each variant for testing and evaluation and exercise CLINs 1001, 1003, and 1005 with the initial delivery order? Or is it possible that they will only be ordering the 7m RIB and 7m RIB SOLAS, CLINs 1001 and 1005?

It is possible the Government will only be ordering the Standard variant initial production boat (CLIN 1001) and the SOLAS variant initial production boat (CLIN 1005) for testing and evaluation purposes.
9Technical Data PackageC-2.15 CLIN 1016, 44 of 137The Contractor shall develop and provide the Technical Data Package (TDP) in accordance with Section 085 of the 7m RIB Specification (Attachment 1) and priced under the TDP Non-Recurring Engineering (7m RIB) CLIN.

Does the TDP CLIN (CLIN 1016) encompass the development of a technical data package(s) for all three variants?

The TDP CLIN (CLIN 1016) does encompass the development of a TDP for ALL three variants.
10EnginesC-2.2 and C-2.21; 45 of 137C-2.20. CLIN 1020 – ENGINES AND IF ORDERED, CLINs 2012, 3012, 4012 AND 5014

The Contractor shall provide an engine for each 7m RIB and 7m RIB LPD 17 variant in accordance with the 7m RIB Specification (Attachment 1) Section 233. The engine cost shall include 10-hour engine break-in.

C-2.21. CLIN 1021 – ENGINE SOLAS VARIANT AND IF ORDERED, CLINs 2013, 3013, 4013 AND 5015

The Contractor shall provide an engine for each 7m RIB SOLAS variant in accordance with the 7m RIB Specification (Attachment 1) Section 233 SOLAS. The engine cost shall include 10-hour engine break-in.

Are CLINs 1020 and 1021 intended to be ordered as a loose engine or as a spare? Our understanding is that the engine and engine installation for each boat is included in the Boat CLIN, CLINs 1002, 1004, 1006? Is this correct?

CLINS 1020 and 1021 are intended to be ordered as a loose engines. The engine cost is to not be included in the boat CLINs (1001, 1002, 1003, 1004, 1005, 1006). H+I14owever the cost to install the engine is to be included in the boat CLIN.
11PDITC-2.10 CLIN 1010, 43 of 137C-2.10. CLIN 1010 – AND IF ORDERED, CLINs 2006, 3006, 4006 AND 5006 – PRE-DELIVERY INSPECTIONS AND TRIALS (PDIT)

The Contractor shall perform boat Pre-Delivery Inspections and Trials (PDIT), in accordance with Section C, Part 3 and the 7m RIB Specification (Attachment 1) Section 094.

Can you please confirm, that a separate PDIT will be ordered for each variant.The intent of CLIN 1010 is that a separate PDIT can be ordered for each variant. The Navy will make that determination when delivery order is awarded.
12Delivery Schedule Form
Attachment 10Ordering Period 1, Delivery Order 1, Delivery Order 2+, Delivery Order 2+Can you please provide further clarification as to what the difference is between the Three Delivery Orders within Ordering Period 1: Delivery Order 1, Delivery Order 2+, and Delivery Order 2+? Additionally is Boat 1 the Initial Production Boat that is being tested? Or is Boat 1, the first boat of the Delivery Order for CLIN 1002, 1004, and 1006 after the Initial Production Boat has been tested/evaluated? If it is the later, when will the delivery order for CLINs 1002, 1004, 1006 be issued? At time of initial award or once testing of the Initial Production Boat is completed?Delivery Order 1 would be the initial delivery order with contract award. The difference in the two delivery order 2+ is if there is a “Break” in production or there is “NO BREAK” in production, which further guidance is provided at the bottom of Attachment 10. Yes, Boat 1 is the initial Production boat that is being tested. The delivery order 2+ is included to provide notional delivery dates if the Government issues a second delivery order within ordering period 1.
13SOLAS – USCG Document Submittal and Design Process

C-1.1. Background; 41 of 137; Paragraph 5 The design, construction, and performance of a rescue boat completes a Preapproval review process as defined in 46 CFR 160.156-7 and 160.156-9, prior to construction. The preapproval is obtained through a collaborative effort between the Contractor and NAVSEA. Can further clarification be supplied for what specifically will be required of the Contractor in the collaborative process? Will the Contractor or NAVSEA manage the submittal of documents to the USCG?

In addition to the general clarification question above, can the Government provide additional information as to what work has already been pre-approved and included in the contract drawings? Has the USCG approved the design shown in the contract drawings? If not, is it the Contractor’s responsibility to complete the design application and obtain approval? Has vessel stability already been verified in light load and loaded conditions for both intact and flooded? Will the Offeror be required to submit additional design-related technical information for approval?

All documents required to be sent to the USCG will be provided by Contractor to NAVSEA, and NAVSEA will submit those documents to the USCG. The USCG is in the process of approving the design. All pre-approval information required from the Contractor is production and facility capability related (i.e. manufacturing sites, subcontractor lists, name of independent lab used for inspections, quality control procedures, label plate drawing, material lists, etc.) The Contractor will not be responsible to complete design work. All design work will be completed by NAVSEA. Vessel stability calculations have already been submitted to the USCG.

14Conferences and ReviewsC-3.042-1; 45 of 137; Paragraph 2After completion of the Government’s Initial Production testing, and design updates, if any, the Contractor shall conduct a 2nd Design Maturity Review for the start of the Production Phase. This Design Maturity Review will follow the same agenda outline and primarily focus on any changes to the configuration and efforts to achieve efficiency. Within seven (7) days from the Design Maturity Review completion, the Government will notify the Contractor whether or not the Start of production is authorized.Requesting clarification on the 2nd Design Maturity Review. Is this a requirement for the SOLAS variant only?No. The second design review is after the Government has completed testing on the initial production boats and intended to be able to discuss results with the Contractor, provide feedback going into the production boats, discuss any changes if necessary, and determine whether the Contractor is prepared to start construction of the production boats.
15Design Maturity ReviewC-3.042-1; 45 of 137; Paragraph 2

(a) Design Maturity Review: The Contractor shall schedule and host Government personnel for a Design Maturity Review prior to construction of the first boat. The purpose of the Design Maturity Review is to demonstrate that the design is sufficiently mature to start construction and that the status of material ordering and delivery will support the proposed build schedule. Any potential risk areas shall be identified and mitigation plans discussed. The Contractor shall demonstrate to the Government that all requirements in the 7m RIB Specification (Attachment 1) have been incorporated into the design. The Government will notify the Contractor within seven (7) days of the Design Maturity Review whether or not the start of construction is authorized. The following shall be provided for the Design Maturity Review:

1. Updated Design, Production, and Delivery Schedule,

2. Material and purchased parts status, including but not limited to:

-hull and deck materials, -major equipment, -long lead time items.

3. Completed Preconstruction Test panels (unless shipped for lab testing),

4. Preliminary construction drawings,

5. Revised offsets,

6. Accepted Weight Estimate (AWE) and first Periodic Weight Report (PWR),

7. Laminating Process Procedures Description (LPPD),

8. Inspection System Plan (ISP),

9. Construction facilities: The Contractor shall provide evidence of the facilities readiness,

10. Production Manning: The Contractor shall provide evidence that manning resources are available to support planned production,

11. Requests For Variance (RFV): There shall be no open RFVs. Contract Problem Identification Reports (CPIRs) shall have a documented resolution.

12. Risk Assessment: an assessment of risk and the risk management approach to eliminate or mitigate those risks.

Specifically, in reference to deliverables such as preliminary construction drawings, weight estimates, procedures, etc. The Offeror recommends submitting all technical information prior to commencement of the Review to allow time for feedback. Suggest that the Government set a due date of “X” amount of days prior to the Review.The Government will take your suggestion into consideration. For purposes of this RFP bid submittal, prices should reflect the RFP as it currently stands.
16Hull Lines and Offsets

Att2 7m RIB Mk4 Contract Drawings, 2, Body View 12-B See Body View 12-B on Contract Drawing 5112260 Hull Lines and Offsets.

On the right-hand side of the body plan, Section 5 does not appear to conform with the offsets provided. Section 5, as labeled on the left-hand side, appears to match. Can clarification be provided as to whether this is a labeling error?There is an error in Body Plan 12-B on the Hull Lines and Offsets drawing (7MRB-100-5112260). The labeling is correct, however the incorrect station is being shown (Station 0 is being shown, where Station 5 should be). An updated drawing will be provided at award when the builder receives electronic versions.
17Deck Construction and Arrangement DetailsAtt2 7m RIB Mk4 Contract Drawings, 22-23, Plan View 17-D & Plan View 27-D

See Plan View 17-D and Plan View 27-D on Contract Drawing 5112265 Deck Construction and Details.

The Offeror is seeking clarification on the design requirement which will “provide access for engine foundations (P&S)”. Will this require a soft patch?

This is a design detail that is to be completed by the Contractor, with approval from the Government.
18CollarAtt_1 7m RIB Mk4 Specification, 54 of 83, 166-1 & 166-1aAs stated in the collar description for the Standard, LPD and SOLAS variant, “Mechanically fastened to the hull per the drawings.”The Offeror could not find the corresponding detail within the Contract Drawing package. Please advise which drawing detail is being referenced within the Specification.See the Miscellaneous Details Drawing (7MRB-600-5112270), Detail 105-B (Typical Collar Attachment)

19 Financial Data L-1.1.1.4 Proposal Content Checklist; 124-125 of 137, L-2.2.1. Factor 3: Price Section G; 128 of 137 G. Financial Data. No award will be made unless the contracting officer makes an affirmative determination of responsibility. In the absence of information clearly indicating that the prospective contractor is responsible, the contracting officer will make a determination of nonresponsibility. As part of this review, the Offeror shall submit the following:

i. Financial statements for your two most recently completed fiscal years and the most recent interim financial statement if available, inclusive of balance sheet, income statement, and cash flow statement (source & application statements). Footnotes should not be removed. These statements, if not compiled or audited by a CPA, must be certified by an officer of the company in accordance with DFARs 232.072-2(b) (1) (ii). The certification statement should state that to the best of your knowledge and belief, the financial data and accompanying notes to the financial statements are accurate and complete as prepared from the company’s general accounting records as of a certain date. This certification must be signed and dated.

ii. Copies of your most current accounts payable and accounts receivable aging reports shown at 30, 60 and 90-day intervals.

iii. Provide copies of any corporate or personal guaranty agreements and any unusually favorable creditor/vendor payment terms. If none, state none.

iv. Financial reference letter from either your bank or at least three (3) major suppliers.

Is the Financial Data as outlined in section L-2.2.1 Factor 3: Price, Letter G, and copied above for reference, the only data required as part of Attachment 13 or does the Government require additional information? It is our understanding that this data becomes Attachment 13 of our proposal and that there was no attachment 13 provided by the Government which outlines the requested financial data, is that correct? Yes this is the information required to assist with the required Contract Officer's Determination of Responsibility and should be submitted as Attachment 13 with the solicitation.