DRAFT SECTION B Supplies or Services and Prices.xlsx
XLSX spreadsheet 1 MB Posted
- Attached to
- TH-57 Contractor Logistics Support Federal contract opportunity
- Solicitation number
- N00019-10-R-0097
About this file
DRAFT SECTION B Supplies or Services and Prices
View the file
Other files for this federal contract opportunity
Show all 50
TH-57 Contractor Logistics Support has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE
| SECTION B "SUPPLIES OR SERVICES AND PRICES/COST DRAFT | |||||
| ITEM | SUPPLIES/SERVICES | QTY | UNIT | UNIT PRICE/COST | EXTENDED PRICE/COST |
TH-57 BASE
| 0001 | Fixed Maintenance for NAS Whiting Field | FFP | ||||
| 0001AA | OPTION Fixed Maintenance 78 Individual Aircraft Daily | 3 | MO | $ | $ | |
| 0001AB | OPTION Fixed Maintenance 83 Individual Aircraft Daily | 3 | MO | $ | $ | |
| 0001AC | OPTION Fixed Maintenance 88 Individual Aircraft Daily | 3 | MO | $ | $ | |
| 0001AD | OPTION Fixed Maintenance 93 Individual Aircraft Daily | 3 | MO | $ | $ | |
| 0001AE | OPTION Fixed Maintenance 96 Individual Aircraft Daily | 3 | MO | $ | $ |
0002 Satellite Site Support for NAS Patuxent River 3 MO $ $ FFP
| 0003 | Additional Aircraft for One Day | FFP | ||||
| 0003AA | OPTION Aircraft | 1 | EA | $ | $ | |
| 0003AB | OPTION Aircraft | 1 | EA | $ | $ | |
| 0003AC | OPTION Aircraft | 1 | EA | $ | $ |
| 0004 | Scheduled Depot - Aircraft Condition Inspection (ACI) | FFP | ||||
| 0004AA | OPTION Aircraft Condition Inspection | 1 | EA | $ | $ | |
| 0004AB | OPTION Aircraft Condition Inspection | 1 | EA | $ | $ | |
| 0004AC | OPTION Aircraft Condition Inspection | 1 | EA | $ | $ | |
| 0004AD | OPTION Aircraft Condition Inspection | 1 | EA | $ | $ | |
| 0004AE | OPTION Aircraft Condition Inspection | 1 | EA | $ | $ | |
| 0004AF | OPTION Aircraft Condition Inspection | 1 | EA | $ | $ | |
| 0004AG | OPTION Aircraft Condition Inspection | 1 | EA | $ | $ |
| 0005 | Unscheduled Depot | FFP | ||||
| 0005AA | OPTION Engine Overhaul due to Metal Contamination | 1 | EA | $ | $ | |
| 0005AB | OPTION Engine Overhaul due to Metal Contamination | 1 | EA | $ | $ | |
| 0005AC | OPTION Engine Overhaul due to Metal Contamination | 1 | EA | $ | $ | |
| 0005AD | OPTION Replace Cabin Roof | 1 | EA | $ | $ | |
| 0005AE | OPTION Replace Cabin Roof | 1 | EA | $ | $ | |
| 0005AF | OPTION Replace Forward Lower Shell | 1 | EA | $ | $ | |
| 0005AG | OPTION Replace Forward Lower Shell | 1 | EA | $ | $ | |
| 0005AH | OPTION Replace Aft Lower Shell | 1 | EA | $ | $ | |
| 0005AJ | OPTION Replace Aft Lower Shell | 1 | EA | $ | $ | |
| 0005AK | OPTION Replace Cabin Roof and Forward Lower Shell | 1 | EA | $ | $ | |
| 0005AL | OPTION Replace Cabin Roof and Forward Lower Shell | 1 | EA | $ | $ | |
| 0005AM | OPTION Replace Cabin Roof and Aft Lower Shell | 1 | EA | $ | $ | |
| 0005AN | OPTION Replace Cabin Roof and Aft Lower Shell | 1 | EA | $ | $ | |
| 0005AP | OPTION Replace Forward and Aft Lower Shell | 1 | EA | $ | $ | |
| 0005AQ | OPTION Replace Forward and Aft Lower Shell | 1 | EA | $ | $ | |
| 0005AR | OPTION Replace Cabin Roof and Forward and Aft Lower Shell | 1 | EA | $ | $ | |
| 0005AS | OPTION Replace Cabin Roof and Forward and Aft Lower Shell | 1 | EA | $ | $ | |
| 0005AT | OPTION Replace Cabin Roof in conjunction with ACI | 1 | EA | $ | $ | |
| 0005AU | OPTION Replace Cabin Roof in conjunction with ACI | 1 | EA | $ | $ | |
| 0005AV | OPTION Replace Cabin Roof in conjunction with ACI | 1 | EA | $ | $ | |
| 0005AW | OPTION Replace Forward Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0005AX | OPTION Replace Forward Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0005AY | OPTION Replace Forward Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0005AZ | OPTION Replace Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0005BA | OPTION Replace Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0005BB | OPTION Replace Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0005BC | OPTION Replace Cabin Roof and Forward Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0005BD | OPTION Replace Cabin Roof and Forward Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0005BE | OPTION Replace Cabin Roof and Forward Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0005BF | OPTION Replace Cabin Roof and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0005BG | OPTION Replace Cabin Roof and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0005BH | OPTION Replace Cabin Roof and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0005BJ | OPTION Replace Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0005BK | OPTION Replace Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0005BL | OPTION Replace Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0005BM | OPTION Replace Cabin Roof and Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0005BN | OPTION Replace Cabin Roof and Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0005BP | OPTION Replace Cabin Roof and Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ |
| 0006 | Flight Hour Generated Maintenance | FFP | ||||
| 0006AA | OPTION Flight Hour Generated Maintenance | 16,000 | FH | $ | $ | |
| 0006AB | OPTION Flight Hour Generated Maintenance | 4,000 | FH | $ | $ | |
| 0006AC | OPTION Flight Hour Generated Maintenance | 2,000 | FH | $ | $ | |
| 0006AD | OPTION Flight Hour Generated Maintenance | 2,000 | FH | $ | $ | |
| 0006AE | OPTION Flight Hour Generated Maintenance | 1,000 | FH | $ | $ | |
| 0006AF | OPTION Flight Hour Generated Maintenance | 1,000 | FH | $ | $ | |
| 0006AG | OPTION Flight Hour Generated Maintenance | 500 | FH | $ | $ | |
| 0006AH | OPTION Flight Hour Generated Maintenance | 500 | FH | $ | $ |
| 0007 | On-Site Conditional Maintenance | LH | ||||
| 0007AA | OPTION Airframe On-Site Conditional Maintenance | 1,200 | LH | $ | $ | |
| 0007AB | OPTION Airframe On-Site Conditional Maintenance | 400 | LH | $ | $ | |
| 0007AC | OPTION Airframe On-Site Conditional Maintenance | 200 | LH | $ | $ | |
| 0007AD | OPTION Airframe On-Site Conditional Maintenance | 100 | LH | $ | $ | |
| 0007AE | OPTION Airframe On-Site Conditional Maintenance | 100 | LH | $ | $ | |
| 0007AF | OPTION Engines On-Site Conditional Maintenance | 800 | LH | $ | $ | |
| 0007AG | OPTION Engines On-Site Conditional Maintenance | 400 | LH | $ | $ | |
| 0007AH | OPTION Engines On-Site Conditional Maintenance | 200 | LH | $ | $ | |
| 0007AJ | OPTION Engines On-Site Conditional Maintenance | 100 | LH | $ | $ | |
| 0007AK | OPTION Engines On-Site Conditional Maintenance | 100 | LH | $ | $ |
| 0008 | Depot Conditional Maintenance | LH | ||||
| 0008AA | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 4,000 | LH | $ | $ | |
| 0008AB | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 4,000 | LH | $ | $ | |
| 0008AC | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 2,000 | LH | $ | $ | |
| 0008AD | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 2,000 | LH | $ | $ | |
| 0008AE | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 1,000 | LH | $ | $ | |
| 0008AF | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 1,000 | LH | $ | $ | |
| 0008AG | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 500 | LH | $ | $ | |
| 0008AH | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 500 | LH | $ | $ | |
| 0008AJ | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 250 | LH | $ | $ | |
| 0008AK | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 250 | LH | $ | $ | |
| 0008AL | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 100 | LH | $ | $ | |
| 0008AM | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 100 | LH | $ | $ | |
| 0008AN | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 500 | LH | $ | $ | |
| 0008AP | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 500 | LH | $ | $ | |
| 0008AQ | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 500 | LH | $ | $ | |
| 0008AR | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 500 | LH | $ | $ | |
| 0008AS | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 500 | LH | $ | $ | |
| 0008AT | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 250 | LH | $ | $ | |
| 0008AU | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 250 | LH | $ | $ | |
| 0008AV | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 250 | LH | $ | $ | |
| 0008AW | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 250 | LH | $ | $ | |
| 0008AX | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 250 | LH | $ | $ | |
| 0008AY | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 100 | LH | $ | $ | |
| 0008AZ | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 100 | LH | $ | $ | |
| 0008BA | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 100 | LH | $ | $ | |
| 0008BB | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 100 | LH | $ | $ | |
| 0008BC | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 100 | LH | $ | $ |
| 0009 | Off-Site Emergency Repair Services (Contractor) | LH | ||||
| 0009AA | OPTION Off-Site Emergency Repair Services (Contractor) | 1,800 | LH | $ | $ | |
| 0009AB | OPTION Off-Site Emergency Repair Services (Contractor) | 200 | LH | $ | $ | |
| 0009AC | OPTION Off-Site Emergency Repair Services (Contractor) | 200 | LH | $ | $ | |
| 0009AD | OPTION Off-Site Emergency Repair Services (Contractor) | 100 | LH | $ | $ | |
| 0009AE | OPTION Off-Site Emergency Repair Services (Contractor) | 100 | LH | $ | $ | |
| 0009AF | OPTION Off-Site Emergency Repair Services (Contractor) | 100 | LH | $ | $ | |
| 0009AG | OPTION Off-Site Emergency Repair Services (Contractor) | 100 | LH | $ | $ |
| 0010 | Engineering and Technical Services | LH | ||||
| 0010AA | OPTION Engineering and Technical Services | 500 | LH | $ | $ | |
| 0010AB | OPTION Engineering and Technical Services | 200 | LH | $ | $ | |
| 0010AC | OPTION Engineering and Technical Services | 100 | LH | $ | $ | |
| 0010AD | OPTION Engineering and Technical Services | 50 | LH | $ | $ | |
| 0010AE | OPTION Engineering and Technical Services | 15 | LH | $ | $ | |
| 0010AF | OPTION Engineering and Technical Services | 15 | LH | $ | $ | |
| 0010AG | OPTION Engineering and Technical Services | 15 | LH | $ | $ |
| 0011 | Modifications - Development | LH | ||||
| 0011AA | OPTION Modifications - Development | 250 | LH | $ | $ | |
| 0011AB | OPTION Modifications - Development | 125 | LH | $ | $ | |
| 0011AC | OPTION Modifications - Development | 65 | LH | $ | $ | |
| 0011AD | OPTION Modifications - Development | 35 | LH | $ | $ | |
| 0011AE | OPTION Modifications - Development | 20 | LH | $ | $ | |
| 0011AF | OPTION Modifications - Development | 10 | LH | $ | $ | |
| 0011AG | OPTION Modifications - Development | 10 | LH | $ | $ |
| 0012 | Material and Subcontractor Labor | Cost Re | ||||
| 0012AA | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 1,000,000.00 | $ 1,000,000.00 | |
| 0012AB | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 1,000,000.00 | $ 1,000,000.00 | |
| 0012AC | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 1,000,000.00 | $ 1,000,000.00 | |
| 0012AD | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 1,000,000.00 | $ 1,000,000.00 | |
| 0012AE | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 1,000,000.00 | $ 1,000,000.00 | |
| 0012AF | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 500,000.00 | $ 500,000.00 | |
| 0012AG | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 500,000.00 | $ 500,000.00 | |
| 0012AH | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 500,000.00 | $ 500,000.00 | |
| 0012AJ | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 500,000.00 | $ 500,000.00 | |
| 0012AK | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 300,000.00 | $ 300,000.00 | |
| 0012AL | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 300,000.00 | $ 300,000.00 | |
| 0012AM | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 300,000.00 | $ 300,000.00 | |
| 0012AN | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 300,000.00 | $ 300,000.00 | |
| 0012AP | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 200,000.00 | $ 200,000.00 | |
| 0012AQ | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 200,000.00 | $ 200,000.00 | |
| 0012AR | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 200,000.00 | $ 200,000.00 | |
| 0012AS | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 200,000.00 | $ 200,000.00 | |
| 0012AT | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012AU | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012AV | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012AW | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012AX | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012AY | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012AZ | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012BA | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012BB | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012BC | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012BD | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012BE | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012BF | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012BG | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012BH | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012BJ | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012BK | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012BL | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012BM | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012BN | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012BP | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012BQ | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012BR | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012BS | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012BT | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012BU | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012BV | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012BW | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012BX | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012BY | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012BZ | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012CA | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 50,000.00 | $ 100,000.00 | |
| 0012CB | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012CC | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012CD | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012CE | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012CF | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012CG | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012CH | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012CJ | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012CK | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012CL | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012CM | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012CN | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012CP | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012CQ | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012CR | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012CS | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012CT | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012CU | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012CV | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012CW | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012CX | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012CY | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012CZ | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012DA | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012DB | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012DC | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012DD | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012DE | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012DF | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012DG | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012DH | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012DJ | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012DK | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012DL | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012DM | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 500,000.00 | $ 500,000.00 | |
| 0012DN | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 300,000.00 | $ 300,000.00 | |
| 0012DP | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 300,000.00 | $ 300,000.00 | |
| 0012DQ | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 200,000.00 | $ 200,000.00 | |
| 0012DR | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 200,000.00 | $ 200,000.00 | |
| 0012DS | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012DT | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012DU | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012DV | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012DW | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012DX | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012DY | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012DZ | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012EA | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012EB | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012EC | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012ED | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012EE | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012EF | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012EG | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012EH | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012EJ | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012EK | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012EL | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012EM | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012EN | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012EP | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012EQ | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012ER | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012ES | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012ET | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012EU | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012EV | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012EW | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012EX | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012EY | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012EZ | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012FA | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012FB | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012FC | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012FD | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012FE | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012FG | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012FH | OPTION Material and Subcontractor Labor (Engine Repair) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012FJ | OPTION Material and Subcontractor Labor (PRL) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012FK | OPTION Material and Subcontractor Labor (PRL) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012FL | OPTION Material and Subcontractor Labor (PRL) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012FM | OPTION Material and Subcontractor Labor (PRL) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012FN | OPTION Material and Subcontractor Labor (PRL) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012FP | OPTION Material and Subcontractor Labor (PRL) | 1 | LOT | $ 3,000.00 | $ 3,000.00 | |
| 0012FQ | OPTION Material and Subcontractor Labor (PRL) | 1 | LOT | $ 2,000.00 | $ 2,000.00 | |
| 0012FR | OPTION Material and Subcontractor Labor (Special Rework) | 1 | LOT | $ 500,000.00 | $ 500,000.00 | |
| 0012FS | OPTION Material and Subcontractor Labor (Special Rework) | 1 | LOT | $ 300,000.00 | $ 300,000.00 | |
| 0012FT | OPTION Material and Subcontractor Labor (Special Rework) | 1 | LOT | $ 200,000.00 | $ 200,000.00 | |
| 0012FU | OPTION Material and Subcontractor Labor (Special Rework) | 1 | LOT | $ 200,000.00 | $ 200,000.00 | |
| 0012FV | OPTION Material and Subcontractor Labor (Special Rework) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012FW | OPTION Material and Subcontractor Labor (Special Rework) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012FX | OPTION Material and Subcontractor Labor (Special Rework) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012FY | OPTION Material and Subcontractor Labor (Special Rework) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012FZ | OPTION Material and Subcontractor Labor (Special Rework) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012GA | OPTION Material and Subcontractor Labor (Special Rework) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012GB | OPTION Material and Subcontractor Labor (Special Rework) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012GC | OPTION Material and Subcontractor Labor (Patuxent River) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012GD | OPTION Material and Subcontractor Labor (Patuxent River) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012GE | OPTION Material and Subcontractor Labor (Patuxent River) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012GF | OPTION Material and Subcontractor Labor (Patuxent River) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012GG | OPTION Material and Subcontractor Labor (Patuxent River) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012GH | OPTION Material and Subcontractor Labor (Patuxent River) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012GJ | OPTION Material and Subcontractor Labor (Patuxent River) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012GK | OPTION Material and Subcontractor Labor (Patuxent River) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012GL | OPTION Material and Subcontractor Labor (Patuxent River) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012GM | OPTION Material and Subcontractor Labor (Modification - Development) | 1 | LOT | $ 1,000,000.00 | $ 1,000,000.00 | |
| 0012GN | OPTION Material and Subcontractor Labor (Modification - Development) | 1 | LOT | $ 1,000,000.00 | $ 1,000,000.00 | |
| 0012GP | OPTION Material and Subcontractor Labor (Modification - Development) | 1 | LOT | $ 1,000,000.00 | $ 1,000,000.00 | |
| 0012GQ | OPTION Material and Subcontractor Labor (Modification - Development) | 1 | LOT | $ 1,000,000.00 | $ 1,000,000.00 | |
| 0012GR | OPTION Material and Subcontractor Labor (Modification - Development) | 1 | LOT | $ 1,000,000.00 | $ 1,000,000.00 | |
| 0012GS | OPTION Material and Subcontractor Labor (Modification - Development) | 1 | LOT | $ 500,000.00 | $ 500,000.00 | |
| 0012GT | OPTION Material and Subcontractor Labor (Modification - Development) | 1 | LOT | $ 300,000.00 | $ 300,000.00 | |
| 0012GU | OPTION Material and Subcontractor Labor (Modification - Development) | 1 | LOT | $ 200,000.00 | $ 200,000.00 | |
| 0012GV | OPTION Material and Subcontractor Labor (Modification - Development) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012GW | OPTION Material and Subcontractor Labor (Modification - Development) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012GX | OPTION Material and Subcontractor Labor (Modification - Development) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012GY | OPTION Material and Subcontractor Labor (Modification - Development) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012GZ | OPTION Material and Subcontractor Labor (Modification - Development) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012HA | OPTION Material and Subcontractor Labor (Modification - Development) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012HB | OPTION Material and Subcontractor Labor (Modification - Development) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012HC | OPTION Material and Subcontractor Labor (Modification - Development) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012HD | OPTION Material and Subcontractor Labor (Modification - Production) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012HE | OPTION Material and Subcontractor Labor (Modification - Production) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012HF | OPTION Material and Subcontractor Labor (Modification - Production) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012HG | OPTION Material and Subcontractor Labor (Modification - Production) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012HH | OPTION Material and Subcontractor Labor (Modification - Production) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0012HJ | OPTION Material and Subcontractor Labor (Modification - Production) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012HK | OPTION Material and Subcontractor Labor (Modification - Production) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0012HL | OPTION Material and Subcontractor Labor (Modification - Production) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012HM | OPTION Material and Subcontractor Labor (Modification - Production) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0012HN | OPTION Material and Subcontractor Labor (Modification - Production) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012HP | OPTION Material and Subcontractor Labor (Modification - Production) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0012HQ | OPTION Material and Subcontractor Labor (Modification - Production) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012HR | OPTION Material and Subcontractor Labor (Modification - Production) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0012HS | OPTION Material and Subcontractor Labor (Modification - Production) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012HT | OPTION Material and Subcontractor Labor (Modification - Production) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0012HU | OPTION Material and Subcontractor Labor (Modification - Production) | 1 | LOT | $ 3,000.00 | $ 3,000.00 | |
| 0012HV | OPTION Material and Subcontractor Labor (Modification - Production) | 1 | LOT | $ 3,000.00 | $ 3,000.00 | |
| 0012HW | OPTION Material and Subcontractor Labor (Modification - Production) | 1 | LOT | $ 2,000.00 | $ 2,000.00 | |
| 0012HX | OPTION Material and Subcontractor Labor (Modification - Production) | 1 | LOT | $ 2,000.00 | $ 2,000.00 | |
| 0012HY | OPTION Material and Subcontractor Labor (Modification - Production) | 1 | LOT | $ 1,000.00 | $ 1,000.00 | |
| 0012HZ | OPTION Material and Subcontractor Labor (Modification - Production) | 1 | LOT | $ 1,000.00 | $ 1,000.00 |
| 0013 | Off-Site Emergency Repair Services (Subcontractor) | Cost Re | ||||
| 0013AA | OPTION Off-Site Emergency Repair Services (Subcontractor) | 1 | LOT | $ 8,000.00 | $ 8,000.00 | |
| 0013AB | OPTION Off-Site Emergency Repair Services (Subcontractor) | 1 | LOT | $ 4,000.00 | $ 4,000.00 | |
| 0013AC | OPTION Off-Site Emergency Repair Services (Subcontractor) | 1 | LOT | $ 2,000.00 | $ 2,000.00 | |
| 0013AD | OPTION Off-Site Emergency Repair Services (Subcontractor) | 1 | LOT | $ 2,000.00 | $ 2,000.00 | |
| 0013AE | OPTION Off-Site Emergency Repair Services (Subcontractor) | 1 | LOT | $ 2,000.00 | $ 2,000.00 | |
| 0013AF | OPTION Off-Site Emergency Repair Services (Subcontractor) | 1 | LOT | $ 2,000.00 | $ 2,000.00 | |
| 0013AG | OPTION Off-Site Emergency Repair Services (Subcontractor) | 1 | LOT | $ 1,000.00 | $ 1,000.00 | |
| 0013AH | OPTION Off-Site Emergency Repair Services (Subcontractor) | 1 | LOT | $ 1,000.00 | $ 1,000.00 | |
| 0013AJ | OPTION Off-Site Emergency Repair Services (Subcontractor) | 1 | LOT | $ 1,000.00 | $ 1,000.00 | |
| 0013AK | OPTION Off-Site Emergency Repair Services (Subcontractor) | 1 | LOT | $ 1,000.00 | $ 1,000.00 | |
| 0013AL | OPTION Off-Site Emergency Repair Services (Subcontractor) | 1 | LOT | $ 500.00 | $ 500.00 | |
| 0013AM | OPTION Off-Site Emergency Repair Services (Subcontractor) | 1 | LOT | $ 500.00 | $ 500.00 |
| 0014 | Travel and Per Diem | Cost Re | ||||
| 0014AA | OPTION Travel and Per Diem | 1 | LOT | $ 16,000.00 | $ 16,000.00 | |
| 0014AB | OPTION Travel and Per Diem | 1 | LOT | $ 8,000.00 | $ 8,000.00 | |
| 0014AC | OPTION Travel and Per Diem | 1 | LOT | $ 4,000.00 | $ 4,000.00 | |
| 0014AD | OPTION Travel and Per Diem | 1 | LOT | $ 4,000.00 | $ 4,000.00 | |
| 0014AE | OPTION Travel and Per Diem | 1 | LOT | $ 2,000.00 | $ 2,000.00 | |
| 0014AF | OPTION Travel and Per Diem | 1 | LOT | $ 2,000.00 | $ 2,000.00 | |
| 0014AG | OPTION Travel and Per Diem | 1 | LOT | $ 1,000.00 | $ 1,000.00 | |
| 0014AH | OPTION Travel and Per Diem | 1 | LOT | $ 1,000.00 | $ 1,000.00 |
0015 Technical Data IAW Exhibit A 1 LOT $ NSP $ NSP NSP
0016 Performance Measurement Framework Incentive 1 LOT $ 750,000.00 $ 750,000.00 Cost Re
| 0017 | Modifications - Production | |||||
| 0017AA | OPTION Modifications - Production | 16,000 | LH | $ - 0 | $ - 0 | LH |
| 0017AB | OPTION Modifications - Production | 8,000 | LH | $ - 0 | $ - 0 | |
| 0017AC | OPTION Modifications - Production | 4,000 | LH | $ - 0 | $ - 0 | |
| 0017AD | OPTION Modifications - Production | 2,000 | LH | $ - 0 | $ - 0 | |
| 0017AE | OPTION Modifications - Production | 1,000 | LH | $ - 0 | $ - 0 | |
| 0017AF | OPTION Modifications - Production | 500 | LH | $ - 0 | $ - 0 | |
| 0017AG | OPTION Modifications - Production | 500 | LH | $ - 0 | $ - 0 | |
| 0017AH | OPTION Modifications - Production | 250 | LH | $ - 0 | $ - 0 | |
| 0017AJ | OPTION Modifications - Production | 250 | LH | $ - 0 | $ - 0 |
| 0018 | Weekend/Holiday Flight Operations Per Day | FFP | ||||
| 0018AA | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AB | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AC | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AD | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AE | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AF | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AG | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AH | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AJ | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AK | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AL | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AM | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AN | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AP | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AQ | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AR | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AS | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AT | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AU | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AV | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AW | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AX | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 2 | EA | $ | $ | |
| 0018AY | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018AZ | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018BA | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018BB | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018BC | OPTION Weekend/Holiday Flight Operations - 50 Aircraft | 1 | EA | $ | $ | |
| 0018BD | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018BE | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018BF | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018BG | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018BH | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018BJ | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018BK | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018BL | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018BM | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018BN | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018BP | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018BQ | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018BR | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018BS | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018BT | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018BU | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018BV | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018BW | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018BX | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018BY | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018BZ | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018CA | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018CB | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018CC | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018CD | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018CE | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018CF | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ | |
| 0018CG | OPTION Weekend/Holiday Flight Operations - 93 Aircraft | 1 | EA | $ | $ |
Page &P
Option 1
| SECTION B "SUPPLIES OR SERVICES AND PRICES/COST DRAFT | |||||
| ITEM | SUPPLIES/SERVICES | QTY | UNIT | UNIT PRICE/COST | EXTENDED PRICE/COST |
TH-57 OPTION PERIOD 01
| 0101 | Fixed Maintenance for NAS Whiting Field | FFP | ||||
| 0101AA | OPTION Fixed Maintenance 78 Individual Aircraft Daily | 3 | MO | $ | $ | |
| 0101AB | OPTION Fixed Maintenance 83 Individual Aircraft Daily | 3 | MO | $ | $ | |
| 0101AC | OPTION Fixed Maintenance 88 Individual Aircraft Daily | 3 | MO | $ | $ | |
| 0101AD | OPTION Fixed Maintenance 93 Individual Aircraft Daily | 3 | MO | $ | $ | |
| 0101AE | OPTION Fixed Maintenance 96 Individual Aircraft Daily | 3 | MO | $ | $ |
0102 Satellite Site Support for NAS Patuxent River 3 MO $ $ FFP
| 0103 | Additional Aircraft for One Day | FFP | ||||
| 0103AA | OPTION Aircraft | 1 | EA | $ | $ | |
| 0103AB | OPTION Aircraft | 1 | EA | $ | $ | |
| 0103AC | OPTION Aircraft | 1 | EA | $ | $ |
| 0104 | Scheduled Depot - Aircraft Condition Inspection (ACI) | FFP | ||||
| 0104AA | OPTION Aircraft Condition Inspection | 1 | EA | $ | $ | |
| 0104AB | OPTION Aircraft Condition Inspection | 1 | EA | $ | $ | |
| 0104AC | OPTION Aircraft Condition Inspection | 1 | EA | $ | $ | |
| 0104AD | OPTION Aircraft Condition Inspection | 1 | EA | $ | $ | |
| 0104AE | OPTION Aircraft Condition Inspection | 1 | EA | $ | $ | |
| 0104AF | OPTION Aircraft Condition Inspection | 1 | EA | $ | $ | |
| 0104AG | OPTION Aircraft Condition Inspection | 1 | EA | $ | $ |
| 0105 | Unscheduled Depot | FFP | ||||
| 0105AA | OPTION Engine Overhaul due to Metal Contamination | 1 | EA | $ | $ | |
| 0105AB | OPTION Engine Overhaul due to Metal Contamination | 1 | EA | $ | $ | |
| 0105AC | OPTION Engine Overhaul due to Metal Contamination | 1 | EA | $ | $ | |
| 0105AD | OPTION Replace Cabin Roof | 1 | EA | $ | $ | |
| 0105AE | OPTION Replace Cabin Roof | 1 | EA | $ | $ | |
| 0105AF | OPTION Replace Forward Lower Shell | 1 | EA | $ | $ | |
| 0105AG | OPTION Replace Forward Lower Shell | 1 | EA | $ | $ | |
| 0105AH | OPTION Replace Aft Lower Shell | 1 | EA | $ | $ | |
| 0105AJ | OPTION Replace Aft Lower Shell | 1 | EA | $ | $ | |
| 0105AK | OPTION Replace Cabin Roof and Forward Lower Shell | 1 | EA | $ | $ | |
| 0105AL | OPTION Replace Cabin Roof and Forward Lower Shell | 1 | EA | $ | $ | |
| 0105AM | OPTION Replace Cabin Roof and Aft Lower Shell | 1 | EA | $ | $ | |
| 0105AN | OPTION Replace Cabin Roof and Aft Lower Shell | 1 | EA | $ | $ | |
| 0105AP | OPTION Replace Forward and Aft Lower Shell | 1 | EA | $ | $ | |
| 0105AQ | OPTION Replace Forward and Aft Lower Shell | 1 | EA | $ | $ | |
| 0105AR | OPTION Replace Cabin Roof and Forward and Aft Lower Shell | 1 | EA | $ | $ | |
| 0105AS | OPTION Replace Cabin Roof and Forward and Aft Lower Shell | 1 | EA | $ | $ | |
| 0105AT | OPTION Replace Cabin Roof in conjunction with ACI | 1 | EA | $ | $ | |
| 0105AU | OPTION Replace Cabin Roof in conjunction with ACI | 1 | EA | $ | $ | |
| 0105AV | OPTION Replace Cabin Roof in conjunction with ACI | 1 | EA | $ | $ | |
| 0105AW | OPTION Replace Forward Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0105AX | OPTION Replace Forward Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0105AY | OPTION Replace Forward Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0105AZ | OPTION Replace Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0105BA | OPTION Replace Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0105BB | OPTION Replace Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0105BC | OPTION Replace Cabin Roof and Forward Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0105BD | OPTION Replace Cabin Roof and Forward Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0105BE | OPTION Replace Cabin Roof and Forward Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0105BF | OPTION Replace Cabin Roof and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0105BG | OPTION Replace Cabin Roof and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0105BH | OPTION Replace Cabin Roof and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0105BJ | OPTION Replace Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0105BK | OPTION Replace Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0105BL | OPTION Replace Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0105BM | OPTION Replace Cabin Roof and Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0105BN | OPTION Replace Cabin Roof and Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ | |
| 0105BP | OPTION Replace Cabin Roof and Forward and Aft Lower Shell in conjunction with ACI | 1 | EA | $ | $ |
| 0106 | Flight Hour Generated Maintenance | FFP | ||||
| 0106AA | OPTION Flight Hour Generated Maintenance | 16,000 | FH | $ | $ | |
| 0106AB | OPTION Flight Hour Generated Maintenance | 4,000 | FH | $ | $ | |
| 0106AC | OPTION Flight Hour Generated Maintenance | 2,000 | FH | $ | $ | |
| 0106AD | OPTION Flight Hour Generated Maintenance | 2,000 | FH | $ | $ | |
| 0106AE | OPTION Flight Hour Generated Maintenance | 1,000 | FH | $ | $ | |
| 0106AF | OPTION Flight Hour Generated Maintenance | 1,000 | FH | $ | $ | |
| 0106AG | OPTION Flight Hour Generated Maintenance | 500 | FH | $ | $ | |
| 0106AH | OPTION Flight Hour Generated Maintenance | 500 | FH | $ | $ |
| 0107 | On-Site Conditional Maintenance | LH | ||||
| 0107AA | OPTION Airframe On-Site Conditional Maintenance | 1,200 | LH | $ | $ | |
| 0107AB | OPTION Airframe On-Site Conditional Maintenance | 400 | LH | $ | $ | |
| 0107AC | OPTION Airframe On-Site Conditional Maintenance | 200 | LH | $ | $ | |
| 0107AD | OPTION Airframe On-Site Conditional Maintenance | 100 | LH | $ | $ | |
| 0107AE | OPTION Airframe On-Site Conditional Maintenance | 100 | LH | $ | $ | |
| 0107AF | OPTION Engines On-Site Conditional Maintenance | 800 | LH | $ | $ | |
| 0107AG | OPTION Engines On-Site Conditional Maintenance | 400 | LH | $ | $ | |
| 0107AH | OPTION Engines On-Site Conditional Maintenance | 200 | LH | $ | $ | |
| 0107AJ | OPTION Engines On-Site Conditional Maintenance | 100 | LH | $ | $ | |
| 0107AK | OPTION Engines On-Site Conditional Maintenance | 100 | LH | $ | $ |
| 0108 | Depot Conditional Maintenance | LH | ||||
| 0108AA | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 4,000 | LH | $ | $ | |
| 0108AB | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 4,000 | LH | $ | $ | |
| 0108AC | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 2,000 | LH | $ | $ | |
| 0108AD | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 2,000 | LH | $ | $ | |
| 0108AE | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 1,000 | LH | $ | $ | |
| 0108AF | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 1,000 | LH | $ | $ | |
| 0108AG | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 500 | LH | $ | $ | |
| 0108AH | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 500 | LH | $ | $ | |
| 0108AJ | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 250 | LH | $ | $ | |
| 0108AK | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 250 | LH | $ | $ | |
| 0108AL | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 100 | LH | $ | $ | |
| 0108AM | OPTION Airframe Depot Conditional Maintenance (Airframe Repair) | 100 | LH | $ | $ | |
| 0108AN | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 500 | LH | $ | $ | |
| 0108AP | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 500 | LH | $ | $ | |
| 0108AQ | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 500 | LH | $ | $ | |
| 0108AR | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 500 | LH | $ | $ | |
| 0108AS | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 500 | LH | $ | $ | |
| 0108AT | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 250 | LH | $ | $ | |
| 0108AU | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 250 | LH | $ | $ | |
| 0108AV | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 250 | LH | $ | $ | |
| 0108AW | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 250 | LH | $ | $ | |
| 0108AX | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 250 | LH | $ | $ | |
| 0108AY | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 100 | LH | $ | $ | |
| 0108AZ | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 100 | LH | $ | $ | |
| 0108BA | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 100 | LH | $ | $ | |
| 0108BB | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 100 | LH | $ | $ | |
| 0108BC | OPTION Engines Depot Conditional Maintenance (Engine Repair) | 100 | LH | $ | $ |
| 0109 | Off-Site Emergency Repair Services (Contractor) | LH | ||||
| 0109AA | OPTION Off-Site Emergency Repair Services (Contractor) | 1,800 | LH | $ | $ | |
| 0109AB | OPTION Off-Site Emergency Repair Services (Contractor) | 200 | LH | $ | $ | |
| 0109AC | OPTION Off-Site Emergency Repair Services (Contractor) | 200 | LH | $ | $ | |
| 0109AD | OPTION Off-Site Emergency Repair Services (Contractor) | 100 | LH | $ | $ | |
| 0109AE | OPTION Off-Site Emergency Repair Services (Contractor) | 100 | LH | $ | $ | |
| 0109AF | OPTION Off-Site Emergency Repair Services (Contractor) | 100 | LH | $ | $ | |
| 0109AG | OPTION Off-Site Emergency Repair Services (Contractor) | 100 | LH | $ | $ |
| 0110 | Engineering and Technical Services | LH | ||||
| 0110AA | OPTION Engineering and Technical Services | 500 | LH | $ | $ | |
| 0110AB | OPTION Engineering and Technical Services | 200 | LH | $ | $ | |
| 0110AC | OPTION Engineering and Technical Services | 100 | LH | $ | $ | |
| 0110AD | OPTION Engineering and Technical Services | 50 | LH | $ | $ | |
| 0110AE | OPTION Engineering and Technical Services | 15 | LH | $ | $ | |
| 0110AF | OPTION Engineering and Technical Services | 15 | LH | $ | $ | |
| 0110AG | OPTION Engineering and Technical Services | 15 | LH | $ | $ |
| 0111 | Modifications - Development | LH | ||||
| 0111AA | OPTION Modifications - Development | 250 | LH | $ | $ | |
| 0111AB | OPTION Modifications - Development | 125 | LH | $ | $ | |
| 0111AC | OPTION Modifications - Development | 65 | LH | $ | $ | |
| 0111AD | OPTION Modifications - Development | 35 | LH | $ | $ | |
| 0111AE | OPTION Modifications - Development | 20 | LH | $ | $ | |
| 0111AF | OPTION Modifications - Development | 10 | LH | $ | $ | |
| 0111AG | OPTION Modifications - Development | 10 | LH | $ | $ |
| 0112 | Material and Subcontractor Labor | Cost Re | ||||
| 0112AA | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 1,000,000.00 | $ 1,000,000.00 | |
| 0112AB | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 1,000,000.00 | $ 1,000,000.00 | |
| 0112AC | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 1,000,000.00 | $ 1,000,000.00 | |
| 0112AD | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 1,000,000.00 | $ 1,000,000.00 | |
| 0112AE | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 1,000,000.00 | $ 1,000,000.00 | |
| 0112AF | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 500,000.00 | $ 500,000.00 | |
| 0112AG | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 500,000.00 | $ 500,000.00 | |
| 0112AH | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 500,000.00 | $ 500,000.00 | |
| 0112AJ | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 500,000.00 | $ 500,000.00 | |
| 0112AK | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 300,000.00 | $ 300,000.00 | |
| 0112AL | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 300,000.00 | $ 300,000.00 | |
| 0112AM | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 300,000.00 | $ 300,000.00 | |
| 0112AN | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 300,000.00 | $ 300,000.00 | |
| 0112AP | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 200,000.00 | $ 200,000.00 | |
| 0112AQ | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 200,000.00 | $ 200,000.00 | |
| 0112AR | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 200,000.00 | $ 200,000.00 | |
| 0112AS | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 200,000.00 | $ 200,000.00 | |
| 0112AT | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0112AU | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0112AV | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0112AW | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0112AX | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0112AY | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0112AZ | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0112BA | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0112BB | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0112BC | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0112BD | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0112BE | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0112BF | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0112BG | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0112BH | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0112BJ | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0112BK | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0112BL | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0112BM | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0112BN | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0112BP | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0112BQ | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0112BR | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0112BS | OPTION Material and Subcontractor Labor (Flight Operations) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0112BT | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0112BU | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0112BV | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0112BW | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0112BX | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0112BY | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0112BZ | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 100,000.00 | $ 100,000.00 | |
| 0112CA | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 50,000.00 | $ 100,000.00 | |
| 0112CB | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0112CC | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0112CD | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0112CE | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0112CF | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0112CG | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 50,000.00 | $ 50,000.00 | |
| 0112CH | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0112CJ | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0112CK | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0112CL | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0112CM | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0112CN | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0112CP | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 30,000.00 | $ 30,000.00 | |
| 0112CQ | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0112CR | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0112CS | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0112CT | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0112CU | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0112CV | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0112CW | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 20,000.00 | $ 20,000.00 | |
| 0112CX | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0112CY | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0112CZ | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0112DA | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0112DB | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0112DC | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0112DD | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 10,000.00 | $ 10,000.00 | |
| 0112DE | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0112DF | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0112DG | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0112DH | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0112DJ | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0112DK | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0112DL | OPTION Material and Subcontractor Labor (ACI) | 1 | LOT | $ 5,000.00 | $ 5,000.00 | |
| 0112DM | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 500,000.00 | $ 500,000.00 | |
| 0112DN | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 300,000.00 | $ 300,000.00 | |
| 0112DP | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 300,000.00 | $ 300,000.00 | |
| 0112DQ | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 200,000.00 | $ 200,000.00 | |
| 0112DR | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 200,000.00 | $ 200,000.00 | |
| 0112DS | OPTION Material and Subcontractor Labor (ISR) | 1 | LOT | $ 100,000.00 | $ 100,000.00 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .