Exhibit A - CDRLs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Response_to_Offerors_Questions.pdf | ||
| SF30_N00024-14-R-5217_0001.pdf | ||
| CDS_TI16_N00024-14-R-5217.pdf | ||
| Attachment_1_-_DD254.pdf | ||
| Attachment_10_-_Cost_Summary_Worksheet.xls | XLS spreadsheet | |
| CDS_TI16_N00024-14-R-5217_Word_Version.doc | DOC document | |
| Attachment_9_-Bidders_Question_Form.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSED CDRL DATA PACKAGE
FOR
COMMON DISPLAY SYSTEM (CDS)
TI-16
N00024-14-R-5217
COMPETITIVE
TABLE OF CONTENTS MATRIX
09-JUN-2014
EXHIBITS A, B & C
CDRL DID NO. TITLE OF DID (SUBTITLE) CONTRACT REFERENCE
EXHIBIT A
A001 DI-MGMT-81797 PROGRAM MANAGEMENT PLAN SOW PARA 3.1
A002 DI-MGMT-81861 INTEGRATED PROGRAM MANAGEMENT REPORT
(IPMR)
SOW PARAs 3.1, 3.1.2, 3.1.3, 3.1.5, 3.1.6, 3.7, 3.7.5.4
A003 DI-MGMT-80227 CONTRACTOR’S PROGRESS, STATUS AND
MANAGEMENT REPORT
SOW PARAs 3.1, 3.1.7, 3.1.8, 3.2.5, 3.3.10, 3.4.3.7, 3.7, 3.7.4.4
A004 DI-ADMN-81249A CONFERENCE AGENDA SOW PARAs 3.1.3, & 3.7.5.4
A005 DI-ADMN-81250A CONFERENCE MINUTES SOW PARAs 3.1.3, 3.5.4 &, 3.7.5.4
A006 DI-ADMN-81373 PRESENTATION MATERIAL SOW PARAs 3.1, 3.1.3, 3.3.10, & 3.7.5.4
A007 DI-MGMT-81334D CONTRACT WORK BREAKDOWN STRUCTURE SOW PARA 3.1.4
A008 DI-MGMT-80368A STATUS REPORT (CONTRACT CDRL DELIVERY STATUS) SOW PARA 3.1.9
A009 DI-FNCL-81116 MANHOUR ESTIMATE, TECHNICAL COST PROPOSALS SOW PARA 3.1.10
A010 DI-MISC-80508B TECHNICAL REPORT – STUDY/SERVICES (END OF
CONTRACT TRANSITION PLAN)
SOW PARA 3.1.11
A011 DI-MISC-80508B TECHNICAL REPORT-STUDIES/SERVICES
(ENGINEERING STUDIES AND INVESTIGATIONS)
SOW PARA 3.2.1
A012 DI-MISC-80711A SCIENTIFIC AND TECHNICAL REPORTS (OPEN
ARCHITECTURE ASSESSMENT TOOL)
SOW PARA 3.2.2.9
A013 DI-ENVR-81375 ENVIRONMENTAL HEALTH AND SAFETY PLAN (HSP) SOW PARA 3.2.5
A014 DI-SAFT-81626 SYSTEM SAFETY PROGRAM PLAN (SSPP) SOW PARA 3.2.5.1
A015 DI-SAFT-80101B SYSTEM SAFETY HAZARD ANALYSIS REPORT (SSHA) SOW PARA 3.2.5.1
A016 DI-FNCL-80448 LIFE CYCLE COST (LCC) AND INDEPENDENT SCHEDULE
ASSESSMENT (ISA) REPORT (LIFE CYCLE COST (LCC)
ANALYSIS)
SOW PARAs 3.3.2, 3.3.3, 3.3.4.1.1, 3.3.10, & 3.7.1
A017 DI-IPSC-81448B FIRMWARE SUPPORT MANUAL (FSM) SOW PARA 3.3.5.1
A018 DI-NDTI-81284 TEST AND EVALUATION PROGRAM PLAN (TEPP) SOW PARA 3.3.7.1
A019 DI-SESS-81704 TEST PLANS/TEST PROCEDURES (PRODUCTION
ACCEPTANCE TEST (PAT) PROCEDURES)
SOW PARAs 3.3.5, 3.3.7.1 &, 3.3.7.5
A020 DI-SESS-81704 TEST PLANS/TEST PROCEDURES (ENVIRONMENTAL
QUALIFICATION TEST (EQT) PLAN)
SOW PARA 3.3.7.4
A021 DI-NDTI-80809B TEST PLANS/TEST PROCEDURES (ENVIRONMENTAL
QUALIFICATION TEST (EQT) REPORT)
SOW PARA 3.3.7.4
A022 DI-QCIC-81794 QUALITY ASSURANCE PROGRAM PLAN (QUALITY
MANAGEMENT PLAN)
SOW PARA 3.3.8.1
A023 DI-MISC-80508B TECHNICAL REPORT-STUDIES/SERVICES
(UNAUTHORIZED SOURCE PURCHASE REPORT)
SOW PARA 3.3.8.2
A024 DI-CMAN-80858B CONTRACTOR’S CONFIGURATION MANAGEMENT PLAN SOW PARA 3.4
A025 DI-SESS-81121A BASELINE DESCRIPTION DOCUMENT SOW PARA 3.4.2
A026 DI-CMAN-80639C ENGINEERING CHANGE PROPOSAL (ECP): CLASS I AND
CLASS II (PRELIMINARY/FINAL)
SOW PARA 3.4.3.2
A027 DI-CMAN-80643C SPECIFICATION CHANGE NOTICE (SCN) SOW PARA 3.4.3.4
A028 DI-CMAN-80640C REQUEST FOR DEVIATION (RFD) SOW PARA 3.4.3.5
A029 DI-CMAN-81516 AS BUILT CONFIGURATION LIST (ABCL) SOW PARA 3.4.3.6
A030 DI-CMAN-81253A CONFIGURATION STATUS ACCOUNTING INFORMATION
(CSA DATABASE)
SOW PARA 3.4.3.7
A031 OT-13-20133 &
OT-14-20013
COMMON DISPLAY SYSTEM (CDS) RELIABILITY AND
MAINTAINABILITY (R&M) PROGRAM PLAN
SOW PARA 3.5.1
A032 DI-RELI-81497 RELIABILITY PREDICTION AND DOCUMENTATION OF
SUPPORTING DATA
SOW PARA 3.5.2.3
A033 DI-MNTY-81604 MAINTAINABILITY/TESTABILITY DEMONSTRATION
TEST PLAN
SOW PARA 3.5.2.5
A034 DI-MGMT-80004A MANAGEMENT PLAN (MATERIALS SCREENING PLAN) SOW PARA 3.5.3.2
A035 DI-RELI-80255 FAILURE SUMMARY AND ANALYSIS REPORT SOW PARAs 3.5.3.4 & 3.6.3
A036 DI-MISC-80508B TECHNICAL REPORT –STUDIES/SERVICES
(CORRECTIVE ACTION SUMMARY REPORT (CASR))
SOW PARA 3.5.3.4
A037 DI-NDTI-80809B TEST/INSPECTION REPORT (PRODUCTION
ACCEPTANCE TEST (PAT) AND SYSTEM BURN-IN TEST
(SBT)
SOW PARA 3.6.3
A038 DI-ILSS-80868 SPECIAL EQUPIMENT TOOLS AND TEST EQUIPMENT
LIST
SOW PARA 3.6.5
A039 DI-MGMT-81949 DIMINISHING MANUFACTURING SOURCES AND
MATERIAL SHORTAGES (DMSMS) IMPLEMENTATION
PLAN
SOW PARA 3.6.6
A040 DI-MISC-80508B TECHNICAL REPORT – STUDY/SERVICES (PRODUCT
RECALL, DMSMS, OBSOLESCENCE IDENTIFICATION
AND VENDOR CHANGE NOTICES)
SOW PARA 3.6.6.1
A041 OT-14-20012 DIMINISHING MANUFACTURING SOURCES AND
MATERIAL SHORTAGES (DMSMS) (HEALTH ANALYSIS
REPORT)
SOW PARA 3.6.6.1
A042 DI-MISC-80711A SCIENTIFIC AND TECHNICAL REPORTS (MAINTENANCE
TASK ANALYSIS (MTA))
SOW PARA 3.7.3
A043 DI-SESS-81872 LEVEL OF REPAIR ANALYSIS (LORA) REPORT SOW PARA 3.7.3
A044 DI-SESS-80992A PLANNED MAINTENANCE SYSTEM (PMS)
MAINTENANCE INDEX PAGE (MIP)
SOW PARAs 3.7.3 & 3.7.3.1
A045 DI-SESS-80991A PLANNED MAINTENANCE SYSTEM (PMS)
MAINTENANCE REQUIREMENT CARD (MRC)
SOW PARAs 3.7.3 & 3.7.3.1
A046 DI-SESS-81518B INSTRUCTIONAL PERFORMANCE REQUIREMENTS
DOCUMENT (LEARNING OBJECTIVES STATEMENTS)
SOW PARA 3.7.4
A047 DI-SESS-81520B INSTRUCTIONAL MEDIA DESIGN PACKAGE
(COMPUTER BASED TRAINING (CBT) DESIGN
STRATEGY)
A048 DI-SESS-81526B INSTRUCTIONAL MEDIA PACKAGE (ELECTRONIC
SCRIPTS, STORYBOARDS)
A049 DI-SESS-815268B INSTRUCTIONAL MEDIA PACKAGE (ON-SCREEN
LESSONS)
SOW PARA 3.7.4
A050 DI-SESS-81520B INSTRUCTIONAL MEDIA DESIGN PACKAGE (TRAINING
PACKAGES AND SOURCE DATA)
A051 DI-SESS-81524B TRAINING EVALUATION DOCUMENT SOW PARA 3.7.4
A052 DI-ILSS-80872 TRAINING MATERIALS (LESSON PLANS AND TRAINING
GUIDES)
A053 DI-ALSS-81545 INTERACTIVE COMPUTER AIDED PROVISIONING
SYSTEM (ICAPS) DATA EXCHANGE (PROVISIONING
TECHNICAL DATA)
SOW PARA 3.7.5.1
A054 DI-SESS-81716 SUPPLEMENTARY PROVISIONING TECHNICAL
DOCUMENTATION
SOW PARA 3.7.5.2
A055 DI-MISC-80508B TECHNICAL REPORT-STUDIES/SERVICES (LOWEST
REPLACEABLE UNIT (LRU) CROSS REFERENCE LIST)
SOW PARA 3.7.5.3
A056 DI-PACK-80455 PACKAGING PLAN (PACKING, HANDLING, STORAGE
AND TRANSPORTATION (PHS&T) PLAN)
SOW PARA 3.7.5.5
A057 DI-MGMT-80004A MANAGEMENT PLAN (SUPPLY SUPPORT SERVICES
PLAN)
SOW PARA 3.7.5.6
A058 DI-SESS-81619 INSTALLATION AND CHECKOUT (INCO) SPARES
LISTING
SOW PARA 3.7.5.6
A059 DI-MGMT-81804A ITEM UNIQUE IDENTIFICATION (IUID) MARKING
ACTIVITY, VALIDATION AND VERIFICATION REPORT
SOW PARA 3.7.5.7
A060 DI-SESS-81254B REQUEST FOR NOMENCLATURE (DD FORM 61) SOW PARA 3.7.5.8
EXHIBIT B
B001 DI-SESS-80776A TECHNICAL DATA PACKAGE (TDP)
SOW PARA 3.3.9
B002 DI-DRPR-81242 INSTALLATION CONTROL DRAWINGS SOW PARA 3.3.9 & 3.3.9.1
B003 DI-CMAN-81248A INTERFACE CONTROL DOCUMENT (ICD) SOW PARA 3.3.9 & 3.3.9.2
EXHIBIT C
C001 TMCR-SNIPP-
130155-000
TECHNICAL MANUAL (ELECTRONIC TECHNICAL
MANUALS (ETM) DRAFT/PRELIMINARY/FINAL)
SOW PARA 3.7.5.4
C002 DI-TMSS-81812 TECHNICAL MANUAL SCHEDULES AND STATUS
REPORT
C003 DI-TMSS-81811 TECHNICAL MANUAL COST REPORT SOW PARA 3.7.5.4
C004 DI-TMSS-81817 TECHNICAL MANUAL QUALITY ASSURANCE (TMQA)
PROGRAM PLAN
C005 DI-TMSS-81818 TECHNICAL MANUAL VALIDATION PLAN SOW PARA 3.7.5.4
C006 DI-TMSS-81819A TECHNICAL MANUAL VALIDATION CERTIFICATE SOW PARA 3.7.5.4
C007 DI-TMSS-81821 TECHNICAL MANUAL VERIFICATION INCORPORATION
CERTIFICATE
TABLE OF CONTENTS ATTACHMENTS
ATTACHMENTS
TO THE CDRL ATTACHMENT NO. OF PAGES
1 GENERAL DD FORM 1423 GLOSSARY WITH ADDRESSEE LIST 9
2 DATA DISTRIBUTION PROFILE (DDP) 29
3 WORDING OF DISTRIBUTION STATEMENTS 6
4 INTENTIONALLY LEFT BLANK 0
5 SPECIAL PROVISION REGARDING ELECTRONIC ADMINISTRATIVE CHANGES 1
6 TMCR – Superseding Revision to SE686-DJ-IEM-010, OPERATION AND MAINTENANCE
INTERACTIVE ELECTRONIC TECHNICAL MANUAL FOR OJ-827(V)/U DATA DISPLAY
GROUP AND CP-2698/U COMPUTER, DIGITAL,COMMON DISPLAY SYSTEM
7 STYLE GUIDE FOR STANDARD TECHNICAL MANUALS 1
8 TDP OPTIONAL SELECTION WORKSHEET 1
9 DATA ITEM DESCRIPTION FOR OT-13-20134 - COMMOM DISPLAY SYSTEM (CDS)
RELIABILITY & MAINTAINABILITY (R&M) PROGRAM PLAN
10 DATA ITEM DESCRIPTION FOR OT-14-20013 - COMMON DISPLAY SYSTEM (CDS)
RELIABILITY AND MAINTAINABILITY (R&M) DEVELOPMENT PROGRAM PLAN
11 DATA ITEM DESCRIPTION FOR OT-14-20014 - DIMINISHING MANUFACTURING
SOURCES AND MATERIAL SHORTAGES (DMSMS) HEALTH ANALYSIS REPORT
CDRL DD FORM 1423
ATTACHMENT 1 TO THE CDRL
GENERAL DD FORM 1423
GLOSSARY WITH ADDRESSEE LIST
GENERAL DD FORM 1423 GLOSSARY
WITH ADDRESSEE LIST
(Addressee Listing begins on page 7)
A. The following information is keyed to and provides explanations for entries in Blocks A through J of the DD Form 1423 Exhibit(s):
Block A. CONTRACT LINE ITEM NO.
The Contract Line Item Number (CLIN) that is associated with this Contract Data Requirements
List (CDRL).
Block B. EXHIBIT The exhibit identifier for this CDRL (see DFARS 204.7105-3 for exhibit identifiers).
NOTE: DFARS 204.7105-2 specifies that the DD Form 1423 shall always be an exhibit.
Block C. CATEGORY The appropriate category (i.e. Technical Data Package (TDP), Technical Manual (TM), or
"Other" data (OTHER)) for the data item. Types of data which comprise a TDP are defined in MIL-T-31000 and MIL-DTL-31000B (as applicable). Types of manuals included under the TM category are defined in Part IX, Section B, of DoDI 5000.2. "Other" data may be further categorized, such as Administrative Data, Provisioning Data, Configuration Management Data, etc., per the functional area assignments contained in DoD 5010.12-L, Acquisition Management Systems and Data Requirements Control List (AMSDL).
Block D. SYSTEM/ITEM The system, item, project designator or name, or title of services being acquired that the data will support.
Block E. CONTRACT/PR NO.
The Procurement Instrument Identification Number (PIIN) (i.e., the contract number, the
Purchase Request (PR) number, the Request for Proposal (RFP) number, or other appropriate designator).
Block F. CONTRACTOR The contractor's name. Following the name, a slash ("/") and the contractor's Commercial and
Government Entity (CAGE) code may be inserted.
(The next four items appear at the bottom of the form, i.e., after Blocks 1 through 16.)
Block G. PREPARED BY The preparer's name and organization responsible for preparation of the CDRL. The signature of the preparer will be on the last page of the exhibit.
Block H. DATE The date the CDRL was prepared.
Block I. APPROVED BY The name of the individual responsible for approving the CDRL. The approving official's signature will be on the last page of the exhibit.
Block J. DATE The date the CDRL was approved.
NOTE: Blocks G through J need only be signed on the last page of each CDRL exhibit when the preparer and the approving official are the same throughout the entire exhibit. All other pages should contain the typed name and date entered on the last page.
B. The following information is keyed to and provides explanations for entries in Blocks 1 through 16 of the DD Form 1423 Exhibit(s):
Block 1. DATA ITEM NO.
The 4-character Exhibit Line Item Number (ELIN). The first and/or second positions consist of the exhibit identifier, and the remaining positions are assigned sequentially. The letters "I" and "O" are not used. ELIN sequencing order can be found in DFARS 204.7106. All ELINs between the first and last ELIN will be accounted for in the exhibit.
Block 2. TITLE OF DATA ITEM DESCRIPTION The exact title of the Data Item Description (DID) cited in Block 4. When the ELIN is used to acquire Technical Manuals (TMs), a Technical Manual Contract Requirements (TMCR) document will be cited in Block 4, and the entry in Block 2 will be the title of the specific type of TM being acquired.
Block 3. SUBTITLE Further identification of the data item to supplement the title, if required (optional entry).
Block 4. AUTHORITY (DATA ACQUISITION DOCUMENT NO.)
The Data Item Description (DID) identification number, One-Time DID number, or Technical
Manual Contract Requirements (TMCR) number of the document which defines data content and format requirements. If a TMCR is used, this block will state "See TMCR ____" and the TMCR will be attached to the CDRL. The TMCR will list the applicable military specifications and/or standards which provide the data preparation instructions. With the exception of a One-Time DID, the document(s) cited in this block (or listed in the TMCR, when used) will have been cleared for listing in DoD 5010.12-L, Acquisition Management Systems and Data Requirements Control List (AMSDL).
Block 5. CONTRACT REFERENCE The specific paragraph number of the applicable contractual document which contains the tasking that generates a requirement for the data item. Normally, this will be a Statement of Work (SOW) paragraph.
Block 6. REQUIRING OFFICE The technical office having responsibility for ensuring the technical adequacy of the data.
Block 7. DD 250 REQ The applicable code, extracted from Table 1, designating the requirements for inspection and acceptance of the data. The DD Form 250 shall be delivered to the first addressee in Block 14, unless otherwise indicated in Block 16.
Block 8. APP CODE Identification, by entry of an "A", of a requirement for advance written approval prior to final distribution of an item of critical data (i.e., test plans, test procedures, program plans, or any other documentation that requires Government approval prior to the contractor taking an action).
An "A" in this block indicates that a preliminary draft is required. Block 16 of the ELIN will show length of time required for Government approval/disapproval and subsequent turn-around time for the contractor to resubmit the data after Government approval/disapproval has been issued. Block 16 will also indicate the extent of the approval requirement, e.g., approval of technical content and/or format.
TABLE 1. DATA INSPECTION AND ACCEPTANCE CODES
CODE DEFINITION
DD 250 CODE INSPECTION ACCEPTANCE
SS Source* Source* DD Destination Destination SD Source* Destination DS Destination Source* LT** Letter of transmittal only NO** No inspection, acceptance or letter of transmittal required.
XX Inspection and acceptance requirements specified elsewhere in the contract.
* Source indicates contractor facility.
** These codes are not authorized for data comprising final delivery of Technical Data Packages or for Technical Manuals. (LT may, however, be used for delivery of preliminary TDPs or TMs.)
LT is not authorized for use when inspection is required. LT will be used when approval of a draft is required in Block 8. LT is also used when the contracting agency does not desire to have a DD Form 250 for each and every piece of data developed by the contractor. The only other authorized use of the LT is the special case where the contracting agency does not desire to have separate DD Forms 250, but desires to have a Government Quality Assurance (QA) representative perform inspection. The Government QA representative shall be listed on the distribution in Block 14 and requested, via the QA letter of instruction, to provide comments.
Block 9. DIST STATEMENT REQUIRED The code letter (e.g., A, B, C, D, E, F, or X) corresponding to the distribution statement to be marked on the data item by the contractor, in accordance with DoDD 5230.24, Distribution Statements on Technical Documents. Block 16 of the ELIN will reflect the appropriate statement and will include the reason, date of determination, and controlling DoD office. If the appropriate statement is not known, or if it may vary among specific submissions under this item, "See Block 16" will be entered in this block and explanatory information will be provided in Block 16. If the data item is not technical in nature and does not require a distribution statement, an "N/A" for "Not Applicable" will be entered in this block.
Block 10. FREQUENCY The frequency of data submittal. Entries in this block are explained in Table 2. If the data is of a recurring type, it is to be submitted at the end of the reporting period established in this block unless otherwise indicated in Block 16.
TABLE 2. DATA SUBMITTAL FREQUENCY CODES
CODE FREQUENCY
ANNLY Annually ASGEN* As generated ASREQ* As required BI-MO Every two months BI-WE Every two weeks CP/RQ* Change pages as required DAILY Daily DFDEL Deferred delivery (See DFARS 252.227-7026) MTHLY Monthly ONE/R One time with revisions OTIME One time (Does not include draft submissions) QRTLY Quarterly R/ASR* Revisions as required SEMIA Every Six months WEKLY Weekly XTIME Multiple separate submittals (2TIME, 3TIME, etc.) (Does not include draft submissions) See Block 16* Requirement is fully described in Block 16. Used in lieu of other codes where such are inadequate to define requirement, or used in addition to other codes requiring amplification in Block 16.
NOTE: The codes are limited to five (5) digits for automation purposes.
* The ELINs citing these codes will have an additional explanation in Block 16 to provide the contractor with guidance necessary to accurately price the deliverable data item.
Block 11. AS OF DATE Date for cutting off collection of the data. If the data is to be submitted multiple times, a numeral will be entered in this block to indicate the number of calendar days prior to the end of the reporting period, established in Block 10, that data collection will be cut off. For example, "15" would place the "as of date" for the data at 15 days before the end of the month, quarter, or year, depending on the frequency established in Block 10; a "0" would place the "as of date" at the end of each month, quarter, etc. If the data is submitted only once, the "as of date" will be as follows:
year/month/day, e.g., 90MAR15. If an "as of date" is not applicable, an entry of "N/A" will be made in this block.
Block 12. DATE OF FIRST SUBMISSION The due date for initial data submission. This is normally the postage date or date the data is delivered to the ACO, entered as year/month/day (e.g., 90MAR15) or keyed to a specific event or milestone, using a code from Table 3.
NOTE: No classified dates are cited in the CDRL.
TABLE 3. DATA SUBMISSION CODES
CODE DEFINITION
ASGEN* As generated ASREQ* As required DFDEL* Deferred delivery XDAC** Days after contract award XDACM** Days after contract modification XDARP** Days after reporting period XDARC** Days after receipt of comments XDATC** Days after test completion NLT No later than EOC End of contract EOM End of month EOQ End of quarter See Block 16* Used to indicate requirement is fully described in Block 16.
Used in lieu of other codes where such are inadequate to define requirement, or used in addition to other codes requiring amplification in Block 16.
* The ELINs citing these codes will have in Block 16 additional specific instructions relative to data submissions.
** The "X" is assigned a value indicating the number of days, e.g., 30DAC.
Block 13. DATE OF SUBSEQUENT SUBMISSION The due date(s) for subsequent data submission(s), if data is to be submitted more than once. If submittal is constrained by a specific event or milestone, the constraint will be given using a code from Table 3.
Block 14. DISTRIBUTION The addressees and the number of draft and final copies (regular and reproducible) to be provided to each. DoD component designator and office symbols/codes may be used; however, an explanation of these will be provided in the Addressee Listing. The first addressee will be the acceptance activity for the data if acceptance by DD 250 is to be accomplished at destination (see Block 7). When reproducible copies (e.g., magnetic tape, vellum, negative, etc.) are required, an explanation will be provided in Block 16. If the data is not to be delivered to the Government or associated contractors, an explanation will be given in Block 16. If deferred delivery is required, "DFDEL" will be entered in this block and amplification will be given in Block 16.
Block 15. TOTAL The total number of draft and final (regular/ reproducible) copies required by Block 14.
Block 16. REMARKS Contains all pertinent data information not specified elsewhere on this DD Form 1423 and any amplification of other blocks on this form (e.g., DID tailoring, use of contractor format, approval criteria and authority, inspection and acceptance clarification, distribution statements, specific submission instructions, explanation of reproducible copy and delivery requirements, desired medium for delivery of the data item, etc.).
C. The following instructions apply to completion of Blocks 17 and 18 by contractor personnel:
Block 17. PRICE GROUP Specify the appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administrative and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data items to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and which does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition – Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying this data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form
1423 at no cost.
Block 18. STIMATED TOTAL PRICE For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The entry "N/C" for "no charge" will be acceptable. The estimated price shall not include any amount for rights in data.
The Government's right to use the data shall be governed by the pertinent provisions of the contract.
ATTACHMENT 1 to the CDRL
ADDRESSEE LIST
MAILING ADDRESS CODE NAME INTERNET E-MAIL
BOWHEAD
15163 DAHLGREN ROAD
SUITE 103
KING GEORGE, VA 22485
D. McCRACKEN McCRACKEN David.McCraken1.ctr@navy.mil D. WELLS WELLS Deborah.Wells.ctr@navy.mil
COMBAT DIRECTION SYSTEMS ACTIVITY
(CDSA) DAM NECK
1922 REGULUS AVE
VIRGINIA BEACH, VA 23461-2097
F32 RICHMOND Robert.L.Richmond@navy.mil F32 RICHMOND Valerie.Richmond@navy.mil
GREYSTONES GROUP
1100 NEW JERSEY AVE, SE
SUITE 200
WASHINGTON DC 20003
R. HICKS HICKS RHicks@greystonesgroup.com B. DEVESE DEVESE BDevese@greystonesgroup.com K. BURNS BURNS KBurns@greystonesgroup.com
NAVSEA
COMMANDER
NAVAL SEA SYSTEMS COMMMAND
ATTN (CODE)
1333 ISAAC HULL AVE SE STOP 2040
WASHINGTON NAVY YARD
WASHINGTON DC 20376-2040
0251 HARBESON matthew.harbeson@navy.mil 02511 PHAM khanh.p.pham@navy.mil
NSWC/DD
SYSTEM CERTIFICATION &
CONFIGURATION MANAGEMENT (SC & CM)
ATTN:(CODE)
BLDG 1500
17214 AVENUE B 132
DAHLGREN, VA 22448-5147
W53 NEWTON Derek.Newton@navy.mil W53 JOHNSON AJohnson@teamscci.com W62 DRISCOLL Sean.Driscoll@navy.mil W64 BURCHAM Deborah.B.Burcham@navy.mil W64 BRENINGER Ronald.Breninger@navy.mil W64 CRAINE Joseph.Craine.ctr@navy.mil W64 GIBSON Gerald.Gibson@navy.mil W64 KELLY Patrick.M.Kelly3@navy.mil W64 LOWE Robert.E.Lowe@navy.mil W64 MCCORMICK Bruce.Mccormick@navy.mil W64 PEDLER William.Pedler@navy.mil W64 PICKOVER Allen.Pickover@navy.mil
NAVY ENTERPRISE SIMULATION PROGRAM
NAVAL SURFACE WARFARE CENTER (NSWCDD)
ATTN: CODE
5389 BRONSON ROAD
SUITE 165
DAHLGREN, VA 22448
W64 PAGE Donald.Page@navy.mil
NSWC/PHD
COMMANDER
NAVAL SURFACE WARFARE CENTER
PORT HUENEME DIVISION
ATTN: (CODE)
4363 MISSILE WAY
PORT HUENEMNE CA 93043-4307
A21 FLORES Paul.Flores@navy.mil
A27 MINARD Garry.Minard@navy.mil A27 PARK Robert.Park@navy.mil A35 DIBBLE Vickie.Dibble@navy.mil A35 GONZALES Joel.Gonzales@navy.mil A35 NGUYEN David.V.Nguyen@navy.mil
NAVAL SURFACE WARFARE CENTER
PORT HUENEME DIVISION
SENSORS AND DISPLAYS ISEA BRANCH
4363 MISSILE WAY
PORT HUENEMNE CA 93043-4307
A36 WOLF Daniel.Wolfe@navy.mil A41 LOPEZ Carey.Lopez@navy.mil A66 ALCON Amber.Alcon@navy.mil A66 EDMONSON Darryl.Edmonson@navy.mil A66 GASTON Camille.Gaston@navy.mil A66 KILLGORE Debbie.Killgore@nay.mil A66 KRESS Michael.Kress@navy.mil A66 TRAN Minhquan.Tran@navy.mil
NAVSUP
BUILDING 410 BAY B15
5450 CARLISLE PIKE P O BOX 2020
MECHANICSBURG, PA 17055-0788
WSS M853 MCDONELL George.Mcdonell1@navy.mil
PEO IWS
PROGRAM EXECUTIVE OFFICE
INTEGRATED WARFARE SYSTEMS
ATTN (CODE)
1333 ISAAC HULL AVE SE STOP 2301
WASHINGTON NAVY YARD
WASHINGTON DC 20376-2301
1AP1 BARTON Bruce.A.Barton@navy.mil 1AP3 CLAGUE Cristin.Clague@navy.mil 1AP4 CROWDER Tanya.Crowder@navy.mil 1CM BLACK David.C.Black@navy.mil 1CM4 GLANERT Gary.Glanert@navy.mil
1SE
1SL3 BROWN Jonas.B.Brown@navy.mil
VIEWNET https://nserc.navy.mil/viewnet/home/view/default.aspx mailto:Cristin.Clague@Navy.mil
ATTACHMENT 2 TO THE CDRL
DATA DISTRIBUTION PROFILE (DDP)
DATA DISTRIBUTION PROFILE
Each addressee shall receive a letter of transmittal notification of data product delivery/posting.
Draft/Final Column indicates addressees responsible for ensuring the adequacy of the data.
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A001 PROGRAM MANAGEMENT PLAN PEO IWS
1AP1 1/1
1SE 0/1
1AP3 0/1
1AP4
NSWC/DD
W64
P. KELLY
B. PEDLER
1/1 0/1
D. BURCHAM 0/1
VIEWNET
GREYSTONES GROUP
A002 INTERGRATED PROGRAM MANAGEMENT REPORT (IPMR) PEO IWS
1AP1 0/1
1SE 0/1
1AP3 0/1
1AP4
NAVSEA
02511
DCARC 0/1
VIEWNET 0/1
GREYSTONES GROUP
A003 CONTRACTORS PROGRESS, STATUS AND MANAGEMENT REPORT PEO IWS
1AP1 0/1
1AP3
1AP4
0/1
VIEWNET 0/1
A004 CONFERENCE AGENDA PEO IWS
1AP3
1SE
1AP4
NSWC/DD W64 0/1
A35 A36 A41 A66
0/1 0/1
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A005 CONFERENCE MINUTES PEO IWS
1AP3
1SE
1AP4
A35 A36
0/1 0/1
VIEW NET
A006 PRESENTATION MATERIAL PEO IWS
1AP3
1SE
1AP4
A35 A36
0/1 0/1
VIEW NET 0/1
A007 CONTRACT WORK BREAKDOWN STRUCTURE (CWBS) PEO IWS
1SE
1AP3
0/1 0/1
1AP4
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A008 STATUS REPORT (CONTRACT CDRL DELIVERY STATUS) PEO IWS 1AP4
GREYSTONES GROUP
0/1
A009 MANHOUR ESTIMATE, TECHNICAL COST PROPOSALS PEO IWS
1SE 0/1
1AP3 0/1
1AP4
NAVSEA
02511
A010 TECHNICAL REPORT-STUDY/SERVICES (END OF CONTRACT
TRANSITION PLAN)
PEO IWS
1AP1 1/1
1AP4
1AP4
0/1
NSWC/DD W64
P. KELLY 0/1
R. BRENINGER 0/1
B. PEDLER 0/1
VIEWNET
GREYSTONES GROUP
A011 TECHNICAL REPORT – STUDIES/SERVICES (ENGINEERING
STUDIES AND INVESTIGATIONS)
PEO IWS
1AP1 0/1
1SE 0/1
1AP3 0/1
1AP4
NSWC/DD W64
P. KELLY 0/1
R. BRENINGER 0/1
B. PEDLER 0/1
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A012 SCIENTIFIC AND TECHNICAL REPORTS (OPEN ARCHITECTURE
ASSESSMENT TOOL)
NSWC/DD W64
P. KELLY
B. PEDLER
R. BRENINGER
PEO IWS
1AP1
1SE
1AP3
1AP4
A013 ENVIRONMENTAL HEALTH AND SAFETY PLAN (HSP) NSWC/DD
G72 W64
P. KELLY
B. PEDLER
J. CRAINE
R. BRENINGER
R. LOWE
A. PICKOVER
D. BURCHAM
W62
PEO IWS
1AP1
1SE
1AP3
1AP4
0/1 0/1 0/1 0/1
A014 SYSTEM SAFETY PROGRAM PLAN (SSPP) NSWC/DD
W64
P. KELLY
B. PEDLER
J. CRAINE
R. BRENINGER
R. LOWE
D. BURCHAM
W62
PEO IWS
1AP1
1SE
1AP3
1AP4
0/1 0/1
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A015 SYSTEM SAFETY HAZARD ANALYSIS REPORT (SSHA) NSWC/DD
W64
P. KELLY
B. PEDLER
J. CRAINE
R. BRENINGER
R. LOWE
D. BURCHAM
W62
PEO IWS
1AP1
1SE
1AP3
1AP4
0/1 0/1
A016 LIFE CYCLE COST (LCC) AND INDEPENDENT SCHEDULE
ASSESSMENT (ISA) REPORT (LIFE CYCLE COST (LCC)
ANALYSIS)
NSWC/PHD A66
A. ALCORN
C. GASTON
A41
PEO IWS
1AP1
1SE
1AP3
1AP4
NSWC/DD W64
D. BURCHAM
A017 FIRMWARE SUPPORT MANUAL (FSM) PEO IWS
1AP1
1AP3
1AP4
NSWC/DD W64
R. LOWE
A. PICKEOVER
R. BRENINGER
D. BURCHAM
BOWHEAD
D. WELLS
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A018 TEST AND EVALUATION PROGRAM PLAN (TEPP) NSWC/DD W64
R. LOWE
A. PICKEOVER
R. BRENINGER
D. BURCHAM
BOWHEAD
D. WELLS
PEO IWS
1AP1
1AP3
1SE
1AP4
A019 TEST PLAN/TEST PROCEDURES (PRODUCTION ACCEPTANCE
TEST (PAT) PROCEDURES)
NSWC/DD
W64
R. LOWE
A. PICKEOVER
R. BRENINGER
D. BURCHAM
A62
BOWHEAD
D. WELLS
PEO IWS
1AP1
1AP3
1SE
1AP4
NSWC/PHD A41
0/1
A020 TEST PLAN/TEST PROCEDURES (ENVIRONMENTAL
QUALIFICATION TEST (EQT) PLAN
NSWC/DD
W64
R. LOWE
A. PICKEOVER
R. BRENINGER
D. BURCHAM
A62
BOWHEAD
D. WELLS
PEO IWS
1AP1
1AP3
1SE
1AP4
NSWC/PHD A41
0/1
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A021 TEST/INSPECTION REPORT (ENVIRONMENTAL
QUALIFICATION TEST (EQT) REPORT
NSWC/DD
W64
R. LOWE
A. PICKEOVER
R. BRENINGER
D. BURCHAM
A62
BOWHEAD
D. WELLS
PEO IWS
1AP1
1AP3
1SE
1AP4
NSWC/PHD A41
0/1
A022 QUALITY ASSURANCE PROGRAM PLAN (QUALITY
MANAGEMENT PLAN)
PEO IWS
1AP1
1SE
1AP3
1AP4
NSWC/PHD A41
A023 TECHNICAL REPORT-STUDIES/SERVICES
(UNAUTHORIZED SOURCE PURCHASE REPORT)
PEO IWS
1AP1
1SE
1AP3
1AP4
NSWC/PHD A41
A024 CONTRACTOR’S CONFIGURATION MANAGEMENT PLAN PEO IWS
1CM4
1AP3 0/1
1AP4
NSWC/DD
W53 W64
R. BRENINGER
J. CRAINE
G. GIBSON
D. BURCHAM
0/1
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A025 BASELINE DESCRIPTION DOCUMENT NSWC/DD
W53 1/1 W64
P. KELLY 0/1
B. PEDLER 0/1
R. BRENINGER
D. BURCHAM
0/1 0/1
PEO IWS
1AP1 1/1
1AP3 0/1
1SE 0/1
1AP4
NSWC/PHD A41 0/1
VIEWNET 0/1
GREYSTONES GROUP
A026 ENGINEERING CHANGE PROPOSAL (ECP) (CLASS I AND
CLASS II (PRELIMINARY/FINAL)
NSWC/DD
W53 W22 W64
R. KELLY
R. BRENINGER
0/1
D. BURCHAM 0/1
PEO IWS
1AP1 0/1
1AP3 0/1
1SE 0/1
1AP4
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A027 SPECIFICATION CHANGE NOTICE (SCN) PEO IWS
1AP1 1/1
1SE 1/1
1AP3
1AP4
0/1
NSWC/DD
W53 1/1
A64
P. KELLY
B. PEDLER
R. BRENINGER
D. BURCHAM
NSWC/PHD
A41
C. LOPEZ
A66
A. ALCORN
C. GASTON
1/1 0/1
VIEWNET 0/1
GREYSTONES GROUP
A028 REQUEST FOR DEVIATION (RFD) NSWC/DD
W53 W64
P. KELLY
B. PEDLER
0/1 0/1
PEO IWS
1SE 0/1
1AP1 0/1
1AP3
1AP4
0/1
NSWC/PHD A41
VIEWNET
GREYSTONES GROUP
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A029 AS BUILT CONFIGURATION LIST (ABCL) (INDENTURED BILL
OF MATERIALS)
1AP3
1SL3
1AP4
0/1
W53 0/1 W64
P. KELLY 0/1
B. PEDLER 0/1
D. BURCHAM 0/1
C. MARSH 0/1
NSWC/PHD
A41 A66
A. ALCORN
C. GASTON
A36
G. TERRELL
D. WELLS
GREYSTONES GROUP
A030 CONFIGURATION STATUS ACCOUNTING INFORMATION
((CSA) DATA BASE)
W53
A64
C. MARSH
D. BURCHAM 0/1
PEO IWS
1AP1 0/1
1AP4
1AP4
0/1
BOWHEAD
D. WELLS
MCCRACKEN
0/1 0/1
NSWC/PHD A66
A. ALCORN
C. GASTON
D. KILLGORE
M. TRAN
0/1 0/1
VIEWNET
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A031 COMMON DISPLAY SYSTEM (CDS) RELIABILITY AND
MAINTAINBILITY (R&M) PROGRAM PLAN
NSWC/PHD
A27
R. PARK
B. MINARD
C. LOPEZ
1AP1 0/1
1AP3 0/1
1AP4
NSWC/DD
W53 0/1 W64
P. KELLY
B. PEDLER
0/1 0/1
VIEWNET
A032 RELIABILITY PREDICITION AND DOCUMENTATION OF
SUPPORTING DATA
NSWC/PHD
A27
R. PARK
B. MINARD
A41
C. LOPEZ
PEO IWS
1AP1
1AP3
1AP4
NSWC/DD W64
P. KELLY
B. PEDLER
R. BRENINGER
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A033 MAINTAINABILITY/TESTABILITY DEMONSTRATION TEST
PLAN
NSWC/PHD
A27
R. PARK
B. MINARD
A41
C. LOPEZ
PEO IWS
1AP1
1AP3
1AP4
NSWC/DD W64
P. KELLY
B. PEDLER
R. BRENINGER
A034 MANAGEMENT PLAN (MATERIALS SCREENING PLAN) NSWC/PHD
A27
R. PARK
G. MINARD
A. ALCORN
C. GASTON
J. FUNG
0/1 0/1
NSWC/DD W64
P. KELLY
0//1
0/1
PEO IWS
1AP1 0/1
1AP3
CM4
0/1 0/1
1AP4
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A035 FAILURE SUMMARY AND ANLYSIS REPORT NSWC/PHD
A27
R. PARK
B. MINARD
A36
D. WOLFE
A41
C. LOPEZ
A66
A. ALCORN
C. GASTON
J. FUNG
T. MINHQUAN
PEO IWS
1AP1
1AP3
1CM4
1AP4
A036 TECHNICAL REPORT – STUDIES/SERVICES (CORRECTIVE
ACTION SUMMARY REPORT (CASR))
NSWC/PHD
A27
R. PARK
B. MINARD
1AP1 0/1
1AP3
1AP4
0/1
NSWC/DD
W22 W64
VIEWNET
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A037 TEST INSPECTION/REPORTS (PRODUCTION ACCEPTANCE
TEST (PAT) AND SYSTEM BURN-IN TEST (SBT))
W64
R. LOWE 0/1
A. PICKOVER 0/1
P. KELLY 0/1
B. PEDLER
R. BRENINGER
0/1 0/1
D. BURCHAM 0/1
PEO IWS
1AP1 0/1
1AP3 0/1
1AP4
1SE
1SL3
0/1 0/1
NSWC/PHD
D. WELLS 0/1
VIEWNET
A038 SPECIAL EQUIPMENT TOOLS AND TEST EQUIPMENT LIST NSWC/DD W64
B. PEDLER
J. CRAINE
R. LOWE
PEO IWS
1AP1
1AP4
CSDA DAM NECK
V. RICHMOND
R. RICHMOND
NSWC/PHD S52
G. ESQUIBEL
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A039 DIMINISHING MANUFACTURING SOURCES AND MATERIAL
SHORTAGES (DMSMS) IMPLEMENTATION PLAN
NSWC/PHD
A66
A. ALCORN
C. GASTON
NAVSUP WSS M853 0/1
PEO IWS
1AP1 0/1
1AP3 0/1
1AP4
A040 TECHNICAL REPORT- STUDY/SERVICES (PRODUCT RECALL,
DMSMS, OBSOLESCENCE IDENTIFICATION AND VENDOR
CHANGE NOTICES)
A. ALCORN
C. GASTON
D. KILLGORE
A41
PEO IWS
1AP1
1AP3
1AP4
1SL3
NAVSUP WSS M853
G. MCDONNELL
NSWC/DD
W22 W53 W64
P. KELLY
B. PEDLER
J. CRAINE
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A041 DIMINISHING MANUFACTURING SOURCES AND MATERIAL
SHORTAGES (DMSMS) HEALTH ANALYSIS REPORT)
1AP1
1AP3
1AP4
NSWC/PHD
A66
A. ALCORN
C. GASTON
A41
C. LOPEZ
NSWC/DD
W53 W64
P. KELLY
B. PEDLER
NAVSUP WSS M853
G. MCDONNELL
A042 SCIENTIFIC AND TECHNICAL REPORTS (MAINTENANCE TASK
ANALYSIS (MTA))
NSWC/PHD
A66
A. ALCORN
C. GASTON
D. KILLGORE
A41
PEO IWS
1AP1
1AP3
1AP4
1SL3
NAVSUP WSS M853
G. MCDONNELL
NSWC/DD
W53
D. NEWTON
A. JOHNSON
W64
P. KELLY
B. PEDLER
J. CRAINE
D. BURCHAM
0/1
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A043 LEVEL OF REPAIR ANALYSIS (LORA) REPORT (DRAFT/FINAL) NSWC/PHD
A. ALCORN
C. GASTON
D. KILLGORE
A27
R. PARK
A41
PEO IWS
1AP1
1AP3
1AP4
1SL3
NAVSUP WSS M853
G. MCDONNELL
NSWC/DD
W53
D. NEWTON
A. JOHNSON
W64
P. KELLY
B. PEDLER
J. CRAINE
D. BURCHAM
0/1
A044 PLANNED MAINTENANCE SYSTEM (PMS) MAINTENANCE
INDEX PAGE (MIP)
NSWC/PHD
A66
A. ALCORN
C. GASTON
D. KILLGORE
A27
R. PARK
A41
PEO IWS
1AP1
1AP3
1AP4
NAVSUP WSS M853
G. MCDONNELL
NSWC/DD
W53
D. NEWTON
W64
P. KELLY
B. PEDLER
D. BURCHAM
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A045 PLANNED MAINTENANCE SYSTEM (PMS) MAINTENNCE
REQUIREMENT CARD (MRC)
NSWC/PHD
A66
A. ALCORN
C. GASTON
A41
PEO IWS
1AP1
1AP3
1AP4
NAVSUP WSS M853
G. MCDONNELL
NSWC/DD
W53
D. NEWTON
A. JOHNSON
W64
P. KELLY
B. PEDLER
D. BURCHAM
A046 INSTRUCTIONAL PERFORMANCE REQUIREMENTS
DOCUMENT (LEARNING OBJECTIVES STATEMENTS)
CDSA/DN F32
NSWC/PHD
A66
A. ALCORN
C. GASTON
A41
C. LOPEZ
PEO IWS
1AP1
1AP3
1AP4
NSWC/DD
D. BURCHAM
VIEWNET
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A047 INSTRUCTIONAL MEDIA DESIGN PACKAGE: INTERACTIVE
COMPUTER BASED TRAINING (CBT) DESIGN STRATEGY
CDSA/DN F32
NSWC/PHD
A66
A. ALCORN
C. GASTON
A41
C. LOPEZ
PEO IWS
1AP1
1AP3
1AP4
NSWC/DD
D. BURCHAM
A048 INSTRUCTIONAL MEDIA PACKAGE (ELECTRONIC SCRIPTS,
STORYBOARDS)
CDSA/DN F32
NSWC/PHD
A66
A. ALCORN
C. GASTON
A41
C. LOPEZ
PEO IWS
1AP1
1AP3
1AP4
NSWC/DD
D. BURCHAM
A049 INSTRUCTIONAL MEDIA PACKAGE (ON-SCREEN LESSONS) CDSA/DN F32
A66
A. ALCORN
C. GASTON
A41
C. LOPEZ
PEO IWS
1AP1
1AP3
1AP4
NSWC/DD
D. BURCHAM
VIEWNET
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A050 INSTRUCTIONAL MEDIA DESIGN PACKAGE (TRAINING
PACKAGES AND SOURCE DATA)
CDSA/DN F32
NSWC/PHD
A66
A. ALCORN
C. GASTON
A41
C. LOPEZ
PEO IWS
1AP1
1AP3
1AP4
NSWC/DD
D. BURCHAM
VIEWNET
A051 TRAINING EVALUATION DOCUMENT CDSA/DN F32
A66
A. ALCORN
C. GASTON
A41
C. LOPEZ
PEO IWS
1AP1
1AP3
1AP4
NSWC/DD
D. BURCHAM
A052 TRAINING MATERIALS (LESSON PLANS AND TRAINING
GUIDES)
CDSA/DN F32
NSWC/PHD
A66
A. ALCORN
C. GASTON
A41
C. LOPEZ
PEO IWS
1AP1
1AP3
1AP4
NSWC/DD
D. BURCHAM
VIEWNET
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A053 INTERFACTIVE COMPUTER AIDED PROVISIONING SYSTGEM
(ICAPS) DATA EXCHANGE (PROVISIONING TECHNICAL DATA)
NSWC/DD
W64
P. KELLY
B. PEDLER
J. CRAINE
R. BRENINGER
NSWC/PHD
A21 A41
C. LOPEZ
A66
M. KRESS
D. KILLGORE
M. TRAN
PEO IWS
1AP1
1AP3
1AP4
A054 SUPPLEMENTARY PROVISIONING TECHNICAL
DOCUMENTATION
NSWC/PHD
A21 A41
C. LOPEZ
A66
M. KRESS
D. KILLGORE
M. TRAN
PEO IWS
1AP1
1AP3
1AP4
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A055 TECHNICAL REPORT – STUDIES/SERVICES (LOWEST
REPLACEABLE UNIT (LRU) CROSS REFERENCE LIST)
NSWC/PHD
A66
A. ALCORN
C. GASTON
M. TRAN
A41
C. LOPEZ
PEO IWS
1AP1
1AP4
1AP3
1SL3
NAVSUP WSS M853
NSWC/DD
W53 W64
P. KELLY
B. PEDLER
J. CRAINE
C. MARSH
D. BURCHAM
BOWHEAD
D. WELLS
0/1
A056 PACKAGING PLAN (PACKAGING, HANDLING, STORAGE AND
TRANSPORTATION (PHS&T) PLAN)
P. KELLY
B. PEDLER
J. CRAINE
D. BURCHAM
PEO IWS
1AP1
1AP3
1SL3
1AP4
NSWC/PHD
A66
A. ALCORN
C. GASTON
A41
C. LOPEZ
NAVSUP WSS M853
G. MCDONNELL
BOWHEAD
D. WELLS
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A057 MANAGEMENT PLAN (SUPPLY SUPPORT SERVICES PLAN) NAVSUP WSS M853 1/1
1AP1 0/1
1CM4 0/1
1AP3 0/1
1AP4
NSWC/PHD
A66
A. ALCORN
C. GASTON
A058 INSTALLATION AND CHECKOUT (INCO) SPARES LISTING NSWC/PHD
A. ALCORN 0/1
C. GASTON
A41
W64
P. KELLY 0/1
B. PEDLER 0/1
D. BURCHAM 0/1
W53
D. NEWTON
A. JOHNSON
0/1 0/1
C. MARSH 0/1
BOWHEAD
J. CRAINE
D. WELLS
PEO IWS
1AP1 0/1
1AP3
1AP4
0/1
NAVSUP WSS M853
G. MCDONNELL 0/1
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
A059 ITEM UNIQUE IDENTIFICATION (IUID) MARKING ACTIVITY
VALIDATION AND VERIFICATION REPORT
NSWC/DD
W64
P. KELLY
B. PEDLER
BOWHEAD
J. CRAINE
NSWC/PHD
A66
A. ALCORN
C. GASTON
A41
C. LOPEZ
PEO IWS
1AP1
1AP3
1SL
1AP4
NAVSUP WSS M853
A060 REQUEST FOR NOMENCLATURE (DD FORM 61) PEO IWS
1AP3
1AP4
NSWC/PHD 41 0/1
NSWC/DD W53
D. NEWTON 0/1
A. JOHNSON 0/1
C. MARSH 0/1
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
B001 TECHICAL DATA PACKAGE (TDP)
P. KELLY
B. PEDLER
R. BRENINGER
NSWC/PHD A35
A. MAQUINALEZ
G. TERRELL
BOWHEAD
J. CRAINE
D. MCCRACKEN
NSWC/PHD
A41
C. LOPEZ
A66
M. KRESS
PEO IWS
1AP1
1AP3
1AP4
B002 INSTALLATION CONTROL DRAWINGS NSWC/DD
P. KELLY
B. PEDLER
J. CRAINE
R. BRENINGER
NSWC/PHD
A21 A41
C. LOPEZ
A66
M. KRESS
D. KILLGORE
M. TRAN
PEO IWS
1AP1
1AP3
1AP4
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
B003 INTERFACE CONTROL DOCUMENTS (ICD) NSWC/DD
P. KELLY
B. PEDLER
J. CRAINE
R. BRENINGER
NSWC/PHD
A21 A41
C. LOPEZ
A66
M. KRESS
D. KILLGORE
M. TRAN
PEO IWS
1AP1
1AP3
1AP4
C001 TECHNICAL MANUAL (ELECTRONIC TECHNICAL MANUALS (ETM)
(DRAFT/PRELIMINARY/FINAL))
NSWC/PHD
A35
V. DIBBLE
J. GONZALES
D. NGUYEN
A36
G. TERRELL
A41
C. LOPEZ
A66
A. ALCORN
C. GASTON
M. KRESS
A62
CDSA/DN F32
PEO IWS
1AP1
1AP3
1AP4
NSWC/DD
W22 W53
D. NEWTON
A. JOHNSON
W64
J. CRAINE
0/1
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
C002 TECHNICAL MANUAL SCHEDULE AND STATUS REPORT PEO IWS
1AP1
1AP3
1AP4
NSWC/PHD
A66
A. ALCORN
C. GASTON
M. KRESS
A35
V. DIBBLE
J. GONZALES
D. NGUYEN
A36
G. TERRELL
A41
C. LOPEZ
A62
CDSA/DN F32
C003 TECHNICAL MANUAL COST REPORT PEO IWS
1AP1
1AP3
1AP4
A36
G. TERRELL
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
C004 TECHNICAL MANUAL QUALITY ASSURANCE (TMQA)
PROGRAM PLAN
NSWC/PHD
A35
V. DIBBLE
J. GONZALES
D. NGUYEN
A36
G. TERRELL
A66
A. ALCORN
C. GASTON
M. KRESS
A41
C. LOPEZ
A62
CDSA/DN F32
PEO IWS
1AP1
1AP3
1AP4
C005 TECHNICAL MANUAL VALIDATION PLAN NSWC/PHD
A35
V. DIBBLE
J. GONZALES
D. NGUYEN
A36
G. TERRELL
A41
C. LOPEZ
A66
A. ALCORN
C. GASTON
M. KRESS
A62
CDSA/DN F32
PEO IWS
1AP1
1AP4
1AP4
NSWC/DD
W22 W53
D. NEWTON
W64
J. CRAINE
ELIN NO. TITLE OF DATA ITEM (SUBTITLE) ADDRESSEES DRAFT/FINAL
C006 TECHNICAL MANUAL VALIDATION CERTIFICATE NSWC/PHD
A35
V. DIBBLE
J. GONZALES
D. NGUYEN
A36
G. TERRELL
A41
C. LOPEZ
A66
A. ALCORN
C. GASTON
M. KRESS
CDSA/DN F32
PEO IWS
1AP1
1AP3
1AP4
C007 TECHNICAL MANUAL VALIDATION INCORPORATION
CERTIFICATE
NSWC/PHD
A35
V. DIBBLE
J. GONZALES
D. NGUYEN
A36
G. TERRELL
A41
C. LOPEZ
A62 A66
A. ALCORN
C. GASTON
M. KRESS
CDSA/DN F32
PEO IWS
1AP1
1AP3
1AP4
NSWC/DD
W22 W53
D. NEWTON
W64
J. CRAINE
ATTACHMENT 3 TO THE CDRL
WORDING OF
DISTRIBUTION STATEMENTS
WORDING OF DISTRIBUTION STATEMENTS
1. DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S.
DoD contractors only; Administrative or Operational Use; 09-JUN-2014. Other requests shall be referred to: Program Executive Office, Integrated Warfare Systems, ATTN: PEO IWS 1AP1, 1333 Isaac Hull Ave. SE, Stop 2301, Washington Navy Yard, DC 20376-2301.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of OPNAVINST 5510.161.
DESTRUCTION NOTICE: For classified documents follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual, Chapter 5, Section 7, or OPNAVINST 5510.1H, Chapter 17. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the documents.
DISCLOSURE STATEMENT: This information is furnished upon the condition that it or knowledge of its possession will not be released to another nation without specific authority of the Department of the Navy of the United States; that it will not be used for other than military purposes; that individual or corporate rights originating in the information, whether patented or not, will be respected; that the information will be provided the same degree of security afforded it by the Department of Defense of the United States.
2. DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S.
referred to: Commander, Naval Surface Warfare Center/Dahlgren Division (NSWC/DD) W64, 1714 Avenue B (132), Building 1500A, Dahlgren, VA 22448-5147.
Control Act (Title 22, U.S.C. Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, of its possession will not be released to another nation without specific authority of the Department of the Navy of the United States; that it will not be used for other than military purposes; that individual or corporate rights originating in the information, whether patented or not, will be respected; that the
3. DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S.
referred to: Commander, Naval Surface Warfare Center/Dahlgren Division (NSWC/DD) G72, 1714 Avenue B, Building 1500A, Dahlgren, VA 22448-5147.
Control Act (Title 22, U.S.C. Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, of its possession will not be released to another nation without specific authority of the Department of the Navy of the United States; that it will not be used for other than military purposes; that individual or corporate rights originating in the information, whether patented or not, will be respected; that the
4. DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S.
referred to:: Commander, Naval Surface Warfare Center, Port Hueneme Division, ATTN:
NSWC/PHD A66, Port Hueneme, CA 93043-4307.
Control Act (Title 22, U.S.C. Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of OPNAVINST 5510.161.
DESTRUCTION NOTICE: For classified documents follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual, Chapter 5, Section 7, or OPNAVINST 5510.1H, Chapter 17. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the documents.
DISCLOSURE STATEMENT: This information is furnished upon the condition that it or knowledge of its possession will not be released to another nation without specific authority of the Department of the Navy of the United States; that it will not be used for other than military purposes; that individual or corporate rights originating in the information, whether patented or not, will be respected; that the
5. DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S.
referred to: Commander, Naval Surface Warfare Center/Dahlgren Division (NSWC/DD) W53, 1714 Avenue B (132), Building 1500A, Dahlgren, VA 22448-5147.
Control Act (Title 22, U.S.C. Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, of its possession will not be released to another nation without specific authority of the Department of the Navy of the United States; that it will not be used for other than military purposes; that individual or corporate rights originating in the information, whether patented or not, will be respected; that the
6. DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S.
referred to: Commander, Naval Surface Warfare Center, Port Hueneme Division, ATTN:
NSWC/PHD A27, Port Hueneme, CA 93043-4307.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of OPNAVINST 5510.161.
DESTRUCTION NOTICE: For classified documents follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual, Chapter 5, Section 7, or OPNAVINST 5510.1H, Chapter 17. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the documents.
DISCLOSURE STATEMENT: This information is furnished upon the condition that it or knowledge of its possession will not be released to another nation without specific authority of the Department of the Navy of the United States; that it will not be used for other than military purposes; that individual or corporate rights originating in the information, whether patented or not, will be respected; that the
7. DISTRIBUTION STATEMENT F: Further dissemination only as directed by: Commander, Naval
Surface Warfare Center, Port Hueneme Division, ATTN: NSWC/PHD A35, Port Hueneme, CA 93043-4307, 09-JUN-2014 or higher DoD authority.
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of OPNAVINST 5510.161.
DESTRUCTION NOTICE: For classified documents follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual, Chapter 5, Section 7, or OPNAVINST 5510.1H, Chapter 17. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the documents.
DISCLOSURE STATEMENT: This information is furnished upon the condition that it or knowledge of its possession will not be released to another nation without specific authority of the Department of the Navy of the United States; that it will not be used for other than military purposes; that individual or corporate rights originating in the information, whether patented or not, will be respected; that the
8. DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S.
referred to: Combat Direction Systems Activity (CSDA), ATTN: F32, 1922 Regulus Ave, Virginia Beach, VA 23461-2097.
Control Act (Title 22, U.S.C. Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, of its possession will not be released to another nation without specific authority of the Department of the Navy of the United States; that it will not be used for other than military purposes; that individual or corporate rights originating in the information, whether patented or not, will be respected; that the
9. DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S.
referred to: Program Executive Office, Integrated Warfare Systems, ATTN: PEO IWS 1SE, Control Act (Title 22, U.S.C. Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, of its possession will not be released to another nation without specific authority of the Department of the Navy of the United States; that it will not be used for other than military purposes; that individual or corporate rights originating in the information, whether patented or not, will be respected; that the
10. DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S.
referred to: Program Executive Office, Integrated Warfare Systems, ATTN: PEO IWS 1CM4, Control Act (Title 22, U.S.C. Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, of its possession will not be released to another nation without specific authority of the Department of the Navy of the United States; that it will not be used for other than military purposes; that individual or corporate rights originating in the information, whether patented or not, will be respected; that the
11. DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S.
DoD contractors only; Administrative or Operational Use; 09-JUN-2014. Other requests shall be referred to: Program Executive Office, Integrated Warfare Systems, ATTN: PEO IWS 1AP5, Control Act (Title 22, U.S.C. Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, of its possession will not be released to another nation without specific authority of the Department of the Navy of the United States; that it will not be used for other than military purposes; that individual or corporate rights originating in the information, whether patented or not, will be respected; that the
12. DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S.
referred to: Commander, Bldg 410 Bay 15, 5450 Carlisle Pike P O Box 2020, Mechanicsburg, PA 17055-0788.
Control Act (Title 22, U.S.C. Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, of its possession will not be released to another nation without specific authority of the Department of the Navy of the United States; that it will not be used for other than military purposes; that individual or corporate rights originating in the information, whether patented or not, will be respected; that the
ATTACHMENT 4 TO THE CDRL
INTENTIONALLY LEFT BLANK
ATTACHMENT 5 TO THE CDRL
SPECIAL PROVISION REGARDING
ELECTRONIC ADMINISTRATIVE CHANGES
TO THE CDRL PACKAGE
ATTACHMENT 5 TO THE CDRL
SPECIAL PROVISION REGARDING ELECTRONIC ADMINISTRATIVE CHANGES TO THE CDRL
PACKAGE
A. General – Administrative Changes, as defined in paragraph F of this Attachment to the CDRL Data Package, shall be executed by unilateral modification using the NAVSEA Corporate Document Management Systems (CDMS) Administrative Modification process described in paragraph B of this Attachment. The CDRL Data Package is defined as the following documents: DD Form 1423, Addressee List, Data Distribution Profile (DDP) and related attachments.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .