This document contains questions and answers related to a draft request for proposal for a forward looking infrared system for the CH-53K helicopter. The solicitation seeks to competitively award a contract for production of FLIR systems, with an expected award date of fiscal year 2025. Key details include that the draft RFP will be released in January 2024 and include sections L and M, with the statement of work to be released in the second quarter of fiscal year 2024. Data rights, retrofit requirements, and compliance with standards such as SOSA/MOSA are still being determined. Integration and testing are planned for fiscal year 2027, with the FLIR vendor responsible for qualification testing and providing integration kits.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

General Information
Contract Name or RFP Number:FLIR 10-15 Competition
Question(s) for Draft or Final:Draft
#Document
(Synopsis, SOW, SPEC, RFP, Attachment)SOW/SPEC/RFP SectionReference ParagraphQuestionProprietary (Yes/No)Government Response
1ID Sep 21 Draft RFPAre Performance Based Payments an option for proposal or are progress payments expected?NoThe USG has not completed its analysis into financing mechanisms at this point. Future details will be provided as requirements mature.
2ID Sep 21 Draft RFPWhen will Sections L & M be released?NoThe USG plans to release the draft RFP inclusive of Sections L & M in January 2024.
3ID Sep 21 Draft RFPWhat are expected Data Rights Requirements?NoThe USG is still determining the necessary data rights required and will provide an update as part of the draft RFP.
4ID Sep 21 Draft RFPWould retrofit of existing Q-29 systems and test equipment be in the interest of the USG?NoThe USG is not considering retrofit systems at this time. The USG is still evaluating total retrofit requirements and will provide additional information as part of the draft RFP.
5ID Sep 21 Draft RFPCan you provide estimated award timeline by CLIN?NoPlanned award for the contract is FY25. Award of subsequent CLINs will be provided in the upcoming draft RFP.
6ID Sep 21 Draft RFPIs there a need for the FLIR to be SOSA/MOSA compliant?NoThe USG is assessing SOSA/ MOSA requirements. Further details will be relayed under the forthcoming draft RFP.
7ID Sep 21 Draft RFPWhen do you expect to release the SOW?NoThe USG plans to release the draft RFP inclusive of SOW in 2QFY24.
8ID Sep 21 Draft RFPWhen will SIL testing be performed?NoSIL testing is currently planned to occur in FY27.
9ID Sep 21 Draft RFPHow will aircraft integration/installation support services be contracted?NoThe FLIR vendor will be responsible for providing a FLIR system and mounting bracket, if necessary, to connect to the existing bolt pattern of the 53K FLIR TFU location. Documentation will be provided as part of the upcoming draft RFP. For integration and test support, the USG plans to establish a secondary CLIN separate to the vendor's NRE CLIN that will establish a min/max ordering period using month as the unit of measure that will be used as reach back support to the USG, who will be contracting with the aircraft OEM for integration into the CH-53K hardware and software.
12ID Sep 21 Technical BriefSlide 5InterfacesWhat is the analog output for exactly? To where is it going?NoThe USG is no longer considering analog output as a minimum requirement.
13ID Sep 21 Technical BriefSlide 5InterfacesAre there display interfaces in the aircraft other than those in the cockpit? If so, where are they located and what kind of operator is it designed for: aircrew? Pax?NoNo
17ID Sep 21 Technical BriefSlide 13Structural RequirementsWhat definition of 'Turret Fatigue Life' is in use? How is it calculated and how is it different from MTBF?NoThe USG is further defining its reliability and maintainability metrics and will provide an update as part of the upcoming draft RFP.
18ID Sep 21 Technical BriefSlide 13Structural RequirementsWhat definition of 'Operating Service Life' is in use? How is it calculated?NoThe USG is further defining its reliability and maintainability metrics and will provide an update as part of the upcoming draft RFP.
19SpecSpecInterfacesWill FLIR systems integration with the existing potato grip be a hard requirements? Or is the USG seeking new hand controllers/joystick controllers?NoFLIR is controlled via MFCU through the DCU. The USG is not seeking a new hand controller.
20Industry DaySlide 9Turret Unit AlignmentDoes the ability to enter Azimuth Offsets within the User Interface remove the requirement for indexing to a mounting reference datum?NoThe USG has taken this question into consideration of its source selection strategy and will provide an update as part of the upcoming draft RFP.
25Industry DayWho makes the MFCU?NoMFCU Esterline-Mason P/N# 799-7715/ P/N# 799-7716
30Industry DayWhat are the power requirements for the laser target marker and the range requirements?NoThe USG is considering this response as part of the draft RFP.
31Industry DayCan you please provide the wiring specs for type of cabling?NoThe USG will provide the wiring specs as part of the draft RFP.
32Industry DayWhat are the data rights requirements? Is the Government going to request intellectual property rights?NoThe USG is considering this response as part of the threshold/objective strategy of the technical factor. This will be released as part of the draft RFP.
34Industry DayWhat range are you looking at for the FLIR system?NoThe USG is considering this response as part of the source selection strategy. Typical operational range is within 10 miles. However, official requirements will be released as part of the draft RFP.
35Industry DayWhat are the CON-OPS?NoCONOPS will be disclosed separately. The USG will provide an update to SAM.gov at a future date.
36Industry DayIs the laser requirement a threshold or objective?NoThe laser requirement is a threshold requirement. However, individual features related to the laser may be considered as part of the threshold objective technical strategy factor.
38Industry DayWhat are the milestones for DT/OT?NoThe FLIR vendor will be responsible for all environmental and qualification testing and required NRE through test readiness review. The FLIR vendor will only be responsible for test support to the USG as part of any SIL or flight testing as part of this CH-53K integration.
39Industry DayCan you publish what task you have to accomplish for integration with Sikorsky?NoThe USG can not comment on other contractual efforts. However, the USG will publish required events and milestones requiring FLIR vendor support during the test and integration support period.
40Industry DayCan you clarify the A-Kit and B-Kit requirements?NoA-Kit will include any installation brackets/wiring assemblies necessary to connect to aircraft cabling. B-Kit will include the actual FLIR WRA system.
46Industry DayCan you provide the CON-OPS?NoCONOPS will be disclosed separately. The USG will provide an update to SAM.gov at a future date.
51ID Brief Sep 21Can you provide a copy of the brief you gave at the Industry Day? It included a breakdown of CLIN and delivery dates that I did not see on SAM.gov that I thought was particularly useful.NoThe industry day technical brief and draft contract was posted prior to industry day. Due to changes in the requirement and contract strucutre, new versions will be posted as part of the draft RFP.
52Draft SF33Section BUnderstand this is a FFP contract awarded in either 2024 or 2025. Likewise, each CLIN is characterized as an FFP. How will the USG pay out the contract? Lump sum, annually, with delivery of each CLIN, etc?NoThe USG is evaluating all payment types including progress payments, performance based payments, and pay at delivery.
54Industry DayHow does the USG plan to control the laser functions of the FLIR?NoPilots will control the laser functions via the existing MFCU. The USG will not entertain offers for a new hand controller.
55Industry DayWhat are the display capabilities of the current MFD?NoThe current MFD's are both Analog and HD capable.
56Industry DayWhat vendor makes the current MFD and what is the Model?NoCollins Aerospace, model #MFD-268X
57Industry DayWhat are the electrical power requirements?NoFor AC power, the FLIR shall require a maximum of 670 Volt-Amp (VA) single-phase steady state, 731 VA peak, from input 115 VAC, 400 Hz power. For DC power, the FLIR shall require a maximum of 210-Watts steady-state input 28 VDC power. Peak power shall be less than 1000 Watts from unregulated 28VDC. However, final power requirements may be adjusted prior to or as part of the final RFP.
58Industry DayHow many retrofits will be completed as part of this requirement?NoKit installation is outside of the scope of this requirement. The offeror is responsible for Kits only.
59Industry DayWhat is the requirement for RS-292?NoThe USG is no longer considering analog output as a minimum requirement. Offerors should propose HD systems.