N00024-17-R-2205 Amendment 0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N00024-17-R-2205-0006.pdf | ||
| N00024-17-R-2205-0005.pdf | ||
| Attachment_6_-_Proposed_Delivery_Schedule_Form_rev1.xls | XLS spreadsheet | |
| N00024-17-R-2205-0004.pdf | ||
| Attachment_1_-_YT_Requirements_Matrix_REV_2.xls | XLS spreadsheet | |
| N00024-17-R-2205-0003.pdf | ||
| YT_Requirements_Matrix_REV_1.xls | XLS spreadsheet | |
| N00024-17-R-2205-0002.pdf | ||
| N00024-17-R-2205-0001.pdf | ||
| Attachment_5_-_Warranty_Terms.docx | DOCX document | |
| Attachment_7_-_Vendor_Recommended_Spares.xlsx | XLSX spreadsheet | |
| Attachment_9_-_ID_of_Non-commercial_data.docx | DOCX document | |
| Attachment_1_-_YT_Requirements_Matrix.xls | XLS spreadsheet | |
| Attachment_2_-_UID.pdf | ||
| N00024-17-R-2205.pdf | ||
| Attachment_6_-_Proposed_Delivery_Schedule_Form.xls | XLS spreadsheet | |
| Attachment_4_-_Past_Performance_Reference_Form.docx | DOCX document | |
| Attachment_8_-_ID_of_Commercial_Tech_Data.docx | DOCX document | |
| Attachment_3_-_List_of_Acronyms_and_Abbreviations.docx | DOCX document | |
| YT_Pre-Solicitation_Q&A.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002416NR53013
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to respond to Bidder's questions.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-May-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00024-17-R-2205
X 9B. DATED (SEE ITEM 11)
09-Mar-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriat ion date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not , is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-May-2017
CODE
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2020
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00024-17-R-2205
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
Response to Bidder’s Questions:
45. Question: Can you give further information on how you evaluate the price? Is it individually for each boat or as a total?
Answer: Section M, Factor 3 Price #1 Total Price states, "For the purpose of source selection, the Government will use the completed Section B to evaluate the total price. The price of all FFP items in the contract requirement (inclusive of option items) will be totaled to determine the total price for evaluation consideration. The Government will evaluate offers for award purposes by adding the total price for all line items in the contract."
46. Question: Are CPARS reports accepted in lieu of submittal of Past Performance Questionnaire Attachment 4?
Answer: In the absence of Past Performance Questionnaires, per Factor 2(a), the Government may use information obtained from DOD databases and other databases available to the Government to evaluate offeror past performance. Further, the burden of providing thorough and complete past performance data remains with the offerors.
47. Question: Are the double bottom tanks a hard requirement?
Answer: Please see response to Question 20 issued with Amendment 0004.
48. Question: Requirements Matrix SWBS 100.2 The fendering shall not be through-bolted in watertight structure but, shall be mounted by such means to facilitate maintenance with the tug afloat.
Does this requirement apply to only the fendering on the side of the vessel, or to all fendering?
Answer: The requirement in Attachment 1 - YT Requirements Matrix Item No. 100.2 "The fendering shall not be through-bolted in watertight structure but, shall be mounted by such means to facilitate maintenance with the tug afloat." applies to all fendering, including fendering installed below the waterline. The watertight integrity of the hull should not need to be compromised to replace any fendering installed on the craft.
49. Requirements Matrix SWBS 233.1 [Excerpt of the requirement with lined-through data omitted] The tug shall be provided with a Selective Catalytic Reduction system for each main propulsion engine to reduce NOx emissions. SCR systems shall be identical. SCR systems shall meet the requirements of the OEM for the main propulsion engines. Each system shall consist of DEF tank, air supply, dosing cabinet with DEF pump and Clean Emission Module
(CEM).
It is clear that each system shall consist of a DEF tank, air supply, dosing cabinet with DEF pump and Clean Emission Module (CEM). However, it is not clear if any of these items can be shared by both main
N00024-17-R-2205 propulsion engines to eliminate the duplication of ancillary components. For example, a single DEF tank could supply both main propulsion engines without the need to further clutter a small compartment with duplicate runs of the heavy stainless steel piping that would be needed from two separate DEF tanks feeding two separate dosing cabinet; the piping from a single DEF tank would simply be split into a tee prior to each dosing cabinet.
Any guidance that you could provide on a single DEF tank being acceptable to meet the requirements of the Requirements Matrix would be appreciated.
Answer: Either a single Diesel Exhaust Fluid (DEF) tank or dual DEF tanks is acceptable, as further detailed in Attachment 1 - YT Requirements Matrix Item No. 123.1.
50. Question: Requirements Matrix SWBS 311 The ship service power generation system shall consist of two (2) identical and independent, minimum 130 kW, three-phase, three-wire, 60 Hz, ungrounded, 440-480 volt, self-exciting generator sets with sufficient capacity to carry the normal vessel operating electrical load at 80% of rated capacity with one ship service generator. Electrical power capacity reserved for the forward towing winch and the aft auxiliary deck winch shall be a minimum of 1.5 times the combined kW power ratings of the main winch motors.
The requirement is fairly clear regarding the generator having sufficient capacity to carry the normal vessel operating electrical load at 80% of rated capacity with one ship service generator. However, it is unclear if the electrical power capacity that must be reserved for the forward towing and aft auxiliary deck winch would be considered with the electrical load on one ship service generator. As the use of the forward towing and aft auxiliary deck winch would not be considered as a normal vessel operating electrical load, but would rather be considered a special operating electrical load, it would seem appropriate to allow the use of both generators to satisfy the electrical load when using the forward towing and aft auxiliary deck winch. Running the electrical generation system in a split-plant operation, with one generator feeding certain electrical loads and the other generator feeding the remaining electrical loads, is a common occurrence for special details (special details being those that are not typically manned during normal underway steaming, such as off-ship firefighting, towing, rescue and assistance, etc.).
Any guidance that you could provide on the electrical loads that would be considered as "normal vessel operating electrical loads," or conversely, guidance on the electrical loads that would be considered outside of the "normal vessel operating electrical loads," would be appreciated.
Answer: Both the forward hawser winch and the aft auxiliary deck winch should be within the normal vessel operating electrical load. Attachment 1 - YT Requirements Matrix Item No. 300 states “The ship service and emergency electrical systems; including power quality, subsystems, and equipment shall be in accordance with IEEE Std. 45 series in addition to the ABS Rules.” Guidance for electric loads analysis is provided in IEEE Std 45.3-2015. IEEE Std 45.3-2015 references IEEE P45.1 [B11] Approved Draft Recommended Practice for Electrical Installations on Shipboard - Design.
(End of Summary of Changes)