This document provides a Resource Distribution Table (RDT) template and details regarding a forthcoming solicitation for Contractor Logistics Support services for the C-40A aircraft. The Naval Air Systems Command intends to award an Indefinite-Delivery/Indefinite-Quantity contract in December 2020 utilizing full and open competition procedures. Interested parties may provide feedback on the draft Request for Proposal by February 24, 2020. The Government will post responses to industry questions by March 18, 2020 and anticipates releasing a final RFP in April 2020 with proposals due 30 days thereafter. The RDT template delineates a work breakdown structure for capturing sustainment costs by category such as manpower, maintenance, supplies, and engineering services.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Resource Distribution Table (RDT) Sustainment WBS Template - TBD
N0001920R0013 Attachment 2
08 JAN 2020
Resource Distribution Table (RDT) Sustainment WBS Template - TBD
Prime Contractor or Sub-Contractor Total In-House Total Sub Sub Description
Contractor/Organization Name TBD Contractor/Organization Location
Contract Number Total Program Office or Contract/Effort Value (Estimated), TY$M
Subtotal Software Contract Value (Estimated), TY$M Government Organization or PARM
CSDR Direct Reporting per CWIPT (Yes/No) SRDR Direct Reporting per CWIPT (Yes/No)
L1 L2 L3 L4 L5 L6 L7
1.0 X
1.1 X
1.1.1 X
1.1.2 X
1.1.3 X
1.2 X
1.2.1 X
1.2.1.1 X
1.2.1.1.1 X
1.2.1.1.2 X
1.2.1.1.3 X
1.2.1.2 X
1.2.1.2.1 X
1.2.1.2.2 X
1.2.1.2.3 X
1.2.1.2.4 X
1.2.1.2.5 X
1.2.1.2.6 X
1.2.1.2.7 X
1.2.1.3 X
1.2.2 X
1.2.2.1 X
1.2.2.2 X
1.2.2.3 X
1.2.2.4 X
1.2.2.5 X
1.2.3 X
1.3 X
1.3.1 X
1.3.1.1 X
1.3.1.2 X
1.3.1.3 X
1.3.1.4 X
1.3.1.5 X
1.3.2 X
1.3.2.1 X
1.3.2.2 X
1.3.2.3 X
1.3.2.4 X
1.3.2.5 X
1.3.3 X
1.3.3.1 X
1.3.3.2 X
1.3.3.3 X
1.3.3.4 X
1.3.4 X
1.3.4.1 X
1.3.4.1.1 X
1.3.4.1.2 X
1.3.4.1.3 X
1.3.4.1.4 X
1.3.4.1.5 X
1.3.4.2 X
1.3.4.2.1 X
1.3.4.2.2 X
1.3.4.2.3 X
1.3.4.2.4 X
1.3.4.2.5 X
1.3.5 X
1.3.6 X
1.4 X
1.4.1 X
1.4.1.1 X
WBS
NUMBERS
Prime Contractor
WBS Element Name
Subcontractors
Sustainment Effort Unit-Level Manpower (System Level Cost Only)
Operations Manpower Unit-Level Maintenance Manpower Other Unit-Level Manpower (Specify In Remarks)
Unit Operations (System Level Cost Only) Operating Material
Energy Fuel Petroleum, Oil and Lubricants (POL) Electricity
Training Munitions/Expendable Stores Ammunition Bombs Rockets Training Missiles Sonobuoys Pyrotechnics Other Munitions
Other Operating Material (Specify in Remarks) Support Services (Including Non-Maintenance FSRs)
Non-Maintenance Field Service Reps Communication Services Facility/Storage Services Transportation Services Other Support Services
Temporary Duty Maintenance
Consumables and Repair Parts Airframe/Hull/Vehicle Consumables and Repair Parts Propulsion Consumables and Repair Parts Electronics/Avionics Consumables and Repair Parts Other Major Subsystem Consumables and Repair Parts 1..n (Speci Other Consumables and Repair Parts
Depot Level Reparables (DLRs) / Repair of Reparables (RORs) Airframe/Hull/Vehicle DLRs Propulsion DLRs Electronics/Avionics DLRs Other Major Subsystems DLRs 1..n (Specify) Other DLRs
Intermediate Maintenance Intermediate Maintenance Consumable Materials and Repair Parts Intermediate-Level Government Maintenance Intermediate-Level Contractor Maintenance Other Intermediate-Level Maintenance
Depot Maintenance Scheduled Overhaul
Airframe/Hull/Vehicle Scheduled Overhaul Propulsion Scheduled Overhaul Electronics/Avionics Scheduled Overhaul Other Major Subsystems Scheduled Overhaul 1..n (Specify) Other Scheduled Overhaul
Unscheduled Overhaul Airframe/Hull/Vehicle Unscheduled Overhaul Propulsion Unscheduled Overhaul Electronics/Avionics Unscheduled Overhaul Other Major Subsystems Unscheduled Overhaul 1..n (Speci Other Unscheduled Unscheduled Overhaul
Other Maintenance Packing, Handling, Shipping and Transportation
Sustaining Support (System Level Cost Only) System Specific Training
Operator Training
N0001920R0013 Attachment 2
08 JAN 2020
1.4.1.2 X
1.4.1.3 X
1.4.2 X
1.4.2.1 X
1.4.2.2 X
1.4.3 X
1.4.3.1 X
1.4.3.2 X
1.4.3.3 X
1.4.3.4 X
1.4.3.5 X
1.4.3.6 X
1.4.3.7 X
1.4.3.8 X
1.4.3.9 X
1.4.3.10 X
1.4.3.11 X
1.4.3.12 X
1.4.3.13 X
1.4.3.14 X
1.4.4 X
1.4.4.1 X
1.4.4.2 X
1.4.4.3 X
1.4.4.4 X
1.4.4.5 X
1.4.4.6 X
1.4.4.7 X
1.4.4.8 X
1.4.5 X
1.4.5.1 X
1.4.5.1.1 X
1.4.5.1.1.1 X
1.4.5.1.1.2 X
1.4.5.1.1.3 X
1.4.5.1.1.4 X
1.4.5.1.2 X
1.4.5.1.3 X
1.4.5.1.4 X
1.4.5.1.4.1 X
1.4.5.1.4.2 X
1.4.5.1.4.3 X
1.4.5.1.4.4 X
1.4.5.1.4.5 X
1.4.5.1.4.6 X
1.4.5.1.5 X
1.4.5.1.6 X
1.4.5.2 X
1.4.5.3 X
1.4.5.3.1 X
1.4.5.3.1.1 X
1.4.5.3.1.2 X
1.4.5.3.1.3 X
1.4.5.3.2 X
1.4.5.3.3 X
1.4.5.3.4 X
1.4.6 X
1.4.7 X
1.4.7.1 X
1.4.7.2 X
1.4.7.3 X
1.4.8 X
1.5 X
1.5.1 X
1.5.1.1 X
1.5.1.2 X
1.5.1.3 X
1.5.1.4 X
1.5.2 X
1.5.2.1 X
1.5.2.1.1 X
1.5.2.1.1.1 X
1.5.2.1.1.1.1 Correction of Deficiencies X
1.5.2.1.1.1.2 Enhancements X
1.5.2.2 X
1.5.2.3 X
1.5.2.4 X
1.5.2.5 X
1.6 X
1. Contract/subcontract information provided in the Contract Plan RDT must be consistent with the information provided in the
Maintenance Training Other Training
Support Equipment Replacement and Repair Support Equipment Replacement Support Equipment Repair
Sustaining/Systems Engineering Reliability And Maintainability Engineering Logistics Engineering (LSA Updates, Logistics Analysis) Supply Analysis Efforts Safety/Human Systems Integration Engineering Affordability Engineering Obsolescence Engineering Availability Management Product Engineering Support Certification and Accreditation Configuration Management System Performance Analysis Supply Data Analysis Physical Security
Program Management Contractor Logistics Support (CLS) Management CLS Supply Management Financial/Schedule Planning and Reporting Transition to Lead Service Quality Assurance (Program Level) Administrative Security Transition to Performance Based Logistics (PBL) Risk Mitigation
Information Systems Tech Refresh
Servers Web Servers Application Servers Database Servers Other Servers
Data Storage Workstations Communication Hardware
Wide-Area Gateways Wide-Area Networks (Wan) Local Area Networks (Lan) Modems And Switches
CRYPTO
Other Communication Hardware
Peripheral Devices Other Hardware
IS Related License Fees System Support / Maintenance
Help Desk Tier 1 Tier 2 Tier 3
System Database Administration Follow On User Training Independent Verification and Validation (IV&V)
Data and Technical Publications Simulator/Training Device Operations and Repair
Simulator/Training Device Operations Simulator/Training Device Hardware Repair and Replace Simulator/Training Device Software Support
Other Sustaining Support (Specify in Remarks) Continuing System Improvements
Hardware Modifications Mod Kit Development Mod Kit Procurement Mod Kit Initial Spares
System Facilities Field Software Engineering (FSE) Operational Management
Installation and Personnel Support (System Level Only)
Mod Kit Installation Software Support
Software Changes Release 1...n (Specify)
WBS Name 1...n (Specify)
Software License Management
N0001920R0013 Attachment 2
08 JAN 2020
Program Plan RDT. It must reflect the most current contract or subcontract value (including all mods or CLINs) and must conform to the applicable rules established for the Program Plan RDT
2. If known, the assigned contract number for each subcontract between the prime and a subcontractor must be included.
RDT
File details come from the government source that posted it. Updated .