This pre-solicitation notice provides information about an upcoming solicitation for Post Shakedown Availability execution services on nine Freedom Variant Littoral Combat Ships homeported in Mayport, Florida. The solicitation will be issued by the Naval Sea Systems Command for full and open competition. The Post Shakedown Availability requirements include providing manpower, support services, material, facilities, dry-docking, and non-standard equipment to accomplish work items, tests, and post repair sea trials. Interested offerors should monitor the Federal Business Opportunities website for updates pertaining to this procurement. This notice is for information only and is subject to modification.
Solicitation
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002419R2320
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0100
| 200,000 |
| Labor Hours |
LCS 17 Post Shakedown Availability
CPAF
USS INDIANAPOLIS (LCS 17) PSA - See Notes B, C, & D FOB: Destination
ESTIMATED COST
BASE FEE
SUBTOTAL EST COST + BASE
MAX AWARD FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0200
| 200,000 |
| Labor Hours |
| OPTION |
| LCS 19 Post Shakedown Availability |
CPAF
USS ST LOUIS (LCS 19) PSA - See Notes A, B, C, & D
ESTIMATED COST
BASE FEE
SUBTOTAL EST COST + BASE
MAX AWARD FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0300
| 200,000 |
| Labor Hours |
| OPTION |
| LCS 21 Post Shakedown Availability |
CPAF
USS MINNEAPOLIS ST PAUL (LCS 21) PSA - See Notes A, B, C, & D
ESTIMATED COST
BASE FEE
SUBTOTAL EST COST + BASE
MAX AWARD FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0400
| 200,000 |
| Labor Hours |
| OPTION |
| LCS 23 Post Shakedown Availability |
CPAF
USS COOPERSTOWN (LCS 23) PSA - See Notes A, B, C, & D
ESTIMATED COST
BASE FEE
SUBTOTAL EST COST + BASE
MAX AWARD FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0500
| 200,000 |
| Labor Hours |
| OPTION |
| LCS 25 Post Shakedown Availability |
CPAF
USS MARINETTE (LCS 25) PSA - See Notes A, B, C, & D
ESTIMATED COST
BASE FEE
SUBTOTAL EST COST + BASE
MAX AWARD FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0600
| 200,000 |
| Labor Hours |
| OPTION |
| LCS 27 Post Shakedown Availability |
CPAF
USS NANTUCKET (LCS 27) PSA - See Notes A, B, C, & D
ESTIMATED COST
BASE FEE
SUBTOTAL EST COST + BASE
MAX AWARD FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0700
| 200,000 |
| Labor Hours |
| OPTION |
| LCS 29 Post Shakedown Availability |
CPAF
USS BELOIT (LCS 29) PSA - See Notes A, B, C, & D
ESTIMATED COST
BASE FEE
SUBTOTAL EST COST + BASE
MAX AWARD FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0800
| 200,000 |
| Labor Hours |
| OPTION |
| LCS 31 Post Shakedown Availability |
CPAF
USS CLEVELAND (LCS 31) PSA - See Notes A, B, C, & D
ESTIMATED COST
BASE FEE
SUBTOTAL EST COST + BASE
MAX AWARD FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CLIN Number 0900
Contract Data Requirements List
CPAF
NSP
ESTIMATED COST
BASE FEE
SUBTOTAL EST COST + BASE
MAX AWARD FEE
TOTAL EST COST + FEE
NOTE A – Option item to which the Section I clause, 52.217-9, “OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) (NAVSEA VARIATION I) (OCT 2018),” applies, and which is to be supplied only if and to the extent said option is exercised.
NOTE B
The Government reserves the right to unilaterally transfer unused labor hours to new CLINs. For example, the Government may need to transfer labor hours from CLIN 0100 to a new CLIN (i.e. 0101, 0102, etc.) to separate fund types (i.e. SCN, OPN, etc.). In this example, the Government will transfer labor hours using the same hourly rate (cost, base fee, and award fee) as the originating CLIN so that there is no increase or decrease to the total contract price.
The Government reserves the right to unilaterally transfer unused labor hours to existing CLINs. For example, the Government may need to transfer labor hours from CLIN 0100 to an existing CLIN (i.e. 0200, 0300, etc.) if a PSA requires additional hours. In this example, the Government will transfer labor hours using the same hourly rate (cost, base fee, and award fee) as the receiving CLIN. While the number of hours will remain constant in this example, the total contract price may be altered (increase or decrease) depending on the difference in the hourly rates between the originating and receiving CLINs.
NOTE C – TECHNICAL INSTRUCTION GUIDELINES FOR THIS CONTRACT
The Government intends to use technical instructions (TIs) under this contract per Section H Special Contract Requirement entitled “H-216-H002 LEVEL OF EFFORT – ALTERNATE 1 (NAVSEA) (OCT 2018)” and pursuant to the Section C requirement entitled "C-242-H003 TECHNICAL INSTRUCTIONS (OCT 2018)." While the work scope for these term type level of effort (LOE) CLINs are defined in Section C and throughout the contract and its associated attachments, the government intends to provide more detailed work item specifications via TIs. The following is an overview of technical instructions process under this contract:
i. The Government and/or the build yard contractor will prepare a detailed work item specification.
ii. The Government will provide work item specifications to the PSA execution yard contractor under this contract.
iii. The PSA execution yard contractor will provide a ROM estimate to perform the work item specification if requested by the Government. The ROM estimate shall include all costs that are necessary to perform the work item which may include direct labor, direct materials and all Other Direct Costs (ODCs) such as subcontractors, vendors, travel, rental charges, drydocking, etc.
iv. Upon determining adequate funds exist on the contract, the Government will authorize work to begin via TI which will be signed by authorized personnel (i.e., authorized COR identified in Section G of this contract, and the PCO/ACO).
v. The "ROM Estimate" field in TIs is the contractor's ROM estimate for performance of work described in work item specification(s) tasked under a TI. This is primarily a tool to help the parties track work scope, contractual ceiling and available budget. TIs and ROM estimates are not to be interpreted as changes to competitively established pricing under contract. If the contractor overruns the dollar ceiling on contract and has not exceeded the labor hour ceiling, the contractor shall continue delivering unused labor hours if tasked by the government and so long as there is available funding obligated under this contract identified for use by the Contracting Officer.
vi. The TI shall never task work that is: (1) outside the scope of the contract; (2) above the Section B labor hour ceiling listed on each LOE CLIN; (3) beyond the Section F period of performance for the respective CLIN(s)/SLIN(s); or (4) above available funding. The contractor has a responsibility to notify the government if any the aforementioned discrepancies exist prior to performing the work tasked. No part of this Note shall be interpreted as giving contrary direction to any other terms, conditions or clauses under this contract.
NOTE D – This CLIN includes all costs required for performance of this contract, including all Other Direct Costs (ODCs) and direct materials. ODCs and direct materials are defined as all direct costs other than prime contractor direct labor, in accordance with the contractor’s Cost Accounting System (CAS) Disclosure Statement, necessary to execute a post shakedown availability (PSA), and may include costs such as subcontractors, vendors, materials, travel, dry dock, etc. It is understood and agreed between the parties that actual costs may differ in PSA execution. As with any cost-type contract, all allowable, allocable, and reasonable costs will be reimbursed (subject to the Limitation of Costs or Limitation of Funds clauses of this contract) without any adjustment to the base fee or award fee amounts as specified in Section B of this contract.
(End of text)
CLAUSES INCORPORATED BY FULL TEXT
B-215-H002 REFUNDS (SPARES AND SUPPORT EQUIPMENT) (NAVSEA) (OCT 2018)
(a) In the event that the price of a spare part or item of support equipment delivered under this contract significantly exceeds its intrinsic value, the Contractor agrees to refund the difference. Refunds will not be made to recoup the amount of cost decreases that occur over time due to productivity gains (excluding economic purchase quantity considerations) or changes in market conditions.
(b) For purposes of this requirement, the intrinsic value of an item is defined as follows:
(1) If the item is one which is sold or is substantially similar or functionally equivalent to one that is sold in substantial quantities to the general public, intrinsic value is the established catalog or market price, plus the value of any unique requirements, including delivery terms, inspection, packaging, or labeling.
(2) If there is no comparable item sold in substantial quantities to the general public, intrinsic value is defined as the price an individual would expect to pay for the item based upon an economic purchase quantity as defined in FAR 52.207-4, plus the value of any unique requirements, including delivery terms, inspection, packaging or labeling.
(c) At any time up to two years after delivery of a spare part or item of support equipment, the Contracting Officer may notify the Contractor that based on all information available at the time of the notice, the price of the part or item apparently exceeds its intrinsic value.
(d) If notified in accordance with paragraph (c) above, the Contractor agrees to enter into good faith negotiations with the Government to determine if, and in what amount, the Government is entitled to a refund.
(e) If agreement pursuant to paragraph (d) above cannot be reached, and the Navy's return of the new or unused item to the Contractor is practical, the Navy, subject to the Contractor's agreement, may elect to return the item to the Contractor. Upon return of the item to its original point of Government acceptance, the Contractor shall refund in full the price paid. If no agreement pursuant to paragraph (d) above is reached, and return of the item by the Navy is impractical, the Contracting Officer may, with the approval of the Head of the Contracting Activity, issue a Contracting Officer's final decision on the matter, subject to Contractor appeal as provided in the "Disputes" clause (FAR 52.233-1).
(f) The Contractor shall make refunds, as required under this requirement, in accordance with instructions from the Contracting Officer.
(g) The Contractor shall not be liable for a refund if the Contractor advised the Contracting Officer in a timely manner that the price it would propose for a spare part or item of support equipment exceeded its intrinsic value, and with such advice, specified the estimated proposed price, the estimated intrinsic value and known alternative sources or item, if any, that can meet the requirement.
(h) This requirement does not apply to any spare parts or items of support equipment whose price is determined through adequate price competition. This requirement also does not apply to any spare part or item of support equipment if the Contractor submitted, and certified the currency, accuracy and completeness of, cost or pricing data applicable to the item.
B-216-H005 DETERMINATION OF AWARD FEE (NAVSEA) (MAR 2019)
(a) Minimum Fee
The base fee, as set forth in Section B of this contract, shall constitute a minimum fee to be paid for the performance of this contract. The Base Fee shall be paid in accordance with the clause of this contract entitled “PAYMENT OF FEE(S) (LEVEL OF EFFORT) - ALTERNATE 1 (NAVSEA) (OCT 2018) and “FIXED FEE” (FAR 52.216-8).
(b) Award Fee
In addition to the minimum (or base fee) to be paid hereunder, if any, the Contractor may earn an award fee as determined by the Fee Determining Official (FDO). The Government's purpose in granting an award fee is to encourage and reward superior Contracting effort directed toward performance of this contract. The specifics for evaluation are set forth in paragraphs that follow.
(c) Award Fee Board
The Contractor's performance evaluation for each period will be conducted by an Award Fee Board (AFB) of a Chairperson/Co-Chairperson and not less than four (4) and a maximum of eight (8) other voting members consisting of:
CHAIRPERSON /CO-CHAIRPERSON
Primary: LCS Program Office, Post Delivery Director, PMS 501D Alternate: LCS Program Office, Deputy Program Manager, PMS 501B.
OTHER VOTING MEMBERS
(1) Executing SUPSHIP Program Office Representative, Code 155
(2) Procuring Contracting Officer (PCO), NAVSEA 02232
(3) LCS Program Office, Post Delivery Representative, PMS 501D
(4) Executing SUPSHIP Technical Engineering Directorate, Code 200 Representative
(5) LCS Program Office Technical Representative, PMS 501T
(6) LCS Post Delivery Hull Manager, PMS 501D
(7) Executing SUPSHIP Quality Assurance Directorate, Code 300 Representative
(8) LCS Integrated Combat Systems Program Representative, IWS 8.0
(d) Fee Determining Official
The FDO, LCS Shipbuilding Program Manager (PMS 501), shall make determinations of the award fee due to the Contractor based upon the performance evaluation conducted by the Award Fee Board established pursuant to paragraph (c) above, and in consultation with the Contracting Officer.
(e) Award Fee Determination and Reclama Procedures
Within ten (10) days after the end of the evaluation period the Contractor will, if desired, submit a self-assessment report to the AFB Chairperson, Procuring Contracting Officer, and the COR. If submitted, this written assessment of the Contractor’s performance throughout the award fee period shall address each of the award fee factors and state the Contractor’s calculated award fee for the evaluation period. It shall contain supporting documentation and may also contain other relevant information, including any mitigating circumstances that may be reasonably expected to assist the AFB and FDO in determining the fee amount.
(1) Upon receipt of the Contractor’s self-assessment report, the COR will review and validate any inconsistencies, inaccuracies or areas of disagreement in the report and address the findings and supporting documentation to the AFB Chairperson and the Procuring Contracting Officer.
(2) Within twenty (20) days after the end of the evaluation period, and after receipt of all required CDRL deliverables, whichever is longer, the PMS 501D Hull Manager shall provide a Fee Recommendation Report of Contractor performance to the AFB Chairperson and Contracting Officer. This report shall clearly identify specific evaluation categories, factors or elements, and state the PMS 501D Hull Manager’s calculated award fee for the evaluation period.
(3) The Award Fee Board evaluation will be scheduled following receipt of required CDRL deliverables, the Contractor’s self-assessment report, if any, and Government input. The Contractor will be provided the opportunity to present a self-assessment brief at the Award Fee Board evaluation. This brief shall not exceed thirty (30) minutes. After reviewing both the Contractor’s and PMS 501D Hull Manager input, the Board will arrive at a consensus on the performance rating and advise the FDO of its recommendation including the reasons, rationale, and justifications .
(4) Within ten (10) working days from receipt of the Boards recommendations, the FDO will provide the Contracting Officer a final performance evaluation and determination of the award fee earned. The Contracting Officer will notify the Contractor of the determination of the award fee.
(5) Within five (5) working days of receipt of written notification, the Contractor may: 1) concur with the award fee determination or 2) submit to the FDO, with a copy to the Contracting Officer, written comments on the evaluation findings. In such case, these comments shall be considered by the FDO in establishing the award fee earned. If no written reclama is received within five (5) working days of written notification, the Contracting Officer will issue a unilateral modification to the contract to provide for award fee earned for that period within ten (10) working days after receipt of the required funding from the program office and approved by the Comptroller.
(6) If there is such a reclama, then within ten (10) working days from the receipt thereof, the FDO shall provide the Contracting Officer a final performance evaluation and determination of the award fee. The Contracting Officer will notify the Contractor of the FDO’s final determination.
(7) Upon written request by the Contractor to the FDO, the Chairman of the AFEB will assign a Board member to de-brief the Contractor, providing constructive feedback as to his performance and recommendations for improvement.
(f) Fee Determination Official’s Determination
Determinations of the FDO with respect to the amount of the award fee to be paid to the Contractor and the methodology for determining the award fee are unilateral decisions made solely at the discretion of the Government.
(g) Performance Objectives and Factors
The Contractor's performance during each evaluation period will be judged in the objectives listed below. The Government reserves the right to make changes in performance objectives and factors or weights assigned to performance objectives by unilateral modification no later than ten (10) working days prior to the commencement of the evaluation period. Unsatisfactory performance under an award fee criterion may result in increased weighting for that factor in subsequent evaluation periods.
During the evaluation period, the Contractor may earn award fee for exceeding performance objectives. The performance objectives are categorized in the following areas: schedule, management, technical and cost. Their relative importance is reflected by the weighting factors provided below:
| Performance Objectives |
| Weighting |
| Schedule Performance |
| 35% |
| Management Performance |
| 30% |
| Technical Performance |
| 20% |
| Cost Performance |
| 15% |
(1) Performance Objectives
The following performance objectives will be evaluated during the evaluation period.
a. Schedule – Emphasis will be placed on the Contractor’s efforts toward development and achievement of aggressive, yet manageable, schedules to support major PSA milestones. The Contractor is to schedule major milestones to occur as early as possible to ensure a successful PSA. Adherence to or improvement upon scheduled key events and major production milestones is considered essential.
Measures of success include:
i. Strict adherence to the PSA schedule milestone dates submitted by the Contractor and approved by the Government prior to the start of PSA and completing growth and new work within the PSA schedule. Actual completion dates will be compared to scheduled dates. Accelerating schedule while maintaining quality and cost is recognized as superior performance.
ii. Submission of an accurate, fully populated, resource-loaded Integrated Master Schedule (IMS) that provides for accomplishment of the total availability work package, including Alteration Installation Team (AIT) or other outside activity installation modifications. The IMS developed shall utilize a front-loaded approach of 70% of all production work complete at the 50% point of the production window between PSA and Production Completion Date (PCD) for work tasked by the beginning of the availability. The Contractor shall also submit accurate, fully populated, resource-loaded IMS updates for inclusion of new and growth work.
iii. Adherence to or improvement upon the integrated schedule for the entire PSA work package as measured by the final Schedule Performance Index (SPI) at the end of the PSA. SPI will initially be based on the IMS and resource loading plan provided by the Contractor at the start of the PSA and subsequently measured based upon work package growth and Contractor Weekly Resource Manning plan CDRLs and Summary Briefs.
iv. Timely completion and turnover of compartments to the Government in accordance with the Compartment Close-out schedule provided by the Contractor prior to the start of PSA and adjusted dates that coincide with the IMS as work is added to the work package.
b. Management – Emphasis will be placed on the Contractor’s effective and efficient management of resources (manpower) during the PSA and ability to manage growth and new work. Consideration will be given to timely negotiation and definitization of changes, including prompt and timely submission of proposals, notification to the Government of any identified problems, reasonableness of estimates, and provision of information required by the Government for negotiations. Consideration will also be given to effective subcontractor management throughout the execution of the PSA. Timely and accurate submission of contract deliverables, particularly schedule and cost data, crucial to Government oversight is considered essential. Cooperation with and support of the Contractor with the integration of outstanding new construction DD250 work items into the overall PSA schedule is mandatory. Active Contractor participation and preparedness for PSA Planning Conferences to discuss work packages, schedules and execution planning is required. Measures of success include:
i. Effectiveness of the Contractor’s workload management plan. Actual manning will be compared to projected manning, as well as progress reporting CPIs.
ii. Acceptance, integration, and execution of new and growth work within the PSA.
iii. Effective subcontractor management, placing emphasis on the prime contractor’s ability to align subcontractor execution to government priorities throughout the execution of the PSA.
iv. Timeliness and accuracy of CDRL deliverables, particularly those associated with cost and schedule reports.
v. Judicious use of overtime, where contractually authorized, striking the appropriate balance between cost and responsiveness.
vi. Incorporation of process improvements that result in reduced cost, improved schedules and/or improved performance.
vii. How effectively the Contractor works with the PSA Planning Yard to ensure SOW efforts provided under separate tasks are totally integrated resulting in seamless support to PMS 501. Award Fee determination will be based upon the success of prime contractors creating a cooperative work environment in providing such seamless support.
c. Technical – Emphasis will be placed in accomplishing the PSA work package with quality workmanship and minimal re-work. Contractor ability to clearly identify and resolve shipboard production and test problems will be monitored. Accuracy of the work packages and test procedures is integral to success. Care and protection of the ship and equipment during an intrusive industrial environment is considered an important element of the PSA. Prevention of equipment damage and contamination from industrial debris is to be accomplished through proactive protection including application of appropriate covers and proper utilization of storage facilities. Maintenance of safe and clean work areas free from accumulated industrial debris and rubbish is essential.
Measures of success include:
i. Effectiveness of the Compartment Close-out process in delivering compartments without PSA related deficiencies.
ii. Quality of the workmanship as measured by equipment and material deficiencies identified during the Post Repair Sea Trials conducted at the conclusion of the PSA and associated man-hours required to correct them.
iii. Quality of workmanship as measured by the re-work required to correct defective repairs and deficient work performed on equipment and shipboard spaces as part of the PSA work package.
iv. Effectiveness of the Contractor to identify and quickly resolve safety, care and protection problems on the ship during PSA.
v. Quality, timeliness and accuracy of Objective Quality Evidence (OQE) submittals during the work package certification process.
d. Cost – The most significant goal in this performance objective is accomplishment of work within the ROM estimates and Section B dollar amounts. The Contractor is required to provide realistic ROM estimates and negotiate work in a timely manner. Accuracy of the ROM estimates and Estimate at Completion (EAC) to projected cost and delivery of all hours tasked is considered a reflection of cost control. Accurate cost accounting (labor, materials, management) of both prime and subcontractors is required. Proactive identification of cost problems, to include timely variance analysis, and Contractor effectiveness in problem resolution will be evaluated. Implementation of cost savings techniques will be viewed favorably.
Measures of success include:
i. ROM estimates are submitted rapidly to support the agreed upon PSA timeline. Particularly crucial is new work and growth identified during the course of the PSA and the prompt communication of any changes to ROM estimates and impacts to schedules.
ii. When Subcontractors are used (especially when on a FFP basis), the prime contractor will be measured by its actions taken to ensure that full and open competition is appropriately and effectively sought from multiple offerors and its actions to effectively negotiate fair and reasonable pricing when competition is not possible or appropriate. The contractor will demonstrate its ability to provide full transparency into its sourcing decisions, the basis of dollars and hours negotiated, and how fair and reasonableness was determined.
iii. Accuracy of ROM estimates that track very closely to the actual costs at end of PSA track with very little or no variance.
(h) Evaluation Periods/Award Fee Pool
(1) Award Fee Period
The Award Fee Board will evaluate the Contractor's performance on all active line items during the evaluation period. The single evaluation period is defined as:
Start - Upon contract award or option exercise, as applicable.
End - 90 days after PSA Completion Date.
An informal review will take place during the course of the evaluation period. This review will be based on the evaluation categories and factors as set forth above and will provide the Contractor with input from the Navy to allow the Contractor to make adjustments in its performance as necessary. This review is not subject to the award fee provisions of this clause and will not reflect an award fee evaluation score, nor will an award fee be established for this review period.
(2) Award Fee Pool
For Level-of-Effort-type Items: The Award Fee Pool for each evaluation period for each Item shall be calculated as follows:
Award Fee Pool = (Percent of hours delivered during evaluation period) X (Section B CLIN Max Award Fee amount).
Where: Percent of hours delivered during the evaluation period = Actual prime contractor hours delivered during evaluation period for each Section B CLIN / Quantity of labor hours listed in Section B CLIN.
Only prime contractor hours shall be used in calculating the award fee pool.
There shall be no rollover of unearned award fee.
(i) Performance Ratings
(1) In evaluating Contractor performance, the following adjective and numerical ratings will be used:
| ADJECTIVE RATING |
| NUMERICAL RATING/ % OF AWARD FEE POOL EARNED |
| CRITERIA/DEFINITION OF RATING |
| Excellent |
| 91%--100% |
| Contractor has exceeded almost all of the significant award-fee criteria and has met overall cost, schedule, management and technical performance requirements of the contract in the aggregate as defined and measured against the criteria in the award-fee plan for the award- fee evaluation period. |
| Very Good |
| 76%--90% |
| Contractor has exceeded many of the significant award- fee criteria and has met overall cost, schedule, management and technical performance requirements of the contract in the aggregate as defined and measured against the criteria in the award-fee plan for the award- fee evaluation period. |
| Good |
| 51%--75% |
| Contractor has exceeded some of the significant award- fee criteria and has met overall cost, schedule, management and technical performance requirements of the contract in the aggregate as defined and measured against the criteria in the award-fee plan for the award- fee evaluation period. |
| Satisfactory |
| No Greater Than 50%. |
| Contractor has met overall cost, schedule, management and technical performance requirements of the contract in the aggregate as defined and measured against the criteria in the award-fee plan for the award-fee evaluation period. |
| Unsatisfactory |
| 0% |
| Contractor has failed to meet overall cost, schedule, management and technical performance requirements of the contract in the aggregate as defined and measured against the criteria in the award-fee plan for the award- fee evaluation period. |
The Award Fee earned by the Contractor for the evaluation period shall be calculated as follows:
AWARD FEE GRADE
| Performance Objective |
| Weighting Factor |
Award Fee Rating
Weighted Grade
| Schedule |
| 35% |
| X |
| Management |
| 30% |
| X |
| Technical |
| 20% |
| X |
| Cost |
| 15% |
| X |
THE SUM IS THE AWARD FEE GRADE (%)
(j) Payment of Award Fee
The Contractor shall be paid award fee, if any, upon submittal of a proper invoice or voucher to the cognizant Payment Office, together with a copy of the unilateral modification to the contract authorizing payment of award fee for the applicable Evaluation Period. The Contractor's invoice shall show the amount of award fee payable to each sub-line item, which shall be directly proportionate to the amount or allowable Estimated Cost (exclusive of base fee and FCCOM) incurred by the Contractor during the Evaluation Period. The Contractor's invoice must cite the appropriate accounting data in order for payment to be affected. There will be no provisional, interim or advance billing of award fee prior to a final determination of the FDO and execution by the contracting officer of a contract modification authorizing payment.
B-231-H001 TRAVEL COSTS (NAVSEA) (OCT 2018)
(a) Except as otherwise provided herein, the Contractor shall be reimbursed for its actual travel costs in accordance with FAR 31.205-46. The travel costs to be reimbursed shall be those costs for which the Contractor has maintained appropriate documentation and which have been determined to be allowable, allocable, and reasonable by the Procuring Contracting Officer, Administrative Contracting Officer, or their duly authorized representative.
(b) Reimbursable travel costs include only that travel performed from the Contractor's facility to the worksite, in and around the worksite, and from the worksite to the Contractor's facility.
(c) Relocation costs and travel costs incidental to relocation are allowable to the extent provided in FAR 31.205-35; however, Procuring Contracting Officer approval shall be required prior to incurring relocation expenses and travel costs incidental to relocation.
(d) The Contractor shall not be reimbursed for the following daily local travel costs:
(i) travel at U.S. Military Installations where Government transportation is available,
(ii) travel performed for personal convenience/errands, including commuting to and from work, and
(iii) travel costs incurred in the replacement of personnel when such replacement is accomplished for the Contractor's or employee's convenience.
B-232-H005 PAYMENTS OF FEE(S) (LEVEL OF EFFORT)--ALTERNATE I (NAVSEA) (OCT 2018)
(a) For purposes of this contract, "fee" means "target fee" in cost-plus-incentive-fee type contracts, "base fee" in cost-plus-award-fee type contracts, or "fixed fee" in cost-plus-fixed-fee type contracts.
(b) The Government shall make payments to the Contractor, subject to and per the clause in this contract entitled "Fixed Fee" (FAR 52.216-8) or "Incentive Fee", (FAR 52.216-10), as applicable. Such payments shall be submitted by and payable to the Contractor pursuant to the clause of this contract entitled "Allowable Cost and Payment" (FAR 52.216-7), subject to the withholding terms and conditions of the "Fixed Fee" or "Incentive Fee" clause, as applicable. Fee paid per hour shall be based on total fee dollars divided by total hours to be provided. Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract. In no event shall the Government be required to pay the Contractor any amount in excess of the funds obligated under this contract.
B-232-H006 LIMITATION OF COST OR LIMITATION OF FUNDS CLARIFICATION (NAVSEA) (OCT 2018)
The clause entitled "Limitation of Cost" (FAR 52.232-20) or "Limitation of Funds" (FAR 52.232-22), as appropriate, shall apply separately and independently to each separately identified estimated cost.
Section C - Descriptions and Specifications
STATEMENT OF WORK
PART I - CONTRACT LINE ITEM DESCRIPTION
The Contractor, under the Technical Authority of the Supervisor of Shipbuilding, Conversion and Repair, USN, Bath Naval Supervising Authority and as independent Contractor and not as an agent of the Government, shall furnish materials, services, and facilities (except those expressly identified in this contract or an attachment as furnished by the Government) necessary for the accomplishment of the following work in accordance with SSBA INSTRUCTION 4700.4 Post Delivery Availability, Planning, Execution and Work Certification. All work shall be accomplished in accordance with NAVSEA Standard Items using the Government Fiscal Year (GFY) in which the availability will be executed unless otherwise directed.
The following Tasks apply to all CLINs:
Task 1 - POST SHAKEDOWN AVAILABILITY (PSA):
The Contractor shall provide all efforts and associated material which support the total Post Shakedown Availability (PSA) requirements for FREEDOM Variant Hull 17 and following ship hulls, to include program management, planning, engineering, design, liaison, scheduling, participation in PSA Planning Conferences and Design Reviews and production supervision above the leading man-level for a notional 22 week production window. The Contractor’s management efforts shall be those necessary to support work defined in the following tasks by variant and hull number:
1. Prior to the start of the PSA, the Contractor shall develop and provide (per Attachment J-1 Contract Data Requirements List) a key events and milestones schedule and an Integrated Master Schedule (IMS) that integrates all work tasked to the Contractor for accomplishment during the PSA, and all work tasked to other Contractors for the accomplishment of fleet maintenance work, Alteration Installation Team (AIT) work and New Construction Shipbuilder deferred and warranty/guaranty work. The IMS shall link all work item activities with the key events and milestones. The IMS developed shall utilize a front-loaded approach of 70% of all production work complete at the midpoint of the production window between PSA and Production Completion Date (PCD) for work tasked by the beginning of the availability. The Contractor shall make provision for an 8-week crew certification period in the IMS, between the PCD and the Post Repair Trials (PRT) date. The Contractor shall provide updates as required until the conclusion of the PSA.
The Contractor shall coordinate development of the key events and milestones schedule and the IMS with PMS 501, to include Regional Maintenance Center (RMC) and shipbuilder deferred work to be accomplished during the availability, and all work to be accomplished by AITs. The Contractor shall utilize a front-loaded approach (70% of all production work complete at 50% of the production window between PSA start and PCD) to the execution of all work tasked for accomplishment of the PSA.
2. The contractor shall make available office and parking facilities for use by the Navy Onsite PSA Support Team of up to 40 personnel starting four weeks prior to PSA start and through the PSA as follows:
· Telephone service for 40 lines.
· Provide T1 lines (1.544 Mbps), Qty (2) Navy (1), and planning yard/other (1) trailer/office to service up to 40 computers each with their own IP address.
· The LAN shall be segmented to support three separate sets of users:
· Government only users on the first T1 line; (30) PSA Team support contractors on the second T1 line.
· Provide Qty (40) parking spaces for PSA Support Team.
· Provide janitorial services to include mopping/buffing and vacuuming the entire facility on a weekly basis.
· Minimum Qty (4) enclosed offices with lockable doors and small conference table.
· Two (2) High Volume, multiple sheet, color capable, printer/copier/scanner with sorter and stapler, capable of processing up to 11x17 inch paper. All copiers to be LAN capable.
· Conference room capable of holding up to 25 individuals.
3. The Contractor shall generate a complete technical analysis of anticipated problems including identification of the potential impact of each problem and recommendations for corrective action.
4. The Contractor shall attend two PSA Planning Conferences (located in Mayport, FL) prior to PSA commencement. During PSA, the Contractor shall attend a daily logistics status meeting and a daily combat systems meeting with the Contracting Officer’s Representative (COR) and members of the Government’s PSA management team. The Contractor shall also conduct a daily production meeting, attended by the Government, to include review status of all critical paths and near term PSA milestone related work items. Upon request, the Contractor shall support other production or status meetings when required by the COR.
5. The Contractor shall maintain central files or record copies that shall include reproducible copies (including CD- R) of the data that are generated for delivery under this contract.
6. Upon request, the Contractor shall assist the PSA Planning Yard with revisions to Ship Selected Record drawings, ILS updates and data to reflect the accomplishment of work accomplished by the executing yard during the PSA.
7. In identifying and providing material requirements and long lead items lists to meet the requirements of the work specifications, the Contractor shall, to the maximum possible extent, utilize equipment and components identical to those of the LCS Class ships as described in Section C clause “STANDARDIZATION”.
8. The Contractor shall provide onboard spare parts and test equipment for all Contractor procured equipment which is different from that previously installed onboard the ship. The range and depth of spare parts shall be in accordance with documented manufacturer's recommendations to support the ship for ninety (90) days.
9. The Contractor shall provide assistance, as requested by certification test and inspection personnel, to support certifications or re-certifications required as a result of work accomplished in accordance with Supervisor of Shipbuilding, Conversion and Repair, U.S. Navy, Bath (SUPSHIP Bath) Instruction 4700.4 (Standard Operating Procedure For Execution Of Post Shakedown Availabilities) and NAVSEA Instruction 5400.108B (Policy for Quality Management of Work on Non-nuclear Surface Ship Critical Systems), or latest revisions.
10. Upon request, the Contractor shall support responses to requests for OQE and condition found reports when required by the COR. The Contractor shall develop a Quality Plan, which integrates all major subcontractor quality assurance programs per the Attachment J-1 Contract Data Requirements List. The Contractor shall also develop and maintain a Test and Inspection Plan in accordance with NAVSEA Standard Item 009-04.
11. The Contractor shall participate in Final Contract Trials (FCT), subsequent trial card screening sessions and ship checks, in an observer capacity, for the purpose of becoming familiar with the ship and the FCT deficiencies.
12. The Contractor shall develop a man-loading chart depicting proposed manning from the start of the availability to the completion per the Attachment J-1 Contract Data Requirements List. During PSA, the Contractor shall provide, on a weekly basis, the planned manning schedule versus the actual manning achieved. The data shall be presented both numerically as well as graphically.
13. The Contractor shall develop earned value metrics on a weekly basis from the start of the availability to the completion per the Attachment J-1 Contract Data Requirements List.
14. Prior to and during PSA, the Contractor shall develop regular EAC status reports per the Attachment J-1 Contract Data Requirements List. All EACs shall be accompanied by the applicable Direct Production Labor (DPL) for the effort. Reports shall be provided weekly beginning at A-30 days through the end of the PSA.
15. At the beginning of week three of the PSA, the Contractor shall develop and provide a Compartment Close-out schedule for all compartments identified in the PSA work package (including work performed by the Contractor, AITs, RMC, PSA Planning Yard and Shipbuilder warranty work) to support the scheduled accomplishment of key events and milestones. The Contractor will provide updates as required until all compartments have been turned over.
16. The Contractor shall prepare and provide a Test Plan that includes a test index, test procedures and test schedule, based on the IMS, that addresses all equipment and systems impacted by work performed during the PSA. The tests shall be run in whole or part as specified in work item specifications. Test documentation not furnished by the Government as part of the Work Item specification shall be developed by the Contractor.
17. The contractor shall develop projected cost reports, actual work item man-hour/material expenditure reports, Post Repair Trials Agenda and Report, Adverse Environmental Conditions Plan, Plant Protection Plan per the Attachment J-1 Contract Data Requirements List.
18. The Contractor shall receive, inventory and store all GFE, and GFP/GFM.
19. Plan, manage, integrate and progress new work and growth work into the work package, and ensure the IMS is updated accordingly.
20. Provide cost estimating and sub-contract administration to support the accomplishment of authorized work.
Task 2 - PSA WORK ITEMS:
The Contractor shall provide all material and labor required to perform all tasked PSA work items. The Contractor shall conduct tests, except those designated as Government responsible, and participate in Post Repair Sea Trials, to verify the accuracy and completion of all shipyard industrial work in accordance with the following:
1. Equipment, single system and integrated ship system level tests shall be conducted to demonstrate operations and contract compliance as specified in work item specifications.
2. Post Repair Sea Trials shall be conducted in accordance with LCS Ship’s specifications except as follows:
a. Post Repair Sea Trials will be conducted by the Government. The operation and navigation of the ship will be under control of the Government. The Contractor shall provide a sea trial coordinator and agreed upon craft personnel, including supervision, to effect emergent repairs and testing during Post Repair Sea Trials. The Contractor shall participate in Post Repair Sea Trials card screening sessions.
b. Correction of deficiencies identified during Post Repair Sea Trials shall be completed by the Contractor prior to end of PSA.
3. The Contractor shall provide ship services and test support personnel during the conduct of Government responsible tests and trials. The Contractor shall test or re-test all supporting and interfacing equipment, systems and structures involved in new installations to ensure completeness and proper operation. The Contractor shall develop and submit recommended trial agenda items to the COR for approval and provide trial support. The Contractor will coordinate this Test Plan with the ship and COR. Results of tests and trials shall be documented by Test Reports.
4. The Contractor shall provide those support services necessary for accomplishment of production work, including but not limited to temporary protection services, cleaners/laborers, transportation services and production supervision at the leading man-level and below.
5. Notwithstanding the requirements set forth in the ship specifications, the Contractor shall not be required to conduct non-recurring tests such as shock, noise, vibration or reliability and maintainability on equipment, systems and interfaces for Government Furnished Equipment, unless any such nonrecurring test is specifically required to be conducted by a work item specification. The Contractor shall conduct first article tests after obtaining Government approval to deviate from previously qualified equipment.
6. The Contractor shall provide waterfront support services when a berthing barge or trailer is assigned to support the PSA. The Contractor shall accomplish the following:
a. The Contractor shall, in conjunction with assigned Government personnel, inspect the barge and submit a detailed report of findings at time of receipt of barge and return of barge.
b. The Contractor shall, upon arrival of the barge at the PSA location and prior to the PSA start, accomplish repairs as authorized by the COR to activate and make the barge habitable. The Contractor shall also effect emergent repairs to the barge during the PSA as directed by the COR.
Task 3 - PSA SUPPORT:
The Contractor shall provide the labor required to perform other work necessary to complete the PSA inclusive of test and trials, in accordance with the Technical Instructions. Other work is defined as that type of work, which is similar but not necessarily identical to, work to be performed under “SPECIFIED PSA WORK ITEMS”, which is identified subsequent to submission of proposals or during the performance of SPECIFIED PSA WORK ITEMS.
The Contractor shall provide all material necessary to support the performance of this effort including any associated overhead and other indirect costs applied to such materials in accordance with the contractor’s Cost Accounting Standards (CAS) Disclosure Statement. The Contractor shall provide those support services necessary for accomplishment of this work including but not limited to temporary protection services, cleaners/laborers, transportation services and production at the leading man-level and below.
The Contractor shall provide additional support for correction of deficiencies identified during Fleet and TYCOM engineering readiness inspections and trials, including FCT, in accordance with the Technical Instructions. The Contractor shall also provide labor and any incidental material to correct discrepancies as directed by the COR, identified during these events. These discrepancies will include, but are not limited to structural, piping, electrical, machinery, auxiliary and combat system deficiencies.
Task 4 – PSA EMERGENT WORK:
The Contractor shall provide the labor to complete emergent work identified prior to, or during the PSA, and other work, as directed via technical instruction, which is identified during performance and in addition to that level of work proposed for specified PSA Work Items. The Contractor shall provide all material necessary to support the performance of this effort including any associated overhead and other indirect costs applied to such materials in accordance with the contractor’s Cost Accounting Standards (CAS) Disclosure Statement.
Task 5 – DRY-DOCKING:
The Contractor shall provide a dry-dock and all material and labor required to dry-dock FREEDOM Variant hulls. The Contractor shall perform all dry-docking PSA work items in accordance with NAVSEA Standard Items.
1. The Contractor shall develop a key events schedule to support dry-docking and scheduling of critical milestones.
2. During the dry-dock period, the Contractor shall attend a daily logistics status meeting and conduct a daily production meeting with the COR and the on-site PSA Team to review status of all critical path and dry-dock related work items.
3. The Contractor shall provide those support services necessary for accomplishment of dry-dock related production work, including but not limited to temporary protection services, cleaners/laborers, transportation services and production supervision above the leading-man level.
Task 6 - PSA FLEET FUNDED:
The Contractor shall provide engineering, design and industrial support for the installation of fleet funded alterations during the PSA, as directed via technical instruction. These alterations will be selected and individually funded after contract award. The Contractor will provide support services necessary for accomplishment of engineering, design and production work including temporary protection services, cleaners/laborers, transportation services and production at the leading man-level and below. The Contractor shall provide all material necessary to support the performance of this effort including any associated overhead and other indirect costs applied to such materials in accordance with the contractor’s Cost Accounting Standards (CAS) Disclosure Statement.
Task 7 – PSA DEFERRED WORK:
The Contractor shall provide labor required to perform other work in support of tests, engineering readiness inspections and trials including test readiness events as directed via technical instruction. The Contractor shall also provide labor to correct discrepancies as directed by the COR, identified during these events. The Contractor shall provide all material necessary to support the performance of this effort including any associated overhead and other indirect costs applied to such materials in accordance with the contractor’s Cost Accounting Standards (CAS) Disclosure Statement.
Item 900– Data for Items 0100-0800
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A, attached hereto.
C-202-H002 ADDITIONAL DEFINITIONS–ALTERNATE I (NAVSEA) (OCT 2018)
(a) Department means the Department of the Navy.
(b) Commander, Naval Sea Systems Command means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program.