Attachment_1_-_YT_Requirements_Matrix_REV_2.xls
XLS spreadsheet 317 KB Posted
- Solicitation number
- N00024-17-R-2205
About this file
Attachment 1 - YT Requirements Matrix REV 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N00024-17-R-2205-0007.pdf | ||
| N00024-17-R-2205-0006.pdf | ||
| N00024-17-R-2205-0005.pdf | ||
| Attachment_6_-_Proposed_Delivery_Schedule_Form_rev1.xls | XLS spreadsheet | |
| N00024-17-R-2205-0004.pdf | ||
| N00024-17-R-2205-0003.pdf | ||
| YT_Requirements_Matrix_REV_1.xls | XLS spreadsheet | |
| N00024-17-R-2205-0002.pdf | ||
| N00024-17-R-2205-0001.pdf | ||
| Attachment_5_-_Warranty_Terms.docx | DOCX document | |
| Attachment_7_-_Vendor_Recommended_Spares.xlsx | XLSX spreadsheet | |
| Attachment_9_-_ID_of_Non-commercial_data.docx | DOCX document | |
| Attachment_1_-_YT_Requirements_Matrix.xls | XLS spreadsheet | |
| Attachment_2_-_UID.pdf | ||
| N00024-17-R-2205.pdf | ||
| Attachment_6_-_Proposed_Delivery_Schedule_Form.xls | XLS spreadsheet | |
| Attachment_4_-_Past_Performance_Reference_Form.docx | DOCX document | |
| Attachment_8_-_ID_of_Commercial_Tech_Data.docx | DOCX document | |
| Attachment_3_-_List_of_Acronyms_and_Abbreviations.docx | DOCX document | |
| YT_Pre-Solicitation_Q&A.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Att 1
| ATTACHMENT 1 | ||
| 90'-95' Azimuthing Stern Drive Tug - Requirements Matrix | ||
| ITEM NO. | DESCRIPTION | APPROACH TO SATISFYING REQUIREMENT AND EQUIPMENT TO BE INSTALLED (Please be specific – Provide enclosures if additional space is required. List make and OEM model number for major equipment/parts specified, as applicable.) |
| 041 | Configuration management shall be exercised to ensure that each craft is identical to the first craft delivered, except where deviation has been specifically authorized by a NAVSEA representative. Redundant equipment shall have identical manufacturer, make, model, and operating parameters. Standardization shall be incorporated in design and equipment selection for each tug and across the tug class. The number of different grades of lubricants and hydraulic fluids shall be minimized. | |
| 042 | A Builder's Warranty shall be included on the entire craft effective for a minimum of twelve (12) months from the date of official Government acceptance of the craft. See ATTACHMENT 5 for full Warranty requirements. | |
| 042.1 | A comprehensive design review shall be conducted prior to the commencenment of production. The Contractor's lead naval architect, lead engineer, project manager, and production manager shall be present at the design review. | |
| 042.2 | The Contractor shall host two (2) interim progress reviews per year at the Contractor's facility. Scheduling of interim progress reviews shall be mutually agreed upon by both the Contractor and the Government. The Contractor shall provide 30 days prior notice of the proposed dates for interim progress reviews along with suggested agendas. The Government reserves the right to approve or disapprove agendas. | |
| 045 | Steel surfaces shall be protected from corrosion (e.g. with pre-construction primer) during exterior construction. | |
| 050 | The tug shall sustain a minimum speed of twelve (12) knots in full load operating condition in WMO sea state 3. | |
| 050.1 | The tug shall be capable of maintaining a straight course at all speeds and in all loading conditions. | |
| 050.2 | The tug shall have a minimum bollard pull ahead of 89,000 lbs. or 40 metric tons. The tug shall have a minimum bollard pull astern of 89,000 lbs. or 40 metric tons. A bollard pull test shall be conducted on the first hull with pull force measured in 100 rpm increments in both ahead and astern pulling modes. A bollard pull test report signed and stamped by a Professional Engineer (PE) shall be provided. The bollard pull test shall be witnessed by an ABS surveyor and an ABS Bollard Pull Certificate shall be provided. | |
| 070 | 90'-95' Azimuthing Stern Drive (ASD) harbor tugboat, 34'-38' beam, 16' maximum navigational draft, with standard features and FOB Origin. Tug shall be designed for ship-assist and escort missions. 25,000 - 32,000 gallon fuel capacity (tankage should be sized for endurance). Minimum 12 knot speed in full load operating condition, in WMO sea state 3. Safe transit in WMO sea state 6. Bollard pull ahead shall be a minimum of 40 metric tons. The craft shall have true omni-directional performance with bollard pull astern of no less than 95% of ahead. Endurance shall be a minimum of 7 days underway at 10 knots. Depart and return to the same port. | |
| 070.1 | The tug shall be designed and constructed in accordance with applicable American Bureau of Shipping (ABS) Rules for Building and Classing Steel Vessels. The tug shall be classed XA1, Towing Vessel, Unrestricted Service XAMS. The tug shall meet the requirements of 46 CFR Chapter C - Coast Guard, Department of Transportation and IEEE Standard 45 series, Recommended Practice for Electric Installations on Shipboard. With the exception of signal flags and shapes, the tug shall be capable of meeting all US Coast Guard regulations in its configuration at delivery, with only the equipment installed or included with the craft. | |
| 070.2 | The tug shall have a commercial design which is both proven and current. The tug design shall have demonstrated performance in commercial industry or Government applications and shall be currently in-use within commercial industry or Government applications. | |
| 070.3 | Compliance with this Requirements Matrix for the craft shall be verified through a Statement of Compliance and a Statement of Fact issued by ABS. The Statement of Compliance and Statement of Fact shall include compliance with ABS Rules, compliance with applicable electrical requirements as stated in IEEE Std. 45 Series standards, and compliance with intact and damage control stability requirements in 46 CFR. | |
| 070.4 | An ABS Interim Class Certificate shall be provided with the craft at delivery. The ABS Certificate of Classification shall be provided within 14 days of receipt from ABS. | |
| 070.5 | An International Load Line Certificate complying with 46 CFR Part 42 shall be provided for the craft. | |
| 070.6 | An International Tonnage Certificate, in accordance with the requirements of 46 CFR Part 69, shall be obtained from ABS and provided with the craft. | |
| 070.7 | All construction materials shall be marine grade and resistant to corrosion and UV degradation. | |
| 070.8 | Unless otherwise specified, OEM installation instructions and recommendations for equipment and components shall be followed. Equipment and components shall be selected for durability, longevity, safety, and ruggedness. | |
| 070.9 | All items requiring regular operation or maintenance (e.g. switches, valves, filters, etc . . .) shall be readily accessible. | |
| 075 | Fasteners installed throughout the craft shall be ASTM F593, stainless steel type 316 (UNS S31600) or type 316L (UNS 31603). Nitronic 50 (UNS S20910), duplex alloy 2205 (UNS S31803), Ferralium 255 (UNS S32550), or alloy AL-6XN (UNS N08367) fasteners may also be used. Fasteners installed in the bilge or in other areas where stagnant water is likely to occur shall be hot-dipped galvanized steel. Threaded fasteners, when installed and tightened, shall protrude a distance of between one and nine threads beyond the top of the nut or plastic insert. Removable pins used for securing parts and equipment shall be secured with a lanyard to prevent loss. | |
| 078 | All hull structural materials and welding shall be in accordance with ABS Rules for Materials and Welding. The Contractor shall perform non-destructive testing of hull welds under the guidance of ABS Guide for Nondestructive Inspection of Hull Welds, to the satisfaction of ABS. | |
| 078.1 | Materials and equipment shall be properly selected and installed to minimize corrosion due to contact between dissimilar metals. Mating of dissimilar metals shall be avoided wherever possible. | |
| 078.2 | The use of and dependence on hazardous material, as defined in 40 CFR 116.4, throughout the craft life cycle shall be avoided. Pollution prevention measures, including source reduction and material substitution shall be incorporated in the craft design. Materials or equipment which contain or utilize chlorofluorocarbons (CFC) or any Class I or Class II Ozone Depleting Substances (ODS) shall not be used. Neither the barge nor anything installed on the barge shall contain asbestos or Polychlorinated Biphenyls (PCB). All interior and exterior paint shall be free from lead and organic tin (TBT) compounds. | |
| 079 | The tug shall be fully operational in WMO sea state 3 and shall provide safe transit in conditions up to and including WMO sea state 6. | |
| 080 | The craft design shall account for human elements. The human role in operating and supporting the craft shall be addressed at all system levels. Human engineering principles shall be applied to the physical craft design, system and equipment selection, control consoles and operating stations. Switches, levers, pushbuttons, and/or equipment start mechanisms shall be located to prevent the possibility of accidental physical damage and inadvertent activation. ASTM F1166 contains reference data for human engineering and may be used where applicable. | |
| 080.1 | All application software, including embedded software within systems, and operating systems shall be supportable and provided the means to be upgraded or updated during the tug's life. At delivery of the tug, all application software and firmware programs, and operating systems shall be delivered with at least three years remaining prior to the software developer's or Original Equipment Manufacturer's (OEMs) end of support date. | |
| 084 | OPTION: Packaging and delivery to NAVBASE Kitsap, Bremerton Annex (Bremerton, WA). Packaging and Delivery shall include all materials, services, labor, and other fees and expenses to transport craft to destination and to demonstrate craft for acceptance inspections at destination. Cradle engineering, shipping cradle, spreader bars, lifting slings, and hoisting fittings shall be provided if necessary for transportation. Cargo ship docking, crane service, and longshoring labor (stevedores/longshoremen, riggers, and welders) shall be provided at both origin and destination if necessary for transportation. A US Coast Guard certified Tug Master shall be provided at destination to serve as the craft captain during underway demonstrations for delivery acceptance. An engineer/machinery specialist shall be provided at destination to demonstrate equipment for delivery acceptance. Tug shall be delivered with no more than 250 operating hours on each main propulsion diesel engine. See Section D for packaging and marking requirements. See Section F for additional delivery requirements. In accordance with DFARS clause 252.247-7023 and 10 USC 2631, vessel(s) used for transporting the craft shall be US Flag unless a written waiver is granted by Military Sealift Command (MSC) and provided by the Contracting Officer. | |
| 084.1 | OPTION: Packaging and delivery to Fleet Activities Yokosuka (Yokosuka, Japan). Packaging and Delivery shall include all materials, services, labor, and other fees and expenses to transport craft to destination and to demonstrate craft for acceptance inspections at destination. Cradle engineering, shipping cradle, spreader bars, lifting slings, and hoisting fittings shall be provided if necessary for transportation. Cargo ship docking, crane service, and longshoring labor (stevedores/longshoremen, riggers, and welders) shall be provided at both origin and destination if necessary for transportation. A US Coast Guard certified Tug Master shall be provided at destination to serve as the craft captain during underway demonstrations for delivery acceptance. An engineer/machinery specialist shall be provided at destination to demonstrate equipment for delivery acceptance. Tug shall be delivered with no more than 250 operating hours on each main propulsion diesel engine. See Section D for additional packaging and marking requirements. See Section F for additional delivery requirements. In accordance with DFARS clause 252.247-7023 and 10 USC 2631, vessel(s) used for transporting the craft shall be US Flag unless a written waiver is granted by Military Sealift Command (MSC) and provided by the Contracting Officer. | |
| 085 | The Contractor shall provide two (2) complete printed copies and two (2) complete digital copies of the Technical Data Package (TDP) with all information necessary for proper evaluation, acceptance, operations, support, maintenance, and repair of the craft. The TDP shall include commercial off the shelf (COTS) manuals, as-built construction drawings in hard copy and CAD format (both DWG and PDF), a Craft Information Book (CIB), and technical information essential for repairs and supply support (i.e., operation and maintenance information and parts lists/ illustrations). All items composing the TDP shall match the as-built configuration of the craft. Final versions of all items composing the TDP shall incorporate all comments previously received from the Government. | |
| 085.1 | Non-commercial Technical Data and computer software: The Government desires at a minimum Government Purpose Rights (GPR) in non-commercial technical data (including drawings, manuals, etc. developed by the builder or their sub-contractor) and computer software to be delivered under the contract. Hull lines drawings and other proprietary details of the boat/system design may be marked with Limited Rights Legend per DFARS 252.227-7013. Rights in Technical Data: For all non-commercial technical data and computer software to be delivered under the contract, the Contractor shall provide a table as required under DFARS 252.227-7017. | |
| 085.2 | Commercial Technical Data: Under DFARS 227.7015 (c) Additional License Rights the Government desires, at a minimum, a special license agreement that provides the Government, in the commercial technical data and commercial computer software to be delivered under the contract by the Contractor and the sub-contractors, the right to use, modify, reproduce, release, perform, display, or disclose the technical data developed by the builder and sub-contractors, and to permit others to do so, that are necessary for acceptance, operation/training, maintenance, repair, modification, and supply support for the delivered boat and trailer (where provided). The Government shall not use the technical data and/or the computer software to manufacture additional quantities of the commercial items. The Government shall not release or disclose any non-commercial technical data, commercial technical data, and computer software delivered under the contract unless A) Prior to release or disclosure, the intended recipient is subject to the non-disclosure agreement at DFARS 227.7103-7; or B) the recipient is a Government contractor receiving access to the data for performance of a Government contract that contains the clause at DFARS 252.227-7025, Limitations on the Use or Disclosure of Government-Furnished Information Marked with Restrictive Legends. For all technical and commercial computer software to be delivered under the contract, the Contractor shall provide a table as requested in the clause for technical data for commercial items. | |
| 085.3 | Commercial Data Marking Requirements: The Contractor shall place the following legend on all technical data relating to commercial items and all commercial computer software: |
SPECIAL LICENSE RIGHTS
The Government's rights to use, modify, reproduce, release, perform, display, or disclose these data are restricted by Contract No._(Insert contract number)____, License No. (Insert license identifier)____. This license grants to the Government the right to use, modify, reproduce, release, perform, displace, or disclose the technical data and to permit others to do so, that are necessary for acceptance, operation/trainijng, maintenance, repair, modification, and supply support for the delivered craft. The license does not allow the Government to use the technical data and/or the computer software to manufacture additional quantities of the items or software.
| 085.4 | Drawings shall include: arrangements, mechanical systems drawings, docking drawings, and electrical diagrams/schematics in accordance with ABS requirements. Electronics drawings shall depict cable/wire designations, point to point wiring diagrams or run sheets, pin-out tables for all connectors, and material list. Drawings shall contain or be cross-referenced to a master parts list with original equipment manufacturer's (OEM) part numbers. All ABS approved and stamped drawings shall be provided. Drawings shall contain NAVSEA drawing numbers and shall be structured with ESWBS weight groups. (PMS325 will provide a block of NAVSEA drawing numbers after contract award, upon request from the Contractor.) |
| 085.5 | At a minimum the following list of drawings shall be provided; Lines Plan; Tank Plan; Midship; Structural Arrangement; Shell Expansion; Structural Sections; Skeg Structure; Wheelhouse Structure; Bulwark Structure; Winch Foundation; Z-Drive Seating; General Arrangement; Inboard Profile; Insulation Plan; Anchor and Mooring Arrangement; Towing Arrangement; Towing Staple; Fendering Arrangement; Machinery Arrangement; Shafting Arrangement; Navigation Lights Plan; Fill, Vent and Sounding System Diagram; Fuel Oil System Diagram; Bilge, Ballast and Fire System Diagram; Off-Ship Fire Fighting Diagram; Off-Ship Fire Fighting Arrangement; Machinery Cooling System Diagram; Compressed Air System Diagram; Lube Oil System Arrangment; SCR and DEF System Arrangement; Sludge and Oily Water System Diagram; Machinery Exhaust System Arrangement; Machinery Ventilation System Arrangement; External Ventilation Openings; HVAC System Diagram; Potable Water System Diagram; Black Water System Diagram; Grey Water System Diagram; Scuppers and Drains; Seachest Arrangement; Mast Arrangement; Electrical Load Analysis; Electrical DC Power Distribution System One-Line Diagram; Short Circuit Analysis; Electrical DC Power Distribution System One-Line Diagram; Switchboard Arrangement; Fire Control Plan; Safety and Life Savings Plan; Electrical Load Analysis; Lighting and Receptacles Below Main Deck; Lighting and Receptacles Main Deck and Above; Emergency Shutdowns; Lube Oil Hose Reel Arrangement; Central Monitoring and Alarm System (CMAS) Block Diagram; Navigation Lighting Monitoring and Control; Fire Alarm & System Fire Suppression System; and Z-Drive Installation. |
| 086 | The Contractor shall provide two (2) printed copies of the Service and Repair Manual(s) for the main propulsion diesel engines. |
| 086.1 | The Contractor shall provide two (2) printed and two (2) digital copies of the Parts Manual for the main propulsion diesel engines. |
| 086.2 | The Contractor shall provide two (2) printed and two (2) digital copies of the Service and Repair Manual(s) for the generator set prime movers. |
| 086.3 | The Contractor shall provide two (2) printed and two (2) digital copies of the Parts Manual for the generator set prime movers. |
| 086.4 | The Contractor shall provide two (2) printed and two (2) digital copies of the Service and Repair Manuals for the rudder propeller (Z-drive) systems. |
| 086.5 | In addition to equipment technical manuals, an HVAC system manual shall be provided to describe all modes of operation and system maintenance. |
| 086.6 | HVAC calculations shall be provided in accordance with SNAME T&R 4-16 to show the vessel's heating, cooling and ventilation summaries and each space’s individual heating, cooling and ventilation loads. |
| 086.7 | Copies of ABS certifications and test reports shall be provided in both hard copy and Adobe PDF format. One (1) complete draft of all drawings and technical manuals is due thirty (30) days prior to Acceptance Trials on the craft. Two (2) additional final copies of all drawings and technical manuals are due with each craft delivery. All drawings shall be provided in both hard copy and reproducible format via DWG and PDF, latest versions, on CD or DVD. All technical manuals shall be provided in both hard copy and PDF format on CD or DVD. At a minimum the following certificates shall be provided: ABS Class Certificate; International Load line Certificate; International Anti-fouling System Certificate; International Tonnage Certificate; Certificate of Alternative Compliance (if required for navigation lights); Tonnage Certificate; ABS issued Statement of Compliance for CDC/USPHS Vessel Sanitation Program Construction Guidelines; USCG Certificate of Inspection; and Bollard Pull Test Certificate. |
| 086.8 | The Contractor shall provide a Craft Information Book (CIB) to serve as the primary intrasystem and intersystem technical publication covering installation, operation, maintenance and repair of craft systems and equipment. The CIB shall meet the requirements as stated in this Requirements Matrix and in Section C. The Contractor shall provide one (1) complete preliminary CIB sixty (60) days prior to Acceptance Trials. The Contractor shall provide one (1) revised CIB at Acceptance Trials, which shall include updates incorporating all comments previously received by the Government. The Contractor shall provide two (2) final CIBs with each craft delivery. The CIB shall include installation, operation, maintenance and repair of all craft systems and equipment including; mechanical, piping, electrical, and electronics systems and equipment. The CIB shall also include sounding tables and electrical schematics. The CIB shall provide a thorough understanding of all equipment on the craft, their intended functions, operations, and limitations, together with intrasystem and intersystem capabilities and limitations. |
| 086.9 | A listing of all technical manuals shall be included in the CIB. The CIB shall be provided in both hard copy and in Adobe PDF format on CD/DVD. |
| 086.10 | Contractor shall provide OEM-supplied warranty information (e.g. warranty sheets and registration cards) for all components provided on the tug which are covered under warranties. |
| 086.11 | A Master spreadsheet shall be provided with all initial passwords for all equipment/devices/software programs etc. installed on the craft. |
| 094 | The Contractor shall perform Builder's Trials (BT) to demonstrate the successful operation of all craft equipment and systems, that the craft meets all contract requirements, and that the craft is ready for Acceptance Trials. The dockside tests portion of BT shall be conducted in accordance with SNAME T&R Bulletin No. 3-39 Guide for Shop and Installation Tests, as applicable for this craft. The underway (sea trials) portion of BT shall be conducted in accordance with SNAME T&R 3-47, Guide for Sea Trials. BT shall demonstrate the successful operation of all craft equipment and systems, that the craft is seaworthy, and that the craft is ready for AT. BT shall be performed with the craft at the full load draft and trim condition. Underway airborne noise and vibration surveys shall be performed during BT for the craft. All noise and vibration surveys shall be performed with main propulsion engines at Maximum Continuous Rating and all accommodation Heating, Ventilation, and Air Conditioning systems and equipment in normal operation. The Contractor shall provide all test equipment, fuel, fluids, and qualified personnel to conduct BT. |
| 094.1 | The Contractor shall send BT schedule notification to the Government at least thirty (30) days prior to BT. BT shall be witnessed by the Government and/or the Government Representatives at the discretion of the Government. The Contractor shall send the BT trials report to the Government within 14 days following completion of BT and the BT trial report shall be made available to the Government at AT. Successful completion of BT is a prerequisite to AT. |
| 094.2 | The Contractor shall perform Acceptance Trials (AT) and shall demonstrate: a) all systems have been satisfactorily tested in accordance with USCG and ABS regulatory requirements and the commercial marine standards specified in this document; b) the craft is reasonably clean and free of trash and other industrial debris; c) the craft, including all data, is in all respects ready for delivery, except for final cleaning and preparation for shipment; and d) all equipment, machinery, components and systems can be safely operated to full capacity under full load operating conditions. The Contractor shall conduct the dockside tests portion of AT in accordance with SNAME T&R Bulletin No. 3-39. The Contractor shall conduct the underway (sea trials) portion of AT in accordance with SNAME T&R 3-47, Guide for Sea Trials. The Contractor shall provide a tugmaster for sea trials. At a minimum, sea trials shall include the following tests, trials, and demonstrations: 1. Ahead Endurance Trials (minimum 1 hour duration); 2. Ahead Steering; 3. Astern Steering; 4. Quick Reversal from Ahead to Astern (“Crash Stop”); 5. Quick Reversal from Astern to Ahead; 6. Turning Circles; 7. “Z” Maneuver; 8. Clockwise and Counterclockwise Rotation on Tug’s Axis; 9. Lateral Walks; 10. Emergency Steering; 11. Anchoring; 12. Off-Ship Fire-Fighting; and 13. Brow Deployment. |
| 094.3 | AT shall be performed with the craft at the full load draft and trim condition. Underway airborne noise and vibration surveys shall be performed during AT for the craft. All noise and vibration surveys shall be performed with main propulsion engines at Maximum Continuous Rating and all accommodation Heating, Ventilation, and Air Conditioning systems and equipment in normal operation. AT shall be conducted by the Contractor and witnessed by Government representatives, who will include the President, Board of Inspection and Survey (PRESINSURV) and Program Office representatives, and may include operating activity representatives (end users). The Contractor shall provide all test equipment, fuel, fluids, and qualified personnel (including but not limited to a captain/tug master) to conduct AT. |
| 094.4 | The Contractor shall provide a complete draft agenda/test plan (detailed list and description of events) and submit preliminary drawings and COTS Manuals thirty (30) days prior to the scheduled AT. The Contractor shall schedule AT as agreed to by the Government to accommodate the schedules of both the Program Office (PMS325T) and PRESINSURV. The Contractor shall provide an estimated date for AT six (6) months prior to the scheduled AT date. The Contractor shall notify the Government immediately of any change in the estimated AT date. To meet contract delivery dates, it is recommended that the Contractor schedule AT no later than four (4) weeks prior to the contracted delivery date to allow sufficient time for required evolutions (i.e. AT discrepancies corrections, shipping, and receipt at destination). |
| 094.5 | The Contractor shall provide notification of readiness for AT and a complete draft AT agenda/test plan at least thirty (30) days prior to AT. Final agenda/test plan shall be provided to the Government fourteen (14) days prior to AT. The AT agenda/test plan shall include detailed operational procedures to be used for checking and verifying satisfactory operation of the installed craft systems. Detailed test operational procedures shall include data to be recorded or verified and pass/fail criteria as applicable. The Government reserves the right to approve or disapprove the AT agenda. Government approval of the AT agenda/test plan is a prerequisite to AT. |
| 094.6 | The Contractor shall ensure the craft is complete and ready for presentation to the Government prior to the AT date. This includes all hardware installed and drawings, tech manuals, CIB, and all previous test data complete and available. See Section C for potential Contractor liabilities if the Contractor cannot satisfactorily conduct AT after arrival of the Government AT team at the Contractor’s location. Satisfactory completion of AT and resolution of any resulting discrepancies (including corrections to drawings, CIB, and other technical data) shall be a condition for acceptance of the craft by the Government. Any unresolved discrepancies may result in acceptance and/or payment delays. |
| 096 | Weight estimates, reports, and supplemental documents shall be prepared in accordance with the SAWE Recommended Practice 12 Issue No. C and SAWE Recommended Practice 13. Acquisition margins shall be selected and applied and service life allowance shall be selected and applied in accordance with SAWE Recommended Practice 14. |
Weight Reports shall include Light Ship (Condition A), and Full Load (Condition D) conditions.
A Final Weight Report, including levers (vertical, longitudinal, and transverse) and moments (vertical, longitudanal, and transverse), for light craft conditions shall be submitted. Each item shall be marked to indicate whether the information given is based on weighing or calculations. Description of items shall include the sizes, ratings or capacities, and the number of units or items reported so that unit weights may be obtained. The Final Weight Report shall match the actual weight of the first completed craft.
| 097 | The Contractor shall perform an inclining experiment prior to Builder’s Trials on the craft constructed under this contract. The inclining experiment shall be performed in accordance with Regulatory Body requirements and ASTM F1321, “Standard guide for Conducting a Stability Test to Determine the Light Ship Displacement and Centers of Gravity of a Vessel”. An Intact/Damage Stability Report that includes a summary of the intact and damage stability analysis required by Regulatory Body criteria for craft stability shall be provided in both hard copy and digital (PDF) formats. The report shall include details of the inclining experiment for the tug. A Dead Weight survey, subject to Regulatory Body approval, may be substituted for the inclining experiment following the first craft. The tug, in all operational and load conditions as specified in the accepted weight estimate, shall not have a list exceeding 0.25 degrees, port or starboard, and the trim shall not exceed 0-0.15 m (0.5 ft.) forward or aft. |
| 099 | The Contractor shall e-mail a minimum of three high resolution JPEG photographs every three months showing current construction progress from the start of construction through completion of Builder's Trials. At least one construction photograph in each submission shall be wide angle to show as much of the entire craft or module(s) completed as possible. |
| GROUP 100 - HULL/DECK/CABIN EQUIPMENT | |
| 100 | Special attention shall be made to the design of the bow and forward entry as to its ability to contact and stabilize the tug when working alongside all classes of Navy ships and submarines. The tug shall have a sea-keeping stern to minimize taking on water over the gunnels while running astern in heavy seas during escort or towing operations. The wheelhouse shall be designed and arranged to maximize visibility to the fore, aft, and sides without requiring the Tug Master to change positions in order to attain the required sight lines. The hull form of the tug shall be designed to maximize stability, especially for indirect towing at high speed. The tug shall make up alongside the bow and stern of Navy ships and submarines without protrusion or obstruction from tug appurtenances that would interfere with or otherwise damage the hull of the vessel being assisted, except for normal hull-to-hull contact when protected by fenders. |
| 100.1 | The tug transom shall have a multi chine bottom form with provision for underwater standoffs or sponsons to prevent contact of the quarters and/or rudder propellers against a submarine hull. A heavy sheer strake shall be integrated into the hull. Heavy duty extruded rubber fendering shall be installed on the bow, side plating, and stern (continuous) to prevent metal-to-metal contact when working alongside Navy surface vessels as well as protecting the underwater body alongside Navy submarines . Tires and/or hanging fenders shall not be used. |
| 100.2 | The fendering shall not be through-bolted in watertight structure but, shall be mounted by such means to facilitate maintenance with the tug afloat. Bulwarks shall be provided around the main deck with adequate tumblehome to prevent contact with surface vessel hulls. Two (2) bulwark doors shall be provided with one (1) on the starboard side and one (1) on the port side. Deck fittings and rigging appurtenance arrangements shall accommodate specific rigs required for specialized barge towing and maneuvers and shall be approved by the Government. Sheer strake and hull framing in the area of the port and starboard (forward) shoulder bitts to be sufficiently reinfoced or designed to withstand force of additional tug working bow-on in this area. The tug shall have a method for safely transferring pilots between tug and ship and submarines when environmental conditions permit. |
| 110 | The tug mast shall have remote folding capability to prevent contact with Navy surface vessel bow flares. The maximum height of the mast shall be 35 feet (10.7 meters) in the folded position. Appurtenance exceeding the maximum mast height shall be readily accessible and retractable. Vessel navigation lights including the masthead and stern lights shall be visible with the mast in the down position (additional short/stub masts shall be installed as necessary). The superstructure and wheelhouse shall be centrally set to maximize the amount of flare the tug can avoid. |
| 110.1 | Bulwarks shall be at least 3 feet (0.9 meters) in height along main deck. Top of bulwarks shall be protected and reinforced for contact with other vessels. Top of bulwarks shall be smooth and free of sharp edges. |
| 111 | The tug shall have welded American Bureau of Shipping (ABS) Grade A steel hull plating construction. |
| 114 | The hull shall incorporate a skeg, which shall be designed to provide the tug with an optimum balance of stability and lateral movement for ship-assist and escort missions. The skeg shall be designed and located so that water flow to the rudder propellers and wash from the rudder propellers are unimpeded. |
| 123 | Main fuel oil tanks shall have double bottoms or deep tanks. |
| 123.1 | The combined capacity of the Diesel Exhaust Fuild (DEF) storage tank(s) shall be sized to operate each diesel engine's exhaust treatment system underway for a duration of 7 days and in accordance with OEM recommendations. The DEF tank capacity shall be no less than 10% of the total fuel capacity of the tug. The DEF tank(s) shall be suitable for SCR Grade AUS 32. The DEF tank(s), hard piping, and fittings shall be constructed of highly alloyed Cr-Ni or Cr-Ni-Mo steel, stainless steel types 304, 304L, 316L, 409, or 439, or titanium. The DEF tank shall be installed in a location and designed/configured/insulated to prevent freezing of the DEF and to prevent the DEF from exceeding 95 degrees F for prolonged time periods. A stainless steel inlet strainer shall be installed to prevent large debris from entering the DEF tank. A secondary DEF filter shall be installed as close as possible to the inlet port of the dosing cabinet. High and low level alarms shall be provided in the wheelhouse and machinery space for each DEF tank. The high level alarm shall be set for 95% tank capacity and the low level alarm shall be set for 13.5% tank capacity.Tug shall be delivered with all DEF tanks at a minimum of 90% capacity. DEF quality shall meet the requirements of ISO 22241-1. |
| 123.2 | A DEF filling and transfer piping system shall be provided to the tug with a DEF filling connection. The DEF filling connection shall be located adjacent to the fuel oil filling connection. DEF valves and piping systems shall be painted in accordance with the Navy color coding for "demineralized electronic cooling water" as cited in NSTM 505." |
| 123.3 | The potable water system shall meet CDC/USPHS recommended shipbuilding construction guidelines with the exception of the water storage capacity requirements. The potable water system shall satisfy the daily water demands of the tug complement and machinery for 7 days continuous underway operation. The total daily demand shall take into consideration: 20 gallons (76 liters) per accommodation; engine jacket water make-up; HVAC water system make-up; and appropriate demand per accommodation for sanitary flushing. The tug shall be provided with a potable water double bottom tank(s), 2500 gallon (9463.5 liter) minimum, that will form an integral part of the hull and shore supply connections (port and starboard). An automatically controlled ultraviolet disinfection system with monitoring, metering and alarm capabilities shall be installed. A remote means shall be provided for indicating potable water tank level in addition to the sounding tube. A standing chilled (refrigerated) water fountain shall be installed in the mess room. |
| 123.4 | An oily waste storage and transfer system that allows for selective suction from oily water generating spaces and the bilges shall be provided. Suction from spaces that generate oily water shall be by means of a dedicated pump and shall discharge to an oily waste holding tank. Means shall be provided to minimize oil contamination of bilge water. Machinery shall have drip pans provided to minimize the volume of oil contaminating the engine room bilges. A waste oil tank, 500 gallon (1892.7 liter) minimum shall be provided. Means shall be provided to transfer the contents of the oily waste holding tank and the waste oil tank using deck connections for shore side discharge. |
| 123.5 | The tug shall be provided with oil storage capacity to accommdate one complete lube oil sump change out for each main propulsion diesel engine and service diesel engine plus make-up lubricant for seven (7) days continuous operation at MCR. The tug shall be provided with stowage for reduction gear oil and steering gear hydraulic oil. |
| 123.6 | All tank access openings shall be at least 18 inches (0.45 meters) in diameter. Tank number shall be welded on the top of each cover. |
| 123.7 | Each main engine shall be provided with an integral oil sump with a ball valve installed on the drain for connection to the waste/dirty oil pump and tank. A removable plug shall be installed on the valve. |
| 130 | Weather decks shall be watertight and self draining. Weather decks shall have sufficient camber to provide quick drainage through freeing ports. The main deck shall have sufficient sheer to reduce the volume of water coming on deck. |
| 150 | Superstructure shall be provided with a compact deckhouse and a bridge deck placed wheelhouse. The superstructure shall be placed well inboard to accommodate working extreme flares and counters of vessels. Upper outboard edges of the deckhouse shall be beveled to prevent contact with vessels and to provide unobstructed sight lines from the wheelhouse. 360 degree, double-pane windows and sky windows shall be provided in the wheelhouse. Wheelhouse windows shall be angled inboard to maximize sight lines. |
| 162 | To maximize sightlines from the wheelhouse, exhaust funnel/stack enclosures shall not extend upward past the level of the deck in the wheelhouse. |
| 163 | Sea chests shall be installed to supply machinery cooling, fire-fighting, and auxiliary systems. Sea chests shall be fitted with stainless steel or aluminum strainer plates. |
| 167 | All main deck hatches shall be arranged with suitable guards to ensure that working lines do not foul. |
| 167.1 | Escape hatches shall be quick-acting watertight aluminum hatches with stainless steel welding rings (Freeman or equivalent). Escape hatches shall be located/arranged to minimize interference with towing/mooring lines and minimize chances of flooding. |
| 167.2 | Gaskets shall be installed on all hatches and doors. Gaskets shall be neoprene or silicone. Silicone gaskets shall be Class 3B (tear and flex-resistant), 30 durometer, per Commercial Item Description (CID) A-A-59588. Gaskets shall be retained by the hatch, cover, or door when the device is opened. Gaskets shall be one continuous length and shall be installed with an adhesive compatible with the gasket material. Contact surfaces of gaskets shall be smooth, free of cracks and gouges, and shall be completely free of paint. |
| 168 | The wheelhouse shall have two (2) port and starboard weather-tight doors each with upper and lower windows. The doors shall be capable of being secured in the open position. |
| 168.1 | All watertight doors shall be quick acting. |
| 168.2 | Doors on deck lockers shall be lockable (have spaces for padlocks). |
| 169 | The tug shall be provided with parts shipping hatches in the main deck, port and starboard, above the azimuthing units. |
| 169.1 | The engine room access hatch shall have permanently installed overhead lifting padeye(s) and each padeye shall be permanently labeled with their safe working load(s). |
| 169.2 | All ventilation hatches shall be flush mounted, e.g. minimal or no protrusion from mounting on deck house, with hinged covers. |
| 169.3 | Overhead lifting padeyes shall be permanently installed to facilitate maintenance for major equipment (diesel engines, Z-drives, shafting, clutches, and fire pump. The padeyes shall be arranged and sized to the manufacturer's recommended location(s) and ratings and each padeye shall be permanently labeled with its respective safe working load. |
| 171 | The tug shall be provided with an electric or hydraulic retracting/folding primary mast designed for mounting of antennas (for systems located in wheelhouse) and navigation lights. The mast retracting/folding shall be remotely controlled from the wheelhouse. |
| 171.1 | Secondary mast(s), shall be suitable for radar scanners. |
| GROUP 200 - PROPULSION PLANT | |
| 233 | The tug shall be provided with two (2) electrically started, main propulsion diesel engines (Caterpillar 3512E or equivalent), minimum 1350 bkW at 1810 bhp EPA Tier 4 Final compliant, rated for unrestricted continuous duty operation. The engines shall be capable of unrestricted continuous operation (operating at rated load and rated speed up to 100% of the time) under ambient temperature and comply with EPA Tier 4 Final emissions requirements. The propulsion engines shall be identical. Cooling, lubricating, and fuel service pumps serving the engines may be engine driven. The engines shall be hard mounted. The engines shall include a secondary fuel filter and have a crankcase recovery system (AIRSEP or equivalent). |
| 233.1 | The tug shall be provided with two (2) identical a Selective Catalytic Reduction systems for each main propulsion engines to reduce NOx emissions. SCR systems shall be identical. SCR systems shall meet the requirements of the OEM for the main propulsion engines. Each system shall consist of DEF tank, air supply, dosing cabinet with DEF pump and Clean Emission Module (CEM). All hard piping and fittings throughout the system shall be highly alloyed Cr-Ni or Cr-Ni-Mo steel, stainless steel types 304, 304L, 316L, 409, or 439, or titanium. Adequate access to and clearance around the CEM shall be provided in accordance with OEM recommendations to allow service and replacement of the catalyst. The air quality of the compressed air supplied to the dosing cabinet shall meet ISO 8573.1 Class 5 compliant, 10 CFM @ 70 - 155 PSIg, partical size of 40 micron and partial density of 10 mg/m3. A water/oil separator shall be supplied to contain any large amount of water in the air lines. The DEF dosing cabinet shall include a 40 micron coalescing filter screen to be installed before the dosing cabinet. The filter/screen shall meet ISO 22241-1 quality requirements with a maximum particle size of 40 microns and be able to handle 1.5 gal/min within a pressure range of 5 to 10 psi. The routing of the air line shall progress continualy without air locks or line bends that would allow condensation to form and freeze, preventing air supply to the dosing cabinet air valve. |
| 233.2 | Over the full operating range of the main engines, the combustion intake and exhaust systems shall not impose a pressure drop or back pressure, which will exceed the acceptable values of the engine manufacturer's recommendations. |
| 233.3 | One (1) main engine electronic diagnostic kit with durable weatherproof laptop PC (Panasonic Toughbook or equivalent), cables, adapters, software and license shall be provided for each tug. The laptop PC shall meet the engine OEM's minimum configuration requirements at time of tugboat delivery. |
| 240 | A Marine Control Drive (MCD) variable speed clutch ("slip clutch") shall be installed on each propulsion shaft line to drive each rudder propeller (Z-drive) from each main propulsion diesel engine. The output speed of each MCD shall be electronically controlled. The MCDs shall have a fire fighting mode to allow the external fire pump to be driven from the main propulsion diesel engines. The MCDs shall be capable of being engaged and disengaged manually, in the event of an emergency. |
| 243.0 | The propulsion shafting system shall be designed to limit vibration responses within the allowable limits specified by the manufacturer of each major component. |
| 243.1 | Straight line drive shafts shall be installed with all couplings necessary to connect the propulsion system components. The rotating shafts shall be provided with removable safety guards providing 360 degree coverage. The guards shall be sufficiently strong and rigid to resist damage from being stepped on by personnel. |
| 245 | The tug shall be provided with Schottel SRP 1012s (or equivalent) rudder propellers (Z-drives). Propellers shall be 4-bladed, fixed pitch, same rotation. Propeller material shall be nickel-aluminum-bronze to ABS grade. Rudder propellers shall be bolt-in style. A slip clutch feature on the drives shall be provided. |
| 246 | The tug shall be provided with propeller nozzles. |
| 252.1 | Single hand control/indication panel for each steering unit shall be provided in each wheelhouse control console, providing integrated steering/engine speed control, propeller speed and drive position indication and alarms. Normal (follow-up) and emergency (non-follow-up) control modes shall be supported. |
| 252.2 | The tug shall be provided with a complete digital instrument package with dimmable backlighting for each main engine, one set mounted in the wheelhouse, one set mounted in the engine room on a centralized panel. Local start capability shall be provided. Emergency (run) and shutdown control shall be provided from the wheelhouse. Instrument package shall be in accordance with ABS Rules. |
| 256 | Main engines shall be cooled using plate-type heat exchangers located on the engines or shall be cooled using box coolers. Generator engines shall be cooled using plate-type heat exchangers, shell and tube-type heat exchangers, grid coolers, or box coolers. |
| 256.1 | Bronze duplex sea water strainers shall be installed on each sea water supply line to the main propulsion diesel engine heat exchangers, generator set heat exchangers, MCD cooling circuits, Z-drive cooling circuits, HVAC cooling circuits, and auxiliary system cooling circuits, as applicable. Sea water strainers shall be sized according to the OEM recommendations for each engine, Z-drive, MCD and other piece of equipment. Sea water strainers shall allow either strainer to be serviced without shutting down the machinery/equipment. Sea water strainers shall have monel baskets. |
| 259 | A muffled, dry exhaust system shall be installed for each main propulsion diesel engine. The exhaust system shall be compatible with the SCR/CEM aftertreatment system. Exhaust piping shall be of stainless steel construction and routed through the top of the deckhouse. Each engine shall exhaust to weather independently and shall be arranged so that exhaust gases do not impact operations. Exhaust outlet openings shall extend above the wheelhouse and shall be angled inboard. The location of the exhaust outlet shall be a sufficient distance away from any supply air ventilation to prevent introducing exhaust gas into the air supply system. Stainless flexible exhaust hose or flexible bellows with turbo liner shall be installed to connect the exhaust piping to the engine exhaust manifold. The entire exhaust sytem shall be resiliently-mounted and shall allow for expansion of the exhaust system. At the exhaust pipe penetrations through the funnel/stack, rain hats shall be mounted over coamings with stainless steel mesh vibration dampers/spacers. Exhaust manifolds and interior exhaust piping shall be insulated with fireproof material such that the temperature of exposed parts does not exceed 94 degrees Celsius (200 degrees Fahrenheit). Hooks, wire, and other hardware securing insulation shall be stainless steel. A dry type spark-arresting exhaust silencer shall be furnished with each engine and shall be installed at a location after the SCR/CEM aftertreament system that allows for the most effective silencing without degrading engine performance. Typical attenuation for the exhaust silencers shall be a minimum of 30 dB(A). Drain pockets with drain valves shall be installed at the lowest points in the exhaust system. |
| 261 | The tug shall be provided with a fuel oil purification system having a fuel oil purifier with sufficient capacity to batch purify a single fuel oil day tank within 8 hours. The fuel oil purifier shall be capable of purifying fuel oil being transferred from any storage tank or day tank to any other storage tank or day tank. The fuel oil purifier shall be capable of batch purifying fuel oil day tank(s) while the tug is underway. |
| 261.1 | Flexible fuel hose shall be US Coast Guard Type A1 and shall meet the requirements of SAE J1527, Marine Fuel Hoses. Fuel hose fittings shall be stainless steel. |
| 261.2 | Diesel fuel lines located within twelve (12) inches of a battery or above the horizontal plane of the battery top surface, as installed, shall be shielded with dielectric material. |
| 299 | Any OEM special tools required for maintenance of the main propulsion diesel engines shall be provided and labeled. The special tool shall be stowed in bins or mounted in the vicinity of the diesel engines, as practical. |
| GROUP 300 - ELECTRIC PLANT | |
| 300 | The ship service and emergency electrical systems; including power quality, subsystems, and equipment shall be in accordance with IEEE Std. 45 series in addition to the ABS Rules. Craft electrical components and subcomponents shall be suitable for a marine environment and isolated from the marine environment. |
| 300.1 | Continuously energized parts, such as positive battery terminals and both ends of all wire connected thereto, shall be physically protected with boots, or other form of protection that cover all energized surfaces to prevent accidental short circuits. Positive battery terminals shall be protected with boots even when located in battery boxes. |
| 300.2 | The hull or grounding conductors shall not be used as a return circuit. |
| 303 | An interlock shall be installed to allow power for the tug's AC electrical system to be supplied by either the ship's service diesel generator sets or by shore power but not both simultaneously. |