Attachment_1_Pricing_Scenario.xls
XLS spreadsheet 246 KB Posted
- Solicitation number
- N00024-14-R-4102
About this file
N00024-14-R-4102 Section J - Attachment 1 Pricing Scenario
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N00024-14-R-4102-0002.pdf | ||
| Attachment_3_DD_254.pdf | ||
| N00024-14-R-4102-0001.pdf | ||
| Attachment_4_Past_Performance_Questionnaire.doc | DOC document | |
| RFP_Attach_3_Personnel_Letter_of_Commitment_(9-20-11).doc | DOC document | |
| SF33_Undersea_OPS_-_N00024-14-R-4102.doc | DOC document | |
| Attachment_5_Resume_Format.doc | DOC document | |
| Attachment_7_GFE.doc | DOC document | |
| CDRLS.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E1-5
| Schedule E: Fixed Price Scheduled Labor Rates (Tables 1 - 5 from RFP section B) | |||||||||
| TABLE 1: Base Year | Facility | Operational | TABLE 4: Option Year 3 | Facility | Operational | ||||
| Hourly (hr) | Overtime (hr) | 12 Hour Day | Overtime (hr) | Hourly (hr) | Overtime (hr) | 12 Hour Day | Overtime (hr) | ||
| Program Manager | $0.00 | $0.00 | $0.00 | $0.00 | Program Manager | $0.00 | $0.00 | $0.00 | $0.00 |
| Systems Engineer | $0.00 | $0.00 | $0.00 | $0.00 | Systems Engineer | $0.00 | $0.00 | $0.00 | $0.00 |
| Project Manager (Search and ROV Operations) | $0.00 | $0.00 | $0.00 | $0.00 | Project Manager (Search and ROV Operations) | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (Search Operations) | $0.00 | $0.00 | $0.00 | $0.00 | Assistant Project Manager (Search Operations) | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (ROV Operations) | $0.00 | $0.00 | $0.00 | $0.00 | Assistant Project Manager (ROV Operations) | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Technician | $0.00 | $0.00 | $0.00 | $0.00 | Senior Technician | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Electronic Techician | $0.00 | $0.00 | $0.00 | $0.00 | Lead Electronic Techician | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Operator Techician | $0.00 | $0.00 | $0.00 | $0.00 | Lead Operator Techician | $0.00 | $0.00 | $0.00 | $0.00 |
| Electronic Techician | $0.00 | $0.00 | $0.00 | $0.00 | Electronic Techician | $0.00 | $0.00 | $0.00 | $0.00 |
| Operator Techician | $0.00 | $0.00 | $0.00 | $0.00 | Operator Techician | $0.00 | $0.00 | $0.00 | $0.00 |
| Logistics/Financial Assistant | $0.00 | $0.00 | $0.00 | $0.00 | Logistics/Financial Assistant | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician | $0.00 | $0.00 | $0.00 | $0.00 | Technician | $0.00 | $0.00 | $0.00 | $0.00 |
| TABLE 2: Option Year 1 | Facility | Operational | TABLE 5: Option Year 4 | Facility | Operational | ||||
| Hourly (hr) | Overtime (hr) | 12 Hour Day | Overtime (hr) | Hourly (hr) | Overtime (hr) | 12 Hour Day | Overtime (hr) | ||
| Program Manager | $0.00 | $0.00 | $0.00 | $0.00 | Program Manager | $0.00 | $0.00 | $0.00 | $0.00 |
| Systems Engineer | $0.00 | $0.00 | $0.00 | $0.00 | Systems Engineer | $0.00 | $0.00 | $0.00 | $0.00 |
| Project Manager (Search and ROV Operations) | $0.00 | $0.00 | $0.00 | $0.00 | Project Manager (Search and ROV Operations) | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (Search Operations) | $0.00 | $0.00 | $0.00 | $0.00 | Assistant Project Manager (Search Operations) | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (ROV Operations) | $0.00 | $0.00 | $0.00 | $0.00 | Assistant Project Manager (ROV Operations) | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Technician | $0.00 | $0.00 | $0.00 | $0.00 | Senior Technician | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Electronic Techician | $0.00 | $0.00 | $0.00 | $0.00 | Lead Electronic Techician | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Operator Techician | $0.00 | $0.00 | $0.00 | $0.00 | Lead Operator Techician | $0.00 | $0.00 | $0.00 | $0.00 |
| Electronic Techician | $0.00 | $0.00 | $0.00 | $0.00 | Electronic Techician | $0.00 | $0.00 | $0.00 | $0.00 |
| Operator Techician | $0.00 | $0.00 | $0.00 | $0.00 | Operator Techician | $0.00 | $0.00 | $0.00 | $0.00 |
| Logistics/Financial Assistant | $0.00 | $0.00 | $0.00 | $0.00 | Logistics/Financial Assistant | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician | $0.00 | $0.00 | $0.00 | $0.00 | Technician | $0.00 | $0.00 | $0.00 | $0.00 |
| TABLE 3: Option Year 2 | Facility | Operational | |||||||
| Hourly (hr) | Overtime (hr) | 12 Hour Day | Overtime (hr) | ||||||
| Program Manager | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Systems Engineer | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Project Manager (Search and ROV Operations) | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Assistant Project Manager (Search Operations) | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Assistant Project Manager (ROV Operations) | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Senior Technician | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Lead Electronic Techician | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Lead Operator Techician | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Electronic Techician | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Operator Techician | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Logistics/Financial Assistant | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Technician | $0.00 | $0.00 | $0.00 | $0.00 |
E6-10
| Schedule E: Fixed Price Scheduled Equipment Rates (Tables 6 - 10 from RFP section B) | |||||
| * The equipment listed is for illustrative purposes. Offeror is free to propose additional or alternative equipment. | |||||
| TABLE 6: Base Year | Operational Day Rate | Standby/Transit Day Rate | TABLE 9: Option Year 3 | Operational Day Rate | Standby/Transit Day Rate |
| Towed Side Scan Sonar (Maximum Operational Depth 1,000') | $0.00 | $0.00 | Towed Side Scan Sonar (Maximum Operational Depth 1,000') | $0.00 | $0.00 |
| Towed Side Scan Sonar (Maximum Operational Depth 10,000') | $0.00 | $0.00 | Towed Side Scan Sonar (Maximum Operational Depth 10,000') | $0.00 | $0.00 |
| Towed Side Scan Sonar (Maximum Operational Depth 20,000') | $0.00 | $0.00 | Towed Side Scan Sonar (Maximum Operational Depth 20,000') | $0.00 | $0.00 |
| AUV (Max Operational Depth 1,000') | $0.00 | $0.00 | AUV (Max Operational Depth 1,000') | $0.00 | $0.00 |
| AUV (Max Operational Depth 10,000') | $0.00 | $0.00 | AUV (Max Operational Depth 10,000') | $0.00 | $0.00 |
| AUV (Max Operational Depth 20,000') | $0.00 | $0.00 | AUV (Max Operational Depth 20,000') | $0.00 | $0.00 |
| ROV (Max Operational Depth 1,000') | $0.00 | $0.00 | ROV (Max Operational Depth 1,000') | $0.00 | $0.00 |
| ROV (Max Operational Depth 10,000') | $0.00 | $0.00 | ROV (Max Operational Depth 10,000') | $0.00 | $0.00 |
| ROV (Max Operational Depth 20,000') | $0.00 | $0.00 | ROV (Max Operational Depth 20,000') | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | ||
| TABLE 7: Option Year 1 | Operational Day Rate | Standby/Transit Day Rate | TABLE 10: Option Year 4 | Operational Day Rate | Standby/Transit Day Rate |
| Towed Side Scan Sonar (Maximum Operational Depth 1,000') | $0.00 | $0.00 | Towed Side Scan Sonar (Maximum Operational Depth 1,000') | $0.00 | $0.00 |
| Towed Side Scan Sonar (Maximum Operational Depth 10,000') | $0.00 | $0.00 | Towed Side Scan Sonar (Maximum Operational Depth 10,000') | $0.00 | $0.00 |
| Towed Side Scan Sonar (Maximum Operational Depth 20,000') | $0.00 | $0.00 | Towed Side Scan Sonar (Maximum Operational Depth 20,000') | $0.00 | $0.00 |
| AUV (Max Operational Depth 1,000') | $0.00 | $0.00 | AUV (Max Operational Depth 1,000') | $0.00 | $0.00 |
| AUV (Max Operational Depth 10,000') | $0.00 | $0.00 | AUV (Max Operational Depth 10,000') | $0.00 | $0.00 |
| AUV (Max Operational Depth 20,000') | $0.00 | $0.00 | AUV (Max Operational Depth 20,000') | $0.00 | $0.00 |
| ROV (Max Operational Depth 1,000') | $0.00 | $0.00 | ROV (Max Operational Depth 1,000') | $0.00 | $0.00 |
| ROV (Max Operational Depth 10,000') | $0.00 | $0.00 | ROV (Max Operational Depth 10,000') | $0.00 | $0.00 |
| ROV (Max Operational Depth 20,000') | $0.00 | $0.00 | ROV (Max Operational Depth 20,000') | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | ||
| TABLE 8: Option Year 2 | Facility | ||||
| Hourly (hr) | Overtime (hr) | ||||
| Towed Side Scan Sonar (Maximum Operational Depth 1,000') | $0.00 | $0.00 | |||
| Towed Side Scan Sonar (Maximum Operational Depth 10,000') | $0.00 | $0.00 | |||
| Towed Side Scan Sonar (Maximum Operational Depth 20,000') | $0.00 | $0.00 | |||
| AUV (Max Operational Depth 1,000') | $0.00 | $0.00 | |||
| AUV (Max Operational Depth 10,000') | $0.00 | $0.00 | |||
| AUV (Max Operational Depth 20,000') | $0.00 | $0.00 | |||
| ROV (Max Operational Depth 1,000') | $0.00 | $0.00 | |||
| ROV (Max Operational Depth 10,000') | $0.00 | $0.00 | |||
| ROV (Max Operational Depth 20,000') | $0.00 | $0.00 | |||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 | ||||
| $0.00 | $0.00 |
E11-13
| Schedule E: Fixed Price Scheduled Equipment Rates (Tables 11 - 13 from RFP section B) | ||
| TABLE 11: Schedule Hazard / Hardship Pay | Hazard / Hardship Premium | Description |
| Base Year (12 Months) | 0.0% | as a % of Scheduled Labor Rates |
| Option I (12 Months) | 0.0% | as a % of Scheduled Labor Rates |
| Option II (12 Months) | 0.0% | as a % of Scheduled Labor Rates |
| Option III (12 Months) | 0.0% | as a % of Scheduled Labor Rates |
| Option IV (12 Months) | 0.0% | as a % of Scheduled Labor Rates |
| TABLE 12: Facility Rates | Facilities Cost | |
| Base Year (12 Months) | $0.00 | |
| Option I (12 Months) | $0.00 | |
| Option II (12 Months) | $0.00 | |
| Option III (12 Months) | $0.00 | |
| Option IV (12 Months) | $0.00 | |
| TABLE 13: G&A Percentage | Est. G&A Percentage | |
| Base Year (12 Months) | 0.0% | |
| Option I (12 Months) | 0.0% | |
| Option II (12 Months) | 0.0% | |
| Option III (12 Months) | 0.0% | |
| Option IV (12 Months) | 0.0% |
D1-Base
| Schedule D: Scenario 1- Facility Operations Cost and Pricing Format (Base Year) | |||||||
| Col. A | Col. B | Col. C | Col. D | Col. E (A x C) | Col. F (B x D) | ||
| Minimum Number Required | Sample Standard Hours | Sample Overtime Hours | Standard Rate | Overtime Rate | Total Standard Time Amount | Total Overtime Amount | |
| Program Manager | 1 | 1560 | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| Systems Engineer | 1 | 1560 | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| Project Manager (Search and ROV Operations) | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (Search Operations) | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (ROV Operations) | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Technician | 4 | 6240 | 832 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Electronic Techician | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Operator Techician | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Electronic Techician | 3 | 4680 | 624 | $0.00 | $0.00 | $0.00 | $0.00 |
| Operator Techician | 3 | 4680 | 624 | $0.00 | $0.00 | $0.00 | $0.00 |
| Logistics/Financial Assistant | 1 | 1560 | 208 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician | 0 | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subtotals | $0.00 | $0.00 | |||||
| Total of Col. E and Col. F | $0.00 | ||||||
| Facility Rate (Insert Amount from Table 12) | $0.00 | ||||||
| Award Fee | $0.00 | ||||||
| Total | $0.00 |
D1-Opt1
| Schedule D: Scenario 1- Facility Operations Cost and Pricing Format (Option Year 1) | |||||||
| Col. A | Col. B | Col. C | Col. D | Col. E (A x C) | Col. F (B x D) | ||
| Minimum Number Required | Sample Standard Hours | Sample Overtime Hours | Standard Rate | Overtime Rate | Total Standard Time Amount | Total Overtime Amount | |
| Program Manager | 1 | 1560 | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| Systems Engineer | 1 | 1560 | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| Project Manager (Search and ROV Operations) | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (Search Operations) | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (ROV Operations) | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Technician | 4 | 6240 | 832 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Electronic Techician | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Operator Techician | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Electronic Techician | 3 | 4680 | 624 | $0.00 | $0.00 | $0.00 | $0.00 |
| Operator Techician | 3 | 4680 | 624 | $0.00 | $0.00 | $0.00 | $0.00 |
| Logistics/Financial Assistant | 1 | 1560 | 208 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician | 0 | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subtotals | $0.00 | $0.00 | |||||
| Total of Col. E and Col. F | $0.00 | ||||||
| Facility Rate (Insert Amount from Table 12) | $0.00 | ||||||
| Award Fee | $0.00 | ||||||
| Total | $0.00 |
D1-Opt2
| Schedule D: Scenario 1- Facility Operations Cost and Pricing Format (Option Year 2) | |||||||
| Col. A | Col. B | Col. C | Col. D | Col. E (A x C) | Col. F (B x D) | ||
| Minimum Number Required | Sample Standard Hours | Sample Overtime Hours | Standard Rate | Overtime Rate | Total Standard Time Amount | Total Overtime Amount | |
| Program Manager | 1 | 1560 | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| Systems Engineer | 1 | 1560 | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| Project Manager (Search and ROV Operations) | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (Search Operations) | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (ROV Operations) | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Technician | 4 | 6240 | 832 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Electronic Techician | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Operator Techician | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Electronic Techician | 3 | 4680 | 624 | $0.00 | $0.00 | $0.00 | $0.00 |
| Operator Techician | 3 | 4680 | 624 | $0.00 | $0.00 | $0.00 | $0.00 |
| Logistics/Financial Assistant | 1 | 1560 | 208 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician | 0 | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subtotals | $0.00 | $0.00 | |||||
| Total of Col. E and Col. F | $0.00 | ||||||
| Facility Rate (Insert Amount from Table 12) | $0.00 | ||||||
| Award Fee | $0.00 | ||||||
| Total | $0.00 |
D1-Opt3
| Schedule D: Scenario 1- Facility Operations Cost and Pricing Format (Option Year 3) | |||||||
| Col. A | Col. B | Col. C | Col. D | Col. E (A x C) | Col. F (B x D) | ||
| Minimum Number Required | Sample Standard Hours | Sample Overtime Hours | Standard Rate | Overtime Rate | Total Standard Time Amount | Total Overtime Amount | |
| Program Manager | 1 | 1560 | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| Systems Engineer | 1 | 1560 | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| Project Manager (Search and ROV Operations) | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (Search Operations) | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (ROV Operations) | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Technician | 4 | 6240 | 832 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Electronic Techician | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Operator Techician | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Electronic Techician | 3 | 4680 | 624 | $0.00 | $0.00 | $0.00 | $0.00 |
| Operator Techician | 3 | 4680 | 624 | $0.00 | $0.00 | $0.00 | $0.00 |
| Logistics/Financial Assistant | 1 | 1560 | 208 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician | 0 | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subtotals | $0.00 | $0.00 | |||||
| Total of Col. E and Col. F | $0.00 | ||||||
| Facility Rate (Insert Amount from Table 12) | $0.00 | ||||||
| Award Fee | $0.00 | ||||||
| Total | $0.00 |
D1-Opt4
| Schedule D: Scenario 1- Facility Operations Cost and Pricing Format (Option Year 4) | |||||||
| Col. A | Col. B | Col. C | Col. D | Col. E (A x C) | Col. F (B x D) | ||
| Minimum Number Required | Sample Standard Hours | Sample Overtime Hours | Standard Rate | Overtime Rate | Total Standard Time Amount | Total Overtime Amount | |
| Program Manager | 1 | 1560 | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| Systems Engineer | 1 | 1560 | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| Project Manager (Search and ROV Operations) | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (Search Operations) | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (ROV Operations) | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Technician | 4 | 6240 | 832 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Electronic Techician | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Operator Techician | 2 | 3120 | 416 | $0.00 | $0.00 | $0.00 | $0.00 |
| Electronic Techician | 3 | 4680 | 624 | $0.00 | $0.00 | $0.00 | $0.00 |
| Operator Techician | 3 | 4680 | 624 | $0.00 | $0.00 | $0.00 | $0.00 |
| Logistics/Financial Assistant | 1 | 1560 | 208 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician | 0 | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subtotals | $0.00 | $0.00 | |||||
| Total of Col. E and Col. F | $0.00 | ||||||
| Facility Rate (Insert Amount from Table 12) | $0.00 | ||||||
| Award Fee | $0.00 | ||||||
| Total | $0.00 |
D2-Base
| Schedule D: Scenario 2 - CURV21/ORION, 4 Week Operation Cost and Pricing Format (Base year) | ||||||
| Scheduled Costs - Table 1 | Col. A | Col. B | Col. C (A X B) | Col. D | Col. E (C + D) | |
| Minimum Number Required | 12 Hour Days | 12 Hour Day Rate | 12 Hour Day Amount | Hazard/ Hardship Premium | Total Amount | |
| Project Manager (Search and ROV Operations) | 1 | 38 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (Search Operations) | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (ROV Operations) | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Technician | 2 | 56 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Electronic Techician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Operator Techician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Electronic Techician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Operator Techician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Logistics/Financial Assistant | 1 | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Scheduled Costs | $0.00 | |||||
| Non-Scheduled Costs - Table 2 | Col. A | Col. B | Col. E (A + B) | |||
| Government Stipulated Amount | Applicable Burden Amount | Total Amount | ||||
| Subcontracts | $500,000 | $0.00 | $500,000.00 | |||
| In-house Non-Scheduled Labor (Engineering Labor) | $25,000 | $0.00 | $25,000.00 | |||
| In-house Non-Scheduled Labor (Non-Exempt Labor) | $25,000 | $0.00 | $25,000.00 | |||
| Material | $50,000 | $0.00 | $50,000.00 | |||
| Total Non-Scheduled Costs | $600,000.00 | |||||
| Total Scheduled and Non-Scheduled Costs - Table 3 | ||||||
| Total Scheduled Costs from Table 1 | $0.00 | |||||
| Total Non-Scheduled Cost from Table 2 | $600,000.00 | |||||
| Subtotal | $600,000.00 | |||||
| Award Fee | $60,000.00 | |||||
| Total | $660,000.00 |
D2-Opt1
| Schedule D: Scenario 2 - CURV21/ORION, 4 Week Operation Cost and Pricing Format (Option Year 1) | ||||||
| Scheduled Costs - Table 1 | Col. A | Col. B | Col. C (A X B) | Col. D | Col. E (C + D) | |
| Minimum Number Required | 12 Hour Days | 12 Hour Day Rate | 12 Hour Day Amount | Hazard/ Hardship Premium | Total Amount | |
| Project Manager (Search and ROV Operations) | 1 | 38 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (Search Operations) | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (ROV Operations) | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Technician | 2 | 56 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Electronic Techician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Operator Techician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Electronic Techician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Operator Techician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Logistics/Financial Assistant | 1 | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Scheduled Costs | $0.00 | |||||
| Non-Scheduled Costs - Table 2 | Col. A | Col. B | Col. E (A + B) | |||
| Government Stipulated Amount | Applicable Burden Amount | Total Amount | ||||
| Subcontracts | $500,000 | $0.00 | $500,000.00 | |||
| In-house Non-Scheduled Labor (Engineering Labor) | $25,000 | $0.00 | $25,000.00 | |||
| In-house Non-Scheduled Labor (Non-Exempt Labor) | $25,000 | $0.00 | $25,000.00 | |||
| Material | $50,000 | $0.00 | $50,000.00 | |||
| Total Non-Scheduled Costs | $600,000.00 | |||||
| Total Scheduled and Non-Scheduled Costs - Table 3 | ||||||
| Total Scheduled Costs from Table 1 | $0.00 | |||||
| Total Non-Scheduled Cost from Table 2 | $600,000.00 | |||||
| Subtotal | $600,000.00 | |||||
| Award Fee | $60,000.00 | |||||
| Total | $660,000.00 |
D2-Opt2
| Schedule D: Scenario 2 - CURV21/ORION, 4 Week Operation Cost and Pricing Format (Option Year 2) | ||||||
| Scheduled Costs - Table 1 | Col. A | Col. B | Col. C (A X B) | Col. D | Col. E (C + D) | |
| Minimum Number Required | 12 Hour Days | 12 Hour Day Rate | 12 Hour Day Amount | Hazard/ Hardship Premium | Total Amount | |
| Project Manager (Search and ROV Operations) | 1 | 38 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (Search Operations) | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (ROV Operations) | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Technician | 2 | 56 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Electronic Techician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Operator Techician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Electronic Techician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Operator Techician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Logistics/Financial Assistant | 1 | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Scheduled Costs | $0.00 | |||||
| Non-Scheduled Costs - Table 2 | Col. A | Col. B | Col. E (A + B) | |||
| Government Stipulated Amount | Applicable Burden Amount | Total Amount | ||||
| Subcontracts | $500,000 | $0.00 | $500,000.00 | |||
| In-house Non-Scheduled Labor (Engineering Labor) | $25,000 | $0.00 | $25,000.00 | |||
| In-house Non-Scheduled Labor (Non-Exempt Labor) | $25,000 | $0.00 | $25,000.00 | |||
| Material | $50,000 | $0.00 | $50,000.00 | |||
| Total Non-Scheduled Costs | $600,000.00 | |||||
| Total Scheduled and Non-Scheduled Costs - Table 3 | ||||||
| Total Scheduled Costs from Table 1 | $0.00 | |||||
| Total Non-Scheduled Cost from Table 2 | $600,000.00 | |||||
| Subtotal | $600,000.00 | |||||
| Award Fee | $60,000.00 | |||||
| Total | $660,000.00 |
D2-Opt3
| Schedule D: Scenario 2 - CURV21/ORION, 4 Week Operation Cost and Pricing Format (Option Year 3) | ||||||
| Scheduled Costs - Table 1 | Col. A | Col. B | Col. C (A X B) | Col. D | Col. E (C + D) | |
| Minimum Number Required | 12 Hour Days | 12 Hour Day Rate | 12 Hour Day Amount | Hazard/ Hardship Premium | Total Amount | |
| Project Manager (Search and ROV Operations) | 1 | 38 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (Search Operations) | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (ROV Operations) | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Technician | 2 | 56 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Electronic Techician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Operator Techician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Electronic Techician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Operator Techician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Logistics/Financial Assistant | 1 | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Scheduled Costs | $0.00 | |||||
| Non-Scheduled Costs - Table 2 | Col. A | Col. B | Col. E (A + B) | |||
| Government Stipulated Amount | Applicable Burden Amount | Total Amount | ||||
| Subcontracts | $500,000 | $0.00 | $500,000.00 | |||
| In-house Non-Scheduled Labor (Engineering Labor) | $25,000 | $0.00 | $25,000.00 | |||
| In-house Non-Scheduled Labor (Non-Exempt Labor) | $25,000 | $0.00 | $25,000.00 | |||
| Material | $50,000 | $0.00 | $50,000.00 | |||
| Total Non-Scheduled Costs | $600,000.00 | |||||
| Total Scheduled and Non-Scheduled Costs - Table 3 | ||||||
| Total Scheduled Costs from Table 1 | $0.00 | |||||
| Total Non-Scheduled Cost from Table 2 | $600,000.00 | |||||
| Subtotal | $600,000.00 | |||||
| Award Fee | $60,000.00 | |||||
| Total | $660,000.00 |
D2-Opt4
| Schedule D: Scenario 2 - CURV21/ORION, 4 Week Operation Cost and Pricing Format (Option Year 4) | ||||||
| Scheduled Costs - Table 1 | Col. A | Col. B | Col. C (A X B) | Col. D | Col. E (C + D) | |
| Minimum Number Required | 12 Hour Days | 12 Hour Day Rate | 12 Hour Day Amount | Hazard/ Hardship Premium | Total Amount | |
| Project Manager (Search and ROV Operations) | 1 | 38 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (Search Operations) | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (ROV Operations) | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Technician | 2 | 56 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Electronic Techician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Operator Techician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Electronic Techician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Operator Techician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Logistics/Financial Assistant | 1 | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician | 1 | 28 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Scheduled Costs | $0.00 | |||||
| Non-Scheduled Costs - Table 2 | Col. A | Col. B | Col. E (A + B) | |||
| Government Stipulated Amount | Applicable Burden Amount | Total Amount | ||||
| Subcontracts | $500,000 | $0.00 | $500,000.00 | |||
| In-house Non-Scheduled Labor (Engineering Labor) | $25,000 | $0.00 | $25,000.00 | |||
| In-house Non-Scheduled Labor (Non-Exempt Labor) | $25,000 | $0.00 | $25,000.00 | |||
| Material | $50,000 | $0.00 | $50,000.00 | |||
| Total Non-Scheduled Costs | $600,000.00 | |||||
| Total Scheduled and Non-Scheduled Costs - Table 3 | ||||||
| Total Scheduled Costs from Table 1 | $0.00 | |||||
| Total Non-Scheduled Cost from Table 2 | $600,000.00 | |||||
| Subtotal | $600,000.00 | |||||
| Award Fee | $60,000.00 | |||||
| Total | $660,000.00 |
D3-Base
| Schedule D: Scenario 3 - DeepDrone/SWISS, 3 Week Operation Cost and Pricing Format | ||||||
| Scheduled Costs - Table 1 | Col. A | Col. B | Col. C (A X B) | Col. D | Col. E (C + D) | |
| Minimum Number Required | 12 Hour Days | 12 Hour Day Rate | 12 Hour Day Amount | Hazard/ Hardship Premium | Total Amount | |
| Project Manager (Search and ROV Operations) | 1 | 31 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (Search Operations) | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (ROV Operations) | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Technician | 2 | 42 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Electronic Techician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Operator Techician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Electronic Techician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Operator Techician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Logistics/Financial Assistant | 1 | 5 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Scheduled Costs | $0.00 | |||||
| Non-Scheduled Costs - Table 2 | Col. A | Col. B | Col. E (A + B) | |||
| Government Stipulated Amount | Applicable Burden Amount | Total Amount | ||||
| Subcontracts | $300,000 | $0.00 | $300,000.00 | |||
| In-house Non-Scheduled Labor (Engineering Labor) | $12,500 | $0.00 | $12,500.00 | |||
| In-house Non-Scheduled Labor (Non-Exempt Labor) | $12,500 | $0.00 | $12,500.00 | |||
| Material | $25,000 | $0.00 | $25,000.00 | |||
| Total Non-Scheduled Costs | $350,000.00 | |||||
| Total Scheduled and Non-Scheduled Costs - Table 3 | ||||||
| Total Scheduled Costs from Table 1 | $0.00 | |||||
| Total Non-Scheduled Cost from Table 2 | $350,000.00 | |||||
| Subtotal | $350,000.00 | |||||
| Award Fee | $35,000.00 | |||||
| Total | $385,000.00 |
D3-Opt1
| Schedule D: Scenario 3 - DeepDrone/SWISS, 3 Week Operation Cost and Pricing Format | ||||||
| Scheduled Costs - Table 1 | Col. A | Col. B | Col. C (A X B) | Col. D | Col. E (C + D) | |
| Minimum Number Required | 12 Hour Days | 12 Hour Day Rate | 12 Hour Day Amount | Hazard/ Hardship Premium | Total Amount | |
| Project Manager (Search and ROV Operations) | 1 | 31 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (Search Operations) | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (ROV Operations) | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Technician | 2 | 42 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Electronic Techician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Operator Techician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Electronic Techician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Operator Techician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Logistics/Financial Assistant | 1 | 5 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Scheduled Costs | $0.00 | |||||
| Non-Scheduled Costs - Table 2 | Col. A | Col. B | Col. E (A + B) | |||
| Government Stipulated Amount | Applicable Burden Amount | Total Amount | ||||
| Subcontracts | $300,000 | $0.00 | $300,000.00 | |||
| In-house Non-Scheduled Labor (Engineering Labor) | $12,500 | $0.00 | $12,500.00 | |||
| In-house Non-Scheduled Labor (Non-Exempt Labor) | $12,500 | $0.00 | $12,500.00 | |||
| Material | $25,000 | $0.00 | $25,000.00 | |||
| Total Non-Scheduled Costs | $350,000.00 | |||||
| Total Scheduled and Non-Scheduled Costs - Table 3 | ||||||
| Total Scheduled Costs from Table 1 | $0.00 | |||||
| Total Non-Scheduled Cost from Table 2 | $350,000.00 | |||||
| Subtotal | $350,000.00 | |||||
| Award Fee | $35,000.00 | |||||
| Total | $385,000.00 |
D3-Opt2
| Schedule D: Scenario 3 - DeepDrone/SWISS, 3 Week Operation Cost and Pricing Format | ||||||
| Scheduled Costs - Table 1 | Col. A | Col. B | Col. C (A X B) | Col. D | Col. E (C + D) | |
| Minimum Number Required | 12 Hour Days | 12 Hour Day Rate | 12 Hour Day Amount | Hazard/ Hardship Premium | Total Amount | |
| Project Manager (Search and ROV Operations) | 1 | 31 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (Search Operations) | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (ROV Operations) | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Technician | 2 | 42 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Electronic Techician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Operator Techician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Electronic Techician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Operator Techician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Logistics/Financial Assistant | 1 | 5 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Scheduled Costs | $0.00 | |||||
| Non-Scheduled Costs - Table 2 | Col. A | Col. B | Col. E (A + B) | |||
| Government Stipulated Amount | Applicable Burden Amount | Total Amount | ||||
| Subcontracts | $300,000 | $0.00 | $300,000.00 | |||
| In-house Non-Scheduled Labor (Engineering Labor) | $12,500 | $0.00 | $12,500.00 | |||
| In-house Non-Scheduled Labor (Non-Exempt Labor) | $12,500 | $0.00 | $12,500.00 | |||
| Material | $25,000 | $0.00 | $25,000.00 | |||
| Total Non-Scheduled Costs | $350,000.00 | |||||
| Total Scheduled and Non-Scheduled Costs - Table 3 | ||||||
| Total Scheduled Costs from Table 1 | $0.00 | |||||
| Total Non-Scheduled Cost from Table 2 | $350,000.00 | |||||
| Subtotal | $350,000.00 | |||||
| Award Fee | $35,000.00 | |||||
| Total | $385,000.00 |
D3-Opt3
| Schedule D: Scenario 3 - DeepDrone/SWISS, 3 Week Operation Cost and Pricing Format | ||||||
| Scheduled Costs - Table 1 | Col. A | Col. B | Col. C (A X B) | Col. D | Col. E (C + D) | |
| Minimum Number Required | 12 Hour Days | 12 Hour Day Rate | 12 Hour Day Amount | Hazard/ Hardship Premium | Total Amount | |
| Project Manager (Search and ROV Operations) | 1 | 31 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (Search Operations) | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (ROV Operations) | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Technician | 2 | 42 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Electronic Techician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Operator Techician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Electronic Techician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Operator Techician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Logistics/Financial Assistant | 1 | 5 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Scheduled Costs | $0.00 | |||||
| Non-Scheduled Costs - Table 2 | Col. A | Col. B | Col. E (A + B) | |||
| Government Stipulated Amount | Applicable Burden Amount | Total Amount | ||||
| Subcontracts | $300,000 | $0.00 | $300,000.00 | |||
| In-house Non-Scheduled Labor (Engineering Labor) | $12,500 | $0.00 | $12,500.00 | |||
| In-house Non-Scheduled Labor (Non-Exempt Labor) | $12,500 | $0.00 | $12,500.00 | |||
| Material | $25,000 | $0.00 | $25,000.00 | |||
| Total Non-Scheduled Costs | $350,000.00 | |||||
| Total Scheduled and Non-Scheduled Costs - Table 3 | ||||||
| Total Scheduled Costs from Table 1 | $0.00 | |||||
| Total Non-Scheduled Cost from Table 2 | $350,000.00 | |||||
| Subtotal | $350,000.00 | |||||
| Award Fee | $35,000.00 | |||||
| Total | $385,000.00 |
D3-Opt4
| Schedule D: Scenario 3 - DeepDrone/SWISS, 3 Week Operation Cost and Pricing Format | ||||||
| Scheduled Costs - Table 1 | Col. A | Col. B | Col. C (A X B) | Col. D | Col. E (C + D) | |
| Minimum Number Required | 12 Hour Days | 12 Hour Day Rate | 12 Hour Day Amount | Hazard/ Hardship Premium | Total Amount | |
| Project Manager (Search and ROV Operations) | 1 | 31 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (Search Operations) | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Assistant Project Manager (ROV Operations) | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Technician | 2 | 42 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Electronic Techician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Lead Operator Techician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Electronic Techician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Operator Techician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Logistics/Financial Assistant | 1 | 5 | $0.00 | $0.00 | $0.00 | $0.00 |
| Technician | 1 | 21 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Scheduled Costs | $0.00 | |||||
| Non-Scheduled Costs - Table 2 | Col. A | Col. B | Col. E (A + B) | |||
| Government Stipulated Amount | Applicable Burden Amount | Total Amount | ||||
| Subcontracts | $300,000 | $0.00 | $300,000.00 | |||
| In-house Non-Scheduled Labor (Engineering Labor) | $12,500 | $0.00 | $12,500.00 | |||
| In-house Non-Scheduled Labor (Non-Exempt Labor) | $12,500 | $0.00 | $12,500.00 | |||
| Material | $25,000 | $0.00 | $25,000.00 | |||
| Total Non-Scheduled Costs | $350,000.00 | |||||
| Total Scheduled and Non-Scheduled Costs - Table 3 | ||||||
| Total Scheduled Costs from Table 1 | $0.00 | |||||
| Total Non-Scheduled Cost from Table 2 | $350,000.00 | |||||
| Subtotal | $350,000.00 | |||||
| Award Fee | $35,000.00 | |||||
| Total | $385,000.00 |
D4-Total
| Schedule D: Summary of Total Costs for Contract | ||||
| SCENARIO 1 | SCENARIO 2 | SCENARIO 3 | TOTAL | |
| BASIC | $0.00 | $660,000.00 | $385,000.00 | $1,045,000.00 |
| OPTION I | $0.00 | $660,000.00 | $385,000.00 | $1,045,000.00 |
| OPTION II | $0.00 | $660,000.00 | $385,000.00 | $1,045,000.00 |
| OPTION III | $0.00 | $660,000.00 | $385,000.00 | $1,045,000.00 |
| OPTION IV | $0.00 | $660,000.00 | $385,000.00 | $1,045,000.00 |
| TOTAL | $0.00 | $3,300,000.00 | $1,925,000.00 | $5,225,000.00 |
File details come from the government source that posted it. Updated .