This document contains a pricing spreadsheet and solicitation for a federal contract to provide the U.S. Navy with 7-meter rigid inflatable boats (RIBs). The Navy plans to award an indefinite delivery/indefinite quantity contract to provide an estimated total of 278 RIBs over five years, including standard, LPD-17 variant, and SOLAS variant models. Pricing is provided for base boats as well as optional components by contract line item number and ordering period. The total evaluated price for engineering and industrial services is $100,000. Responses to solicitation N00024-20-R-2210 are due to the Navy by June 15, 2020, with award by the Naval Sea Systems Command to a small business contractor to fulfill mission requirements.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total Contract N0002420R2210 Attachment #9 CLIN Pricing Sheet
| COLOR CODING KEY |
| To Be Filled in by Contractor |
| Auto-fill calculation |
| No Data Required |
| CLINS | Extended Description | Notional Qty | CLIN Price | Total per CLIN |
| CONTRACT YEAR ONE PRICING | ||||
| CLIN1001 | 7M RIB (Initial Production Boat) | 1 | $ - 0 | $ - 0 |
| CLIN1002 | 7M RIB | 72 | $ - 0 | $ - 0 |
| CLIN1003 | 7M RIB LPD17 Variant (Initial Prod Boat) | 1 | $ - 0 | $ - 0 |
| CLIN1004 | 7M RIB LPD17 Variant | 10 | $ - 0 | $ - 0 |
| CLIN1005 | 7M RIB SOLAS Variant (Initial Prod Boat) | 1 | $ - 0 | $ - 0 |
| CLIN1006 | 7M SOLAS Variant | 7 | $ - 0 | $ - 0 |
| CLIN1007 | Batteries | 84 | $ - 0 | |
| CLIN1008 | Batteries SOLAS Variant | 8 | $ - 0 | |
| CLIN1009 | Hull & Deck Mold Inspection | 1 | $ - 0 | |
| CLIN1010 | Pre-Delivery Inspection and Trials | 9 | $ - 0 | |
| CLIN1011 | 7M RIB Shipping- Cheatham Annex | 92 | $ - 0 | |
| CLIN1012 | 7M RIB Shipping- DDDC | 92 | $ - 0 | |
| CLIN1013 | Short Slings | 92 | $ - 0 | |
| CLIN1014 | Long Slings | 92 | $ - 0 | |
| CLIN1015 | Long Term Preservation | 92 | $ - 0 | |
| CLIN1016 | TDP NRE | 1 | $ - 0 | |
| CLIN1017 | Provisioned Item Ordered (PIO) Spares | $ - 0 | ||
| CLIN1018 | Engineering & Industrial Services | $100,000.00 | ||
| CLIN1019 | Display Models | 2 | $ - 0 | |
| CLIN1020 | Engine | 84 | $ - 0 | |
| CLIN1021 | Engine SOLAS Variant | 8 | $ - 0 | |
| Total Contract Year 1 | $ 100,000.00 | |||
| CONTRACT YEAR TWO PRICING | ||||
| CLIN2001 | 7M RIB | 34 | $ - 0 | $ - 0 |
| CLIN2002 | 7M RIB LPD17 Variant | 2 | $ - 0 | $ - 0 |
| CLIN2003 | 7M SOLAS Variant | 4 | $ - 0 | $ - 0 |
| CLIN2004 | Batteries | 36 | $ - 0 | |
| CLIN2005 | Batteries SOLAS Variant | 4 | $ - 0 | |
| CLIN2006 | Pre-Delivery Inspection and Trials | 6 | $ - 0 | |
| CLIN2007 | 7M RIB Shipping- Cheatham Annex | 40 | $ - 0 | |
| CLIN2008 | 7M RIB Shipping- DDDC | 40 | $ - 0 | |
| CLIN2009 | Short Slings | 40 | $ - 0 | |
| CLIN2010 | Long Slings | 40 | $ - 0 | |
| CLIN2011 | Long Term Preservation | 40 | $ - 0 | |
| CLIN2012 | Engine | 36 | $ - 0 | |
| CLIN2013 | Engine SOLAS Variant | 4 | $ - 0 | |
| Total Contract Year 2 | $ - 0 | |||
| CONTRACT YEAR THREE PRICING | ||||
| CLIN3001 | 7M RIB | 39 | $ - 0 | $ - 0 |
| CLIN3002 | 7M RIB LPD17 Variant | 2 | $ - 0 | $ - 0 |
| CLIN3003 | 7M SOLAS Variant | 5 | $ - 0 | $ - 0 |
| CLIN3004 | Batteries | 41 | $ - 0 | |
| CLIN3005 | Batteries SOLAS Variant | 5 | $ - 0 | |
| CLIN3006 | Pre-Delivery Inspection and Trials | 6 | $ - 0 | |
| CLIN3007 | 7M RIB Shipping- Cheatham Annex | 46 | $ - 0 | |
| CLIN3008 | 7M RIB Shipping- DDDC | 46 | $ - 0 | |
| CLIN3009 | Short Slings | 46 | $ - 0 | |
| CLIN3010 | Long Slings | 46 | $ - 0 | |
| CLIN3011 | Long Term Preservation | 46 | $ - 0 | |
| CLIN3012 | Engine | 41 | $ - 0 | |
| CLIN3013 | Engine SOLAS Variant | 5 | $ - 0 | |
| Total Contract Year 3 | $ - 0 | |||
| CONTRACT YEAR FOUR PRICING | ||||
| CLIN4001 | 7M RIB | 49 | $ - 0 | $ - 0 |
| CLIN4002 | 7M RIB LPD17 Variant | 2 | $ - 0 | $ - 0 |
| CLIN4003 | 7M SOLAS Variant | 4 | $ - 0 | $ - 0 |
| CLIN4004 | Batteries | 51 | $ - 0 | |
| CLIN4005 | Batteries SOLAS Variant | 4 | $ - 0 | |
| CLIN4006 | Pre-Delivery Inspection and Trials | 6 | $ - 0 | |
| CLIN4007 | 7M RIB Shipping- Cheatham Annex | 55 | $ - 0 | |
| CLIN4008 | 7M RIB Shipping- DDDC | 55 | $ - 0 | |
| CLIN4009 | Short Slings | 55 | $ - 0 | |
| CLIN4010 | Long Slings | 55 | $ - 0 | |
| CLIN4011 | Long Term Preservation | 55 | $ - 0 | |
| CLIN4012 | Engine | 51 | $ - 0 | |
| CLIN4013 | Engine SOLAS Variant | 4 | $ - 0 | |
| Total Contract Year 4 | $ - 0 | |||
| CONTRACT YEAR FIVE PRICING | ||||
| CLIN5001 | 7M RIB | 39 | $ - 0 | $ - 0 |
| CLIN5002 | 7M RIB LPD17 Variant | 2 | $ - 0 | $ - 0 |
| CLIN5003 | 7M SOLAS Variant | 4 | $ - 0 | $ - 0 |
| CLIN5004 | Batteries | 41 | $ - 0 | |
| CLIN5005 | Batteries SOLAS Variant | 4 | $ - 0 | |
| CLIN5006 | Pre-Delivery Inspection and Trials | 6 | $ - 0 | |
| CLIN5007 | 7M RIB Shipping- Cheatham Annex | 45 | $ - 0 | |
| CLIN5008 | 7M RIB Shipping- DDDC | 45 | $ - 0 | |
| CLIN5009 | Short Slings | 45 | $ - 0 | |
| CLIN5010 | Long Slings | 45 | $ - 0 | |
| CLIN5011 | Long Term Preservation | 45 | $ - 0 | |
| CLIN5012 | Engine | 41 | $ - 0 | |
| CLIN5013 | Engine SOLAS Variant | 4 | $ - 0 | |
| Total Contract Year 5 | $ - 0 | |||
| Total Evaluated Price | $ 100,000.00 |
Boat CLIN Price Breakout
| COLOR CODING KEY |
| To Be Filled in by Contractor |
| Auto-fill calculation |
| No Data Required |
| CLIN 1001 - 7M RIB (Initial Production Boat) | CLIN 1002 - 7M RIB | CLIN 1003 - 7M RIB LPD 17 Variant (Initial Prod Boat) | CLIN 1004 - 7M RIB LPD 17 Variant | CLIN 1005 - 7M RIB SOLAS Variant (Initial Prod Boat) | CLIN 1006 - 7M RIB SOLAS Variant | ||||||
| Description | Price | Description | Price | Description | Price | Description | Price | Description | Price | Description | Price |
| Base Boat (Less Items Below) | Base Boat (Less Items Below) | Base Boat (Less Items Below) | Base Boat (Less Items Below) | Base Boat (Less Items Below) | Base Boat (Less Items Below) | ||||||
| Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | ||||||
| Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | ||||||
| Collar w/ MBCS | Collar w/ MBCS | Collar w/ MBCS | Collar w/ MBCS | Collar w/ MBCS | Collar w/ MBCS | ||||||
| Lift Bail (LPD 17 Variant) | Lift Bail (LPD 17 Variant) | Lift Bail (LPD 17 Variant) | Lift Bail (LPD 17 Variant) | Lift Bail (LPD 17 Variant) | Lift Bail (LPD 17 Variant) | ||||||
| Cranston Eagle Hook (LPD 17 Variant) | Cranston Eagle Hook (LPD 17 Variant) | Cranston Eagle Hook (LPD 17 Variant) | Cranston Eagle Hook (LPD 17 Variant) | Cranston Eagle Hook (LPD 17 Variant) | Cranston Eagle Hook (LPD 17 Variant) | ||||||
| Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | ||||||
| Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | ||||||
| Bow Bitt | Bow Bitt | Bow Bitt | Bow Bitt | Bow Bitt | Bow Bitt | ||||||
| SOLAS Arch (SOLAS Variant) | SOLAS Arch (SOLAS Variant) | SOLAS Arch (SOLAS Variant) | SOLAS Arch (SOLAS Variant) | SOLAS Arch (SOLAS Variant) | SOLAS Arch (SOLAS Variant) | ||||||
| Propeller Guard (SOLAS Variant) | Propeller Guard (SOLAS Variant) | Propeller Guard (SOLAS Variant) | Propeller Guard (SOLAS Variant) | Propeller Guard (SOLAS Variant) | Propeller Guard (SOLAS Variant) | ||||||
| SOLAS Righting Bag and Co2 Bottle System (SOLAS Variant) | SOLAS Righting Bag and Co2 Bottle System (SOLAS Variant) | SOLAS Righting Bag and Co2 Bottle System (SOLAS Variant) | SOLAS Righting Bag and Co2 Bottle System (SOLAS Variant) | SOLAS Righting Bag and Co2 Bottle System (SOLAS Variant) | SOLAS Righting Bag and Co2 Bottle System (SOLAS Variant) | ||||||
| SOLAS Painter Release Device (SOLAS Variant) | SOLAS Painter Release Device (SOLAS Variant) | SOLAS Painter Release Device (SOLAS Variant) | SOLAS Painter Release Device (SOLAS Variant) | SOLAS Painter Release Device (SOLAS Variant) | SOLAS Painter Release Device (SOLAS Variant) | ||||||
| Total | $ - 0 | Total | $ - 0 | Total | $ - 0 | Total | $ - 0 | Total | $ - 0 | Total | $ - 0 |
| CLIN 2001 - 7M RIB | CLIN 2002 - 7M RIB LPD 17 Variant | CLIN 2003 - 7M RIB SOLAS Variant | |||
| Description | Price | Description | Price | Description | Price |
| Base Boat (Less Items Below) | Base Boat (Less Items Below) | Base Boat (Less Items Below) | |||
| Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | |||
| Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | |||
| Collar w/ MBCS | Collar w/ MBCS | Collar w/ MBCS | |||
| Lift Bail (LPD 17 Variant) | Lift Bail (LPD 17 Variant) | Lift Bail (LPD 17 Variant) | |||
| Cranston Eagle Hook (LPD 17 Variant) | Cranston Eagle Hook (LPD 17 Variant) | Cranston Eagle Hook (LPD 17 Variant) | |||
| Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | |||
| Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | |||
| Bow Bitt | Bow Bitt | Bow Bitt | |||
| SOLAS Arch (SOLAS Variant) | SOLAS Arch (SOLAS Variant) | SOLAS Arch (SOLAS Variant) | |||
| Propeller Guard (SOLAS Variant) | Propeller Guard (SOLAS Variant) | Propeller Guard (SOLAS Variant) | |||
| SOLAS Righting Bag and Co2 Bottle System (SOLAS Variant) | SOLAS Righting Bag and Co2 Bottle System (SOLAS Variant) | SOLAS Righting Bag and Co2 Bottle System (SOLAS Variant) | |||
| SOLAS Painter Release Device (SOLAS Variant) | SOLAS Painter Release Device (SOLAS Variant) | SOLAS Painter Release Device (SOLAS Variant) | |||
| Total | $ - 0 | Total | $ - 0 | Total | $ - 0 |
| CLIN 3001 - 7M RIB | CLIN 3002 - 7M RIB LPD 17 Variant | CLIN 3003 - 7M RIB SOLAS Variant | |||
| Description | Price | Description | Price | Description | Price |
| Base Boat (Less Items Below) | Base Boat (Less Items Below) | Base Boat (Less Items Below) | |||
| Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | |||
| Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | |||
| Collar w/ MBCS | Collar w/ MBCS | Collar w/ MBCS | |||
| Lift Bail (LPD 17 Variant) | Lift Bail (LPD 17 Variant) | Lift Bail (LPD 17 Variant) | |||
| Cranston Eagle Hook (LPD 17 Variant) | Cranston Eagle Hook (LPD 17 Variant) | Cranston Eagle Hook (LPD 17 Variant) | |||
| Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | |||
| Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | |||
| Bow Bitt | Bow Bitt | Bow Bitt | |||
| SOLAS Arch (SOLAS Variant) | SOLAS Arch (SOLAS Variant) | SOLAS Arch (SOLAS Variant) | |||
| Propeller Guard (SOLAS Variant) | Propeller Guard (SOLAS Variant) | Propeller Guard (SOLAS Variant) | |||
| SOLAS Righting Bag and Co2 Bottle System (SOLAS Variant) | SOLAS Righting Bag and Co2 Bottle System (SOLAS Variant) | SOLAS Righting Bag and Co2 Bottle System (SOLAS Variant) | |||
| SOLAS Painter Release Device (SOLAS Variant) | SOLAS Painter Release Device (SOLAS Variant) | SOLAS Painter Release Device (SOLAS Variant) | |||
| Total | $ - 0 | Total | $ - 0 | Total | $ - 0 |
| CLIN 4001 - 7M RIB | CLIN 4002 - 7M RIB LPD 17 Variant | CLIN 4003 - 7M RIB SOLAS Variant | |||
| Description | Price | Description | Price | Description | Price |
| Base Boat (Less Items Below) | Base Boat (Less Items Below) | Base Boat (Less Items Below) | |||
| Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | |||
| Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | |||
| Collar w/ MBCS | Collar w/ MBCS | Collar w/ MBCS | |||
| Lift Bail (LPD 17 Variant) | Lift Bail (LPD 17 Variant) | Lift Bail (LPD 17 Variant) | |||
| Cranston Eagle Hook (LPD 17 Variant) | Cranston Eagle Hook (LPD 17 Variant) | Cranston Eagle Hook (LPD 17 Variant) | |||
| Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | |||
| Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | |||
| Bow Bitt | Bow Bitt | Bow Bitt | |||
| SOLAS Arch (SOLAS Variant) | SOLAS Arch (SOLAS Variant) | SOLAS Arch (SOLAS Variant) | |||
| Propeller Guard (SOLAS Variant) | Propeller Guard (SOLAS Variant) | Propeller Guard (SOLAS Variant) | |||
| SOLAS Righting Bag and Co2 Bottle System | SOLAS Righting Bag and Co2 Bottle System | SOLAS Righting Bag and Co2 Bottle System | |||
| SOLAS Painter Release Device (SOLAS Variant) | SOLAS Painter Release Device (SOLAS Variant) | SOLAS Painter Release Device (SOLAS Variant) | |||
| Total | $ - 0 | Total | $ - 0 | Total | $ - 0 |
| CLIN 5001 - 7M RIB | CLIN 5002 - 7M RIB LPD 17 Variant | CLIN 5003 - 7M RIB SOLAS Variant | |||
| Description | Price | Description | Price | Description | Price |
| Base Boat (Less Items Below) | Base Boat (Less Items Below) | Base Boat (Less Items Below) | |||
| Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | Independent Lab Construction oversite for Prototype SOLAS variant | |||
| Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | Independent Lab Construction oversite for Production SOLAS variant | |||
| Collar w/ MBCS | Collar w/ MBCS | Collar w/ MBCS | |||
| Lift Bail (LPD 17 Variant) | Lift Bail (LPD 17 Variant) | Lift Bail (LPD 17 Variant) | |||
| Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | Forward and Aft Hoisting Fittings | |||
| Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | Transom Cap / Aft Tow Bitt | |||
| Bow Bitt | Bow Bitt | Bow Bitt | |||
| SOLAS Arch (SOLAS Variant) | SOLAS Arch (SOLAS Variant) | SOLAS Arch (SOLAS Variant) | |||
| Propeller Guard (SOLAS Variant) | Propeller Guard (SOLAS Variant) | Propeller Guard (SOLAS Variant) | |||
| SOLAS Righting Bag and Co2 Bottle System (SOLAS Variant) | SOLAS Righting Bag and Co2 Bottle System (SOLAS Variant) | SOLAS Righting Bag and Co2 Bottle System (SOLAS Variant) | |||
| SOLAS Painter Release Device (SOLAS Variant) | SOLAS Painter Release Device (SOLAS Variant) | SOLAS Painter Release Device (SOLAS Variant) | |||
| Total | $ - 0 | Total | $ - 0 | Total | $ - 0 |
CLIN 1018 EIS
| N0002420R2210 |
| COLOR CODING KEY |
| To Be Filled in by Contractor |
| Auto-fill calculation |
| No Data Required | |||
| Note: Fully Loaded rates should include all overheads and profit | |||
| 25% | 75% | ||
| Total | Engineering | Production | |
| Estimated Labor Hours | 1000 | 250 | 750 |
| Ordering | ||||
| Period | Percentage | Engineering | Production | |
| Ordering Period 1 | 45% | 113 | 338 | |
| Ordering Period 2 | 35% | 88 | 263 | |
| Ordering Period 3 | 5% | 13 | 38 | |
| Ordering Period 4 | 5% | 12 | 37 | |
| Ordering Period 5 | 10% | 25 | 75 | |
| 100% | 250 | 750 |
| OFFEROR PROPOSED RATES CLIN 1018 | ||
| Ordering | ||
| Period | Fully Loaded Engineering Rate (per hour) | Fully Loaded Production Rate |
| (per hour) | **Material Handling Rate (percentage) | |
| Ordering Period 1 | ||
| Ordering Period 2 | ||
| Ordering Period 3 | ||
| Ordering Period 4 | ||
| Ordering Period 5 | ||
| *Material Handling Rate MUST be a percentage (i.e. 5%, 10%, 15%) |
| Estimated Material | $ 100,000.00 | ||
| Ordering | |||
| Period | Percentage | Estimated Material (Less MH rate) | |
| Ordering Period 1 | 45% | $45,000.00 | |
| Ordering Period 2 | 35% | $35,000.00 | |
| Ordering Period 3 | 5% | $5,000.00 | |
| Ordering Period 4 | 5% | $5,000.00 | |
| Ordering Period 5 | 10% | $10,000.00 | |
| 100% | $100,000.00 |
| TOTAL EVALUATED PRICE FOR CLIN 1018 | |||||
| Ordering | |||||
| Period | Engineering | Production | Materials (with MH Rate) | Total | |
| Ordering Period 1 | $0.00 | $0.00 | $45,000.00 | $45,000.00 | |
| Ordering Period 2 | $0.00 | $0.00 | $35,000.00 | $35,000.00 | |
| Ordering Period 3 | $0.00 | $0.00 | $5,000.00 | $5,000.00 | |
| Ordering Period 4 | $0.00 | $0.00 | $5,000.00 | $5,000.00 | |
| Ordering Period 5 | $0.00 | $0.00 | $10,000.00 | $10,000.00 | |
| Total | $100,000.00 |