N00024-19-R-5380-0003_(Mod).docx

DOCX document 59 KB Posted

Attached to
FY19-23 MK 41 Vertical Launching System (VLS) Canister Production
Solicitation number
N00024-19-R-5380
Issued by

About this file

This document is a modification to a federal contract solicitation for the production of MK 41 Vertical Launching System (VLS) canisters and associated hardware. The solicitation requires the production of various MK canisters including the MK 13, MK 14, MK 21, MK 25, and MK 29 at rates of up to 16 units per month. Ancillary items include coding plug assemblies, explosive bolts, impulse cartridges, and interface converter assemblies. Option items include canister refurbishment using expended canisters as government furnished property, production readiness reviews, first article testing, and physical configuration audits. Delivery dates range from 12 to 14 months after contract or option award. Packaging and warranty requirements are specified. Inspection and acceptance will be conducted by government representatives. The Naval Sea Systems Command is the contracting agency.

N00024-19-R-5380-0003 (Mod)

View the file

Other files

File Type Posted
N00024-19-R-5380-0003_(Conformed).docx DOCX document
Attachment_22,_Step_Ladder_Pricing_4.18.2019.xls XLS spreadsheet
Attachment_26_-_DFARS_252.227-7018.xlsx XLSX spreadsheet
Attachment_25_-_DFARS_252.227-7017.xlsx XLSX spreadsheet
19-R-5380_Bidders_Q&A_4.25.2019.xlsx XLSX spreadsheet
19-R-5380_Bidders_Q&A_4.16.2019.xlsx XLSX spreadsheet
N00024-19-R-5380-0002_(Mod).docx DOCX document
Exhibit_A_and_B,_N00024-19-R-5380_CDRL_4.9.2019.pdf PDF
N00024-19-R-5380-0002_(Conformed).docx DOCX document
Attachment_22,_Step_Ladder_Pricing_4.1.2019.xls XLS spreadsheet
Attachment_10,_Warranty_tracking_4.1.2019.xls XLS spreadsheet
Attachment_10,_Warranty_tracking_3.20.2019.xls XLS spreadsheet
N00024-19-R-5380-0001.docx DOCX document
Attachment_22,_Step_Ladder_Pricing_3.7.2019.xls XLS spreadsheet
N00024-19-R-5380-0001_(Conformed).docx DOCX document
19-R-5380_Bidders_Q&A_3.28.2019.xlsx XLSX spreadsheet
Attachment_1,_SOW_3.26.19.docx DOCX document
19-R-5380_Bidders_Q&A_3.19.2019.xlsx XLSX spreadsheet
N00024-19-R-5380.pdf PDF
RFP_Attachments.zip ZIP file
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002419R5380

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0101

The option status has changed from No Status to Option.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

Option Items 0101, 0201, 0301, 0401 and 0501– MK 13 MOD 0 Canisters w/PHS&T:

The MK 13 MOD 0 Canisters with Packaging, Handling, Storage and Transportation (PHS&T) delivered under this CLIN shall meet the requirements of the Critical Item Performance Specifications (CIPS), Weapon Specification WS-20318, the MK 13 MOD 0 Canister Parameters Document, NAVSEA Drawing No. 7116148, and the Statement of Work, Attachment 1. The contractor shall warrant the MK 13 MOD 0 Canisters with PHS&T to conform to these design, manufacturing, and performance requirements, and to be free from defects in material and workmanship for five years from date of acceptance, as described in Warranty Tracking Information, Attachment 10.

Option Items 0102, 0202, 0302, 0402 and 0502– MK 14 MOD 2 Canisters w/PHS&T:

The MK 14 MOD 2 Canisters with Packaging, Handling, Storage and Transportation (PHS&T) delivered under this CLIN shall meet the requirements of the Critical Item Performance Specifications (CIPS), Weapon Specification WS-20318, the MK 14 MOD 2 Canister Parameters Document, NAVSEA Drawing No. 7251170, and the Statement of Work, Attachment 1. The contractor shall warrant the MK 14 MOD 2 Canisters with PHS&T to conform to these design, manufacturing, and performance requirements, and to be free from defects in material and workmanship for five years from date of acceptance, as described in Warranty Tracking Information, Attachment 10.

Item 0103 and Option Items 0203, 0303, 0403 and 0503 – MK 21 MOD 2 Canisters w/PHS&T:

The MK 21 MOD 2 Canisters with Packaging, Handling, Storage and Transportation (PHS&T) delivered under this CLIN shall meet the requirements of the Critical Item Performance Specifications (CIPS), Weapon Specification WS-20318, the MK 21 MOD 2 Canister Parameters Document, NAVSEA Drawing No. 7251721, and the Statement of Work, Attachment 1. The contractor shall warrant the MK 21 MOD 2 Canisters with PHS&T to conform to these design, manufacturing, and performance requirements, and to be free from defects in material and workmanship for five years from date of acceptance, as described in Warranty Tracking Information, Attachment 10.

Option Items 0104, 0204, 0304, 0404 and 0504 – MK 21 MOD 3 Canisters w/PHS&T:

The MK 21 MOD 3 Canisters with Packaging, Handling, Storage and Transportation (PHS&T) delivered under this CLIN shall meet the requirements of the CIPS, Weapon Specification WS-20318, the MK 21 MOD 3 Canister Parameters Document, NAVSEA Drawing No. 8240134, and the Statement of Work, Attachment 1. The contractor shall warrant the MK 21 MOD 3 Canisters with PHS&T to conform to these design, manufacturing, and performance requirements, and to be free from defects in material and workmanship for five years from date of acceptance, as described in Warranty Tracking Information, Attachment 10.

Option Items 0105, 0205, 0305, 0405 and 0505 – MK 21 MOD 4 Canisters w/PHS&T:

The MK 21 MOD 4 Canisters with Packaging, Handling, Storage and Transportation (PHS&T) delivered under this CLIN shall meet the requirements of the CIPS, Weapon Specification WS-20318, the MK 21 MOD 4 Canister Parameters Document, NAVSEA Drawing No. 8408670, and the Statement of Work, Attachment 1. The contractor shall warrant the MK 21 MOD 4 Canisters with PHS&T to conform to these design, manufacturing, and performance requirements, and to be free from defects in material and workmanship for five years from date of acceptance, as described in Warranty Tracking Information, Attachment 10.

Option Items 0106 and 0206 – MK 25 MOD 0 Canister w/PHS&T:

The MK 25 MOD 0 Canisters with Packaging, Handling, Storage and Transportation (PHS&T) delivered under this CLIN shall meet the requirements of the CIPS, Weapon Specification WS-20318, the MK 25 MOD 0 Canister Parameters Document, NAVSEA Drawing No. 7116999, and the Statement of Work, Attachment 1. The contractor shall warrant the MK 25 MOD 0 Canisters with PHS&T to conform to these design, manufacturing, and performance requirements, and to be free from defects in material and workmanship for five years from date of acceptance, as described in Warranty Tracking Information, Attachment 10.

Item 0107 and Option Items 0207, 0307, 0407 and 0507 – MK 25 MOD 1 Canister w/PHS&T:

The MK 25 MOD 1 Canisters with Packaging, Handling, Storage and Transportation (PHS&T) delivered under this CLIN shall meet the requirements of the CIPS, Weapon Specification WS-20318, the MK 25 MOD 1 Canister Parameters Document, NAVSEA Drawing No. 8408701, and the Statement of Work, Attachment 1. The contractor shall warrant the MK 25 MOD 1 Canisters with PHS&T to conform to these design, manufacturing, and performance requirements, and to be free from defects in material and workmanship for five years from date of acceptance, as described in Warranty Tracking Information, Attachment 10.

Item 0108 and Option Items 0208, 0308, 0408 and 0508 – MK 29 MOD 0 Canister w/PHS&T:

The MK 29 MOD 0 Canisters with Packaging, Handling, Storage and Transportation (PHS&T) delivered under this CLIN shall meet the requirements of the CIPS, Weapon Specification WS-20318, the MK 29 MOD 0 Canister Parameters Document, NAVSEA Drawing No. 8407574, and the Statement of Work, Attachment 1. The contractor shall warrant the MK 29 MOD 0 Canisters with PHS&T to conform to these design, manufacturing, and performance requirements, and to be free from defects in material and workmanship for five years from date of acceptance, as described in Warranty Tracking Information, Attachment 10.

Option Items 0109, 0209, 0309, 0409, and 0509 – Renewed GFP MK 14 MOD 2 Expended Canisters:

The contractor shall fabricate, construct, assemble, test and deliver MK 14 MOD 2 Canisters with Packaging, Handling, Storage and Transportation (PHS&T) to meet the requirements of the Critical Item Performance Specification (CIPS), Weapon Specification WS-20318, and the MK 14 MOD 2 Canister Parameters Document, and ensure delivered canisters are in accordance with NAVSEA Drawing No. 7251170 and the Statement of Work, Attachment 1.

Attachment 3, Government Furnished Property, will be updated at option exercise and lists material the contractor shall use for renewing MK 14 MOD 2 Canisters under CLINs 0109, 0209, 0309, 0409 and 0509 in accordance with the following:

GOVERNMENT FURNISHED PROPERTY - EXPENDED MK 14 MOD 2 CANISTERS WITH PHS&T

The contractor shall take possession of the EXPENDED MK 14 MOD 2 Canisters, set forth in Attachment 3. Those assets will become the contractor’s property once received and no longer be considered GFP. The expended canisters will be provided in "as is" condition. The contractor will receive enough MK 14 MOD 2 expended assets to fulfill all requirements under these CLINs. The contractor may use components from the expended canister as long as the canister being delivered meets all requirements, including warranty.

Furthermore, the contractor shall be responsible for managing and disposing of any and all material remaining from the EXPENDED MK 14 MOD 2 Canisters not used in building canisters in accordance with all applicable Local, State and Federal laws and regulations. The material being disposed of shall be rendered inoperable for its intended military use. The EXPENDED MK 14 MOD 2 Canisters contain hazardous materials. The contractor is responsible for all costs associated with managing and disposing of these EXPENDED MK 14 MOD 2 Canisters.

Option Items 0110, 0210, 0310, 0410 and 0510 – Renewed GFP MK 13 MOD 0 Expended Canisters:

The contractor shall fabricate, construct, assemble, test and deliver MK 13 MOD 0 Canisters with Packaging, Handling, Storage and Transportation (PHS&T) to meet the requirements of the Critical Item Performance Specification (CIPS), Weapon Specification WS-20318, and the MK 13 MOD 0 Canister Parameters Document, and ensure delivered canisters are in accordance with NAVSEA Drawing No. 7116148, and the Statement of Work, Attachment 1.

Attachment 3, Government Furnished Property, will be updated at option exercise and lists material the contractor shall use for renewing MK 13 MOD 0 Canisters under CLINs 0110, 0210, 0310, 0410 and 0510 in accordance with the following:

GOVERNMENT FURNISHED PROPERTY - EXPENDED MK 13 MOD 0 CANISTERS WITH PHS&T

The contractor shall take possession of the EXPENDED MK 13 MOD 0 Canisters, set forth in Attachment 3. Those assets will become the contractor’s property once received and no longer be considered GFP. The expended canisters will be provided in "as is" condition. The contractor will receive enough MK 13 MOD 0 expended assets to fulfill all requirements under these CLINs. The contractor may use components from the expended canister as long as the canister being delivered meets all requirements, including warranty.

Furthermore, the contractor shall be responsible for managing and disposing of any and all material remaining from the EXPENDED MK 13 MOD 0 Canisters not used in building canisters in accordance with all applicable Local, State and Federal laws and regulations. The material being disposed of shall be rendered inoperable for its intended military use. The EXPENDED MK 13 MOD 0 Canisters contain hazardous materials. The contractor is responsible for all costs associated with managing and disposing of these EXPENDED MK 13 MOD 0 Canisters.

Option Items 0111AA, 0211AA, 0311AA, 0411AA and 0511AA – Renewed GFP MK 25 MOD 0 Expended Canisters:

The contractor shall fabricate, construct, assemble, test and deliver MK 25 MOD 0 Canisters with Packaging, Handling, Storage and Transportation (PHS&T) to meet the requirements of the Critical Item Performance Specification (CIPS), Weapon Specification WS-20318, and the MK 25 MOD 0 Canister Parameters Document, and ensure delivered canisters are in accordance with NAVSEA Drawing No. 7116999, and the Statement of Work, Attachment 1.

Attachment 3, Government Furnished Property, will be updated at option exercise and lists material the contractor shall use for renewing MK 25 MOD 0 Canisters under CLINs 0111AA, 0211AA, 0311AA, 0411AA and 0511AA in accordance with the following:

GOVERNMENT FURNISHED PROPERTY - EXPENDED MK 25 MOD 0 CANISTERS WITH PHS&T

The contractor shall take possession of the EXPENDED MK 25 MOD 0 Canisters, set forth in Attachment 3. Those assets will become the contractor’s property once received and no longer be considered GFP. The expended canisters will be provided in "as is" condition. The contractor will receive enough MK 25 MOD 0 expended assets to fulfill all requirements under these CLINs. The contractor may use components from the expended canister as long as the canister being delivered meets all requirements, including warranty.

Furthermore, the contractor shall be responsible for managing and disposing of any and all material remaining from the EXPENDED MK 25 MOD 0 Canisters not used in building canisters in accordance with all applicable Local, State and Federal laws and regulations. The material being disposed of shall be rendered inoperable for its intended military use. The EXPENDED MK 25 MOD 0 Canisters contain hazardous materials. The contractor is responsible for all costs associated with managing and disposing of these EXPENDED MK 25 MOD 0 Canisters.

Option Items 0311AB, 0411AB and 0511AB – Renewed GFP MK 25 MOD 1 Expended Canister:

The contractor shall fabricate, construct, assemble, test and deliver MK 25 MOD 1 Canisters with Packaging, Handling, Storage and Transportation (PHS&T) to meet the requirements of the Critical Item Performance Specification (CIPS), Weapon Specification WS-20318, and the MK 25 MOD 1 Canister Parameters Document, and ensure delivered canisters are in accordance with NAVSEA Drawing No. 8408701, and the Statement of Work, Attachment 1.

Attachment 3, Government Furnished Property, will be updated at option exercise and lists material the contractor shall use for renewing MK 25 MOD 1 Canisters under CLINs 0311AB, 0411AB and 0511AB in accordance with the following:

GOVERNMENT FURNISHED PROPERTY - EXPENDED MK 25 MOD 1 CANISTERS WITH PHS&T

The contractor shall take possession of the EXPENDED MK 25 MOD 1 Canisters, set forth in Attachment 3. Those assets will become the contractor’s property once received and no longer be considered GFP. The expended canisters will be provided in "as is" condition. The contractor will receive enough MK 25 MOD 1 expended assets to fulfill all requirements under these CLINs. The contractor may use components from the expended canister as long as the canister being delivered meets all requirements, including warranty.

Furthermore, the contractor shall be responsible for managing and disposing of any and all material remaining from the EXPENDED MK 25 MOD 1 Canisters not used in building canisters in accordance with all applicable Local, State and Federal laws and regulations. The material being disposed of shall be rendered inoperable for its intended military use. The EXPENDED MK 25 MOD 1 Canisters contain hazardous materials. The contractor is responsible for all costs associated with managing and disposing of these EXPENDED MK 25 MOD 1 Canisters.

Option Items 0112AA, 0212AA, 0312AA, 0412AA and 0512AA – Renewed GFP MK 21 MOD 2 Expended Canisters:

The contractor shall fabricate, construct, assemble, test and deliver MK 21 MOD 2 Canisters with Packaging, Handling, Storage and Transportation (PHS&T) to meet the requirements of the Critical Item Performance Specification (CIPS), Weapon Specification WS-20318, and the MK 21 MOD 2 Canister Parameters Documents, and ensure delivered canisters are in accordance with NAVSEA Drawing No. 7251721 and the Statement of Work, Attachment 1.

Attachment 3, Government Furnished Property, will be updated at option exercise and lists material the contractor shall use for renewing MK 21 MOD 2 Canisters under CLINs 0112AA, 0212AA, 0312AA, 0412AA, and 0512AA in accordance with the following:

GOVERNMENT FURNISHED PROPERTY - EXPENDED MK 21 MOD 2 CANISTERS WITH PHS&T

The contractor shall take possession of the EXPENDED MK 21 MOD 2 Canisters, set forth in Attachment 3. Those assets will become the contractor’s property once received and no longer be considered GFP. The expended canisters will be provided in "as is" condition. The contractor will receive enough MK 21 MOD 2 expended assets to fulfill all requirements under these CLINs. The contractor may use components from the expended canister as long as the canister being delivered meets all requirements, including warranty.

Furthermore, the contractor shall be responsible for managing and disposing of any and all material remaining from the EXPENDED MK 21 MOD 2 Canisters not used in building canisters in accordance with all applicable Local, State and Federal laws and regulations. The material being disposed of shall be rendered inoperable for its intended military use. The EXPENDED MK 21 MOD 2 Canisters contain hazardous materials. The contractor is responsible for all costs associated with managing and disposing of these EXPENDED MK 21 MOD 2 Canisters.

Option Items 0112AB, 0212AB, 0312AB, 0412AB and 0512AB – Renewed GFP MK 21 MOD 3 Expended Canisters:

The contractor shall fabricate, construct, assemble, test and deliver MK 21 MOD 3 Canisters with Packaging, Handling, Storage and Transportation (PHS&T) to meet the requirements of the Critical Item Performance Specification (CIPS), Weapon Specification WS-20318, and the MK 21 MOD 3 Canister Parameters Documents, and ensure delivered canisters are in accordance with NAVSEA Drawing No. 8240134, 8240134 and the Statement of Work, Attachment 1.

Attachment 3, Government Furnished Property, will be updated at option exercise and lists material the contractor shall use for renewing MK 21 MOD 3 Canisters under CLINs 0112AB, 0212AB, 0312AB, 0412AB, and 0512AB in accordance with the following:

GOVERNMENT FURNISHED PROPERTY - EXPENDED MK 21 MOD 3 CANISTERS WITH PHS&T

The contractor shall take possession of the EXPENDED MK 21 MOD 3 Canisters, set forth in Attachment 3. Those assets will become the contractor’s property once received and no longer be considered GFP. The expended canisters will be provided in "as is" condition. The contractor will receive enough MK 21 MOD 3 expended assets to fulfill all requirements under these CLINs. The contractor may use components from the expended canister as long as the canister being delivered meets all requirements, including warranty.

Furthermore, the contractor shall be responsible for managing and disposing of any and all material remaining from the EXPENDED MK 21 MOD 3 Canisters not used in building canisters in accordance with all applicable Local, State and Federal laws and regulations. The material being disposed of shall be rendered inoperable for its intended military use. The EXPENDED MK 21 MOD 3 Canisters contain hazardous materials. The contractor is responsible for all costs associated with managing and disposing of these EXPENDED MK 21 MOD 3 Canisters.

Item 0113 and Option Items 0213, 0313, 0413, and 0513 – Coding Plug Assemblies:

The contractor shall fabricate, construct, assemble, test and deliver coding plug assemblies for each MK 13 MOD 0, MK 14 MOD 2, MK 15 MOD 1, MK 21 MOD 2, MK 21 MOD 3, MK 21 MOD 4 and MK 29 MOD 0 Canister in accordance with NAVSEA Drawing No. 6264000-19 and the Statement of Work, Attachment 1. The contractor shall warrant the coding plug assemblies to conform to these design, manufacturing, and performance requirements, and to be free from defects in material and workmanship for five years from date of acceptance, as described in Warranty Tracking Information, Attachment 10.

Item 0119 and Option Items 0219, 0319, 0419, and 0519 – Coding Plug Assemblies:

The contractor shall fabricate, construct, assemble, test and deliver coding plug assemblies for each MK 25 MOD 0 and MK 25 MOD 1 Canister in accordance with NAVSEA Drawing No. 7117132 and the Statement of Work, Attachment 1. The contractor shall warrant the coding plug assemblies to conform to these design, manufacturing, and performance requirements, and to be free from defects in material and workmanship for five years from date of acceptance, as described in Warranty Tracking Information, Attachment 10.

Option Items 0124, 0224, 0324, 0424, and 0524 – MK 7 MOD 0 Explosive Bolt:

The contractor shall fabricate, construct, assemble, test and deliver MK 7 MOD 0 Explosive Bolts for each MK 21 MOD 2, MK 21 MOD 3, MK 21 MOD 4 and MK 29 MOD 0 Canister in accordance with NAVSEA Drawing No. 6261661 and the Statement of Work, Attachment 1. The contractor shall warrant the MK 7 MOD 0 Explosive Bolts to conform to these design, manufacturing, and performance requirements, and to be free from defects in material and workmanship for one year from date of acceptance, as described in Warranty Tracking Information, Attachment 10.

Option Items 0125, 0225, 0325, 0425, and 0525 – MK 236 MOD 1 Impulse Cartridge Assembly:

The contractor shall fabricate, construct, assemble, test and deliver MK 236 MOD 1 Impulse Cartridge Assemblies for each MK 21 MOD 2, MK 21 MOD 3, MK 21 MOD 4 and MK 29 MOD 0 Canister in accordance with NAVSEA Drawing No. 7546126-1 and the Statement of Work, Attachment 1. The contractor shall warrant the MK 236 MOD 1 Impulse Cartridge Assemblies to conform to these design, manufacturing, and performance requirements, and to be free from defects in material and workmanship for one year from date of acceptance, as described in Warranty Tracking Information, Attachment 10.

Item 0126 and Option Items 0226, 0326, 0426 and 0526 - MK 8 MOD 0 Explosive Bolt:

The contractor shall fabricate, construct, assemble, test and deliver each lot of 4 MK 8 MOD 0 Explosive Bolts for MK 25 MOD 0 and MK 25 MOD 1 Canisters in accordance with NAVSEA Drawing No. 6784421 and the Statement of Work, Attachment 1. The contractor shall warrant the MK 8 MOD 0 Explosive Bolts to conform to these design, manufacturing, and performance requirements, and to be free from defects in material and workmanship for one year from date of acceptance, as described in Warranty Tracking Information, Attachment 10.

Option Item 0128 – Preliminary and Final Production Readiness Reviews

The Government will conduct a single Preliminary Production Readiness Review and a single Final Production Readiness Review, as described and scheduled in Statement of Work, Attachment 1 Section 5.0. The contractor shall provide engineering, technical, administrative, and management support for these reviews.

Option Item 0129 – Aft Closure First Article Test

The contractor shall plan, conduct, and report the results of Aft Closure First Article Tests, as described in Statement of Work, Attachment 1 Section 7.0 and 7.1.

Option Items 0130, 0230, 0330, 0430 and 0530 – MK 13 MOD 0 Physical Configuration Audit

The Government will perform a Physical Configuration Audit (PCA) of the first MK 13 MOD 0 canister assembly with PHS&T built by the contractor, as described in the Statement of Work, Attachment 1 Section 6.0. The contractor shall provide qualified engineering, technical, manufacturing, administrative, management and other support as necessary for this Government audit. The contractor shall provide a work area, materials, documentation, and reporting as described in the Statement of Work, Attachment 1 Section 6.0.

Option Item 0131 – MK 13 MOD 0 Forward Closure First Article Test

The contractor shall plan, conduct, and report the results of MK 13 MOD 0 Forward Closure First Article Tests, as described in Statement of Work, Attachment 1 Section 7.0 and 7.2.

Option Items 0132, 0232, 0332, 0432 and 0532 – MK 21 MOD 2 Physical Configuration Audit

The Government will perform a Physical Configuration Audit (PCA) of the first MK 21 MOD 2 canister assembly with PHS&T built by the contractor, as described in the Statement of Work, Attachment 1 Section 6.0. The contractor shall provide qualified engineering, technical, manufacturing, administrative, management and other support as necessary for this Government audit. The contractor shall provide a work area, materials, documentation, and reporting as described in the Statement of Work, Attachment 1 Section 6.0.

Option Item 0133 – MK 21 MOD 2 First Article Test

The contractor shall plan, conduct, and report the results of MK 21 MOD 2 First Article Tests, as described in Statement of Work, Attachment 1 Section 7.0 and 7.3.

Option Items 0134, 0234, 0334, 0434 and 0534 – MK 21 MOD 4 Physical Configuration Audit

The Government will perform a Physical Configuration Audit (PCA) of the first MK 21 MOD 4 canister assembly with PHS&T built by the contractor, as described in the Statement of Work, Attachment 1 Section 6.0. The scope of this PCA will include the parts and processes of the MK 21 MOD 4 canister assembly with PHS&T that are not common to the MK 21 MOD 3 canister assembly with PHS&T. The contractor shall provide qualified engineering, technical, manufacturing, administrative, management and other support as necessary for this Government audit. The contractor shall provide a work area, materials, documentation, and reporting as described in the Statement of Work, Attachment 1 Section 6.0.

Option Item 0135 – MK 21 MOD 4 First Article Test

The contractor shall plan, conduct, and report the results of MK 21 MOD 4 First Article Tests, as described in Statement of Work, Attachment 1 Section 7.0 and 7.4.

Option Items 0136, 0236, 0336, 0436 and 0536 – MK 25 MOD 1 Physical Configuration Audit

The Government will perform a Physical Configuration Audit (PCA) of the first MK 25 MOD 1 canister assembly with PHS&T built by the contractor, as described in the Statement of Work, Attachment 1 Section 6.0. The contractor shall provide qualified engineering, technical, manufacturing, administrative, management and other support as necessary for this Government audit. The contractor shall provide a work area, materials, documentation, and reporting as described in the Statement of Work, Attachment 1 Section 6.0.

Option Item 0137 – MK 25 MOD 1 First Article Test

The contractor shall plan, conduct, and report the results of MK 25 MOD 1 First Article Tests, as described in Statement of Work, Attachment 1 Section 7.0 and 7.5.

Option Items 0138, 0238, 0338, 0438 and 0538 – MK 29 MOD 0 Physical Configuration Audit

The Government will perform a Physical Configuration Audit (PCA) of the first MK 29 MOD 0 canister assembly with PHS&T built by the contractor, as described in the Statement of Work, Attachment 1 Section 6.0. The contractor shall provide qualified engineering, technical, manufacturing, administrative, management and other support as necessary for this Government audit. The contractor shall provide a work area, materials, documentation, and reporting as described in the Statement of Work, Attachment 1 Section 6.0.

Option Item 0139 – MK 29 MOD 0 First Article Test

The contractor shall plan, conduct, and report the results of MK 29 MOD 0 First Article Tests, as described in Statement of Work, Attachment 1 Section 7.0 and 7.6.

Option Items 0140, 0240, 0340, 0440 and 0540 - MK 10 MOD 1 Explosive Bolt:

The contractor shall fabricate, construct, assemble, test and deliver MK 10 MOD 1 Explosive Bolts for MK 21 MOD 2, MOD 3, MOD 4 and MK 29 MOD 0 Canisters in accordance with NAVSEA Drawing No. 8568603 and the Statement of Work, Attachment 1. The contractor shall warrant the MK 10 MOD 1 Explosive Bolts to conform to these design, manufacturing, and performance requirements, and to be free from defects in material and workmanship for one year from date of acceptance, as described in Warranty Tracking Information, Attachment 10.

Option Items 0141AA, 0241AA, 0341AA, 0441AA, and 0541AA – MK 41 Launcher Support Equipment Spares for Yorktown:

The contractor shall fabricate, construct, assemble, test and deliver MK 41 Launcher Support Equipment Spares in accordance with Attachment 20 and the Statement of Work, Attachment 1. The contractor shall warrant the MK 41 Launcher Support Equipment Spares to conform to these design, manufacturing, and performance requirements, and to be free from defects in material and workmanship for one year from date of acceptance, as described in Warranty Tracking Information, Attachment 10.

Option Items 0141AB, 0241AB, 0341AB, 0441AB, and 0541AB – MK 41 Launcher Support Equipment Spares for Seal Beach:

The contractor shall fabricate, construct, assemble, test and deliver MK 41 Launcher Support Equipment Spares in accordance with Attachment 21 and the Statement of Work, Attachment 1. The contractor shall warrant the MK 41 Launcher Support Equipment Spares to conform to these design, manufacturing, and performance requirements, and to be free from defects in material and workmanship for one year from date of acceptance, as described in Warranty Tracking Information, Attachment 10.

Option Items 0142, 0242, 0342, 0442 and 0542 – Interface Converter Ethernet Assemblies:

The contractor shall fabricate, construct, assemble, test and deliver Interface Converter Ethernet Assemblies to support MK 21 MOD 4 Canisters in accordance with NAVSEA Drawing 7572348 and the Statement of Work, Attachment 1. The contractor shall warrant the MK 41 Interface Converter Ethernet Assemblies to conform to these design, manufacturing, and performance requirements, and to be free from defects in material and workmanship for five years from date of acceptance, as described in Warranty Tracking Information, Attachment 10.

SECTION D - PACKAGING AND MARKING

Items 0103, 0107, 0108 and Option Items 0101, 0102, 0104, 0105, 0106, 0109, 0110, 0111AA, 0112AA, 0112AB, 0201- 0208, 0209, 0210, 0211AA, 0212AA, 0212AB, 0301-0305, 0307-0310, 0311AA, 0311AB, 0312AA, 0312AB, 0401-0405, 0407-0410, 0411AA, 0411AB, 0412AA, 0412AB, 0501- 0505, 0507-0510, 0511AA, 0511AB, 0512AA, and 0512AB The contractor shall package, pack and mark all Canister Assemblies procured hereunder in accordance with NAVSEA Drawing No. 5599182. The contractor shall package and secure all unattached cables, unattached piping and unconnected connectors to prevent movement, chaffing and foreign object contamination. This may be accomplished by the use of appropriate cushioning materials (i.e. bubble wrap), connector protective dust covers, cable ties, lacing cord or other means. The Canister Assemblies with PHS&T will be loaded on a truck in accordance with NAVSEA Drawing No. 5599192. In addition, all shipping documents and containers shall identify:

(1)Government (as applicable) Navy
(2)FMS Case No. (if applicable)
(3)Contract Number
(4)Equipment nomenclature MK/MOD designation
(5)Equipment Part Number
(6)NAVSEA Serial Number, if applicable
(7)National Stock Number (if known)
(8)Quantity of Items delivered
(9)Allowance Parts List (APL)/Allowance Equipment List (AEL) number (if applicable)
(10)Equipment Shortages in the shipment
(11)Date shortages will be supplied
(12)Directions if any components of the shipment are to be returned to point of origin
(13)Government representative and telephone number at the shipment point of origin.
(14)Condition Code Tags affixed in accordance with MIL-STD 129 (DD Form 1576)
(15)Canisters labeled as “Empty” in Accordance with MIL-STD-129P

Items 0113, 0119 and Option Items 0141AA, 0141AB, 0142, 0213, 0219, 0241AA, 0241AB, 0242, 0313, 0319, 0341AA, 0341AB, 0342, 0413, 0419, 0441AA, 0441AB, 0442, 0513, 0519, 0541AA, 0541AB, and 0542 The contractor shall package, pack and mark all equipment procured hereunder in accordance with best commercial practices. In addition, all shipping documents and containers shall identify:

(1)Government (as applicable) Navy
(2)FMS Case No. (if applicable)
(3)Contract Number
(4)Equipment nomenclature MK/MOD designation
(5)Equipment Part Number
(6)NAVSEA Serial Number, if applicable
(7)National Stock Number (if known)
(8)Quantity of Items delivered
(9)Allowance Parts List (APL)/Allowance Equipment List (AEL) number (if applicable)
(10)Equipment Shortages in the shipment
(11)Date shortages will be supplied
(12)Directions if any components of the shipment are to be returned to point of origin
(13)Government representative and telephone number at the shipment point of origin.

Item 0126 and Option Items 0124, 0125, 0140, 0224, 0225, 0226, 0240, 0324, 0325, 0326, 0340, 0424, 0425, 0426, 0440, 0524, 0525, 0526, and 0540 The contractor shall package, pack and mark all equipment procured hereunder in accordance with "Level A Packaging and Packing" of Military Specification MILE17555H or the latest revision as of the date of the solicitation. In addition, all shipping documents and containers shall identify:

(1)Government (as applicable) Navy
(2)FMS Case No. (if applicable)
(3)Contract Number
(4)Equipment nomenclature MK/MOD designation
(5)Equipment Part Number
(6)NAVSEA Serial Number, if applicable
(7)National Stock Number (if known)
(8)Quantity of Items delivered
(9)Allowance Parts List (APL)/Allowance Equipment List (AEL) number (if applicable)
(10)Equipment Shortages in the shipment
(11)Date shortages will be supplied
(12)Directions if any components of the shipment are to be returned to point of origin
(13)Government representative and telephone number at the shipment point of origin.

HQ D-1-0007 WARRANTY NOTIFICATION FOR ITEMS- ALTERNATE I (NAVSEA) (APR 2015)

ITEMS: 0103, 0107, 0108, 0113, 0119 and Option Items 0101, 0102, 0104, 0105, 0106, 0109, 0110, 0111AA, 0112AA, 0112AB, 0141AA, 0141AB, 0142, 0201- 0210, 0211AA, 0212AA, 0212AB, 0213, 0219, 0241AA, 0241AB, 0242, 0301- 0305, 0307-0310, 0311AA, 0311AB, 0312AA, 0312AB, 0313, 0319, 0341AA, 0341AB, 0342, 0401- 0405, 0407-0410, 0411AA, 0411AB, 0412AA, 0412AB, 0413, 0419, 0441AA, 0441AB, 0442, 0501- 0505, 0507-0510, 0511AA, 0511AB, 0512AA, 0512AB, 0513, 0519, 0541AA, 0541AB, and 0542

The contractor shall apply a permanent warranty notification stamping or marking on each warranted deliverable end item and its container in accordance with MIL-STD-129R dated 18 February 2014 and MIL-STD-130N(1) dated 16 November 2012. The notification shall be placed in close proximity to other required stamping or markings so as to be easily readable by personnel. The warranty notification shall read:

THIS ITEM WARRANTED UNDER CONTRACT
N00024-XX-C-5380 TO CONFORM TO DESIGN,
MANUFACTURING, AND PERFORMANCE REQUIREMENTS
AND BE FREE FROM DEFECTS IN MATERIAL AND
WORKMANSHIP FOR FIVE YEARS FROM
DATE OF ACCEPTANCE. IF ITEM IS DEFECTIVE
NOTIFY PEO IWS 3L AND PCO.

ITEM: 0126 and Option Items 0124, 0125, 0140, 0224, 0225, 0226, 0240, 0324, 0325, 0326, 0340, 0424, 0425, 0426, 0440, 0524, 0525, 0526, and 0540

The contractor shall apply a permanent warranty notification stamping or marking on each warranted deliverable end item and its container in accordance with MIL-STD-129P(4) dated 19 September 2007 and MIL-STD 130N dated 17 December 2007. The notification shall be placed in close proximity to other required stamping or markings so as to be easily readable by personnel. The warranty notification shall read:

THIS ITEM WARRANTED UNDER CONTRACT
N00024-XX-C-5380 TO CONFORM TO DESIGN,
MANUFACTURING, AND PERFORMANCE REQUIREMENTS
AND BE FREE FROM DEFECTS IN MATERIAL AND
WORKMANSHIP FOR ONE YEAR FROM
DATE OF ACCEPTANCE. IF ITEM IS DEFECTIVE
NOTIFY PEO IWS 3L AND PCO.

SECTION E - INSPECTION AND ACCEPTANCE

SECTION E

Items 0103, 0107, 0108, and Option Items 0101, 0102, 0104, 0105, 0106, 0109, 0110, 0111AA, 0112AA, 0112AB, 0201- 0210, 0211AA, 0212AA, 0212AB, 0301- 0305, 0307-0310, 0311AA, 0311AB, 0312AA, 0312AB, 0401- 0405, 0407-0410, 0411AA, 0411AB, 0412AA, 0412AB, 0501- 0505, 0507-0510, 0511AA, 0511AB, 0512AA, and 0512AB The Cognizant Government Representative at the Contractor's facility will provide Contract Quality Assurance (CQA) and acceptance at origin by signature on a DD-250 for the equipment under these CLIN/SLINs upon successful completion of applicable factory inspections and acceptance tests in accordance with the applicable canister Parameters Document for the applicable canister and the Statement of Work, Attachment 1. A final copy of the DD-250’s will be provided in IDE format mutually agreed to by NSWC DD H31. PDF will be provided to PEO IWS 3L/PHD NSWC, Code A66 via electronic transmission. Final copy will be available on CDMS with a notification sent to NSWC DD H31.

The contractor shall certify on the DD Form 250 that the canister meets the requirements of the Critical Item Performance Specification (CIPS).

Items 0113, 0119, 0126 and Option Items 0124, 0125, 0140, 0141AA, 0141AB, 0142, 0213, 0219, 0224, 0225, 0226, 0240, 0241AA, 0241AB, 0242, 0313, 0319, 0324, 0325, 0326, 0340, 0341AA, 0341AB, 0342, 0413, 0419, 0424, 0425, 0426, 0440, 0441AA, 0441AB, 0442, 0513, 0519, 0524, 0525, 0526, 0540, 0541AA, 0541AB, and 0542 - The Cognizant Government Representative at the Original Equipment Manufacturer's (OEM) plant or at the Contractor's facility will provide Contract Quality Assurance (CQA) and acceptance by signature on a DD-250 for the equipment under these CLINs upon successful completion of applicable factory inspections and acceptance tests in accordance with the Statement of Work, Attachment 1. A final copy of the DD-250’s will be provided in IDE format mutually agreed to by NSWC DD H31. PDF will be provided to PEO IWS 3L/PHD NSWC, Code A66 via electronic transmission. Final copy will be available on CDMS with a notification sent to NSWC DD H31.

APPLICABLE TO ALL CLINs:

In emergency situations as directed by the PCO, Inspection and Acceptance of detailed components and lower order assemblies may be conducted at vendor or subcontractor sites by an authorized Government Representative. Inspection for determining possible shipping damage will be at destination by an authorized Government Representative.

SECTION F - DELIVERIES OR PERFORMANCE

Option Items 0101, 0201, 0301, 0401, 0501 shall be delivered at a rate not to exceed sixteen (16) units per month within twelve (12) months after contract award or option exercise date, respectively.

Option Items 0102, 0202, 0302, 0402, 0502, shall be delivered at a rate not to exceed sixteen (16) units per month within twelve (12) months after option exercise date.

Item 0103, and if options exercised, 0203, 0303, 0403, 0503, shall be delivered at a rate not to exceed six (6) units per month within fourteen (14) months after contract award or option exercise date, respectively.

Option Items 0104, 0105, 0204, 0205, 0304, 0305, 0404, 0405, 0504, and 0505, shall be delivered at a rate not to exceed twelve (12) units per month within fourteen (14) months after contract award or option exercise date, respectively.

Item 0107, and if options exercised, 0106, 0206, 0207, 0307, 0407, and 0507shall be delivered at a rate not to exceed six (6) units per month within twelve (12) months after contract award or option exercise date, respectively.

Item 0108, and if options exercised, 0208, 0308, 0408, 0508 shall be delivered at a rate not to exceed six (6) units per month within fourteen (14) months after contract award or option exercise date, respectively.

Option Items 0109, 0209, 0309, 0409, 0509, shall be delivered at a rate not to exceed sixteen (16) units per month within twelve (12) months after option exercise date.

Option Items 0110, 0111AA, 0112AA, 0112AB, 0210, 0211AA, 0212AA, 0212AB, 0310, 0311AA, 0311AB, 0312AA, 0312AB, 0410, 0411AA, 0411AB, 0412AA, 0412AB, 0510, 0511AA, 0511AB, 0512AA, and 0512AB shall be delivered at a rate not to exceed six (6) units per month within twelve (12) months after option exercise date.

Option Item 0128 shall be delivered 270 days after option exercise date.

Option Items 0129-0139, 0230, 0232, 0234, 0236, 0238, 0330, 0332, 0334, 0336, 0338, 0430, 0432, 0434, 0436, 0438, 0530, 0532, 0534, 0536, and 0538 shall be delivered sixty (60) days after option exercise date.

Items 0113, 0119, 0126, and if options exercised, 0124, 0125, 0140, 0141AA, 0141AB, 0142, 0213, 0219, 0224, 0225, 0226, 0240, 0241AA, 0241AB, 0242, 0313, 0319, 0324, 0325, 0326, 0340, 0341AA, 0341AB, 0342, 0413, 0419, 0424, 0425, 0426, 0440, 0441AA, 0441AB, 0442, 0513, 0519, 0524, 0525, 0526, 0540, 0541AA, 0541AB, and 0542 shall be delivered twelve (12) months after contract award or option exercise date, respectively.

Dates below represent a placeholder for when and where deliveries will begin. This will be updated at time of award or option exercise.

SECTION I - CONTRACT CLAUSES

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989) (NAVSEA VARIATION I) (SEP 2009)

The Government may require the delivery of the numbered line item(s)/subline item(s), identified in the Schedule as an option item(s), in the quantity and at the price(s) stated in the Schedule. If more than one option exists, the Government has the right to unilaterally exercise any such option, in whole or in part up to the total quantity specified in the option item, whether or not it has exercised other options. Option(s) shall be exercised, if at all, by written or telegraphic notice(s) signed by the Contracting Officer and sent within the time(s) specified below:

ITEM(S) LATEST OPTION EXERCISE DATE

0101, 0102, 0104, 0105, 0106, 0109, 0110, 0111AA, 0112AA, 0112AB, 0113, 0119, 0124, 0125, 0128-0140, 0141AA, 0141AB, and 0142
90 days after contract award
0201 – 0210, 0211AA, 0212AA, 0212AB, 0213, 0219, 0224, 0225, 0226, 0230, 0232, 0234, 0236, 0238, 0240, 0241AA, 0241AB, and 0242
31 March 2020
0301 – 0305, 0307 - 0310, 0311AA, 0311AB, 0312AA, 0312AB, 0313, 0319, 0324, 0325, 0326, 0330, 0332, 0334, 0336, 0338, 0340, 0341AA, 0341AB, and 0342
31 March 2021
0401 – 0405, 0407 - 0410, 0411AA, 0411AB, 0412AA, 0412AB, 0413, 0419, 0424, 0425, 0426, 0430, 0432, 0434, 0436, 0438, 0440, 0441AA, 0441AB, and 0442
31 March 2022
0501 – 0505, 0507 - 0510, 0511AA, 0511AB, 0512AA, 0512AB, 0513, 0519, 0524, 0525, 0526, 0530, 0532, 0534, 0536, 0538, 0540, 0541AA, 0541AB, and 0542
31 March 2023

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following document(s), exhibit(s), and other attachment(s) form a part of this contract:

List of Solicitation Attachments:

J-S1 – Terms of Use Agreement J-S2 – Question Submittal Form J-S3 – Press Release Information Form J-S4 – CDRL Price Group

Exhibit A and B - Contract Data Requirements List (CDRL), DD Form 1423

List of Contract Attachments:

Attachment 1 - Statement of Work (SOW) – dated 26 March 2019 - 31 Pages

Attachment 2 - Technical Data Package and Associated Drawings - CD

Attachment 3 - Government Furnished Property – dated 12 July 2018 - 4 Pages

Attachment 4 - Make or Buy Plan, (Offeror to Propose), TBD Pages

Attachment 5 - MK 33 Loader With Encan/Decan Kits Location and Points of Contacts – dated 13 July 2018 - 1 Page

Attachment 6 - Instructions for Contractor Registration Interface Control Documents and Corporate Data Management System – dated 05 December 2018 - 1 Page

Attachment 7 - MK 41 VLS Standing Instruction 94-1F - dated 29 October 2004 - 12 Pages

Attachment 8 - MDA Requirements for MK 21 MOD 2 and MK 29 MOD 0 Canister Manufacturing, dated 29 October 2018 - 12 Pages

Attachment 9 – Small Business Plan, (Offeror to Propose), TBD Pages

Attachment 10 - Warranty Tracking Information – dated 01 April 2019 – 3 Pages

Attachment 11 - Warranty Repair Source Instructions, – dated 13 July 2018 - 3 Pages

Attachment 12 – Reserved

Attachment 13 - SLS-98-1 VLS Test Assessment Plan - dated 28 April 2016 - 12 Pages

Attachment 14 - Production Readiness Review Plan - dated 29 October 2018 - 13 Pages

Attachment 15 - Configuration Management Plan for the MK 41 Vertical Launch System, Vol. 1 Equipment (Hardware) Configuration Management - dated 1 August 2002 - CD

Attachment 16 - MK 21 Mod 3 Test Plan for Packaging, Handling, Storage and Transportation - dated April 2008 - CD

Attachment 17 - MK 680 Combined Missile Test Set Operation & Maintenance Overview - dated 13 January 2012 – CD

Attachment 18 – Reserved

Attachment 19 – Reserved

Attachment 20 – LSE Spares for WPNSTA Yorktown – dated 12 July 2018 – 4 Pages

Attachment 21 – LSE Spares for WPNSTA Seal Beach – dated 12 July 2018 – 4 Pages

Attachment 22 - Stepladder Pricing Spreadsheet – dated 18 April 2019, (Offeror to fill-in) – 20 Pages

Attachment 23 – Reserved

Attachment 24 - Government Furnished Information (GFI) – dated 13 July 2018 – 1 Page

Attachment 25 - DFARS 252.227-7017 Identification and Assertion of Restrictions on the Government’s Use, release or Disclosure of Technical Data or Computer Software, incorporated upon award, if applicable (Offeror to propose if applicable)

Attachment 26 - DFARS 252.227-7018 Technical Data or Computer Software Previously Delivered to the Government, incorporated upon award, if applicable (Offeror to propose if applicable)

Attachment 27 - Supplemental Information – Noncommercial Technical Data, Noncommercial Computer Software, Noncommercial Computer Software Documentation, incorporated upon award, if applicable (Offeror to propose if applicable)

Attachment 28 - Commercial Technical Data, Commercial Computer Software, and Commercial Computer Software Documentation – Government Use Restrictions, incorporated upon award, if applicable (Offeror to propose if applicable)

At contract award, the Contracting Officer reserves the right to unilaterally incorporate the successful offeror’s proposed Attachment(s), 4, 9, 22, 25, 26, 27, and 28.

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it. Updated .