This document is a Request for Information from the Department of the Navy Naval Sea Systems Command regarding the Surface Electronic Warfare Improvement Program Block 3 subsystem and associated ancillary equipment. The Navy is seeking industry input on hardware production and considering different procurement strategies, including a potential winner-take-all single award contract or awarding to both a Leader and Challenger. The Leader would receive a higher proportion of work and be responsible for engineering support services and maintaining technical data packages. Responses to the RFI are due by February 15, 2019 and should not exceed 30 pages. The Navy intends to issue a solicitation in FY20 for build-to-print production to begin in FY20-24, with a notional award date of Q3FY20 and contract type of fixed-price incentive fee for production and cost-type for engineering support services.
Attachment 6 N00024-19-R-5519 Question Responses
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Attachment 3 - AN/SLQ-32 Block 3 N00024-19-R-5519 Question Submittal Form | ||||
| Question Number: | Question Source: (RFP, attachment #, GFI title, etc.) | Page number and paragraph header from source: | Question: | Navy Response |
| 1 | RFI Solicitation Posting | Last Page, Section: Industry Day | Does the Navy intend to hold an industry day? If so, will it occur prior to or after submission of RFI responses? | The Navy is planning to conduct individual meetings with interested companies prior to submission of the RFI. |
| 2 | RFI Solicitation Posting | Section 2: General Information | When does the Navy anticipate issuing a final RFP? Will a draft RFP be provided in advance of the final? | The Navy will issue any solicitation details via Federal Business Opportunities (FBO) as appropriate. The Navy does not intend to release a draft RFP. |
| 3 | RFI Solicitation Posting | Section 1: Synopsis, paragraph two | Can the Navy please clarify the meaning behind Leader-Challenger. Is the intent to award full-suite (all components in a ship set) H/W production to both Leader and Challenger, with Leader receiving a majority ship set share? Or does the Navy envision splitting the H/W production by splitting the suite (e.g. main components to Leader, others to Challenger)? | The intent of a Leader-Challenger procurement strategy is to award a quantity of full-suite hardware production to both a Leader and Challenger. |
| 4 | RFI Solicitation Posting | Section 1: Synopsis, paragraph two | Is the Government assuming the role of Lead Systems Integrator (LSI) in the case of the stipulated potential “Leader/Challenger scenario” (separate contracts with “Leader” and “Challenger”), or is the intent that the “Leader” function as a prime contractor, with the “Challenger” as a subcontractor, and have scope/contractual responsibility as the LSI? | The Navy is considerating multiple procurement strategies for SEWIP Block 3 procurement. If the Navy pursued a Leader-Challenger procurement strategy, the Navy is considering the award of separate production contracts to a Leader and a Challenger. As part of this RFI, the Navy is interested in feedback on the procurement strategies discussed in the RFI as well as alternate strategies. |
| 5 | RFI Solicitation Posting | Section 1: Synopsis, paragraph three | Will the Navy complete the TDP prior to issuing the RFP and competing H/W production, or will the Navy compete production with the current TDP, and enact changes to complete the TDP after award? | The Navy plans to provide a complete, updated TDP as part of a solicitation. The Navy anticipates setting up a bidders library as part of the process in order to update industry with additional information as applicable. |
| 6 | RFI - Attachement #4 | Attachment #4 - Configuration Column | Can the Navy please clarify the Hemisphere, Quadrant, and Scaled configurations and how they will be deployed on the ship. Hemisphere entails two (2) quadrants on the top-side equipment group (TEG) including AESAs with full back-end? Does the Scaled configuration entail four (4) full quadrants of top-side equipment for fewer than four? | Please refer to the separate file "SEWIP Block 3 RFI Hemi-Quad-Scale Response 2.1.2019" for more details on the Hemisphere, Quadrant, and Scaled configurations. This attachment has been emailed separately to all parties that have requested the GFI. |
| 7 | RFI Solicitation Posting | Section 3: Requirements Overview | Does the overall SEWIP Block 3 architecture (logical and physical) meet the Navy’s requirements? | The Navy intends to procure SEWIP Block 3 in accordance with the TDP. |
| 8 | RFI Solicitation Posting | Section 3: Requirements Overview | Are there specific requirements not being met by the current SEWIP Block 3 H/W design (as described in the TDP), and does the Navy desire to make changes in the design (TDP) to address performance shortfalls? |
a. Does the system meet the Navy’s threshold requirements for EIRP over band, both Low Band and High Band?
b. Does the system meet the Navy’s threshold requirements for Tx-Rx Array isolation, both Low Band and High Band?
c. Do the Low Band and High Band Tx Arrays meet side-lobe control requirements?
d. Does the Techniques Generator meet the Navy’s threshold requirements?
e. Does the overall system meet end-to-end timing / response time requirements? The Navy intends to procure SEWIP Block 3 in accordance with the TDP.