Attachment_10_-_Cost_Summary_Worksheet.xls

XLS spreadsheet 155 KB Posted

Attached to
COMPETITIVE SOLICITATION FOR THE DESIGN & PRODUCTION OF THE TECHNICAL INSERTION 16 (TI-16) COMMON DISPLAY SYSTEM (CDS) (FULL AND OPEN)
Solicitation number
N00024-14-R-5217
Issued by

About this file

Attachment 10 - Cost Summary Worksheets

View the file

Other files

File Type Posted
Response_to_Offerors_Questions.pdf PDF
SF30_N00024-14-R-5217_0001.pdf PDF
CDS_TI16_N00024-14-R-5217.pdf PDF
Attachment_1_-_DD254.pdf PDF
Exhibit_A_-_CDRL's_06.09.14.pdf PDF
CDS_TI16_N00024-14-R-5217_Word_Version.doc DOC document
Attachment_9_-Bidders_Question_Form.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J-10 (Summary Matrix)

TI-16 CDS SECTION L COST TABLE ATTACHMENT J-10
CLINDescription2a (CLIN Summary by FY)2b (CLIN Breakout)2c (Breakout by CY)2d (Eng Svcs Breakout)2e (WBS Breakout)2f (Rate Summary)
CLIN summarySummary data including all CLINS excluding 0008, 1004, 2004, 3004, 4004, 5001, 5002, 5003, 5005, and 5006X
0001Variant A DesignXXX
0002Variant A FAU ProductionXXX
0003Variant A Testing & Acceptance
0004Variant B DesignXXX
0005Variant B FAU ProductionXXX
0006Variant B Testing & Acceptance
0007Engineering ServicesXXX
0008Other Direct Costs (ODCs) *
0009Variant A Production Units for DDG 119XXXX
0010Variant A Production Units for SSDSXXXX
0011Variant B Production Units for SSDSXXXX
0012Variant A Production Units for DDG 81XXXX
0013Variant A Production Units for DDG 83XXXX
0014Schedule Incentives 0001, 0002, 0004, 0005 (CLINs 0009, 0010, 0011, 0012, 0013) *
0014AAIncentive for DDG 119 Delivery (CLIN 0009) *
0014ABIncentive for SSDS (CLIN 0010, 0011) *
0014ACIncentive for DDG 81 (CLIN 0012)
0014ADIncentive for DDG 83 (CLIN 0013) *
1001Variant A Production *
1002Variant B Production *
1003Engineering ServicesXXX
1004Parts & Materials for CLINs 1003
1005Other Direct Costs (ODCs) *
2001Variant A Production *
2002Variant B Production *
2003Engineering ServicesXXX
2004Parts & Materials for CLIN 2003
2005Other Direct Costs (ODCs) *
3001Variant A Production *
3002Variant B Production *
3003Engineering ServicesXXX
3004Parts & Materials for CLIN 3003
3005Other Direct Costs (ODCs) *
4001Variant A Production *
4002Variant B Production *
4003Engineering ServicesX
4004Parts & Materials for CLIN 4003
4005Other Direct Costs (ODCs) *
5001Data *
5002Data *
5003Data *
5004Data Rights
5005PIO *
5006Spares and INCO *
* CLINs not included in the J-10 Cost Summary
TI-16 CDS SECTION L COST TABLE ATTACHMENT J-10

&CDRAFT

2a (CLIN Summary by FY)

TI-16 CDS SECTION L - COST TABLE ATTACHMENT J-10 2a
FY Cost Summary Detail for Priced CLINs *
CLINFY15FY16FY17FY18FY18FY19FY20FY21FY22FY23TOTAL Proposed CLIN Amount
CLIN 0001
CLIN 0002
CLIN 0003
CLIN 0004
CLIN 0005
CLIN 0006
CLIN 0007
CLIN 0008
CLIN 0009
CLIN 0010
CLIN 0011
CLIN 0012
CLIN 0013
CLIN 1003
CLIN 1004
CLIN 1005
CLIN 2001
CLIN 2002
CLIN 2003
CLIN 2004
CLIN 2005
CLIN 3001
CLIN 3002
CLIN 3003
CLIN 3004
CLIN 3005
CLIN 4001
CLIN 4002
CLIN 4003
CLIN 4004
CLIN 4005
CLIN 5004**
TOTAL
* Production FFP CLINs Prices (1001, 1002, 2001, 2002, 3001, 3002, 4001, and 4002) shall be entered at the stepladder quatitiestable as specified in Section B - Note D.
** Offeror shall enter one (1) price for CLIN 5004 Data Rights in total Proposed CLIN amount. Does not need to be broken out by FY.
Round cost values to whole dollars.
The cells on this form do not need to be linked to any other form.
Cost should be through FCCM

2b (CLIN Breakout)

TI-16 CDS SECTION L COST TABLE ATTACHMENT J-10 2b
Cost Summary Table By CLIN/SLIN
Major Cost ElementCLIN 0001CLIN 0002CLIN 0004CLIN 0005CLIN 0009CLIN 0010CLIN 0011CLIN 0012CLIN 0013Total
Purchase Parts ($)
Material Overhead ($)
Major SubContracts ($)
Other SubContracts ($)
Interorganizational Transfer ($)
Total Material ($)
Direct Program Management Labor (Hours)
Direct Program Management Labor ($)
Program Management Overhead ($)
Total Program Management ($)
Direct Engineering Labor (Hours)
Direct Engineering Labor ($)
Engineering Overhead ($)
Total Engineering ($)
Direct Manufacturing Labor (Hours)
Direct Manufacturing Labor ($)
Manufacturing Overhead ($)
Total Manufacturing ($)
Subtotal Labor ($)
Subtotal Material, Labor, and ODC ($)
G&A Expense ($)
Subtotal Estimated Costs less FCCM ($)
Facilities Capital Cost of Money (FCCM) ($)
Total Target Cost ($)
Target Fee/Profit ($)
Target Fee/Profit (%)
CLIN TypeCPIFCPIFCPIFCPIFFPIFFPIFFPIFFPIFFPIFN/A
TOTAL ($)
Round cost values to whole dollars.
Link each cell in this form with the appropriate cells in the Worsheet 2f for each of the CLIN. Do not just paste values where value can be linked to another form.
*Under CLIN 0006, Offeror shall include a SLIN Column for each Enhanced Data Rights Item priced option offered in section B.
TI-16 CDS SECTION L COST TABLE ATTACHMENT J-10 2b

2c (Breakout by CY)

TI-16 CDS SECTION L COST TABLE ATTACHMENT J-10 2c
Cost Summary Detail by Calendar Year For CLINs 0001, 0002, 0004, 0005, 0009, 0010, 0011, 0012, and 0013 (Offeror shall provide a separate sheet for each CLIN)
Major Cost ElementCY15CY16CY17CY18CY19CY20CY21CY22CY23Total $
Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $Hours/CostRateSubTotal $
Material Non-Recurring
Purchase Parts
Material Overhead ($)
Major Subs
*
*
Other Subs
Interorganizational Transfer
Total Material Non-Recurring
Material Recurring
Purchase Parts
Material Overhead ($)
Major Subs
*
*
Other Subs
Interorganizational Transfer
Total Material Recurring
Labor Non-Recurring
Program Management
Category/Personnel
*
*
*
Program Management Indirect Rates
*
*
*
Engineering
Category/Personnel
*
*
*
Engineering Indirect Rates
*
*
*
Manufacturing
Category/Personnel
*
*
*
Manufacturing Indirect Rates
*
*
*
Total Labor Non-Recurring
Labor Recurring
Program Management
Category/Personnel
*
*
*
Program Management Indirect Rates
*
*
*
Engineering
Category/Personnel
*
*
*
Engineering Indirect Rates
*
*
*
Manufacturing
Category/Personnel
*
*
*
Manufacturing Indirect Rates
*
*
*
Total Labor Recurring
SUBTOTAL COSTS ($)
G&A Expense ($)
Type
*
*
SUBTOTAL COSTS ($)
Facilities Capital Cost of Money (FCCM) ($)
Type
*
*
TOTAL ESTIMATED COSTS ($)
Fee/Profit ($)
Fee/Profit (%)
TOTAL ($)
Offeror to fill out this template in accrodance with the CLIN breakout in the J-10 Summary Matrix.
Round cost values to whole dollars.
Link values on this form with values/equations on Worksheet 2f. Do not just paste values where value can be linked to another form.
Sub totals must calculate within this form and not be linked to other forms
Link each cell containing the NRE/RE Material Costs, Major Sub-Contractor Costs, Other Sub-Contractors Costs, Interorganizational Transfer Costs, Labor Category Costs (number of hours), and Other Direct Costs with the unburdened values in Form L-I or L-J. Link each cell containing rates to appropriate cells in Form L-L.
Calculations with rates computed on this form shall link to rates from Form L-L and material and labor costs from Form L-J.
Cost basis for application of Material Overhead, Indirect Labor Rates, G&A and FCCM must link to value(s) contained in Form L-H, not Form L-J.
For CLIN/SLINs which do not have a required Form L-I or L-J, contractor shall enter costs directly onto this form.
Categories provided are for example only, link categories to actual categories listed on Form L-L.
All values shall be bid in accordance with Offeror's Accounting System Disclosure Statement (OH, Fringe, etc.)
TI-16 CDS SECTION L COST TABLE ATTACHMENT J-10 2c

2d (Eng Svcs Breakout)

TI-16 CDS SECTION L COST TABLE ATTACHMENT J-10 2d
Cost Summary Detail for CLINs 0007, 0008, 1003, 2003, 3003, 4003 (Offeror shall provide a separate sheet for each CLIN)
Major Cost ElementCY15CY16CY17CY18CY19CY20CY21CY22TOTAL
HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateTotal $
Labor
Program Management
Category/Personnel
*
*
*
Program Management Indirect Rates
*
*
*
Engineering
Category/Personnel
*
*
*
Engineering Indirect Rates
*
*
*
Manufacturing
Category/Personnel
*
*
*
Manufacturing Indirect Rates
*
*
*
Total Labor
SUBTOTAL COSTS ($)
G&A Expense ($)
SUBTOTAL COSTS ($)
Facilities Capital Cost of Money (FCCM) ($)
TOTAL ESTIMATED COSTS ($)
Fee ($)
Fee (%)
TOTAL ESTIMATED COSTS ($) Plus Fixed Fee
** Shall be bid in accordance with Offeror's Accounting System Disclosure Statement (OH, Fringe, etc.)
Major Cost ElementCY15CY16CY17CY18CY19CY20CY21
HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $
Total Labor (Hours)
TOTAL Estimated COSTS ($) Plus Fixed Fee
Composite Rate through Fee
Labor CategoryCLIN 0007CLIN 1003CLIN 2003CLIN 3003Total Hours
HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $HoursRateSubTotal $
Sample Program Manager
Senior Engineer
Engineer
Site Support / Technician
Senior Logistician
Logistician
Admin
TOTAL CLIN COST
Prepare one of these forms for each CLIN as specified on Worksheet J-10 (Summary Matrix)
See Instructions for Engineering Services Composite Labor Rate BOE to the right of the table.
Round cost values to whole dollars, Round Rates to two decimal points and G&A and FCCM to three decimal points.
Link values on this form with values/equations on other forms. Do not just paste values where value can be linked to another form.
Categories provided are for example only, link categories to actual categories listed on Worksheet 2f.
Rate cells should be linked to the rates Form L-L. Total values shall be computed in this form.
Provide equations for Total Cost computation.

2e (WBS )

TI-16 CDS SECTION L COST TABLE ATTACHMENT J-10 2e
Cost Summary Table by Contract WBS for CLINs 0001, 0002, 0004, 0005, 0009, 0010, 0011, 0012, 0013
TotalCY13
Line Item *DescriptionMaterial CostsMajor Sub Ktr CostsOther Sub Ktr CostsInterorganizational Transfer CostsCost of MaterialLabor Category CostsOther Direct CostsTotal CostsMaterial 1 CostsMaterial 2 CostsMaterial N CostsMaterial Costs TotalMajor Sub Ktr 1 CostsMajor Sub Ktr 2 CostsMajor Sub Ktr N CostsMajor Sub Ktr Costs TotalOther Sub Ktr 1 CostsOther Sub Ktr 2 CostsOther Sub Ktr N CostsOther Sub Ktr Costs TotalInterorganizational Transfer 1 Costs
Line ItemNRERENRERENRERENRERENRERENRERENRERENRERERateNRERERateNRERERateNRERENRERERateNRERERateNRERERateNRERENRERERateNRERERateNRERERateNRERENRE
1.0TI 16 CDS Console
1.1* Sample WBS Structure
1.1.1
1.1.1.1
1.1.1.2
1.1.1.3
1.1.1.3.1
1.1.1.3.2
1.1.1.3.3
1.1.1.4
1.1.1.5
1.1.1.6
1.1.1.7
1.1.1.7.1
1.1.1.7.2
1.1.1.8
1.1.1.9
1.1.1.10
1.1.1.11
1.1.1.12
1.1.1.13
1.1.1.13.1
1.1.1.13.2
1.1.1.13.3
1.1.1.14
1.1.1.14.1
1.1.1.14.2
1.1.1.14.3
1.1.1.15
1.1.2
1.1.3
1.1.4
1.1.4.1
1.1.4.1.1
1.1.4.1.1.1
1.1.4.1.1.2
1.1.4.1.2
1.1.4.1.3
1.1.4.1.3.1
1.1.4.1.3.2
1.1.4.1.3.3
1.1.4.1.4
1.1.4.1.4.1
1.1.4.1.4.2
1.1.4.1.4.3
1.1.4.2
1.1.4.3
1.1.4.4
1.1.4.5
1.1.5
1.1.5.1
1.1.5.2
1.1.5.3
1.1.6
1.1.6.1
1.1.6.2
1.1.6.3
1.1.6.4
1.1.6.5
1.1.7
1.1.7.1
1.1.7.2
1.1.8
1.1.8.1
1.1.8.2
1.1.9
1.1.10
1.1.11
1.2
Totals
Prepare one of these forms for each CLIN as specified on Form L-N Instructions.
Round cost values to whole dollars.
Rate cells should be linked to the rates Worksheet 2f. Total values shall be computed in the form.
Cells containing the NRE/RE Material Costs, Major Sub-Contractor Costs, Other Sub-Contractors Costs, Interorganizational Transfer Costs, Labor Category Costs (number of hours), and Other Direct Costs in this form are industry inputs.
Link each cell containing rates to appropriate cells in Worksheet 2f. Displayed rate shall be through G&A.
Provide equations for Total Cost computation. Costs shall be through G&A.
Add additional columns for additional labor, material and sub-contractor costs as required.
The formulas in this form shall compute the appropriate parent/child cost roll up relationships.
TI-16 CDS SECTION L COST TABLE ATTACHMENT J-10 2e

2f (Rate Summary)

TI-16 CDS SECTION L COST TABLE ATTACHMENT J-10
Cost Category
Rates by Calendar Year
Rates Category201520162017201820192020202120222023
Material Overhead
Category 1
Category 2
Category n
Direct Labor Rate
Category 1
Category 2
Category n
Indirect Rate
Category 1
Category 2
Category n
General & Adminstrative Rate
Category 1
Category 2
Category n
Facility Capital Cost of Money Rate
Category 1
Category 2
Category n
Other Rate
Category 1
Category 2
Category n
*
*
*
Category N
Prepare one of these forms as needed for each CLIN as specified in the J-10 (Summar Matrix)
These rates will be used in rates cells in Worksheets 2a, 2b, 2c, 2d, 2e.
Round cost values to whole dollars, Round Rates to two decimal points and G&A and FCCM to three decimal points.
Rate categories shall include all rates used in this proposal.
Categories listed are for example only, provide actual categories included in the proposal.
TI-16 CDS SECTION L COST TABLE ATTACHMENT J-10

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .