N00024-19-R-4468_A0001.pdf
PDF 29 KB Posted
- Solicitation number
- N00024-19-R-4468
About this file
This amendment modifies a solicitation for ship maintenance and modernization availabilities. The solicitation seeks proposals for the FY20 USS CARNEY DDG 64 Extended Dry-Docking Selected Restricted Availability and the FY21 USS WINSTON CHURCHILL DDG 81 Depot Modernization Period. The CARNEY availability period is approximately 13 months from July 2020 through August 2021. The WINSTON CHURCHILL period is approximately 13 months from April 2021 through May 2022. The amendment updates contact information, removes some work items from the specification package, and modifies attachments related to pricing, milestones and key dates. The Naval Sea Systems Command will issue the solicitation electronically on FedBizOpps.gov. Interested offerors should monitor for release and amendments. Proposals will be evaluated for award of a single contract anticipated in April 2020. The work requires maintenance, modernization and repair of two DDG 51 class ships with the use of an appropriately equipped pier, drydock and workforce.
N00024-19-R-4468 Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_S3_BQ_PPI_QA2_FINAL.xlsm | XLSM spreadsheet | |
| N00024-19-R-4468_conformed_through_A0002.pdf | ||
| N00024-19-R-4468_A0002.pdf | ||
| Attachment_S3_BQ_PPI_QA1_FINAL.xlsm | XLSM spreadsheet | |
| N00024-19-R-4468_conformed_through_A0001.pdf | ||
| Attachment_S-3_BQ_PPI_A0001.xlsm | XLSM spreadsheet | |
| Attachment_S-9_Past_Performance_Questionnaire.docx | DOCX document | |
| Attachment_S-1_Manpower_Utilization_Data_Sheet.xlsx | XLSX spreadsheet | |
| Attachment_S-5_Eligibility_Criteria_Data_Sheet.docx | DOCX document | |
| Attachment_S-6__VATEP.xlsx | XLSX spreadsheet | |
| Attachment_S-3_BQ_PPI.xlsm | XLSM spreadsheet | |
| Attachment_J-5_QASP.docx | DOCX document | |
| Attachment_S-8_Pier_and_Drydock_Graphical_Representation_Template.xlsx | XLSX spreadsheet | |
| Attachment_S-2_PP_CPARS_Reference_List.docx | DOCX document | |
| Attachment_S-7_Proposal_Assessment.xlsx | XLSX spreadsheet | |
| Attachment_J-8_Performance_Report.xlsx | XLSX spreadsheet | |
| Attachment_S-4__Manpower_Plan_to_Actual_Data_Sheet.xlsx | XLSX spreadsheet | |
| N00024-19-R-4468.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002419FR62006
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0001 includes the items below :
Section J: Updates Attachment S-3 w ith PCO Erica Fetter and contact information, Attachment J-1 w ith Version CON of Work Package, and Attachment J-3.
See below for details of Amendment.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002419R4468
X 9B. DATED (SEE ITEM 11)
06-Sep-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Sep-2019
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0002419R4468
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Below is a summary table of Work Items that were removed from the Work Specification Package with Version CON. The total number of Work Items in the Work Specification Package (160 WIs) now match the number of Work Items that are to be priced in Attachment J-4 (160 WIs).
Work Items Removed 244-11-001 643-80-001 643-80-002 643-80-003 643-80-004 643-80-005 643-80-006 643-80-007 643-80-008 644-80-001 644-80-002 993-11-003 993-31-002
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
DOCUMENTS/EXHIBITS/ATTACHMENTS
The following document(s), exhibit(s), and other attachment(s) form a part of this solicitation:
No. Document Attachment S-1 Manpower Utilization Data Sheet Attachment S-2 Past Performance CPARS References Attachment S-3 Pre-Proposal Information (PPI) Form (Amendment 0001) Attachment S-4 Manpower Plan to Actual Data Sheet Attachment S-5 Eligibility Criteria Data Sheet Attachment S-6 Value Adjusted Total Evaluated Price Reduction Tables Attachment S-7 Proposal Assessment Crosswalk Attachment S-8 Pier and Drydock Graphical Representation Template Attachment S-9 Past Performance Questionnaire
The following document(s), exhibit(s), and other attachment(s) also form a part of this solicitation and will form a part of the contract resulting from this solicitation:
USS CARNEY DDG 64 FY20 EDSRA
N0002419R4468
Attachment J-1 Specification Package (Version CON) Attachment J-2 Work Item Plans, Drawings, and Other References Attachment J-3 Execution Milestones and Key Event Dates (Amendment 0001) Attachment J-4 Pricing Workbook Attachment J-5 Quality Assurance Surveillance Plan Attachment J-6 Subcontracting Plan (to be incorporated upon award) Attachment J-7 Schedule Model Review Attachment J-8 Performance Report
USS WINSTON CHURCHILL DDG 81 FY21 DMP
Attachment J-11 Specification Package Attachment J-12 Work Item Plans, Drawings, and Other References Attachment J-13 Execution Milestones and Key Event Dates Attachment J-14 Pricing Workbook Attachment J-5 Quality Assurance Surveillance Plan Attachment J-16 Subcontracting Plan (to be incorporated upon award) Attachment J-7 Schedule Model Review Attachment J-8 Performance Report
Exhibit A Contract Data Requirements List (CDRL) (DD Form 1423) A001-A003; A005-A009; A011; A012;
A014; A015; A016 (Does not include A004, A0010, or A0013) Exhibit B Contract Data Requirements List (CDRL) (DD Form 1423) B001-B009 Exhibit C Contract Data Requirements List (CDRL) (DD Form 1423) C001-C002
(End of Summary of Changes)
File details come from the government source that posted it. Updated .