Revised Standard Item Index

View the file

Other files

File Type Posted
S-5_Eligibility_Criteria_Data_Sheet_v5.docx DOCX document
N00024-17-R-4426_Conformed_Amendment_9.docx DOCX document
N00024-17-R-4426_Modification_Amendment_9.docx DOCX document
MAKIN_ISLAND_QA_Round_8.docx DOCX document
N00024-17-R-4426_Modification_Amend_8.pdf PDF
N00024-17-R-4426_Conformed_Amend_8.pdf PDF
MAKIN_ISLAND_QA_Round_7v1.pdf PDF
N00024-17-R-4426_Conformed_Amend_7.pdf PDF
N00024-17-R-4426_Modification_Amend_7.pdf PDF
N00024-17-R-4426_Modification_Amend_6.pdf PDF
N00024-17-R-4426_Conformed_Amend_6.pdf PDF
Attachment_1_QA6_No_185.xlsx XLSX spreadsheet
N00024-17-R-4426_Conformed_Amend_5.pdf PDF
N00024-17-R-4426_Modification_Amend_5.pdf PDF
MAKIN_ISLAND_QA_Round_6v1.docx DOCX document
N00024-17-R-4426_Modification_Amend_4.pdf PDF
MAKIN_ISLAND_QA_Round_5v1.docx DOCX document
N00026-17-R-4426_Modification_Amend_4.pdf PDF
N00024-17-R-4426_Conformed_Amend_4.pdf PDF
J-4_Pricing_Workbook_MAKIN_ISLAND_RFP_Rev_6.xlsx XLSX spreadsheet
Attachment_1_QA4_No.142.xlsx XLSX spreadsheet
MAKIN_ISLAND_QA_Round_4v1.docx DOCX document
MAKIN_ISLAND_QA_Round_3v1.docx DOCX document
N00024-17-R-4426_Modification_Amend_3.pdf PDF
N00024-17-R-4426_Conformed_Amend_3.pdf PDF
J-4_Pricing_Workbook_MAKIN_ISLAND_RFP_Rev_5.xlsx XLSX spreadsheet
N00024-17-R-4426_MAKIN_ISLAND_DPMA_RFP.pdf PDF
ERRATA_2_TPPC-LHD8-SWRMC17-CN01__WI_Package_2-8-17.pdf PDF
N00024-17-R-4426_Conformed_Amendment_1.pdf PDF
N00024-17-R-4426_Modification_Amend_2.pdf PDF
ERRATA_1_Canceling_857-11-002.pdf PDF
N00024-17-R-4426_Modification_Amendment_1.pdf PDF
MAKIN_ISLAND_QA_Round_2.docx DOCX document
N00024-17-R-4426_Conformed_Amend_2.pdf PDF
N00024-17-R-4426_Conformed_Amendment_1.pdf PDF
J-5_QASP_Rev_B.docx DOCX document
MAKIN_ISLAND_Q&A_Round_1v1.pdf PDF
N00024-17-R-4426_Modification_Amendment_1.pdf PDF
J-4_Pricing_Workbook_MAKIN_ISLAND_RFP_Rev_4.xlsx XLSX spreadsheet
J-4_Pricing_Workbook_MAKIN_ISLAND_RFP_v3.xlsx XLSX spreadsheet
N00024-17-R-4426_MAKIN_ISLAND_DPMA_RFP.docx DOCX document
Exhibit_A.pdf PDF
J-5_QASP_Rev_A.docx DOCX document
Exhibit_B.pdf PDF
S-4_PP_Reference_List.docx DOCX document
J-3_Execution_Milestones_(LHD8)_1-18-17_(PMS_407_Rev).xlsx XLSX spreadsheet
Exhibit_C.pdf PDF
S-5_Eligibility_Criteria_Data_Sheet_v1.docx DOCX document
S-1_Technical_Capabilities_Data_Sheet.docx DOCX document
S-3_PPI_Form.docx DOCX document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX

SHIP: USS MAKIN ISLAND (LHD 8) TPPC-LHD8-SWRMC17-CN01

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-17 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE DATE

009-01 General Criteria; accomplish 07/30/2015

009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide 07/18/2014

009-03 Toxic and Hazardous Substances; control 07/18/2014

009-04 Quality Management System; provide 07/30/2015

009-05 Temporary Accesses; provide 07/30/2015

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

07/30/2015

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 07/30/2015

009-08 Fire Protection at Contractor's Facility; accomplish 07/30/2015

009-10 Shipboard Asbestos-Containing Material (ACM); control 07/18/2014

009-18 Magnetic Material; control 07/18/2014

009-19 Provisioning Technical Documentation (PTD); provide 07/30/2015

009-20 Government Property; control 07/18/2014

009-21 Logistics and Technical Data; provide 07/18/2014

009-23 Interferences; remove and install 07/30/2015

009-24 Shipboard Authorization, Control, Isolation, Blanking,Tagging, and Cleanliness Requirements; accomplish

07/30/2015

009-28 Fire Prevention Requirements; accomplish 07/30/2015

009-29 Asbestos-Free Pipe Hanger Liner Material; install 07/29/2004

009-34 Fire Protection of Unmanned Vessels at Contractor's Facility; provide 01/17/2013

009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish

07/30/2015

009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/ Component; provide

07/30/2015

009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish

07/18/2014

009-59 Organotin Antifouling Material; control 07/29/2011

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;

provide and manage

09/01/2015

009-61 Shipboard Use of Fluorocarbons; control 07/18/2014

009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 07/18/2014

009-65 Polychlorinated Biphenyls (PCBs); control 07/29/2011

009-67 Integrated Total Ship Testing; manage 07/18/2014

009-69 Heavy Weather/Mooring Plan; provide 07/30/2015

009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

07/30/2015

009-72 Physical Security at Private Contractor's Facility; accomplish 07/18/2014

009-73 Shipboard Electrical/Electronic Cable; remove, relocate, repair, and install 07/30/2015

009-74 Occupational, Safety and Health Requirements; accomplish 07/30/2015

009-77 Cofferdam Requirements; accomplish 07/18/2014 ksneed Cross-Out ksneed Cross-Out ksneed Cross-Out

ITEM_NO. TITLE DATE

009-79 Government Owned Material (GOM); status reporting 07/18/2014

009-80 Ship's Facilities; provide 07/18/2014

009-81 Compartment Closeout; accomplish 07/30/2015

009-82 Data Requirements When Installing an Equal Component Vice Specified Component; provide

07/29/2011

009-83 Wire Rope Fitting Verfication; provide 01/17/2013

009-84 Accountability of Temporary Fasteners; provide 07/18/2014

009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H) Materials; accomplish

08/01/2008

009-87 Chemical disinfection Procedures; accomplish 07/18/2014

009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify

07/18/2014

009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes;

accomplish

07/29/2011

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

07/18/2014

009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish 01/17/2013

009-95 Mechanically Attached Fittings (MAF's) for Piping Systems; install 07/18/2014

009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide

01/17/2013

009-99 Ship Departure Report; provide 07/18/2014

009-100 Ship's Stability Process Control Procedure (PCP); maintain 07/18/2014

009-101 Requirements for Entry to and Departure from Contractor's Facility; accomplish 07/18/2014

009-102 Alteration Verification; provide 07/29/2011

009-103 Weight and Moment Change Data; provide 07/18/2014

009-106 Work Authorization Form Coordinator (WAFCOR); provide 01/06/2014

009-108 Aircraft Carrier Requirements for Entry to, Movement within, and Departure from Contractor's Facility; accomplish

07/18/2014

009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels;

accomplish

07/18/2014

009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish 07/18/2014

009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration;

provide and manage

07/30/2015

009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish 07/18/2014

009-118 CG Deck Loading; accomplish 07/18/2014

009-120 Fact Finding and Critique of Unplanned Events; manage 07/30/2015

009-121 Ship Assessment/Inspection Requirements; provide 07/18/2014

009-122 Temporary Padeye; install and remove 07/30/2015 ksneed Cross-Out ksneed Cross-Out ksneed Cross-Out ksneed Cross-Out

DATETITLEITEM NO.

CATEGORY II. FY-17 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER

009-09 Process Control Procedure (PCP); provide and accomplish 07/18/2014

009-12 Welding, Fabrication, and Inspection Requirements;

accomplish

07/30/2015

009-14 Gages, Switches, and Thermometers; repair and certify calibration

07/30/2015

009-15 Rotating Machinery; balance 01/17/2013

009-17 Rotating Electrical Equipment; repair 07/30/2015

009-25 Structural Boundary Test; accomplish 07/30/2015

009-26 Deck Covering Requirements; accomplish 05/12/2016

009-32 Cleaning and Painting Requirements; accomplish 05/12/2016

009-32 Cleaning and Painting Requirements; accomplish 05/12/2016

009-33 Rotating Electrical Equipment; rewind 07/30/2015

009-46 Butterfly Valve, Synthetic and Metal Seated; repair 07/18/2014

009-47 Gate Valve; repair 07/18/2014

009-47 Gate Valve; repair 07/18/2014

009-51 Globe, Globe Angle, and Globe Stop Check Valve; repair 01/17/2013

009-51 Globe, Globe Angle, and Globe Stop Check Valve; repair 01/17/2013

009-52 Relief Valve; repair 07/30/2015

009-57 Reduction Gear Security Requirements; accomplish 07/30/2015

009-58 Pump and Driver Shaft Alignment; accomplish 09/01/2015

009-63 Lubricating Oils and Hydraulic Fluids; analyze 07/18/2014

009-71 Testing Requirements for Piping Systems; accomplish 07/10/2015

009-76 Waveguide and Transmission Line Temporary Lay-Up, Pressurization, and Purging; accomplish

07/30/2015

009-90 Technical Representative; provide 07/18/2014

009-92 Resilient Mount; remove and install 07/30/2015

009-96 Ball Valve; repair 07/29/2011

009-96 Ball Valve; repair 07/29/2011

009-98 Monel Fasteners; inspect 07/18/2014

009-104 Vibration Testing and Analysis; accomplish 07/18/2014

009-107 Piping System Cleanliness Restoration (Non-Nuclear);

accomplish

07/30/2015

009-114 Mold Remediation; accomplish 11/07/2013

009-117 Support for Combat Systems Light-Off; provide 07/18/2014 ksneed Cross-Out ksneed Cross-Out ksneed Cross-Out

ITEM NO. TITLE

Condition Reports and Estimates; develop and submit042-11-001

Accountability of Manhour and Material Reservation; accomplish042-11-001

Hazardous Waste Produced on Naval Vessels; control077-11-001

Underwater Hull and Appendages; inspect110-11-001

Sewage Receiving Station No. One Bulkhead; repair122-21-001

Fuel/Ballast Tank Partial Preserve; accomplish123-11-001

Compensated Fuel Oil Tank; repair123-11-002

Compensated Fuel Oil Tank Partial Preserve; accomplish123-11-003

Compensated Fuel Oil Tank; preserve123-11-004

Fuel Oil Service Tank and Auxiliary Fuel Oil Service Tank; preserve123-11-006

CHT Tank; repair123-11-008

Fuel Oil Service Tank and Auxiliary Fuel Oil Service Tank Clad Weld;

accomplish

123-11-009

Fuel/Ballast Tank(s)Clad Weld; accomplish123-11-010

JP-5 Tank; preserve123-12-004

JP-5 Tank Partial Preservation; accomplish123-12-005

Potable Water Tank Clad Weld; accomplish123-14-002

Potable Water Tank; preserve123-14-003

Water Mist Stowage Tank; preserve123-14-004

Structural Damage; repair123-16-001

Fire Pump and Refr Machinery Room; preserve123-16-002

Waste Water Drain Tank Partial Preservation; accomplish123-16-003

Ballast Tank; repair123-16-004

Ballast Tank; preserve123-16-005

Contaminated Oil Tank; repair123-17-001

Waste Water Drain Tank; preserve123-17-002

Contaminated Oil Tank; preserve123-17-003

JP-5 Tank; preserve123-17-004

Waste Water Drain Tank; preserve123-19-001

CHT Tank; repair123-19-002

CHT Tank; preserve123-19-003

Chain Locker; preserve123-21-001

Accessible Void Cofferdam; preserve123-21-002

Accessible Void Cofferdam; preserve123-22-002

Chain Locker; preserve123-22-003

Well Deck STBD Bulkhead; repair123-42-001

Water Mist Stowage Tank; preserve123-61-001

ShipAlt LHD8 - 82042K, JSF Topside Mods: Flight Deck Structures;

accomplish

130-90-001

Structural Repair; accomplish135-11-001

Flight Deck Catwalk; preserve138-11-001

Aircraft Hanger; repair150-11-001

ShipAlt LHD8 - 82034K, JSF Topside MODS: C5I Systems; accomplish160-90-001

Waster Sleeve; replace163-11-001

Sea Chest; inspect and repair163-11-002

Door, Watertight, Quick-Acting & Airtight; replace167-11-001

Door, Viewport; repair and preserve167-11-002

Door, Interior, Steel; repair167-11-003

Hatch; repair167-11-004

Scuttle, Quick-Acting, Watertight; repair167-11-005

Hatch; repair167-11-006

Main Reduction Gear (MRG) Turning Gear; overhaul241-11-001

Lube Oil Purifier Heater Controller Number One; adjust241-11-002

Lube Oil Purifier Heater Controller Number 2; adjust241-12-001

Waterborne Propulsion Shafting; inspect and repair243-11-001

Stern Tube Shaft Seal; overhaul243-11-002

Starboard Stern Tube Shaft Seal; overhaul243-11-003

Starboard Propulsion Shafting; inspect and repair243-11-005

Port Propulsion Shafting; inspect and repair243-12-003

Outboard Propulsion Shafting (Starboard), Bearing Clearance Measurement; perform

244-11-001

Outboard Propulsion Shafting, Bearing Clearance Measurement;

accomplish

244-12-001

Outboard Propulsion Shafting, Bearing Clearance Measurement;

accomplish

244-12-002

Outboard Propulsion Shafting (Port), Bearing Clearance Measurement;

accomplish

244-12-003

Controllable Pitch Propeller (CPP) Blade; assess and repair245-11-001

CPP Shaft No. 2 HOPM Check Valve; replace245-11-002

Controllable Pitch Propeller (CPP) Starboard Hub Assembly; replace245-11-003

Controllable Pitch Propeller (CPP) Starboard Valve Rod Assembly;

repair

245-11-004

Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box Number 2;

replace

245-11-005

CPP Shaft No. One HOPM Check Valve; replace245-11-006

Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box Number One; replace

245-12-001

Controllable Pitch Propeller (CPP) Port Hub; replace245-12-002

Controllable Pitch Propeller (CPP) Port Valve Rod Assembly; repair245-12-003

Controllable Pitch Propeller (CPP) Sump Heaters; clean245-12-005

Gas Turbine (GT) Cooling Fan; repair251-21-001

Intake Louver; preserve251-31-001

Intake Louver; preserve251-32-001

Propulsion Gas Turbine Exhaust Duct No. One; repair259-11-001

Air Exhaust Louver Foreign Object Damage (FOD) Screen; remove259-11-003

Gas Turbine Air Intake Perforated Sheathing; preserve259-11-004

Quick Closing Valve Remote Pull Cable; replace261-11-001

Fuel Oil Purifier; overhaul261-31-001

Main Lube Oil Cooler Clean and Inspect262-11-001

Lube Oil System Piping; repair262-11-002

Lube Oil Service Pump; overhaul262-41-001

Lube Oil Service Pump; overhaul262-42-001

Main Reduction Gear (MRG) and Controllable Pitch Propeller (CPP) Lube Oil Purifier Heater; clean

264-31-001

Main Reduction Gear (MRG) and Controllable Pitch Propeller (CPP) Lube Oil Purifier Heater; clean

264-31-002

Multiple Cable Penetrator (MCP); repair304-11-001

Ship Service Diesel Generator (SSDG) No.One, "D" Level 8,000 Hour Maintenance; accomplish

311-21-001

Ship Service Diesel Generator (SSDG) No. 2, "D" Level 16,000 Hour Maintenance; accomplish

311-22-001

Ship Service Diesel Generator (SSDG) Engine Number 3, Fuel Oil Booster Pump; replace

311-23-001

Ship Service Diesel Generator (SSDG) No.3, "D" Level 8,000 Hour Maintenance; accomplish

311-23-002

Number 3 Ship Service Diesel Generator Intake Air Cooler; repair311-23-003

Ship Service Diesel Generator (SSDG) No. 4, "D" Level 16,000 Hour Maintenance; accomplish

311-24-001

Ship Service Diesel Generator (SSDG) No. 5, "D" Level 16,000 Hour Maintenance; accomplish

311-25-001

Cylinder Head Cap Plug, No.6 Ship Service Diesel Generator Engine(SSDGE); replace

311-26-001

Ship Service Diesel Generator Engine (SSDGE) Number 6, Fuel Oil Booster Pump; replace

311-26-002

Ship Service Diesel Generator (SSDG) No.6, "D" Level 8,000 Hour Maintenance; accomplish

311-26-003

ShipAlt 83220K, Lithium-Ion Battery Shop to Support JSF; accomplish313-90-001

Cable Connector; replace321-22-001

ShipAlt LHD8-71492K, HESS (400Hz) Line Voltage Regulator Upgrade and ShipAlt LHD8-71497K, AESS (270VDC) For The F-35 Joint Strike Fighter; accomplish

321-90-001

**ROLLED INTO 321-90-001**ShipAlt LHD 8 - 71497K, AESS (270VDC) For The F-35 Joint Strike Fighter; accomplish

321-90-002

Strainer, Self-Clean; replace342-11-001

ShipAlt LHD8-84700K LMMT AFLOAT Installation and Alteration Installation Team (AIT) Support Services; provide (OPTION ITEM)

415-90-001

**REVISED TO 603-11-001 BY DLP**ShipAlt LHD8-11374K, Amphibious Assault Ship Projected Draft Marks; accomplish

426-90-001

Interior Communication Box; replace432-12-001

ShipAlt LHD8-81709D, Radar Tank Level Indicator (TLI) Installation in F-76 Tanks; accomplish

437-80-001

ShipAlt LHD8 - 84548D, Radar Tank Level Indicator (TLI) System Replace; accomplish

437-80-002

ShipAlt LHD8-81322K, Automated Digital Network System (ADNS)AN/USQ-144K(V)2 With SP1/2, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)

441-90-001

SCD 71575K, JSF Tramline Relocation; accomplish492-90-001

SCD 82041K, JSF Topside Mods: Short Take-Off (STO) Lighting;

accomplish

492-90-002

Lagging and Insulation; repair508-11-001

Lagging and Insulation; replace508-11-002

Lagging and Insulation for Pipe, Hull and Machinery, Inside Machinery Spaces; replace

508-11-004

Lagging and Insulation, Outside Machinery Space Piping; replace508-12-001

Ventilation Access Cover; install512-11-001

Fan Coil Assembly; replace512-11-002

Exhaust Ventilation; clean512-11-003

Exhaust Ventilation; clean512-11-004

Ventilation Access Cover; install512-11-005

Ventilation Access Cover; install512-11-006

Resilient Mount; replace512-11-007

Fan Coil Assembly; replace512-11-008

Motor, Supply Ventilation System; repair512-11-009

Fan Motor; rewind512-11-010

Ventilation Closure Valve Assembly; repair512-11-011

ShipAlt LHD8-87631D, Machinery Control System Tactical Cooling Upgrades; accomplish

512-80-003

ShipAlt 82038K, JSF Topside Mods: HVAC Supply Vent Mods;

accomplish

512-90-001

Number One Air Conditioning Plant Hellan Strainer Discharge Piping;

Replace

514-21-001

Refrigeration Plant Seawater Piping; replace516-11-001

Refrigeration Cooler; replace516-11-002

Sea Valve; repair and replace520-10-001

Firemain Valve; repair521-11-001

Auxiliary Machinery Seawater Pump; repair524-21-001

Deck Drain; replace526-11-001

Deck Drain; replace526-11-002

"ON HOLD" Deck Drain; replace526-11-002

Ballast Valves; repair529-11-001

Remote Valve Operator Assembly; replace529-11-002

Main and Secondary Drainage Valves; repair529-11-004

Main and Secondary Drainage Valves; replace529-11-005

Deballast Air Main Isolation Valve; replace529-31-001

Air Deballast Silencer; replace529-31-002

Airmain Unloader Valve; overhaul529-31-003

Deballast Air Compressor (DBAC) NO. 2, Class B Overhaul; accomplish529-61-001

Deballast Air Compressor (DBAC) No. One, Class B Overhaul;

accomplish

529-61-002

Deballast Air Compressor (DBAC) No. 3, Class B Overhaul; accomplish529-61-004

Deballast Air Compressor (DBAC) No. 5, Class B Overhaul; accomplish529-61-005

Deballast Air Compressor (DBAC) No. 4, Class B Overhaul; accomplish529-61-006

Reverse Osmosis Distilling Plant No. One Membrane; replace531-51-001

Reverse Osmosis Distilling Plant No. 2 Membrane; replace531-51-002

Reverse Osmosis Distilling Plant Membrane; replace531-51-003

Reverse Osmosis Distilling Plant Membrane; replace531-51-004

Reverse Osmosis Distilling Plant Membrane; replace531-51-005

Reverse Osmosis Distilling Plant No. 2 Membrane; replace531-52-001

Reverse Osmosis Distilling Plant No. 3 Membrane; replace531-53-001

Reverse Osmosis Distilling Plant No. 4 Membrane; replace531-54-001

Potable Water Pump No. 4; overhaul533-11-001

Fuel Oil Fill and Vent Check Valve; replace541-11-001

Fuel Transfer Valve Electric Actuator; adjust541-11-002

Fuel Service Valve; replace541-11-006

Remote Operator Reach Rod; install541-11-007

Fuel/Ballast Tank Suction Piping; repair541-12-001

Valve Pilot Controller; replace541-12-002

Hellan Strainer; replace541-12-003

Seawater Compensated Leslie Diaphram Control Valve; replace541-12-004

Fuel Oil Stripping Pump Assembly No. One; repair542-21-001

Jettison Lever and Cable, Mogas Platform; repair542-31-001

ShipAlt LHD8 - 82040K, JSF Topside Mods, JP-5 Fuel Stations;

accomplish

542-90-001

High Pressure Air Compressor (HPAC) Class B overhaul; accomplish551-51-001

Nitrogen Generator/Compressor No. One and No. 2; overhaul and system clean

553-10-001

AFFF Sprinkling Valve; replace555-12-003

Gate Valve; repair555-12-004

ShipAlt LHD8 - 82036K, JSF Topside Mods; Firefighting Protection Mods; accomplish

555-90-001

ShipAlt 81531K, JSF AFFF Weapon Staging Area Expansion; accomplish (On Hold for 100%)

555-90-002

Hydraulic Valve; replace556-11-001

Rudderstock Seal Assembly (PORT and STBD); repair562-11-001

Rudderstock Seal Assembly (STBD); replace562-11-002

Rudder Stock Bearing; replace562-11-003

Anchor Windlass Brake Band Lining; replace581-11-001

Anchor and Anchor Chain; inspect and preserve581-11-002

Fairlead; repair582-11-001

Boat Slewing Arm Davit (SLAD); overhaul583-11-001

ShipAlt LHD8 - 82043K, JSF Topside Mods: Liferafts Stowage;

accomplish

583-90-001

ShipAlt 75091K, Class Boat Davit Removal/Replacement; accomplish583-90-002

Stern Gate Upper and Lower Hydraulic Cylinder Assembly; repair584-21-001

Stern Gate Gasket; replace584-21-002

Upper Stern Gate Latch, Port and Starboard; replace584-21-003

Vehicle and Amphibious Recovery Winch Clutch Assembly; overhaul584-31-001

Thrust Roller, Deck Edge Aircraft Elevator; repair588-11-001

Port Aircraft Elevator Lockbar; repair588-11-003

Thrust Roller, Deck Edge Aircraft Elevator No. 2 (Port); repair588-12-001

Aviation Certification Discrepancies; correct588-21-001

ShipAlt LHD8-82019D, Aircraft Elevator (ACE) Grease Line Modification;

accomplish

588-80-001

Hydroblast, Collection, Holding, and Transfer (CHT) System; accomplish593-11-001

Oily Waste Transfer Pump No 2; overhaul593-21-001

Oily Waste Transfer Pump No 4; overhaul593-21-002

Oily Waste Transfer Pump No. One; repair593-21-003

LHD Class AER 40/99, (CHT) Eddy Pump Replacement; accomplish593-80-001

ShipAlt LHD8-81788D, Replace Collection Holding and Transfer (CHT) Aspiration System; accomplish

593-80-002

Amphibious Assault Ship Permanent Projected Draft Marks; install603-11-001

Safety Net and Frame, Flight Deck; preserve612-21-001

ShipAlt LHD8 - 82047K, JSF Personnel Safety - Safety Nets/Liferails;

accomplish

612-90-001

Starboard (Stbd) Accommodation Ladder; repair623-11-002

Balanced Joiner Door; remove, store and install624-11-001

Primary Flight Control Station Window; replace625-11-001

Conflag Station No. 8 Window; replace625-11-002

Landing Craft Well Space; preserve631-11-001

AN/SPN-35 Radome; preserve631-11-002

Hangar Bay Overhead; preserve631-11-003

Shaft Alley Bilges; preserve631-11-004

Machinery Room No. 2 Bilge; preserve631-11-005

Shaft Alley Bilges; preserve631-11-006

Machinery Room No. One Bilge; preserve631-11-007

Weather Deck Platform; preserve631-13-001

Well Deck preservation; accomplish631-13-002

AFFF Control Switch Enclosure; replace631-20-001

MK 38 Weapon Platform; preserve631-21-001

Superstructure; preserve631-21-002

Uptake Louver, Uptake Screen, and Exhaust Stack; preserve631-21-003

Forward Uptake Louver, Forward Uptake Screen, and Forward Stack;

preserve

631-21-004

EHF Platform; inspect and preserve631-21-005

Underwater Hull; preserve631-31-001

Access Platform; preserve631-31-002

Freeboard; preserve631-41-001

Freeboard; preserve631-41-002

Intake, Exhaust, and Natural Ventilation Ducting and Screen; preserve631-41-003

Impressed Current Cathodic Protection System Reference Electrode Assembly; replace

633-21-001

Platform, AN/SMQ-11 Antenna; preserve634-11-001

Troop Walkway Deck; preserve634-11-002

Deck Covering, Nonskid; replace634-11-003

Deck Covering, Nonskid; replace634-11-004

Cosmetic Polymeric Deck Covering System; replace634-11-005

Carpet; replace634-11-006

Electrical Grade Matting; replace634-11-007

Cargo Elevator Platform Nonskid; replace634-11-008

Cosmetic Polymeric Deck Covering (PRC); replace634-11-009

Deck Covering, Nonskid; replace634-11-010

Accommodation Ladder Stowage Platform, Port; preserve634-11-011

AN/SPN-41 Platform Deck; preserve634-11-012

Accommodation Ladder Stowage Platform Starboard; preserve634-11-013

Deck Covering, Nonskid; replace634-11-014

Deck Covering, Nonskid; replace634-11-015

Deck Covering, Nonskid; replace634-11-016

Cosmetic Polymer Deck Covering; replace634-11-018

Cosmetic Polymer Deck Covering (Terrazzo); replace634-11-020

Cosmetic Polymeric Deck Covering (Terrazzo); replace634-11-021

Cosmetic Polymeric Deck Covering (Terrazzo); replace634-11-022

Non-skid; replace634-11-031

Flight Deck Nonskid; replace634-21-001

Lagging and Insulation, Inside Machinery Space; replace635-11-001

Lagging and Insulation, Outside Machinery Space; replace635-11-002

Sanitary Space; repair644-11-001

Troop Shower; repair644-11-002

Troop Shower; repair644-11-003

Troop Shower; repair644-11-004

Crew Shower; repair644-11-005

Dishwashing Machine; replace651-11-001

Dishwasher; replace651-11-002

Laundry Washer Extractor; replace655-11-002

ShipAlt 82046K, JSF Shops and Services; accomplish665-90-001

Abandon Ship Life Preserver Locker; preserve671-11-001

ShipAlt LHD8 - 71836K, JSF AECM PREP; accomplish700-90-001

ShipAlt LHD 8 - 82876K, (CMBRE)Common Munitions BIT/Reprogramming Equipment; accomplish

700-90-002

ShipAlt LHD8-71563K, Joint Strike Fighter (F-35) Weapons Support;

accomplish

703-90-001

ShipAlt 82044K, JSF Aviation Weapons Support; accomplish (On Hold for 100%)

703-90-002

ShipAlt 82035K, JSF Topside Mods: Warfare Systems; accomplish721-90-001

Cargo Handling Elevator, System Operability Test (SOT), Level III;

accomplish (OPTION ITEM)

772-11-001

Cargo Handling Elevator, System Operability Test (SOT), Level III;

accomplish (OPTION ITEM)

772-11-002

Cargo Handling Elevator, System Operability Test (SOT), Level III;

accomplish (OPTION ITEM)

772-11-003

Cargo Handling Elevator, System Operability Test (SOT), Level III;

accomplish (OPTION ITEM)

772-11-004

Cargo Handling Elevator, System Operability Test (SOT), Level III;

accomplish (OPTION ITEM)

772-11-005

Cargo Handling Elevator, System Operability Test (SOT), Level III;

accomplish (OPTION ITEM)

772-11-006

Electric Motor; repair772-11-007

ShipAlt LHD8 - 71743K, JSF DMRT/OMS Installation; accomplish790-90-001

ShipAlt LHD8-13907.02D, Weight and Moment Compensation;

accomplish

830-80-001

Antenna Photographs; provide837-11-001

Combat Systems Discrepancy Correction; accomplish844-31-001

Temporary Duty Section Berthing Off-Ship; provide (OPTION ITEM)857-11-001

Temporary Off-Ship Berthing Equivalent to BOQ/BEQ; provide (Option Item)

857-11-002

Crew Transportation; provide (OPTION ITEM)857-11-003

ShipAlt LHD8 - 83135K, Close In Weapons System (CIWS) Cable Reliability Alteration, Alteration Installation Team (AIT) Support Service;

provide (Option Item)

980-11-001

ShipAlt LHD8-85830K, ISNS ORT PC Replacement, Alteration Instalation Team (AIT) Support Service; provide (OPTION ITEM)

980-11-002

ShipAlt LHD8 - 70678K, AN/SPS-48G(V) ROAR Alteration, Alteration Installation Team (AIT) Support Service; provide (Option Item)

980-11-003

ShipAlt LHD8 - 82879K SATCC, Alteration Installation Team (AIT) Support Service; provide (Option Item)

980-11-004

ShipAlt LHD8 - 88171D, CPS Preheater Excess Fanroom Temp Interlock, Alteration Instalation Team (AIT) Support Service; provide

980-11-005

ShipAlt LHD8-86641D Ventilation Push Button, Alteration Installation Team (AIT) Support Service; provide

980-11-006

ShipAlt LHD8-71386K PEOC4I Advanced Digital Antenna Production (ADAP), Alteration Installation Team (AIT) Support Service; provide

(OPTION ITEM)

980-11-007

SCD 15294K, Autonomic Logistics Information System (ALIS) V2, Alteration Installation Team (AIT) Support Services; provide (Option Item)

980-11-008

ShipAlt LHD8 - 83463K, AF27T-12 HCTS, Alteration Installation Team (AIT) Support Service; provide (Option Item)

980-11-009

ShipAlt LHD8 - 84906K, Portable Oxygen Regulator Test Set (PORTS) Electrical Alteration Installation Team (AIT) Support Services;

accomplish (Option Item)

980-11-010

Temporary Office, Parking, and Classroom for Ship's Force; provide

(OPTION ITEM)

980-31-001

ShipAlt 84419D, ACE Stanchion Mod, Alteration Installation Team (AIT) Support Service; provide

980-80-001

Machinery Space Production Completion and Requirement for Light-Off Assessment (LOA): accomplish

982-11-001

Dock Trial Discrepancy Correction; accomplish982-31-001

Sea Trial Discrepancy Correction; accomplish982-31-002

Dock Trial, Fast Cruise and Sea Trial; accomplish982-31-003

Staging/Temporary Fall Protection for Ship's Force Use; provide991-12-001

Temporary Stowage Area for Ships Force; provide992-11-001

Temporary Flammable Liquid Storage and Hazardous Material Storage Unit; provide

992-11-002

Ship's Force Parking; provide992-11-003

Support Service for Ship's Force Security; provide (OPTION ITEM)992-11-004

Temporary Air Conditioning; provide992-11-005

Regional Maintenance Center (RMC) Office Space; provide992-11-006

Temporary Refrigerated Storage Facility, provide992-11-007

Fuel Assistance and Towboat Service for Fuel Barge; provide (OPTION

ITEM)

992-11-008

Temporary Service; provide992-11-009

Tow Service, Temporary Service, Equipment and Systems Test, Inspection and Repair in Contractor Plant, Barge; accomplish (OPTION

ITEM)

992-11-010

Pierside Small Boat Storage; provide (OPTION ITEM)992-11-011

Transport Control Protocol/Internet Protocol Based T-1 Type Computer Network (T-1 Line) Support Service; provide (OPTION ITEM)

992-12-001

Cleaning and Pumping; accomplish992-31-001

Cleaning and Pumping Bilges Tanks and Voids; accomplish992-31-002

Tank Fluids Removal and Disposal; accomplish (OPTION ITEM)992-31-003

Ship's Force Rigging, Crane and Transportation Service; provide993-21-001

Temporary Deck Covering; install993-31-001

Main Reduction Gear Temporary Dehumidification System Installation;

accomplish

993-31-002

Drydocking and Undocking; accomplish997-11-002