N00024-17-R-4426_Conformed_Amend_5.pdf
PDF 663 KB Posted
- Attached to
- USS MAKIN ISLAND FY17 DPMA
- Solicitation number
- N00024-17-R-4426
About this file
N00024-17-R-4426 Conformed Amendment 5
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 03:00 PM local t ime 08 Mar 2017
X
A X B X C X D
EX
X
G F 71 - 76
77 - 89 X H 90 - 94 bran.sherman@navy .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DOA3 1 94
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00024 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 3 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
SEE SECTION L
conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
BRAN M SHERMAN 202-781-2894
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 15
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
16 - 39 40 - 41
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
42 - 43
44 - 45 X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 46 - 49 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 50 - 56 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
57 - 69
PART II - CO NTRACT CLAUSES
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.
N0002416NR93022
5. DATE ISSUED
24 Jan 2017
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N00024-17-R-4426
09:00 AM
(Hour)
27 March 2017 (Date)
N00024-17-R-4426
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
Data
FFP
1 Lot
CONTRACT DATA REQUIREMENTS LIST (CDRLs) FOR ALL CLINs, INCLUDING
OPTION CLINS, IF EXERCISED.
The data to be furnished hereunder shall be prepared and submitted in accordance with the Contract Data Requirements List, DD Form 1423, Exhibits A, B and C attached hereto. The CDRLs form a part of the schedule of this solicitation.
Not Separately Priced (NSP). See Notes A and C.
FOB: Destination
PURCHASE REQUEST NUMBER: N0002416NR93022
NET AMT
USS MAKIN ISLAND DPMA - Non Prorated WIs
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS MAKIN ISLAND (LHD 8) DURING FY17 DRY-DOCKING PHASED
MAINTENANCE AVAILABILITY (DPMA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS MAKIN ISLAND (LHD 08) as specified in the statement of work provided herein and in accordance with standard items, work item specification package SSP TPPC-LHD8-SWRMC17-CNO1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A and C.
JOINT STRIKE FIGHTER (JSF) Work Items
Work Items: See attachment J-4 for list The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS MAKIN ISLAND (LHD 08) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A and C.
BOAT DAVIT Work Items
Work Items: See attachment J-4 for list The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS MAKIN ISLAND (LHD 08) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A and C.
USS MAKIN ISLAND DPMA - Prorated WIs
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS ONBOARD
USS MAKIN ISLAND (LHD 8) DURING FY17 DRY-DOCKING PHASED
MAINTENANCE AVAILABILITY (DPMA) (Prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS MAKIN ISLAND (LHD 08) as specified in the statement of work provided herein and in accordance with standard items, work item specification package SSP TPPC-LHD8-SWRMC17-CNO1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A and C.
TYCOM Work Items
OPTION Work Items: See attachment J-4 for list The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS MAKIN ISLAND (LHD 08) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, & C.
TYCOM Work Item (Berthing Barge Svcs)
The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS MAKIN ISLAND (LHD 08) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, & C.
TYCOM Work Items
The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS MAKIN ISLAND (LHD 08) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, & C.
NAVSEA Work Items
The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS MAKIN ISLAND (LHD 08) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, & C.
SPAWAR Work Items
The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS MAKIN ISLAND (LHD 08) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, & C.
The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS MAKIN ISLAND (LHD 08) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, & C.
The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS MAKIN ISLAND (LHD 08) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, & C.
NAVAIR Work Items
The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS MAKIN ISLAND (LHD 08) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, & C.
The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS MAKIN ISLAND (LHD 08) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, & C.
The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS MAKIN ISLAND (LHD 08) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, & C.
IWS Work Items
The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS MAKIN ISLAND (LHD 08) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, & C.
IWS Work Items
The Contractor shall prepare for and accomplish repair and alterations during the Dry- Docking Phased Maintenance Availability (DPMA) onboard USS MAKIN ISLAND (LHD 08) as specified in the statement of work provided herein and in accordance with standard items, work item specification package J-1 drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, & C.
NOTE A: FIXED SHIP REPAIR LABOR AND MATERIAL BURDEN RATES FOR GROWTH AND NEW
WORK
SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)
1. The Contractor’s fully loaded ship repair labor rate will be used for negotiating growth and new work to be performed under this contract. The contractor agrees that the number of man hours included in its price proposal for contract modifications shall include only direct production man hours. For these purposes, direct production man-hours are for skilled labor at the journeyman level expended in direct production including but not limited to the following functions:
Abrasive cleaning/blasting Fire Watch Welding Burning Brazing Carpentry Machinists (inside and outside) Electrical Work Electronic Work Engineering Design Support Lagging Ship-fitting Boiler-making Painting
Sheet-metal Work Pipefitting Rigging General Labor Staging/Scaffolding Diesel Mechanics
2. The fully burdened ship repair labor rate proposed by the contractor listed in paragraph 1 above shall include all costs associated with support functions (whether charged directly or indirectly by the offeror’s accounting systems) provided in support of the direct production man hour functions listed in paragraph 1 above. Support functions shall be considered to be included in the offeror’s fully burdened ship repair labor rate for direct production man hours. Labor hours for the below support functions shall not be separately proposed. Support functions include, and are not limited to, those types listed below:
Testing Quality Assurance Execution Planning Cleaning (except tank cleaning) Supervision Security Surveying Administration Transportation Purchasing Staff Lofting Other indirect support Material handling & Warehousing Safety/Environmental
3. The fully burdened ship repair labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit. The fully burdened ship repair labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.
4. Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that are consumed/used in the process of repair and do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor’s fully burdened ship repair labor rate and not separately priced.
5. Physical materials are goods that become an integral part of the repaired vessel in the course of the repair, such as equipment, replacement steel, pipes, paint, and fasteners. The material burden rates apply to physical materials but not to consumable materials. The material burden rate will be applied to the actual cost of the physical material. Actual cost does not include handling charges, general and administrative cost, overhead, profit, or any other indirect cost.
6. For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs
(ODCs) and will be subject to the contract material burden rate shown in paragraph (7) below. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a Request for Contract Change (RCC) issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. The proposed total pricing restriction addressed in the preceding sentence does not apply in any case where the work is required to be performed by Original Equipment Manufacturers (OEMs) and Government directed subcontractors.
7. The contract fixed fully burdened ship repair labor rate and material burden rate are shown below. These fixed rates shall be used for negotiating growth and new work during the entire availability regardless of how many labor hours and material dollars are procured and negotiated.
Fully burdened Ship Repair Labor Rate TBD Material Burden Rate TBD
NOTE B: Option item to which the option clause FAR 52.217-7 applies and which is to be supplied only if and to the extent said option is exercised.
NOTE C: GROWTH RESERVATION
The growth reservation manhours and material dollar requirements listed in the individual Work Items are a part of this contract under the original solicitation and award. The manhour reservation shall include both prime contractor and subcontractor efforts. The balance of hours and material remaining in the reservation items after negotiations have concluded, and when it is evident that no additional work will be tasked, is subject to a decrease change order.
Only actual production manhours expended will be considered towards the contractor’s obligation to provide the defined reservation manhour effort. While supervision, quality assurance, and other nonproduction labor should be included in the pricing for reservation items in the original bid, they shall not count towards satisfying the contractor’s obligation to provide reserved manhours. The manhour reservation shall not include any allowance for technical representatives or for any other Government directed source unless specifically addressed in the individual Work Item. Material dollars shall be based on actual costs to the Contractor of acquiring the materials provided.
Material dollars may include freight or duties which would be reflected on the invoice for the material. The Contractor shall not be allowed to add material handling charges, overhead (including G&A), or profit into the actual cost of materials expended toward the reservation. The information received in the consolidated final report required by Section C Paragraph 6 will be used by the Contracting Officer in the issuance of one contract modification, which will be a final settlement for all reservation Work Items. The reservations listed in the individual Work Items are not to be considered Time and Material or a Level of Effort. Once the scope of work for a task has been listed and a mutually agreeable number of manhours or materials has been agreed to, neither party will be entitled to an adjustment based on actual manhours or material dollars required. Each task shall receive approval by, the Navy Project Manager and the Administrative Contracting Officer (ACO).
CLAUSES INCORPORATED BY FULL TEXT
HQ B-2-0004 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC 1995)
(a) As part of the negotiated fixed price or total estimated amount of this contact, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $500 or less at the time of final contract closeout. The term “residual dollar amount” shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
HQ B-2-0022 CONTRACT SUMMARY FOR PAYMENT OFFICE (FIXED PRICE) (FEB 1997)
This entire contract is fixed price.
Section C - Descriptions and Specifications
SCOPE OF WORK
USS MAKIN ISLAND FY17 DPMA SOW
1. GENERAL REQUIREMENTS
1.1 The Contractor under the direction of the Regional Maintenance Center (RMC) and as an independent Contractor and not as an agent of the Government, shall furnish the material, support (electrical, crane, rigging, etc.) and facilities (except those furnished by the Government under express provisions of this contract) and provide the management, technical, procurement, production, testing and quality assurance necessary to prepare and accomplish the repair and alteration of the FY17 USS MAKIN ISLAND (LHD 8) Dry-Docking Phased Maintenance Availability (DPMA) in accordance with the requirements stated in this Section, the Work Item Specifications and Work Item Plans, Drawings, and Other References, the Delivery Schedule, and all other terms and conditions set forth in this contract. Category I NAVSEA FY17 Standard Items through CHG 1 identified under Attachment J-1 are applicable to all items without further reference.
Category II NAVSEA FY17 Standard Items through CHG 1 are applicable when invoked and/or referenced in individual work items specified in Attachment J-1.
NAVSEA Standard items may be found at:
http://www.navsea.navy.mil/Home/RMC/CNRMC/OurPrograms/SSRAC/NSI.aspx
1.2 The Contractor shall accomplish planning and scheduling to ensure a rational, integrated and timely plan for receipt, storage and installation of Government Furnished Material as identified in work item specifications, and for accomplishment of production work.
1.3 The Contractor shall provide an integrated milestone plan for the availability. These milestones will include a schedule of key events necessary to meet the contract delivery dates. A critical path analysis and a milestone schedule shall be used to measure schedule accomplishment of the functions and elements required to successfully complete the repair and alteration of FY17 USS MAKIN ISLAND (LHD 8) DPMA within the availability dates herein.
1.4 INTEGRATED PRODUCTION SCHEDULE DEVELOPMENT, UPDATE, AND REVIEWS: In support of NAVSEA Standard Item requirements and to confirm the contractor has all available input for development of the Integrated Production Schedule, including the development of the Integrated Work Package, Production Schedule, Integration of O, I and D level Work, Integration of AIT and SHIPALT requirements and any other contractor assigned or Third Party work scheduled for accomplishment concurrent with the CNO availability, the contractor shall, with the Regional Maintenance Center (RMC), conduct the Work Package Execution Review (WPER). The WPER will take place at the RMC at the vessel’s homeport. The RMC will schedule the WPER per the JFMM Milestones either as a separate event or concurrent with an Integrated Project Team Development (IPTD) event no later than A-30 for CNO availabilities. This review shall be accomplished following the Joint Fleet Maintenance Manual, Volume II, Integrated Fleet Maintenance requirements including the Critical Time Period, First 100 Hour Plan. Final 100 Hour plan and identify any schedule or scope impact. See Appendix E of the JFMM II-I-2E-1.
The Contractor shall formally present its Integrated Production Schedule to the Navy Supervisory Authority (NSA) at the WPER, Start of the Availability, 25% complete conference, 50% complete conference, 75% complete conference, production completion meetings, and for pre Sea Trials requirements. The Integrated Production Schedule shall include Alteration Installation Teams (AIT), Government-Contracted Third Party Maintenance Providers, Ship's Force, Commercial Industrial Services (CIS), and Fleet Maintenance Activity (FMA) work to the maximum extent this information is available. At each meeting, the contractor shall present and explain, at minimum, the following information:
1.4.1 The Contractor's latest, Government approved, Integrated Production Schedule created in full compliance with Standard Item 009-60.
1.4.2 The Contractor's current progress in preparing for and/or executing the Availability in accordance with their Integrated Production Schedule. The Contractor shall provide an explanation and mitigation plan for any preparation or execution delays in comparison to their Integrated Production Schedule.
1.4.2.1 The Contractor's plan shall describe opportunities for schedule acceleration (at no cost to the Government unless directly related to a Government caused delay) and potential risks and mitigations to remaining schedule attainment.
1.5 Wherever the term “Job Order” is used in this solicitation/award, it also means “Contract.”
1.6 The Contractor shall report and recommend corrective action during contract performance for those deficiencies discovered which are not covered by the work specifications. As found conditions, needed repairs and corrective action reports will be submitted to the Government in the form of a Condition Found Report (CFR). The Contractor's conditions found reporting shall be in accordance with that set forth in Standard Item 009-01.
1.7 The Navy may send a site inspection team to perform an inspection of the contractor's facility prior to arrival of the vessel.
1.8 GOVERNMENT FURNISHED MATERIAL: Government Furnished Material (GFM) cited in the solicitation will be shipped to the contractor’s facility. The successful offeror is to coordinate delivery of Government Furnished Material with the Project Manager. Government property permanently removed from a vessel that requires a Property Administrator's disposition instructions shall be properly prepared for shipment and be delivered as directed by the Property Administrator.
GFM will be listed in paragraph 5 of the Work Item(s).
1.9 QUALITY ASSURANCE:
1.9.1 QUALITY ASSURANCE PROGRAM: The Contractor shall provide and maintain a quality assurance program acceptable to the Government, and shall perform or have performed the inspections and tests pursuant to that program to substantiate that the material and workmanship provided pursuant to the job order conform to the drawings, specifications, job orders, and contract requirements listed herein. The Contractor's quality assurance program shall be in accordance with that set forth in Standard Item 009-
04. In addition to its rights under Clause 252.217-7005, the Government shall have the right to deem work or material furnished by the Contractor to be incomplete and not in accordance with the requirements of the job order by reason of the Contractor's failure to comply with the requirements of its quality assurance program and, as such, the Contractor shall not be entitled to progress payments for said work and material.
1.9.2 Quality Assurance Surveillance Plan (QASP): The Contractor shall meet the performance/acceptable quality level requirements for each deliverable/assessment area in the QASP, Attachment J-5. There will be monetary deductions based on unfavorable contractor performance as stated in the QASP. There is no maximum dollar limit to the deductions which can be assessed against the Contractor for failing to meet the performance/acceptable quality level requirements.
1.10 REQUEST IDENTIFICATION OF CONDITION FOUND: In accordance with the requirements of NAVSEA Standard Item 009-01, the contractor shall identify needed repairs and recommend corrective action during contract performance for work/deficiencies discovered which are not covered by the existing work package. For conditions to impact the critical path(s) /controlling item(s), the contractor shall notify the government via electronic media within 24-hours of discovery. This initial notification need not include all content required for a Condition Found Report (CFR), but must include a description of the condition/deficiency and an estimated timeframe for the offeror's professional recommendation for resolution, which shall not exceed five (5) working days as specified below. Recommended repairs and corrective actions shall be submitted to the Government in the form of a CFR (intended to represent the "Work Request" described in DFARS 252.217-7028) per CDRL A002.
1.10.1 CONDITION FOUND NOTIFICATION TO GOVERNMENT: CFRs shall be submitted through the Navy Maintenance Database Re-platform (NMDR) within five (5) working days of discovery of the condition. At a minimum, the CFR will include the following:
(1) Identify contract, ship, and hull number
(2) Serialized by CFR number
(3) Identification of the applicable Work Item number
(4) Date requirement was discovered
(5) Description of the work requirement
(6) Specific location of the work
(7) Recommendation for corrective action
(8) Recommendation for the appropriate/best time to accomplish the work (i.e. during current availability with or without schedule change, future CNO or Continuous Maintenance Availability). Provide supporting rationale for the recommendation, such as cost efficiencies, availability of work force, availability of material, premium expenditures, etc.
(9) Identification of related changes, if any, to the internal milestones and production and contract completion dates.
(10) Class “C” (+/- 15 percent) cost estimate
1.10.2 GOVERNMENT REVIEW AND RESPONSE TO CFR: The Maintenance Team shall review the CFR. If the CFR is inadequate or incomplete, it will be rejected with time continuing to accrue (relative to five (5) working day requirement). As appropriate, the Government and contractor will need to meet, conduct ship checks and/or discuss the recommendation for corrective action further to determine the full scope of work required prior to final approval of the CFR. The contractor's accuracy reflected in the CFRs submitted may be evaluated in CPARS and utilized for past performance ratings on future requirements.
1.11 REQUEST FOR CONTRACT CHANGE (RCC)
When the requirement is validated and fully scoped, the Government will generate a Request for Contract Change (RCC) and the ACO will request a firm fixed price proposal from the contractor.
The contractor shall provide all Change Order Price Analysis (COPA) proposals to the ACO in response to RCCs within three (3) business days. A COPA addressing a change to the FFP contract shall include at a minimum:
a. Labor hours to be performed by the Prime Contractor __________
b. Subcontractor Quote* (If applicable) $__________
c. Material Quote* (If applicable) $__________
d. Mark-up (If applicable) $__________ *Documentation must accompany the COPA for the COPA to be considered submitted to the ACO.
If circumstances arise where the contractor is unable to submit a COPA within three (3) business days, the contractor shall notify the Government in writing of the specific circumstances and provide a date in which a COPA proposal will be submitted. Notification of late submission of a COPA proposal does not exempt the contractor from meeting the three (3) business day requirement, but will be considered by the Government when conducting a CPARS evaluation. The contractor's timeliness in submitting COPAs in response to RCCs may be evaluated in CPARS and utilized for past performance ratings on future requirements.
1.12 AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER: No order, statement, or conduct of Government personnel who visit the Contractor's facilities or in any other manner communicates with Contractor personnel during the performance of this contract shall constitute a change under the "Changes" clause of this contract. The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract.
The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and, notwithstanding provisions contained elsewhere in this contract, the said authority remains solely the Contracting Officer's. In the event the contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof.
1.13 NAVY MAINTENANCE DATABASE (NMD): The Contractor shall use NMD for the submission of Condition Found Reports throughout the administration of this contract.
1.14 ORGANIZATION CHART AND EMPLOYEE ROSTER:
1.14.1 ORGANIZATION CHART: Within 30 days of contract award, submit a chart detailing each management, technical, engineering and production position from the highest company level to the lowest supervisory level. Include descriptions of each position describing the duties, responsibilities, authority and names of the individuals filling the positions. The organizational chart must represent the facility that will perform the work.
1.14.2 EMPLOYEE ROSTER: After receipt of award and prior to starting work aboard the vessel, the contractor must submit a list of employees who will work aboard ship to the Commanding Officer of the ship via the NSA Security Office. The list should be on company letterhead, include each employee's name and security clearance when required, and bear the signature of a company official.
2. LOCATION: Government provided pier space may be provided for this requirement. All other work shall be completed at the contractor’s facilities.
2.12 DRYDOCK CERTIFICATION: The dry-docking of all vessels shall be accomplished in dry docks certified in accordance with MIL-STD-1625D(SH) dated 27 August 2009.
3. SCHEDULE: USS MAKIN ISLAND must be delivered, mission-ready, no later than 9 September 2018.
3.1 MILESTONES: In addition to the contract completion date of 9 September 2018, the Government has established execution dates for the milestones identified in Attachment J-3.
3.1.1 If any milestone event is not accomplished by the date provided, and the failure to accomplish any such milestone event does not arise from a cause beyond the control and without fault or negligence of the Contractor, such failure may be deemed to constitute a failure to perform this contract in accordance with its terms within the meaning of subparagraph (a)(1)(ii) of the clause of this contract entitled "DEFAULT” (DFARS 252.217- 7009).
3.1.2 Reserved
3.1.3 The Contractor shall schedule the performance of all items in the USS MAKIN ISLAND
DPMA work package, including work items included as both Base and Option items, so as to permit a contract scope increase up to 391,680 “hours” and $15,000,000 in “material” to be performed as "Additional Requirements" (including growth and new work). “Material,” as defined for the application of this paragraph, is defined as physical deliverable materials, exclusive of prime and subcontractor labor. “Hours,” as defined for the application of this paragraph is to include both prime and subcontract labor hours. The contractor agrees that these Additional Requirements, if ordered, shall be performed concurrently with the aforementioned work items, during the contract period of performance, without impacting, accelerating, or causing delay or disruption to the work required by the aforementioned work items, to any other Government contract, or to any other work in progress for the Government.
The "Additional Requirements," if required, shall be ordered during the contract period of performance, as may be modified, on the following schedule:
• No more than 75% of the hours or material following the 25% schedule point the availability (as measured in days between the “Start Availability” and “End of Availability” milestones in Attachment J-3).
• No more than 50% of the hours or material following the 50% schedule point the availability (as measured in days between the “Start Availability” and “End of Availability” milestones in Attachment J-3).
• No more than 25% of the hours or material following the 75% schedule point the availability (as measured in days between the “Start Availability” and “End of Availability” milestones in Attachment J-3).
3.2 DELAYS / DISRUPTIONS: The contractor shall coordinate the work effort with the NSA Project
Manager on a daily basis to prevent changing situations from causing delays and disruptions.
Disruption due to minor delays in obtaining access to spaces and operation of equipment are to be expected. A minor delay is defined as eight (8) hours or less. These disruptions are considered normal rather than unusual occurrences during the performance of tasks ordered under this contract. If, during contract performance, delays greater than those indicated above are encountered, the Contractor shall immediately verbally notify the Project Manager and Contracting Officer, followed by a written statement within 24 hours after occurrence of delay, stating time of impact, reason for delay, duration of impact, number of people affected, action taken to properly schedule the work, action taken to minimize impact, and the names of the Government person(s) contacted.
3.3 SCHEDULE AND ASSOCIATED REPORTS: The proposed scheduling of work, resources, key events and milestones submitted by the Contractor in accordance with Standard Item 009-60 during the course of contract performance shall not be materially different from the Schedule and Associated Reports provided in the Contractor’s technical proposal.
3.4 MILESTONES FOR CERTAIN REPORTS (Quality Assurance Plan (QASP), Attachment J-5, Deliverable 2): The Contractor shall complete the necessary work associated with the following reports and submit to the Government the required reports in the necessary format and containing the required information as specified in the Work Item.
Work Item Description Report
Paragraph Number
Report Type
Reports Due On or Before the First 20% of the Docking Duration
110-11-001 Underwater Hull and Appendages; inspect 3.4.2 Visual
3.5.3 NDT
163-11-002 Sea Chest; inspect and repair 3.3.2 Visual
3.4.2 NDT
243-11-002 Stern Tube Shaft Seal; overhaul 3.2.2.1 Visual with OEM assist
3.2.4.4 Visual &
Measurement 243-11-005 Starboard Propulsion Shafting; inspect and repair 3.3.2.1 Visual 243-12-003 Port Propulsion Shafting; inspect and repair 3.3.2.1 Visual 244-11-001 Outboard Propulsion Shafting (Starboard), Bearing Clearance
Measurement; perform
3.1.1 Measurement
3.2.3 Visual &
Measurement
3.3.3.3 Visual &
Measurement 244-12-003 Outboard Propulsion Shafting (Port), Bearing Clearance
Measurement; accomplish
3.2.3 Visual &
Measurement
3.3.3.3 Visual &
Measurement 245-11-001 Controllable Pitch Propeller (CPP) Blade; repair and assess 3.3.4 Torque 245-11-004 Controllable Pitch Propeller (CPP) Starboard Valve Rod
Assembly; repair
3.2.2.4 Visual &
Measurement 245-12-003 Controllable Pitch Propeller (CPP) Port Valve Rod Assembly;
repair
3.2.2.4 Visual &
Measurement 520-10-001 Sea Valve; repair and replace 3.1.1 Pre-Op Test 529-11-004 Main and Secondary Drainage Valves; repair 3.1.1 Pre-Op Test 529-11-005 Main and Secondary Drainage Valves; replace 3.4.1 Visual 562-11-001 Rudderstock Seal Assembly (PORT and STBD); repair 3.2.1.1 Visual 562-11-003 Rudder Stock Bearing; replace 3.5.1.1 Visual
3.8.1.2 Visual
3.10.1.1 Visual &
Measurement 631-31-001 Underwater Hull; preserve 3.4.5.2 Visual 633-21-001 Impressed Current Cathodic Protection System Reference
Electrode Assembly; replace
3.2.1 Pre-Op Test, Visual
Reports Due On or Before the First 20% of the Avail Duration
138-11-001 Flight Deck Catwalk; preserve 3.2.1 Visual 241-11-001 Main Reduction Gear (MRG) Turning Gear; overhaul 3.6.4 Visual &
Measurement 259-11-001 Propulsion Gas Turbine Exhaust Duct No. One; repair 3.4.2 Visual & NDT 259-11-004 Gas Turbine Air Intake Perforated Sheathing; preserve 3.3.1 Visual 261-11-001 Quick Closing Valve Remote Pull Cable; replace 3.2.1 Inspection 262-11-001 Main Lube Oil Cooler Clean and Inspect 3.4.3 Repair
Recommendations 262-41-001 Lube Oil Service Pump; overhaul 3.3.3.1 Inspection 262-42-001 Lube Oil Service Pump; overhaul 3.3.3.1 Inspection 304-11-001 Multiple Cable Penetrator (MCP); repair 3.1.1 Inspection 311-21-001 Ship Service Diesel Generator (SSDG) No.One, "D" Level 8,000 3.4.8 Inspection of 3.4.1, Hour Maintenance; accomplish 3.4.3, & 3.4.4 311-23-002 Title: Ship Service Diesel Generator (SSDG) No.3, "D" Level
8,000 Hour Maintenance; accomplish
3.4.8 Inspection of 3.4.1, 3.4.3, & 3.4.4 311-23-003 Number 3 Ship Service Diesel Generator Intake Air Cooler;
repair
3.3.1.1 Visual
311-26-001 Cylinder Head Cap Plug, No.6 Ship Service Diesel Generator Engine(SSDGE); replace
3.6.3.1 Visual &
Measurements
311-26-003 Ship Service Diesel Generator (SSDG) No.6, "D" Level 8,000 Hour Maintenance; accomplish
3.4.8 Inspection of 3.4.1, 3.4.3, & 3.4.4
521-11-001 Firemain Valve; repair 3.1.1 Pre-Op 524-21-001 Auxiliary Machinery Seawater Pump; repair 3.3.3.2 Visual &
Measurements 529-11-001 Ballast Valves; repair 3.1.1 Pre-Op 529-61-001 Deballast Air Compressor (DBAC) NO. 2, Class B Overhaul;
accomplish
3.3.2.1 Inspection
529-61-002 Deballast Air Compressor (DBAC) No. One, Class B Overhaul;
accomplish
3.3.2.1 Inspection
529-61-004 Deballast Air Compressor (DBAC) No. 3, Class B Overhaul;
accomplish
3.3.2.1 Inspection
529-61-005 Deballast Air Compressor (DBAC) No. 5, Class B Overhaul;
accomplish
3.3.2.1 Inspection
529-61-006 Deballast Air Compressor (DBAC) No. 4, Class B Overhaul;
accomplish
3.3.2.1 Inspection
533-11-001 Potable Water Pump No. 4; overhaul 3.4.1.1 Visual 541-12-003 Hellan Strainer; replace 3.1.2 Pre-Op & Visual 553-10-001 Nitrogen Generator/Compressor No. One and No. 2; overhaul and system clean
3.3.4.2 Inspection
581-11-002 Anchor and Anchor Chain; inspect and preserve 3.4.11 Inspection 584-21-001 Stern Gate Upper and Lower Hydraulic Cylinder Assembly;
repair
3.3.1 Visual
588-11-001 Thrust Roller, Deck Edge Aircraft Elevator; repair 3.2.2 Inspection 588-11-003 Port Aircraft Elevator Lockbar; repair 3.1.2 Inspection 623-11-002 Starboard (Stbd) Accommodation Ladder; repair 3.1.1 Visual
This listing is not all-inclusive of reports to be provided by the Contractor.
3.5 MILSTONE DEFINITIONS: The milestones as defined in Attachment J-3 shall be considered achieved (certified) if all work associated with each of the key events as identified in the Key Event Readiness List (ERL) are complete in accordance with this section. All incomplete ERL line items must be accepted and certified by the SUPERVISOR.
The milestones are considered achieved if all heavy industrial work in the compartments associated with each milestone is complete.
• “Heavy industrial work” is hot work, cutting, grinding, deck work (PRC, Terrazzo, NOMEX), and spray painting and any other industrial type of work that would either limit compartment access or limit the availability of services in the compartment. Access routes need not be released but must be passable or alternate routes made available at all times.
4. SAFETY
4.1 SAFETY INSPECTOR / FIRE MARSHALL: In addition to the safety standards provided in the specifications, the contractor is responsible for providing an experienced Safety Inspector/Fire Marshall who will accomplish daily inspections of the Contractor's entire work area on the ship, together with the Contracting Office’s Safety Representative. This Inspector or Fire Marshall shall not be one of the Contractor's supervisors or superintendents normally assigned to the ship and shall be identified in the contractor’s approved Safety Plan.
4.2 PERSONAL PROTECTIVE EQUIPMENT: Whenever work is performed aboard U.S. Naval Ships or vessels at piers or dry docks of a Naval Shipyard or Naval Station, Contractor employees (including management personnel) shall have and use at all times the following personal protective equipment:
(a) Protective hard hats that meet the following specifications:
(1) Protective helmets purchased after July 5, 1994 shall comply with ANSI Z89.1-1986, "American National Standard for Personnel Protection-Protective Headwear for Industrial Workers-Requirements," or shall be demonstrated to be equally effective.
(2) Protective helmets purchased before July 5, 1995 shall comply with ANSI Standard "American National Standard Safety requirements for Industrial Head Protection," Z89.1- 1969, or shall be demonstrated by the employer to be equally effective. [Ref. 29 CFR
1910.135 Head Protection]
(b) Approved type Plano or prescription glasses meeting the following specifications:
(1) Protective eye and face devices purchased after July 5, 1994 shall comply with ANSI standard Z87.1-1989, "American National Standard Practice for Occupational and Educational Eye and Face Protection", or shall be demonstrated by the employer to be equally effective.
(2) Protective eye and face devices purchased before July 5, 1994 shall comply with ANSI "USA standard for Occupational and Educational Eye and Face Protection", Z87.1- 1968, or shall be demonstrated by the employer to be equally effective. [Ref. 29 CRF
1910.133 Protective eye and face devices.]
(c) Safety toe shoes, with built-in protective toe box that meet the following specifications:
(1) Protective footwear purchased after July 5, 1994 shall comply with ANSI Standard Z41-1991, "American National Standard for Personal Protection-Protective Footwear", or shall be demonstrated by the employer to be equally effective.
(2) Protective footwear purchased before July 5, 1994 shall comply with the ANSI standard "USA Standard for Men's Safety Toe Footwear", Z41.1 1967, or shall be demonstrated by the employer to be equally effective [Ref. 29 CFR 1910.136 Protective eye and face devices.]
4.3 BLACK OXIDE COATED THREADED FASTENERS (BOCTFs): Due to safety concerns, use of
BOCTFs is not authorized when installing or replacing threaded fasteners in the accomplishment of any work required by any Work Item in this contract.
4.4 FORCE PROTECTION CONDITION: The Navy is currently in force protection condition Bravo. Any costs associated with delays, disruptions, or security precautions associated with this force protection condition level shall be included in your proposal. Contractors will not receive additional compensation for delays, disruptions, or security precautions associated with this force protection condition level.
4.5 FIRE DRILL: The Contractor shall coordinate the execution of a full scale fire drill with the NSA within the first 30 days after the ship's arrival at the contractor's facility. The drill will include at a minimum the requirements of the drill specified in NAVSEA Standard Items 009-08 (Fire Protection at Contractor's Facility; Accomplish) and 009-28 (Fire Prevention Requirements). For the contractor, this drill will require all production work to stop for a minimum of 4 hours during day shift on the selected day. As part of the drill, the contractor is required to evacuate the ship, provide a muster report of all personnel safely off ship, support the drill with any firefighting personnel/company emergency procedures, and support the disconnection of temporary services at the drill site. Temporary services at the drill site may be disconnected in the process of the drill, and the Contractor will be responsible for restoring them after the drill. This drill will require involvement with the local fire department. For awareness, the government will be conducting the drill and using the evaluation criteria found in CH- 12, 13, and Appendix A, of S0570-AC-CCM-010/8010
5. OTHER REQUIREMENTS
5.1 USE/POSSESSION OF PERSONAL ELECTRONIC DEVICES (PED'S) - The possession and use of portable electronic devices (PED's) within the confines of any naval vessel, or in the Contractor's facility where equipment removed from the vessel is being worked, is strictly controlled. Cellular phones with digital imaging capabilities are strictly prohibited. PED's may not be connected to any Navy-owned or controlled network. PED's may not be used to store or process any digital information associated with the conduct of the contract without written authorization from the Naval Supervising Activity (NSA). PED's include:
• mobile computing devices such as personal digital assistants (PDA's);
• hand-held or laptop computers;
• mobile telephone devices such as data-enabled cellular telephones;
• two-way pagers, including those with e-mail capability;
• analog and digital sound recorders; and
• digital cameras, including cellular phones with digital imaging capabilities.
5.2 NON SMOKING POLICY: Contractors are advised that in light of the Navy's policy regarding smoke-free facilities, the entire vessel, topside and below decks, is to be considered a "No Smoking Area" unless otherwise indicated by shipboard policy.
5.3. CITIZENSHIP REQUIREMENTS: The contractor shall comply with the Department of Defense
Industrial Security Manual (DoD 5220.22), and any revisions to that manual as of the Bid Opening Date prescribed, for verification of all U. S. Citizens. Prospective offerors shall refer all questions pertaining to the above to NSA, Security Manager.
5.4 MARINE PAINTS: Accomplish safety precautions as specified in S9086-VD-STM-010/CH-631, Preservation of Ships in Service - General, and 29 CFR 1915, Occupational Safety and Health Standards for Shipyard Employment, Subparts C and Z, and the Work Item or task order during surface preparation and the application or removal of marine paints.
6. ACCOUNTABILITY OF MANHOUR AND MATERIAL RESERVATION
6.1 Accomplish the following, in addition to the specific requirements of the Job Order, for Work Items which identify reservation of manhours or material dollars.
6.2 Identify task/discrepancies and initiate an estimate of manhours and material dollars on Reservation
Task Request/Control Form (Attachment A) for each discrepancy or task identified to be accomplished under a reservation item or reservation paragraph, entering the date and estimate of labor and material, and deliver the estimate to the SUPERVISOR.
6.2.1 Reservation taskings shall not be used to accomplish work outside the scope of the specific
Work Item identifying a reservation work paragraph.
6.3 The SUPERVISOR shall review the estimate submitted and if in agreement, shall sign the "RMC/NSA Authorization Agreement to Quote" blank, authorizing the work at the manhour and material dollars quoted. The contractor shall then sign the "Contractor Obligation/Agreement to Quote" blank and enter the estimated start date. The RMC/NSA contracts representative shall initial the form in the blank provided.
6.3.1 If there is a difference of opinion in the estimate provided by the…