Enclosure_2_Cost_Evaluation_Template.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- USS Boise (SSN 764) Engineer Overhaul
- Solicitation number
- N00024-17-R-4314
About this file
USS Boise (SSN 764) EOH Enclosure 2 Cost Evaluation Template
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment_5.docx | DOCX document | |
| attachment_1_revised_solicitation.docx | DOCX document | |
| attachment_1_revised_solicitation.docx | DOCX document | |
| amendment_4.docx | DOCX document | |
| amendment_0003.docx | DOCX document | |
| QA_tracker_amend2rev1.pdf | ||
| Amendment_2.pdf | ||
| Final_QA_responses_Amend_2.pdf | ||
| Conformed_Solicitation.pdf | ||
| Enclosure_1_Revised_Solicitation.docx | DOCX document | |
| Released_Question_15_backup.pdf | ||
| Released_QA.pdf | ||
| Released_Question_49_backup.pdf | ||
| Amendment_01.pdf | ||
| USS_BOISE_SOLICITATION_N00024-17-R-4314.docx | DOCX document | |
| Exhibit_A_USS_BOISE_CDRLS.ppt | PPT presentation | |
| Question_and_Answer_Tracker.xlsx | XLSX spreadsheet | |
| Enclosure_1_DD_254_Security_classification.pdf | ||
| RedactedUSSBOISE.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instruction to offeror
Instruction to Offeror:
Pricing Database template:
The purpose of the Pricing Database Template is to aid the Government in conducting evaluation of the USS Boise (SSN 764) Engineering Overhaul proposal (EOH). The following instructions apply to the completion of this Pricing Database template:
1. Contractor: Offeror shall indicate if the charge is a prime contractor vs subcontractor charge. If the charge is a subcontractor charge, the Offeror shall denote the subcontractor's name.
2. Contract Line Item Number (CLINs): The Offeror shall note the CLIN for each charge recorded. This pricing database shall be all inclusive and reflective of the entire USS Boise (SSN 764) EOH effort. Therefore, this CLIN shall encompass all CLINs.
3. System Work List Item Number (SWLIN): The contractor shall specify the SWLIN to which the proposed cost is being applied. If a particular charge is not tied to a SWLIN (i.e. CPFF LOE CLINs), please type N/A for this field.
4. Description: Provide the Description of the SWLIN.
5. Nuclear vs Non-Nuclear: For CLINs 0001, 0004, and 0005, the Offeror shall fill out whether the SWLIN is nuclear vs non-nuclear.
6. Direct Labor: The Offeror shall fill out the labor type . To ensure speedy evaluation, the Offeror(s) shall not fill out each individual personnel that will work on the USS Boise (SSN 764) EOH. Instead, the labor category shall be reflective and consistent with the labor category stated in the forward pricing rate proposal (FPRP) at the department level. If the Offeror does not have a FPRP for direct labor rates, the labor category should be aggregated to a higher level (i.e. engineering, production, services). However, offeror shall seperately provide backup documentiton in excel format with all linkable formulas attached illustrating how it was able to aggregate its labor rates to a higher level.
7. Labor Rate: Per section L paragraph 3.2.4 of the solicitation, the Offeror shall fill in its direct labor rates that is associated with the applicable charge.
8. Total Direct Labor Cost: The Offeror shall illustrate how the total direct labor costs are derived by ensuring the particular cells are linked and excel formulas are available. Hard entry will not be acceptable.
9. Material Cost: The Offeror shall propose specific material cost. Material costs are defined as material incidental to labor costs (i.e. O-rings, lubricants, valves, washers, etc.). Note, for CLINs 0003 and 0006, the proposed material cost shall aggregate to the amount denoted in the solicitation.
10. Travel Cost: Offeror shall specify travel estimates pertaining to each CLIN.
11. Indirect rates, and FCCM rates: Per section L paragraph 3.2.4, the Offeror shall fill in the indirect rates and FCCM rate that is associated with the applicable charge.
12. Indirect Cost, and FCCM cost: Offeror shall illustrate how each indirect cost and FCCM cost is derived by ensuring the cells are linked and excel formulas are available. hard entry will not be acceptable.
13. Base fee, Special Incentive fee %: Base fee and special incentive fees shall be applied in accordance with the chart illustrated in Section L of the solicitation.
14. Base fee and Special Incentive Fee: Offeror shall illustrate how each of the base fee or special incentive fee amount is derived by ensuring the cells are linked and excel formulas are available. hard entry will not be acceptable.
15. Total contract value inclusive of fee: The total contract value inclusive of fee column is derived by ensuring the cells are linked and excel formulas are available. Hard entry will not be acceptable.
16. Notes: For travel and material charges, Offeror(s) shall provide unique marking that cross reference the specific proposed travel or material charges contained in the pricing database to the specific location within the proposal illustrating how that particular travel or material charge is being calculated. See section L paragrpah 3.2.5 for further details on material cost backup instruction and paragraph 3.2.6 for travel cost backup submission.
Summary sheet:
Offeror shall summarize its USS Boise Pricing in pivot table format utilizing the pricing database template information. The privot table shall contain the following minimum cost elements:
By CLIN:
Summary Labor hours Summary Labor Cost Summary Material Cost if any Summary Travel Cost if any summary of each Individaul indirect cost type if any Summary FCCM Costs if any Summary Profit/fee if any Summary Grand Total Cost/Price
Pricing Database template CLIN SWLIN Description Nuclear/Non-Nuclear Direct Labor Man Hours Labor Rate Total Direct Labor Cost Material Cost Travel Cost Indirect Rate Type 1 Indirect Cost Type 1 Indirect Rate 2 Indirect Cost 2 Indirect Rate 3 Indirect Cost 3 Indirect Rate 4 Indirect Cost 4 Total Cost FCCM Rate FCCM Cost Base fee % Base Fee Special Incentive Fee % Special Incentive Fee Total Value Inclusive of Fee Notes
Summary sheet
File details come from the government source that posted it. Updated .