Attachment L-2

View the file

Other files

File Type Posted
N00024-17-R-6308_0005_Conformed.doc DOC document
Amendment_0005_Summary_of_Changes.doc DOC document
Amendment_0004_Summary_of_Changes.doc DOC document
N00024-17-R-6308_0004_Conformed.doc DOC document
Amendment_0003_Summary_of_Changes.doc DOC document
N00024-17-R-6308_0003_Conformed.doc DOC document
Amendment_0002_Summary_of_Changes.docx DOCX document
N00024-17-R-6308_0002_Conformed.doc DOC document
N00024-17-R-6308_0001_Conformed.doc DOC document
Amendment_0001_Summary_of_Changes.doc DOC document
Attachment_L-2.xlsx XLSX spreadsheet
N00024-17-R-6308.doc DOC document
FedBizOpps_Instructions.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

CLINDescriptionForm L-2-AForm L-2-B
0001XLUUV System Design and Tech Data PackageX
0010Engineering ServicesX
0110Engineering ServicesX
0210Engineering ServicesX
0310Engineering ServicesX
0410Engineering ServicesX

Form L-2-A

UNIT PRICE ANALYSIS
(BY WORK BREAKDOWN STRUCTURE)

CLIN : 0001

Prime orDIRECT LABORLABOR OVERHEAD ($)LABOR G&A ($)TOTAL LABOR COSTS ($)MATERIAL ($)MATERIAL OVERHEAD ($)MATERIAL G&A ($)TOTAL MATERIAL ($)PRIME TOTAL ($) at COSTSUBCONTRACT COSTS (to PRIME) ($)ODC ($)PROFIT ($)FCCM ($)TOTAL ($) PRICE
SubcontractorLABOR MANHOURSDIRECT LABOR ($)NON-RECURRINGRECURRING
Company UsedNON-RECURRINGRECURRINGNON-RECURRINGRECURRING
1.0 Unmanned Maritime System - see MIL-STD-881C, Appendix I for further definitionsTotal
Prime Subtotal
Sub KTR #1 Subtotal
…
Sub KTR #N Subtotal
1.1XLUUV Element
1.1.1Hull and Structure
1.1.2Propulsion
1.1.3Energy Storage / Conversion
1.1.4Electrical Power
1.1.5Vehicle Command and Control
1.1.6Surveillance
1.1.7Communications/Identification
1.1.8Ship Control Systems
1.1.9Auxiliary Systems
1.1.10Vehicle Software Release 1…n
1.1.11Vehicle Integration, Assembly, Test and Checkout
1.1.12CDM Payload
1.1.12.1Payload Integration, Assembly, Test and Checkout
1.1.12.2CDM Mission Payload
1.1.12.3Payload Software Release 1…n
1.1.12.4Other Payload 1…n (Specify)
1.2XLUUV Support Element
1.2.1Integration, Assembly, Test and Checkout
1.2.2Launch and Recovery Equipment
1.2.3Storagerefer to P-Spec, Section 1
1.2.4Handling Equipmentrefer to P-Spec, Section 1
1.2.5Communications Equipment
1.2.6Maintenance Equipmentrefer to P-Spec, Section 1
1.2.7Energy Replenishmentrefer to P-Spec, Section 1
1.2.8Manual Controlsrefer to P-Spec, Section 1
1.2.5Software Release 1…n
1.2.6Other Support Segment 1…n (Specify)
1.3XLUUV Ashore Element
1.3.1Integration, Assembly, Test and Checkout
1.3.2Command & Control, Planning and Post Mission Analysisrefer to P-Spec, Section 1
1.3.3Data Storage
1.3.4Storage
1.3.5Communications Equipment
1.3.6Maintenance Equipment
1.3.7Energy Replenishment
1.3.8Vehicle Handling Equipment
1.3.9Auxiliary Equipment
1.3.10Software Release 1…n
1.3.11Other Ashore Segment 1…n (Specify)
1.4XLUUV Mobile C2 Element
1.4.1Integration, Assembly, Test and Checkout
1.4.2Command & Control, Planning and Post Mission Analysis
1.4.3Data Storage
1.4.4Communications Equipment
1.4.5Software Release 1…n
1.4.6Other Mobile C2 Segment 1…n (Specify)

1.5 Transportation Segment/Vehicles

1.6 UM System Software Release 1…n

1.7 UM System Integration, Assembly, Test and Checkout

1.8 System Engineering

1.9 Program Management

1.10System Test and Evaluation
1.10.1Test & Evaluation Program Planningrefer to SOW, 3.1.4
1.10.1Test & Evaluation Support
1.10.2Test Facilities
1.11Data
1.11.1Technical Publications
1.11.2Engineering Data
1.11.3Management Data
1.11.4Support Data
1.11.5Data Depository
1.12Peculiar Support Equipment
1.12.1Test and Measurement Equipment
1.12.2Support and Handling Equipment
1.13Common Support Equipment
1.12.1Test and Measurement Equipment
1.12.2Support and Handling Equipment
1.14Operational/Site Activation
1.14.1System Assembly, Installation and Checkout on Site
1.14.2Contractor Technical Support
1.14.3Site Construction
1.14.4Site/Ship/Vehicle Conversion
1.14.5Sustainment/Interim Contractor Support
1.15Industrial Facilities
1.15.1Construction/Conversion/Expansion
1.15.2Equipment Acquisition or Modernization
1.15.3Maintenance (Industrial Facilities)

1.16 Initial Spares Planning

TOTAL

&"Arial,Regular"&14&A

&"Arial,Regular"&14&A &"Arial,Regular"&14L-2 Attachments Set A

Form L-2-B

Cost Summary Detail for CLINs 0010, 0110, 0210, 0310, and 0410

Major Cost ElementGovernment Labor Category (Senior, Mid, Junior)CY17CY18CY19CY20CY21CY22Total $
HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $
Labor
Program Management
Category/Personnel
*
*
*
Program Management Indirect Rates
*
*
*
Engineering
Category/Personnel
*
*
*
Engineering Indirect Rates
*
*
*
Egineering Technician
Category/Personnel
*
*
*
Engineering Technician Indirect Rates
*
*
*
Admin
Category/Personnel
*
*
*
Admin Indirect Rates
*
*
*

Total Labor

Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

SUBTOTAL COSTS ($)

TOTAL ESTIMATED COSTS ($)
Fee ($)
Fee (%)
TOTAL ESTIMATED COSTS ($) Plus Fixed Fee
Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs
Labor CategoryCY17CY18CY19CY20CY21CY22Total Hours
Hours% of Total HoursHours% of Total HoursHours% of Total HoursHours% of Total HoursHours% of Total HoursHours% of Total Hours
Program Management
Engineering
Engineering Technician
Admin
Prepare one of these forms for each CLIN as specified on Form L-I Instructions.
See Instructions for Engineering Services Composite Labor Rate BOE to the right of the table.
Round cost values to whole dollars, Round Rates to two decimal points and G&A and FCCM to three decimal points.
Link values on this form with values/equations on other forms. Do not just paste values where value can be linked to another form.
Categories provided are for example only, link categories to actual categories listed on Form L-G.
Rate cells should be linked to the rates Form L-G. Total values shall be computed in this form.
Provide equations for Total Cost computation.
Shall be bid in accordance with Offeror's Accounting System Disclosure Statement (OH, Fringe, etc.)

PersonnelNormMatrix

ABCD
ManagementGeneral EngineeringFinancial/AdminProduction
1ExectutiveA1B1C1D1
EducationMA/MS or MBAMA/MS + PE or PhDMA/MS or MBABA/BS or MA/MS
Experience12+12+12+15+
2Upper/LeadA2B2C2D2
EducationBA/BS or MA/MSMA/MS + PEBA/BS or MA/MSBA/BS
Experience9-129-129-1210-15
3MiddleA3B3C3D3
EducationBA/BSBA/BS + PE or MA/MSBA/BSAA/AS
Experience5-95-95-95-10
4Low/EntryA4B4C4D4
EducationAA/ASBA/BSNone ReqNone Req
Experience<5<5<5<5

File details come from the government source that posted it. Updated .