CDRL_Data_Package_for_N00024-19-R-5111_06JUN2019Signed.pdf
PDF 1 MB Posted
- Solicitation number
- N0002419R5111
About this file
This is a contract data requirements list (CDRL) for the FY19-23 build-to-print production of MK 82 MOD 0 Guided Missile Directors and MK 200 MOD 0 Guided Missile Director Controls in support of US Navy and Foreign Military Sales requirements. The CDRL identifies 32 data items required to be delivered by the contractor, including program management plans, progress reports, presentation materials, meeting minutes, status reports, acceptance test plans and procedures, test reports, technical documentation, specifications, engineering change proposals, quality assurance plans, and item unique identification plans. It provides delivery timelines, distribution requirements, and approval processes for each data item.
CDRL package dated 06 June 2019
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEW PROCUREMENT
N00024-19-R-5111
FOR
GUIDED MISSILE DIRECTOR MK 82 MOD 0/
DIRECTOR CONTROLLER MK 200 MOD 0
TABLE OF CONTENTS MATRIX
04-JUN-2019
EXHIBITS A & B
CDRL DID NO. TITLE OF DID (SUBTITLE) CONTRACT REFERENCE
EXHIBIT A
A001 DI-MGMT-81797 PROGRAM MANAGEMENT PLAN SOW SEC. C, PARA 3.2.1
A002 DI-MGMT-80227 CONTRACTOR’S PROGRESS, STATUS AND
MANAGEMENT REPORT
SOW SEC. C, PARAs 3.2, 3.2.4,
3.2.9 & 3.3.5
A003 DI-ADMN-81373 PRESENTATION MATERIAL SOW SEC. C, PARA 3.2.5
A004 DI-ADMN-81505 REPORT, RECORD OF MEETING/MINUTES SOW SEC. C, PARAs 3.2, 3.2.5 &
3.9.4
A005 DI-MGMT-80368A STATUS REPORT (CONTRACT CDRL DELIVERY
STATUS)
SOW SEC. C, PARA 3.2.6
A006 DI-QCIC-80553A ACCEPTANCE TEST PLAN (FACTORY/
PRODUCTION ACCEPTANCE TEST PLAN)
SOW SEC. C, PARAs 3.3.3 & 3.4
A007 DI-NDTI-80603A TEST PROCEDURE (ACCEPTANCE INSPECTION
AND TEST PROCEDURES)
SOW SEC. C, PARAs 3.3.3, 3.4 &
SOW SUBSEC. 1B, PARA II.B.8
A008 DI-NDTI-80809B TEST/INSPECTION REPORT (FACTORY
ACCEPTANCE TEST AND SYSTEM BURN-IN
TEST)
SOW SEC. C, PARAs 3.3.3 & 3.3.6.1
A009 DI-SESS-81309A INTERNAL CONTRACTOR TECHNICAL DATA
REPORT (AWS SPECIFICATIONS, WS-10501)
SOW SEC. C, PARA 3.3.3
A010 DI-SESS-80643D SPECIFICATION CHANGE NOTICE (SCN) SOW SUBSEC. 1A
A011 DI-SESS-81253C CONFIGURATION STATUS ACCOUNTING (CSA)
INFORMATION
SOW SEC. C, PARA 3.3.5 &
SOW SUBSEC. 1C, PARA V
A012 DI-SESS-80255A FAILURE SUMMARY AND ANALYSIS REPORT
(FAILURE REPORTING, ANALYSIS AND
CORRECTIVE ACTION SYSTEM (FRACAS))
SOW SEC. C, PARAs 3.3.6.1 & 3.9.3
A013 DI-FNCL-81565C COST DATA SUMMARY REPORT (DD FORM
1921)
SOW SEC. C, PARA 3.2.12
A014 DI-MGMT-81334D CONTRACT WORK BREAKDOWN STRUCTURE SOW SEC. C, PARAs 3.2.12 &
3.4.1
A015 DI-FNCL-81765B CONTRACTOR BUSINESS DATA REPORT (DD
FORM 1921-3)
A016 DI-FNCL-81566C FUNTIONAL COST-HOUR REPORT (DD FORM
1921-1)
A017 DI-SESS-81022D CONFIGURATION AUDIT SUMMARY REPORT
AND CERTIFICATION (FUNCTIONAL AND
PHYSICAL CONFIGURATION AUDITS)
SOW SEC. C, PARA 3.4.4 &
SOW SUBSEC. 1C, PARA IV.C
A018 DI-SESS-80858C SUPPLIER’S CONFIGURATION MANAGEMENT
PLAN
SOW SEC. C, PARAs 3.6, 3.6.1,
3.8 & SOW SUBSEC. 1C, PARA I
A019 DI-SESS-80640D REQUEST FOR VARIANCE (RFV) (REQUEST FOR
DEVIATIONS/WAIVERS)
SOW SEC.C, PARAs 3.6.1, 3.6.2
& SOW SUBSEC. 1C, PARA
VI.D
A020 DI-SESS-80639D ENGINEERING CHANGE PROPOSAL (ECP) SOW SEC. C, PARAs 3.6.1, 3.6.3
& SOW SUBSEC. 1C, PARA
VI.C
A021 DI-QCIC-81794 QUALITY ASSURANCE PROGRAM PLAN SOW SUBSEC. 1B, PARAs I & II
A022 DI-MISC-81832 COUNTERFEIT PREVENTION PLAN SOW SEC. C, PARA 3.7.2.1
A023 DI-MISC-80508B TECHNICAL REPORT-STUDIES/SERVICES
(UNAUTHORIZED SOURCES PURCHASE
REPORT)
SOW SEC. C, PARA 3.7.2.1
A024 DI-SESS-81613A RELIABILITY & MAINTAINABILITY (R & M)
PROGRAM PLAN
SOW SEC.C, PARAs 3.9, 3.9.5 &
SOW SUBSEC. 1F
A025 DI-SAFT-81626 SYSTEM SAFETY PROGRAM PLAN (SSPP) SOW SEC. C, PARA 3.10
A026 DI-MGMT-81803 ITEM UNIQUE IDENTIFICATION (IUID)
MARKING PLAN
SOW SEC. C, PARA 3.11
A027 DI-MGMT-81804A ITEM UNIQUE IDENTIFICATION (IUID)
MARKING ACTIVITY, VALIDATION AND
VERIFICATION REPORT
A028 DI-SESS-80776A TECHNICAL DATA PACKAGE (AWS DRAWING
PACKAGE)
SOW SEC. C, PARA 3.3.1 &
SOW SUBSEC. 1E
A029 DI-MISC-80508B TECHNICAL REPORT – STUDY/SERVICES
(SPECIFICATION/STANDARDS ASSESSMENTS)
SOW SUBSEC. 1F, PARA I
A030 DI-MGMT-82247 CONTRACTOR’S SYSTEMS SECURITY PLAN
AND ASSOCIATED PLANS OF ACTION TO
IMPLEMENT NIST SP 800-171 ON A
CONTRACTOR'S INTERNAL UNCLASSIFIED
INFORMATION SYSTEM ( SYSTEM SECURITY
PLAN)
SOW SEC. C, PARAs 3.12.1 & 3.12.3
A031 DI-ENVR-81014A ENVIRONMENTAL STRESS SCREENING
PROCEDURES AND IMPLEMENTATION PLAN
SOW SUBSEC. 1D
A032 DI-MISC-80508B TECHNICAL REPORT – STUDY/SERVICES
(CYBER INCIDENT REPORT)
SOW SEC. C, PARA 3.12.5
EXHIBIT B
B001 DI-SESS-81309A INTERNAL CONTRACTOR TECHNICAL DATA
REPORT (PROVISIONING TECHNICAL
DOCUMENTATION (PTD))
SOW SUBSEC. 1A, PARA 2
B002 DI-SESS-81713 PROVISIONING PERFORMANCE SCHEDULE
(PPS)
SOW SUBSEC. 1A, PARA 2
ATTACHMENTS TO THE CDRL ATTACHMENT TITLE
1 ADDRESSEE LIST
2 WORDING OF DISTRIBUTION STATEMENTS
3 ELECTRONIC DELIVERY OF DATA
4 TDP OPTION SELECTION WORKSHEET
CDRL DD FORM 1423
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER MGMT
D. SYSTEM/ITEM
GUIDED MISSILE DIRECTOR MK 82 MOD
0/DIRECTOR CONTROLLER MK 200 MOD 0
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
PROGRAM MANAGEMENT PLAN
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81797 (SEE BLK 16)
5. CONTRACT REFERENCE
SOW SEC. C, PARA 3.2.1
6. REQUIRING OFFICE
PEO IWS 1AP6
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
SEE BLK 16
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
30 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
16. REMARKS
Block 4: Contractor's format is acceptable.
Block 7: Letter of transmittal shall be via E-mail with notification of file attributes and directory information for retrieval.
Block 8: Approval will be for technical content and contractual compliance. the Government will provide approval or review comments within 45 calendar days after receipt. Final copy reflecting review comments or conditions for approval, if any, is due 30 calendar days after receipt of review comments.
Block 9: Wording of Distribution Statements:
Distribution Statement D (USN): see paragraph 4 of Attachment 2 to the CDRL;
Distribution Statement D (FMS): see paragraph 6 of Attachment 2 to the CDRL.
Block 13: Subsequent submissions will be 30 days after identification of change.
Block 14a: For Addressee List: see Attachment 1 to the CDRL.
Block 14b: For Electronic Delivery of Data: see Attachment 3 to the
CDRL.
PEO IWS 1AP6 1 1 0
PEO IWS 1AP4 0 0 0
PEO IWS 4TD 0 1 0
PEO IWS 4TD6 0 1 0
VENESCO DMTS 0 0 0
15. TOTAL 1 3 0
G. PREPARED BY
KATHERINE BURNS,
PEO IWS 1AP7
H. DATE
04-JUN-2019
I. APPROVED BY
TANYA D. CROWDER, DATA MANAGER,
PEO IWS 1AP4
J. DATE
05-JUN-2019
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 35 Pages
17. PRICE GROUP
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
TDP TM OTHER ADMN
0/DIRECTOR CONTROLLER MK 200 MOD 0
E. CONTRACT/PR NO.
A002
2. TITLE OF DATA ITEM
CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT
3. SUBTITLE
N/A
DI-MGMT-80227 (SEE BLK 16)
SOW SEC. C, PARAs 3.2, 3.2.4, 3.2.9 & 3.3.5
6. REQUIRING OFFICE
PEO IWS 1AP6
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
SEE BLK 16
10. FREQUENCY
MTHLY
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4: Contractor's format is acceptable.
Block 7: Letter of transmittal shall be via E-mail with notification of file attributes and directory information for retrieval.
Block 9: Wording of Distribution Statements:
Distribution Statement D (USN): see paragraph 4 of Attachment 2 to the CDRL;
Distribution Statement D (FMS): see paragraph 6 of Attachment 2 to the CDRL.
Blocks 12/13: Initial submission due 45 DAC. Subsequent submissions due monthly thereafter.
Block 14a: For Addressee List: see Attachment 1 to the CDRL.
Block 14b: For Electronic Delivery of Data: see Attachment 3 to the
CDRL.
PEO IWS 1AP6 0 1 0
PEO IWS 1AP4 0 0 0
PEO IWS 4TD 0 1 0
PEO IWS 4TD6 0 1 0
NAVSEA 025 0 0 0
15. TOTAL 0 3 0
KATHERINE BURNS,
PEO IWS 1AP7
H. DATE
04-JUN-2019
I. APPROVED BY
TANYA D. CROWDER, DATA MANAGER,
PEO IWS 1AP4
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 35 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
0/DIRECTOR CONTROLLER MK 200 MOD 0
E. CONTRACT/PR NO.
A003
2. TITLE OF DATA ITEM
PRESENTATION MATERIAL
3. SUBTITLE
SEE BLK 16
DI-ADMN-81373 (SEE BLK 16)
SOW SEC. C, PARA 3.2.5
6. REQUIRING OFFICE
PEO IWS 1AP6
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
SEE BLK 16
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 3: Subtitle to be provided to match the applicable program review/meeting/conference.
Block 4: Format shall be mutually agreed upon by Navy and contractor.
Block 7: Letter of transmittal shall be via E-mail with notification of file attributes and directory information for retrieval.
Block 9: Wording of Distribution Statements:
Distribution Statement D (USN): see paragraph 4 of Attachment 2 to the CDRL;
Distribution Statement D (FMS): see paragraph 6 of Attachment 2 to the CDRL.
Blocks 12/13: Presentation material shall be provided at each program review/meeting/conference, as applicable.
Block 14a: For Addressee List: see Attachment 1 to the CDRL.
Block 14b: For Electronic Delivery of Data: see Attachment 3 to the
CDRL.
PEO IWS 1AP6 0 1 0
PEO IWS 1AP4 0 0 0
PEO IWS 4TD 0 1 0
PEO IWS 4TD6 0 1 0
DCMA
P. RICCI 0 1 0
CACI
T. O'DOWD 0 0 0
15. TOTAL 0 4 0
KATHERINE BURNS,
PEO IWS 1AP7
H. DATE
04-JUN-2019
I. APPROVED BY
TANYA D. CROWDER, DATA MANAGER,
PEO IWS 1AP4
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 3 of 35 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
0/DIRECTOR CONTROLLER MK 200 MOD 0
E. CONTRACT/PR NO.
A004
2. TITLE OF DATA ITEM
REPORT, RECORD OF MEETING/MINUTES
3. SUBTITLE
N/A
DI-ADMN-81505 (SEE BLK 16)
SOW SEC. C, PARAs 3.2, 3.2.5 & 3.9.4
6. REQUIRING OFFICE
PEO IWS 1AP6
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
SEE BLK 16
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4: Contractor's format is acceptable.
Block 7: Letter of transmittal shall be via E-mail with notification of file attributes and directory information for retrieval.
Block 9: Wording of Distribution Statements:
Distribution Statement D (USN): see paragraph 3 of Attachment 2 to the CDRL;
Distribution Statement D (FMS): see paragraph 6 of Attachment 2 to the CDRL.
Blocks 10/12/13: Submit NLT 10 working days after each meeting.
Block 14a: For Addressee List: see Attachment 1 to the CDRL.
Block 14b: For Electronic Delivery of Data: see Attachment 3 to the
CDRL.
PEO IWS 1AP6 0 1 0
PEO IWS 1AP4 0 0 0
PEO IWS 4TD 0 1 0
PEO IWS 4TD6 0 1 0
DCMA
P. RICCI 0 1 0
CACI
T. O’DOWD 0 1 0
15. TOTAL 0 6 0
KATHERINE BURNS,
PEO IWS 1AP7
H. DATE
04-JUN-2019
I. APPROVED BY
TANYA D. CROWDER, DATA MANAGER,
PEO IWS 1AP4
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 4 of 35 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
0/DIRECTOR CONTROLLER MK 200 MOD 0
E. CONTRACT/PR NO.
A005
2. TITLE OF DATA ITEM
STATUS REPORT
3. SUBTITLE
CONTRACT CDRL DELIVERY STATUS
DI-MGMT-80368A (SEE BLK 16)
SOW SEC. C, PARA 3.2.6
6. REQUIRING OFFICE
PEO IWS 1AP6
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
SEE BLK 16
10. FREQUENCY
QRTLY
12. DATE OF FIRST SUBMISSION
115 DAC
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT
15 DARP
Reg Repro
16. REMARKS
Block 4: In DID DI-MGMT-80368A, the paragraphs 3.1 and 3.2.4 are applicable. Contractor's format is acceptable.
Block 7: Letter of transmittal shall be via E-mail with notification of file attributes and directory information for retrieval.
Block 9: Wording of Distribution Statements:
Distribution Statement D (USN): see paragraph 4 of Attachment 2 to the CDRL;
Distribution Statement D (FMS): see paragraph 6 of Attachment 2 to the CDRL.
Block 14a: For Addressee List: see Attachment 1 to the CDRL.
Block 14b: For Electronic Delivery of Data: see Attachment 3 to the
CDRL.
PEO IWS 1AP6 0 1 0
PEO IWS 1AP4 0 1 0
PEO IWS 4TD 0 1 0
PEO IWS 4TD6 0 1 0
DCMA
P. RICCI 0 1 0
CACI
T. O'DOWD 0 1 0
VENESCO DMTS 0 1 0
15. TOTAL 0 8 0
KATHERINE BURNS,
PEO IWS 1AP7
H. DATE
04-JUN-2019
I. APPROVED BY
TANYA D. CROWDER, DATA MANAGER,
PEO IWS 1AP4
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 5 of 35 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
TDP TM OTHER QCIC
0/DIRECTOR CONTROLLER MK 200 MOD 0
E. CONTRACT/PR NO.
A006
2. TITLE OF DATA ITEM
ACCEPTANCE TEST PLAN
3. SUBTITLE
FACTORY/PRODUCTION ACCEPTANCE TEST PLAN
DI-QCIC-80553A (SEE BLK 16)
SOW SEC. C, PARAs 3.3.3 & 3.4
6. REQUIRING OFFICE
PEO IWS 1AP6
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
SEE BLK 16
10. FREQUENCY
R/ASR
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4: Contractor's format is acceptable.
Block 7: Letter of transmittal shall be via E-mail with notification of file attributes and directory information for retrieval.
Block 8: Approval will be for technical content and contractual compliance. The Government will provide comments or approval within 30 days after receipt.
Block 9: Wording of Distribution Statements:
Distribution Statement D (USN): see paragraph 4 of Attachment 2 to the CDRL;
Distribution Statement D (FMS): see paragraph 6 of Attachment 2 to the CDRL.
Blocks 10/12/13: Submit draft document 90 days after contract award.
Final copies, reflecting review comments or conditions for approval, if any, are due 30 calendar days after receipt of review comments.
Submit revision 30 days after change occurs.
Block 14a: For Addressee List: see Attachment 1 to the CDRL.
Block 14b: For Electronic Delivery of Data: see Attachment 3 to the
CDRL.
PEO IWS 1AP6 1 1 0
PEO IWS 1AP4 0 1 0
PEO IWS 4TD 0 1 0
PEO IWS 4TD6 0 1 0
NSWC/PHD A35
A. MAQUINALEZ 0 1 0
D. NGUYEN 0 1 0
DCMA
P. RICCI 0 1 0
CACI
15. TOTAL 1 9 0
KATHERINE BURNS,
PEO IWS 1AP7
H. DATE
04-JUN-2019
I. APPROVED BY
TANYA D. CROWDER, DATA MANAGER,
PEO IWS 1AP4
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 6 of 35 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
TDP TM OTHER NDTI
0/DIRECTOR CONTROLLER MK 200 MOD 0
E. CONTRACT/PR NO.
A007
2. TITLE OF DATA ITEM
TEST PROCEDURE
3. SUBTITLE
ACCEPTANCE INSPECTION AND TEST PROCEDURES
DI-NDTI-80603A (SEE BLK 16)
SOW SEC. C, PARAs 3.3.3, 3.4 & SOW
SUBSEC. 1B, PARA II.B.8
6. REQUIRING OFFICE
PEO IWS 1AP6
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
SEE BLK 16
10. FREQUENCY
R/ASR
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4: Contractor's format is acceptable.
Block 7: Letter of transmittal shall be via E-mail with notification of file attributes and directory information for retrieval.
Block 8: Approval will be for technical content and contractual compliance. The Government will provide review comments within 30 days after receipt.
Block 9: Wording of Distribution Statements:
Distribution Statement D (USN): see paragraph 4 of Attachment 2 to the CDRL;
Distribution Statement D (FMS): see paragraph 6 of Attachment 2 to the CDRL.
Blocks 10/12/13: Submit draft copy 60 calendar days prior to acceptance inspection test. Final copies, reflecting review comments or conditions for approval, if any, are due 30 calendar days after receipt of review comments. Submit revision 30 days after change occurs.
Block 14a: For Addressee List: see Attachment 1 to the CDRL.
Block 14b: For Electronic Delivery of Data: see Attachment 3 to the
CDRL.
PEO IWS 1AP6 1 1 0
PEO IWS 1AP4 0 1 0
PEO IWS 4TD 0 1 0
PEO IWS 4TD6 0 1 0
NSWC/PHD A35
A. MAQUINALEZ 0 1 0
D. NGUYEN 0 1 0
DCMA
P. RICCI 0 1 0
CACI
KATHERINE BURNS,
PEO IWS 1AP7
H. DATE
04-JUN-2019
I. APPROVED BY
TANYA D. CROWDER, DATA MANAGER,
PEO IWS 1AP4
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 7 of 35 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
TDP TM OTHER NDTI
0/DIRECTOR CONTROLLER MK 200 MOD 0
E. CONTRACT/PR NO.
A008
2. TITLE OF DATA ITEM
TEST/INSPECTION REPORT
3. SUBTITLE
FACTORY ACCEPTANCE TEST AND SYSTEM BURN-IN
TEST
DI-NDTI-80809B
SOW SEC. C, PARAs 3.3.3 & 3.3.6.1
6. REQUIRING OFFICE
PEO IWS 1A6
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
SEE BLK 16
10. FREQUENCY
R/ASR
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4: Contractor's format is acceptable.
Block 7: Letter of transmittal shall be via E-mail with notification of file attributes and directory information for retrieval.
Block 9: Wording of Distribution Statements:
Distribution Statement D (USN): see paragraph 4 of Attachment 2 to the CDRL;
Distribution Statement D (FMS): see paragraph 6 of Attachment 2 to the CDRL.
Blocks 10/12/13: Report is due 30 days after completion of test.
Block 14a: For Addressee List: see Attachment 1 to the CDRL.
Block 14b: For Electronic Delivery of Data: see Attachment 3 to the
CDRL.
PEO IWS 1AP6 0 1 0
PEO IWS 1AP4 0 0 0
PEO IWS 4TD 0 1 0
PEO IWS 4TD6 0 1 0
NSWC/PHD A35
A. MAQUINALEZ 0 1 0
D. NGUYEN 0 1 0
DCMA
P. RICCI 0 1 0
CACI
15. TOTAL 0 9 0
KATHERINE BURNS,
PEO IWS 1AP7
H. DATE
04-JUN-2019
I. APPROVED BY
TANYA D. CROWDER, DATA MANAGER,
PEO IWS 1AP4
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 8 of 35 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
TDP TM OTHER SESS
0/DIRECTOR CONTROLLER MK 200 MOD 0
E. CONTRACT/PR NO.
A009
2. TITLE OF DATA ITEM
INTERNAL CONTRACTOR TECHNICAL DATA REPORT
3. SUBTITLE
AWS SPECIFICATIONS, WS-10501
DI-SESS-81309A (SEE BLK 16)
SOW SEC. C, PARA 3.3.3
6. REQUIRING OFFICE
PEO IWS 1AP6
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
SEE BLK 16
10. FREQUENCY
R/ASR
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4: Contractor's format is acceptable.
Block 7: DD 250 inspection by DCMA and DD 250 Acceptance by PEO IWS 1AP6 submittal shall be via E-mail with notification of file attributes and directory for retrieval. Adjudicated comments shall be included in DD 250 delivery of specifications.
Block 8: Approval shall be for technical content and contractual compliance. Allow 30 days for Government review.
Block 9: Wording of Distribution Statements:
Distribution Statement D (USN): see paragraph 4 of Attachment 2 to the CDRL;
Distribution Statement D (FMS): see paragraph 6 of Attachment 2 to the CDRL.
Blocks 10/12/13: Deliver revisions 30 days after need is determined.
Final copies, reflecting review comments or conditions for approval, if any, are due 30 days after receipt of review comments.
Block 14a: For Addressee List: see Attachment 1 to the CDRL.
Block 14b: For Electronic Delivery of Data: see Attachment 3 to the
CDRL.
PEO IWS 1AP6 1 1 0
PEO IWS 1AP4 0 0 0
PEO IWS 4TD 0 1 0
PEO IWS 4TD6 0 1 0
NSWC/DD V43 0 1 0
NSWC/PHD A35
A. MAQUINALEZ 0 1 0
D, NGUYEN 0 1 0
DCMA
P. RICCI 0 1 0
CACI
KATHERINE BURNS,
PEO IWS 1AP7
H. DATE
04-JUN-2019
I. APPROVED BY
TANYA D. CROWDER, DATA MANAGER,
PEO IWS 1AP4
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 9 of 35 Pages
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
0/DIRECTOR CONTROLLER MK 200 MOD 0
E. CONTRACT/PR NO.
A010
2. TITLE OF DATA ITEM
SPECIFICATION CHANGE NOTICE (SCN)
3. SUBTITLE
N/A
DI-SESS-80643D (SEE BLK 16)
SOW SUBSEC. 1A
6. REQUIRING OFFICE
PEO IWS 1AP6
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
SEE BLK 16
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4: Contractor's format is acceptable.
Block 7: Distribution via DD 250 to PEO IWS 1AP6. All other recipients and interim deliveries via letter of transmittal. Letter of transmittal shall be via E-mail with notification of file attributes and directory information for retrieval.
Block 9: Wording of Distribution Statements:
Distribution Statement D (USN): see paragraph 3 of Attachment 2 to the CDRL;
Distribution Statement D (FMS): see paragraph 6 of Attachment 2 to the CDRL.
Blocks 10/12/13: Submit as required to document engineering changes.
SCNs shall include change pages to affected specifications.
Block 14a: For Addressee List: see Attachment 1 to the CDRL.
Block 14b: For Electronic Delivery of Data: see Attachment 3 to the
CDRL.
PEO IWS 1AP6 0 1 0
PEO IWS 1AP4 0 0 0
PEO IWS 4TD 0 1 0
PEO IWS 4TD6 0 1 0
CSCS AN47 0 1 0
NSWC/DD V43 0 1 0
NSWC/PHD A35
A. MAQUINALEZ 0 1 0
D. NGUYEN 0 1 0
DCMA
P. RICCI 0 1 0
CACI
15. TOTAL 0 10 0
KATHERINE BURNS,
PEO IWS 1AP7
H. DATE
04-JUN-2019
I. APPROVED BY
TANYA D. CROWDER, DATA MANAGER,
PEO IWS 1AP4
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 10 of 35
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
0/DIRECTOR CONTROLLER MK 200 MOD 0
E. CONTRACT/PR NO.
A011
2. TITLE OF DATA ITEM
CONFIGURATION STATUS ACCOUNTING (CSA) INFORMATION
3. SUBTITLE
N/A
DI-SESS-81253C (SEE BLK 16)
SOW SEC. C, PARA 3.3.5 & SOW SUBSEC.
1C, PARA V
6. REQUIRING OFFICE
PEO IWS 1CM
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4: Reports shall reflect the composite status, including modifications of each system under the contract.
Block 7: Letter of transmittal shall be via E-mail with notification of file attributes and directory information for retrieval.
Block 9: Wording of Distribution Statements:
Distribution Statement D (USN): see paragraph 3 of Attachment 2 to the CDRL;
Distribution Statement D (FMS): see paragraph 6 of Attachment 2 to the CDRL.
Blocks 10/12/13: First submission for each report shall be NLT 15 days after completion of system acceptance. Subsequent submission shall be NLT 15 days after last major item(s) of the respective report have been shipped. This will be an 'As Built Configuration Report'.
Block 14a: For Addressee List: see Attachment 1 to the CDRL.
Block 14b: For Electronic Delivery of Data: see Attachment 3 to the
CDRL.
PEO IWS 1CM 0 1 0
PEO IWS 1AP6 0 1 0
PEO IWS 1AP4 0 0 0
PEO IWS 4TD 0 1 0
PEO IWS 4TD6 0 1 0
NSWC/PHD A35
A. MAQUINALEZ 0 1 0
D. NGUYEN 0 1 0
DCMA
P. RICCI 0 1 0
CACI
KATHERINE BURNS,
PEO IWS 1AP7
H. DATE
04-JUN-2019
I. APPROVED BY
TANYA D. CROWDER, DATA MANAGER,
PEO IWS 1AP4
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 11 of 35
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
0/DIRECTOR CONTROLLER MK 200 MOD 0
E. CONTRACT/PR NO.
A012
2. TITLE OF DATA ITEM
FAILURE SUMMARY AND ANALYSIS REPORT
3. SUBTITLE
SEE BLK 16
DI-SESS-80255A (SEE BLK 16)
SOW SEC. C, PARAs 3.3.6.1 & 3.9.3
6. REQUIRING OFFICE
NSWC/PHD A74
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 3: FAILURE REPORTING, ANALYSIS, AND CORRECTIVE ACTION SYSTEM
(FRACAS)
Block 4: In paragraph 10.3.1 of DI-SESS-80255A, the requirements 10.3.1c, 10.3.1h, 10.3.1i, 10.3.1o, 10.3.1p, 10.3.1q and paragraph
10.2.3 do not apply. Contractor's format is acceptable.
Block 7: Letter of transmittal shall be via E-mail with notifications of file attributes and directory information for retrieval.
Block 9: Wording of Distribution Statements:
Distribution Statement D (USN): see paragraph 3 of Attachment 2 to the CDRL;
Distribution Statement D (FMS): see paragraph 6 of Attachment 2 to the CDRL.
Blocks 10/12/13: The initial reporting shall commence after two months of cabinet testing. Subsequent submissions shall be made quarterly beginning 28 FEB.
Block 14a: For Addressee List: see Attachment 1 to the CDRL.
Block 14b: For Electronic Delivery of Data: see Attachment 3 to the CDRL. Deliver to PCO or ACO in accordance with the condition provided in SOW SEC. C, PARAs 3.3.6.1 & 3.9.3 of this contract.
NSWC/PHD A74 0 1 0
NSWC/PHD A64 0 1 0
PEO IWS 1AP6 0 1 0
PEO IWS 1AP4 0 0 0
PEO IWS 4TD 0 1 0
PEO IWS 4TD6 0 1 0
DCMA
P. RICCI 0 1 0
CACI
KATHERINE BURNS,
PEO IWS 1AP7
H. DATE
04-JUN-2019
I. APPROVED BY
TANYA D. CROWDER, DATA MANAGER,
PEO IWS 1AP4
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 12 of 35
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
TDP TM OTHER FNCL
0/DIRECTOR CONTROLLER MK 200 MOD 0
E. CONTRACT/PR NO.
A013
2. TITLE OF DATA ITEM
COST DATA SUMMARY REPORT (DD FORM 1921)
3. SUBTITLE
N/A
DI-FNCL-81565C
6. REQUIRING OFFICE
PEO IWS 1AP6
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
SEE BLK 16
10. FREQUENCY
3TIME
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 7: Letter of transmittal shall be via E-mail with notification of file attributes and directory information for retrieval.
Block 9: Wording of Distribution Statements:
Distribution Statement D (USN): see paragraph 4 of Attachment 2 to the CDRL;
Distribution Statement D (FMS): see paragraph 6 of Attachment 2 to the CDRL.
Blocks 11/12/13: Prior to and after contract definitization, submissions shall be in accordance with the approved Cost and Software Data Reporting Plan.
Block 14a: For Addressee List: see Attachment 1 to the CDRL.
Block 14b: For Electronic Delivery of Data: see Attachment 3 to the CDRL. The cost Data Summary Report must be submitted electronically to DCARC as stand-alone Excel compatible files or as DCARC approved Extensible Markup Language (XML) files by report upload to the DCARC's secure website. PDF format is not acceptable. The DCARC website (http://dcarc.cape.osd.mil) contains information about delivery methods and submission instructions.
PEO IWS 1AP6 0 1 0
PEO IWS 1AP4 0 0 0
PEO IWS 4TD 0 1 0
PEO IWS 4TD6 0 1 0
DCMA
P. RICCI 0 0 0
DCARC 0 1 0
NAVSEA 025 0 1 0
15. TOTAL 0 5 0
KATHERINE BURNS,
PEO IWS 1AP7
H. DATE
04-JUN-2019
I. APPROVED BY
TANYA D. CROWDER, DATA MANAGER,
PEO IWS 1AP4
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 14 of 35
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
0/DIRECTOR CONTROLLER MK 200 MOD 0
E. CONTRACT/PR NO.
A014
2. TITLE OF DATA ITEM
CONTRACT WORK BREAKDOWN STRUCTURE
3. SUBTITLE
N/A
DI-MGMT-81334D
SOW SEC. C, PARAs 3.2.12 & 3.4.1
6. REQUIRING OFFICE
PEO IWS 1AP6
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
SEE BLK 16
10. FREQUENCY
R/ASR
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 7: Letter of transmittal shall be via E-mail with notification of file attributes and directory information for retrieval.
Block 9: Wording of Distribution Statements:
Distribution Statement D (USN): see paragraph 3 of Attachment 2 to the CDRL;
Distribution Statement D (FMS): see paragraph 6 of Attachment 2 to the CDRL.
Blocks 10/12/13: Prior to and after contract definitization, submissions shall be in accordance with the Cost and Software Data Reporting Plan.
Block 14a: For Addressee List: see Attachment 1 to the CDRL.
Block 14b: For Electronic Delivery of Data: see Attachment 3 to the CDRL. The Contract Work Breakdown Structure form must be submitted electronically to DCARC as stand-alone Excel compatible files or as DCARC approved Extensible Markup Language (XML) files by report upload to the DCARC's secure website. PDF format is not acceptable.
The DCARC website (http://dcarc.cape.osd.mil) contains information about delivery methods and submission instructions.
PEO IWS 1AP6 0 1 0
PEO IWS 1AP4 0 0 0
PEO IWS 4TD 0 1 0
PEO IWS 4TD6 0 1 0
DCMA
P. RICCI 0 0 0
DCARC 0 1 0
KATHERINE BURNS,
PEO IWS 1AP7
H. DATE
04-JUN-2019
I. APPROVED BY
TANYA D. CROWDER, DATA MANAGER,
PEO IWS 1AP4
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 15 of 35
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
0/DIRECTOR CONTROLLER MK 200 MOD 0
E. CONTRACT/PR NO.
A015
2. TITLE OF DATA ITEM
CONTRACTOR BUSINESS DATA REPORT (DD FORM 1921-3)
3. SUBTITLE
N/A
DI-FNCL-81765B
6. REQUIRING OFFICE
PEO IWS 1AP6
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
SEE BLK 16
10. FREQUENCY
ANNLY
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 7: Letter of transmittal shall be via E-mail with notification of file attributes and directory information for retrieval.
Block 9: Wording of Distribution Statements:
Distribution Statement D (USN): see paragraph 3 of Attachment 2 to the CDRL;
Distribution Statement D (FMS): see paragraph 6 of Attachment 2 to the CDRL.
Blocks 12/13: Reports are due 60 days subsequent to the end of the contractor's fiscal year.
Block 14a: For Addressee List: see Attachment 1 to the CDRL.
Block 14b: For Electronic Delivery of Data: see Attachment 3 to the CDRL. The Contractor Business Data Report form must be submitted electronically to DCARC as stand-alone Excel compatible files or as DCARC approved Extensible Markup Language (XML) files by report upload to the DCARC's secure website. PDF format is not acceptable.
The DCARC website (http://dcarc.cape.osd.mil) contains information about delivery methods and submission instructions.
PEO IWS 1AP6 0 1 0
PEO IWS 1AP4 0 0 0
PEO IWS 4TD 0 1 0
PEO IWS 4TD6 0 1 0
DCMA
P. RICCI 0 0 0
DCARC 0 1 0
KATHERINE BURNS,
PEO IWS 1AP7
H. DATE
04-JUN-2019
I. APPROVED BY
TANYA D. CROWDER, DATA MANAGER,
PEO IWS 1AP4
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 16 of 35
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
0/DIRECTOR CONTROLLER MK 200 MOD 0
E. CONTRACT/PR NO.
A016
2. TITLE OF DATA ITEM
FUNCTIONAL COST-HOUR REPORT (DD FORM 1921-1)
3. SUBTITLE
N/A
DI-FNCL-81566C
6. REQUIRING OFFICE
PEO IWS 1AP6
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
SEE BLK 16
10. FREQUENCY
ANNLY
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 7: Letter of transmittal shall be via E-mail with notifications of file attributes and directory information for retrieval.
Block 9: Wording of Distribution Statements:
Distribution Statement D (USN): see paragraph 3 of Attachment 2 to the CDRL;
Distribution Statement D (FMS): see paragraph 6 of Attachment 2 to the CDRL.
Blocks 12/13: Reports are due 60 days subsequent to the end of the contractor's fiscal year.
Block 14a: For Addressee List: see Attachment 1 to the CDRL.
Block 14b: For Electronic Delivery of Data: see Attachment 3 to the CDRL. The Contractor Business Data Report form must be submitted electronically to DCARC as stand-alone Excel compatible files or as DCARC approved Extensible Markup Language (XML) files by report upload to the DCARC's website. PDF format is not acceptable. The DCARC website (http://dcarc.cape.osd.mil) contains information about delivery methods and submission instructions.
PEO IWS 1AP6 0 1 0
PEO IWS 1AP4 0 0 0
PEO IWS 4TD 0 1 0
PEO IWS 4TD6 0 1 0
NASEA 025 0 0 0
DCMA
P. RICCI 0 0 0
DCARC 0 1 0
KATHERINE BURNS,
PEO IWS 1AP7
H. DATE
04-JUN-2019
I. APPROVED BY
TANYA D. CROWDER, DATA MANAGER,
PEO IWS 1AP4
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 17 of 35
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
0/DIRECTOR CONTROLLER MK 200 MOD 0
E. CONTRACT/PR NO.
A017
2. TITLE OF DATA ITEM
CONFIGURATION AUDIT SUMMARY REPORT AND CERTIFICATION
3. SUBTITLE
FUNCTIONAL AND PHYSICAL CONFIGURATION AUDITS
DI-SESS-81022D (SEE BLK 16)
SOW SEC. C, PARA 3.4.4 & SOW SUBSEC.
1C, PARA IV.C
6. REQUIRING OFFICE
PEO IWS 1CM
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
SEE BLK 16
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4: Contractor's format is acceptable.
Block 7: Letter of transmittal shall be via E-mail with notification of file attributes and directory information for retrieval.
Block 9: Wording of Distribution Statements:
Distribution Statement D (USN): see paragraph 3 of Attachment 2 to the CDRL;
Distribution Statement D (FMS): see paragraph 6 of Attachment 2 to the CDRL.
Blocks 10/12/13: Submit report within 15 working days after completion of each audit.
Block 14a: For Addressee List: see Attachment 1 to the CDRL.
Block 14b: For Electronic Delivery of Data: see Attachment 3 to the
CDRL.
PEO IWS 1CM 0 1 0
PEO IWS 1AP6 0 1 0
PEO IWS 1AP4 0 0 0
PEO IWS 4TD 0 1 0
PEO IWS 4TD6 0 1 0
NSWC/PHD A35
A. MAQUINALEZ 0 1 0
D. NGUYEN 0 1 0
DCMA
P. RICCI 0 1 0
CACI
KATHERINE BURNS,
PEO IWS 1AP7
H. DATE
04-JUN-2019
I. APPROVED BY
TANYA D. CROWDER, DATA MANAGER,
PEO IWS 1AP4
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 18 of 35
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
0/DIRECTOR CONTROLLER MK 200 MOD 0
E. CONTRACT/PR NO.
A018
2. TITLE OF DATA ITEM
SUPPLIER'S CONFIGURATION MANAGEMENT PLAN
3. SUBTITLE
N/A
DI-SESS-80858C (SEE BLK 16)
SOW SEC. C, PARAs 3.6, 3.6.1, 3.8 &
SOW SUBSEC. 1C, PARA I
6. REQUIRING OFFICE
PEO IWS 1CM
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
SEE BLK 16
10. FREQUENCY
R/ASR
12. DATE OF FIRST SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
Block 4: Contractor's format is acceptable.
Block 7: Letter of transmittal shall be via E-mail with notification of file attributes and directory information for retrieval.
Block 8: Approval will be for technical content and contractual compliance. Allow 30 days for Government review.
Block 9: Wording of Distribution Statements:
Distribution Statement D (USN): see paragraph 4 of Attachment 2 to the CDRL;
Distribution Statement D (FMS): see paragraph 6 of Attachment 2 to the CDRL.
Blocks 10/12/13: Deliver revisions 90 days after need is determined.
Final copies, reflecting review comments or conditions for approval, if any, are due 30 days after receipt of review comments.
Block 14a: For Addressee List: see Attachment 1 to the CDRL.
Block 14b: For Electronic Delivery of Data: see Attachment 3 to the
CDRL.
PEO IWS 1CM 1 1 0
PEO IWS 1AP6 0 1 0
PEO IWS 1AP4 0 0 0
PEO IWS 4TD 0 1 0
PEO IWS 4TD6 0 1 0
NSWC/PHD A35
A. MAQUINALEZ 0 1 0
D. NGUYEN 0 1 0
DCMA
P. RICCI 0 1 0
CACI
KATHERINE BURNS,
PEO IWS 1AP7
H. DATE
04-JUN-2019
I. APPROVED BY
TANYA D. CROWDER, DATA MANAGER,
PEO IWS 1AP4
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 19 of 35
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
0/DIRECTOR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .