Amendment_0001_Murphy_Mechanical-Revised_SOW_7-18-17.pdf

PDF 3 MB Posted

Attached to
Building Operations and Maintenance Services at the Frederick C. Murphy Federal Records Center
Solicitation number
Murphy_Mechanical_2017
Issued by

About this file

Amendment 0001 Revised SOW-PDF Version

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposal (RFP) for

Building Operations and Maintenance Services at the Frederick C. Murphy Federal Records Center (MA0136ZZ), 380 Trapelo Road, Waltham, Massachusetts 02452

PERIOD OF PERFORMANCE: 11/01/2017 – 10/31/2022

SOLICITATION ISSUE DATE: June 26, 2017(Amended 7/18/2017)

SITE VISIT DATE: July 6, 2017

10:00 AM EST

QUESTIONS RECEIPT DATE and TIME: July 13, 2017 Not later than 2:00 PM EST david.mark@gsa.gov

OFFER RECEIPT DATE and TIME: July 31, 2017 Not later than 2:00 PM EST

General Services Administration 10 Causeway Street, Room 1100 Boston, MA 02222 Attention: David Mark

GSA, Region 1, Public Buildings Service is following the procedures set forth in Federal Acquisition Regulation (FAR) 13.5 in soliciting and awarding this Contract.

mailto:david.mark@gsa.gov https://acquisition.gov/far/current/html/Subpart%208_4.html#wp1091211

TABLE OF CONTENTS

(Sections A through M)

SOLICITATION/CONTRACT FORM

A.1. STANDARD FORMS

B. SERVICES, ORDERING AND PRICES

B.1. DESCRIPTION OF SERVICES

C. DESCRIPTION/SPECIFICATION/STATEMENT OF WORK

INTRODUCTION

C.1. SCOPE OF WORK

C.1.1 GENERAL

C.1.2 THE CONTRACTOR SHALL:

C.1.3 EXCLUDED FROM THIS SCOPE ARE:

C.2. DEFINITIONS

C.2.1 ACCEPTANCE

C.2.2 ACTS OF GOD

C.2.3 ADDITIONAL SERVICES

C.2.4 ADVANCED METERS

C.2.5 ADVANCED METERING SYSTEMS

C.2.6 APPROVAL

C.2.7 ARCHITECTURAL AND STRUCTURAL

C.2.8 BASIC SERVICES

C.2.9 BUILDING AUTOMATION SYSTEM (BAS)

C.2.10 BUILDINGLINK

C.2.11 BUILDING OPERATING PLAN

C.2.12 COMMISSIONING

C.2.13 ONGOING COMMISSIONING

C.2.14 COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEM (CMMS)

C.2.15 CONSUMABLE PARTS

C.2.16 CONTRACTING OFFICER (CO)

C.2.17 CONTRACTING OFFICER'S REPRESENTATIVE (COR) OR DESIGNEE

C.2.18 CONTRACTOR

C.2.19 CONTRACTOR’S OTHER THAN NORMAL WORKING/DUTY HOURS

C.2.20 CONTROLS AND CONTROL SYSTEM

C.2.21 DEFECTIVE SERVICE

C.2.22 EMERGENCY

C.2.23 EMERGENCY CALLBACK

C.2.24 ENVIRONMENTALLY SUSTAINABLE

C.2.25 EXISTING DEFICIENCY LIST REPORT

C.2.26 EXTERIOR

C.2.27 FEDERAL HOLIDAYS

C.2.28 FEDERAL EXECUTIVE HOLIDAYS, UNANTICIPATED

C.2.29 FIRE PROTECTION AND LIFE SAFETY SYSTEMS

C.2.30 GUIDING PRINCIPLES FOR SUSTAINABLE EXISTING BUILDINGS

C.2.31 GSA GREEN PURCHASING PROGRAM (GPP)

C.2.32 INDEFINITE QUANTITY

C.2.33 MAINTENANCE REPAIR

C.2.34 MISCELLANEOUS WORK

C.2.35 MODIFICATION OF CONTRACT

C.2.36 NEGLIGENCE

C.2.37 NON-REIMBURSABLE REPAIR

C.2.38 NORMAL WORKING HOURS

C.2.39 OCCUPANT EMERGENCY PLAN (OEP)

C.2.40 OPEN SYSTEMS

C.2.41 OPERATIONS

C.2.42 PERFORMANCE BASED SERVICE CONTRACTING

C.2.43 PERFORMANCE WORK STATEMENT (PWS)

C.2.44 PREDICTIVE MAINTENANCE

C.2.45 PREVENTIVE MAINTENANCE (SCHEDULED AND UNSCHEDULED)

C.2.46 PRODUCT PREFERENCE

C.2.47 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

C.2.48 QUALITY CONTROL PLAN

C.2.49 REPAIR

C.2.50 REIMBURSABLE REPAIR

C.2.51 SEQUENCE OF OPERATIONS

C.2.52 SERVICE REQUEST

C.2.53 STANDARD SERVICES

C.2.54 STEWARDSHIP

C.2.55 SUPERVISOR, ON-SITE

C.2.56 TOUR

C.2.57 VERTICAL TRANSPORTATION SYSTEMS

C.2.58 WATCH

C.3. REFERENCES

C.4. EXISTING DEFICIENCY INSPECTION/INITIAL DEFICIENCY LIST

C.4.1 INITIAL INSPECTION

C.4.2 INITIAL DEFICIENCY LIST

C.5. STARTUP PHASE/TRANSITION PHASE

C.5.2 START UP PHASE SCHEDULE

C.5.3 ADJUSTMENTS AND CORRECTIONS

C.6. PHASE-OUT TRANSITION PERIOD

C.7. DEFICIENCY LIST COMPLETION AND WITHHOLDING OF FINAL PAYMENT

C.8. GENERAL AND ADMINISTRATIVE REQUIREMENTS

C.8.1 MINIMUM STAFFING AND ABILITY TO CONTACT AND COMMUNICATE WITH THE CO OR

DESIGNEE

C.8.2 COMMUNICATION EQUIPMENT

C.8.3 ONSITE RECORDS

C.8.4 SERVICE REQUEST AND ADMINISTRATIVE SUPPORT

C.8.5 USE OF CMMS

C.8.6 QUALITY CONTROL PROGRAM

C.8.7 GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PROGRAM

C.9. BUILDING OPERATING PLAN

C.9.1 BUILDING OPERATING PLAN

C.9.2 COMPONENTS OF THE BUILDING OPERATING PLAN (BOP)

C.10. EQUIPMENT INVENTORY

C.11. MONTHLY PROGRESS REPORTS

C.12. PERFORMANCE REVIEW MEETINGS

C.13. EQUIPMENT CONDITION ASSESSMENT

C.14. OCCUPANT FEEDBACK PROGRAM

C.15. REFERENCE LIBRARY

C.16. REVIEW OF DESIGN DOCUMENTS

C.17. BUILDING MANAGEMENT SUPPORT SERVICES (MISCELLANEOUS AND UTILITY

ESCORT HOURS)

C.18. INSPECTION ASSISTANCE FOR SPACE BUILD OUTS

C.19. EMERGENCY SHUTDOWN INSTRUCTIONS AND TOUR CHECKLISTS

C.20. LABELING OF ELECTRICAL CIRCUITS

C.21. OPERATIONAL REQUIREMENTS

C.21.1 GENERAL

C.21.2 EXTENDED OPERATING HOURS

C.21.3 CONTINUITY OF OPERATIONS (COOP)

C.21.4 EMERGENCY OPERATIONS PLAN

C.21.5 TENANT ENVIRONMENT

C.21.6 ENERGY AND WATER EFFICIENCY

C.22. SYSTEM PERFORMANCE STANDARDS OR PROCEDURES

C.23. SERVICE REQUESTS

C.23.1 GENERAL

C.23.2 MINOR ALTERATIONS

C.23.3 EMERGENCY SERVICE REQUEST

C.23.4 EMERGENCY CALL BACK (AFTER HOURS)

C.23.5 URGENT SERVICE REQUEST RESPONSE

C.23.6 ROUTINE SERVICE REQUEST RESPONSE

C.24. TOURS

C.24.1 GENERAL

C.24.2 OPERATING LOGS AND TOUR CHECK SHEETS

C.24.3 TOUR FREQUENCIES

C.24.4 CONDENSATE DRIP PANS

C.24.5 MONITORING OF CENTRAL PLANT EQUIPMENT

C.25. DEMAND RESPONSE PROGRAMS

C.26. CURTAILMENT PROGRAM

C.27. BAS ALARM RESPONSE

C.28 ADVANCED METERING PROGRAM

C.28.1 VERIFICATION AND CALIBRATION

C.29. PROTECTION AND DAMAGE

C.30. NEGLIGENCE

C.31. KEY CONTROL

C.32. DISRUPTIVE OR HAZARDOUS TOOLS

C.33. SCHEDULED DISRUPTION TO UTILITIES, LIGHTING, FIRE PROTECTION & LIFE

SAFETY SYSTEMS, OR SPACE CONDITIONING

C.34. PLUMBING AND RESTROOMS

C.35. MAINTENANCE PROGRAM

C.35.1 GENERAL

C.35.2 MAINTENANCE STANDARD

C.35.3 APPLICATION OF DIAGNOSTIC SOFTWARE

C.35.4 BAS CONTROL SYSTEMS

C.35.5 SMART BUILDING TECHNOLOGY

C.35.6 ONGOING COMMISSIONING /RE-TUNING

C.36. WATER TREATMENT

C.36.1 GENERAL

C.36.2 TOLERANCES

C.36.3 INITIAL REPORT AND DEVELOPMENT OF PROGRAM

C.36.4 COOLING TOWER WATER MANAGEMENT PLAN

C.36.5 CORROSION MONITORING

C.36.6 MONTHLY TESTING

C.37. OIL ANALYSIS AND OIL CHANGES

C.37.1 PERIODIC OIL ANALYSIS

C.37.2 OIL AND REFRIGERANT ADDITIVES

C.38. LAMPS AND BALLASTS

C.39. ARCHITECTURAL AND STRUCTURAL SYSTEMS MAINTENANCE

C.39.1 GENERAL

C.39.2 MAINTENANCE AND REPAIR

C.39.3 REPAIR AND REPLACEMENT WORK

C.39.4 PAINTING

C. 39.5 INTERIOR SIGNAGE AND DIRECTORIES

C. 39.6 FINISHES MAINTENANCE

C. 39.7 HISTORIC BUILDING PRESERVATION

C.39.8 VERTICAL TRANSPORTATION AND ASSOCIATED EQUIPMENT

C.39.9 FLAG PROCEDURES

C. 40. REPAIRS

C.40.1 GENERAL

C.40.2 NON-REIMBURSABLE REPAIRS

C.40.3 REIMBURSABLE REPAIRS

C.40.4 MISCELLANEOUS WORK

C.40.5 REPAIR SHARED LIABILITY EXAMPLE:

C.40.6 APPROVAL OF WORK

C.40.7 INVOICING

C.40.8 ORDERING REPAIRS FROM OUTSIDE SOURCE

C.40.9 FORCE MAJEURE (UNCONTROLLABLE EVENTS)

C. 40.10 WARRANTIES

C.40.11 QUALITY OF MATERIALS AND REPLACEMENT PARTS

C. 41. SAFETY AND ENVIRONMENTAL MANAGEMENT

C. 41.1 GENERAL

C. 41.2 SCHEDULING AND RECORDKEEPING

C. 41.3 REFRIGERANTS

C.41.4 LOCAL AIR QUALITY MANAGEMENT OPERATING PERMITS

C.41.5 FUEL STORAGE TANKS

C.41.6 SOLID WASTE AUDIT

C.41.7 POLYCHLORINATED BIPHENYL (PCB) CONTROL

C.41.8 FACILITY HAZARDS

C. 41.9 WORKPLACE SAFETY

C.41.10 ELECTRICAL SAFETY

C.41.11 FALL PROTECTION

C.41.12 POWERED PLATFORMS

C.41.13 LOCKOUT/TAGOUT

C.41.14 CONFINED SPACES

C.41.15 ASBESTOS MANAGEMENT

C.41.16 HAZARDOUS MATERIALS

C. 41.17 BOILER/PRESSURE VESSEL OPERATION AND INSPECTION STANDARDS

C.41.18 LABELING AND SIGNAGE

C.41.19 ROOF ANCHORAGE POINTS

C.42. FIRE PROTECTION AND LIFE SAFETY EQUIPMENT AND SYSTEMS

C.42.1 GENERAL

C.42.2 FIRE ALARM SYSTEM SERVICES

C.42.3 WATER-BASED FIRE SUPPRESSION SYSTEMS

C.42.4 FIRE-RATED DOOR ASSEMBLIES

C.42.5 FIRE DAMPER AND COMBINATION FIRE/SMOKE DAMPERS

C.42.6 SMOKE DOORS ASSEMBLIES

C.42.7 SMOKE DAMPERS

C.42.8 PORTABLE FIRE EXTINGUISHERS

C.42.9 NON-WATER-BASED FIRE EXTINGUISHING SYSTEMS

C.42.10 SMOKE CONTROL SYSTEMS

C.42.11 EMERGENCY AND STANDBY POWER SYSTEMS

C.42.12 EMERGENCY LIGHTING SYSTEMS AND EXIT SIGNAGE

C.43 MAINTENANCE AND REPAIR OF VERTICAL TRANSPORTATION SYSTEMS

C.44 OPERATIONS AND MAINTENANCE OF SOLAR ROOF

C.45 SUBMITTALS CHART (CONTRACTOR DELIVERABLES)

C.46 FEDERAL REQUIREMENTS

C.47 SNOW AND ICE REMOVAL………………………………………………………………83

C.48 GROUNDS MAINTENANCE………………………………………………………………84

D. PACKAGING & MARKING

E. INSPECTION & ACCEPTANCE

F. DELIVERIES OR PERFORMANCE

G. CONTRACT ADMINISTRATION DATA

H. SPECIAL CONTRACT REQUIREMENTS

H.1. SECURITY

H.1.1 SECURITY REQUIREMENTS AND PERSONAL IDENTITY VERIFICATION PROCEDURES

(NON-CLASSIFIED CONTRACT)

FAR 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (SEPT

2007)

H.1.2. GSAR 552.237-71 QUALIFICATIONS OF EMPLOYEES (MAY 1989)

H.1.3. SUITABILITY DETERMINATIONS

H.1.4. COMPLIANCE WITH SECURITY REQUIREMENTS

H.2. IDENTIFICATION CREDENTIAL

H.3. ESCORT REQUIREMENTS

H.4. STANDARDS OF CONDUCT

H.5. REMOVAL FROM CONTRACT WORK

H.6. SENSITIVE BUT UNCLASSIFIED (SBU) BUILDING INFORMATION

H.7. RECORDING PRESENCE

H.8. GOVERNMENT FORMS

H.9. OTHER CONTRACTORS

H.10. ORDINANCES, TAXES, PERMITS, AND LICENSES

H.11. DISCREPANCY IN THE SPECIFICATIONS

H. 12. AFFIRMATIVE PROCUREMENT PROGRAM (APP)

H.12.1 STANDARDS

H.12.2 REPORTING

H.12.3 RECYCLE CONTENT CERTIFICATION

H.13. ASBESTOS AWARENESS TRAINING

H.14. UNIFORMS

H.15. PERSONNEL QUALIFICATIONS

H.15.1 PERSONNEL TRAINING

H.15.2 QUALIFICATIONS OF PROJECT MANAGER AND ONSITE SUPERVISORY PERSONNEL109

H.15.3 QUALIFICATIONS OF TECHNICIANS

H.15.4 SUBMISSION OF RESUMES FOR NEW EMPLOYEES

H.15.5 STATE LICENSING

H.15.6 COMPLIANCE WITH FEDERAL, STATE, AND LOCAL CODES

H.16. GOVERNMENT-FURNISHED MATERIALS

H.16.1 REQUIREMENTS FOR NETWORK CONNECTION

H.17. CONTRACTOR-FURNISHED MATERIALS

H.18. ADDITIONAL SERVICES INDEFINITE QUANTITY PROVISIONS

H.18.1 GENERAL

H.18.2 PRICE PROPOSAL FOR ADDITIONAL SERVICES WORK

H.18.3 PRICING

H.18.4 PARTS AND MATERIALS

H.18.5. LABOR

H.18.6 SUBCONTRACTS

H.18.7 COST DOCUMENTATION

H.18.8 COMPETITIVE BIDS

H.18.9 METHOD OF ORDERING AND INVOICING

H.19. AWARD FEE

H.20. STRIKE CONTINGENCY PLAN (SCP)

H.21. OCCUPANCY EMERGENCY PLAN (OEP)

H.22. CONTRACTOR PANDEMIC PLAN

I. CONTRACT CLAUSES

52.212-4 CONTRACT TERMS AND CONDITIONS-COMMERCIAL ITEMS (Jan 2017)

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS-COMMERCIAL ITEMS (Jan 2017) 52.223-1 BIO-BASED PRODUCT CERTIFICATION (May 2012)

52.223-2 AFFIRMATIVE PROCUREMENT OF BIO-BASED PRODUCTS UNDER SERVICE

AND CONSTRUCTION CONTRACTS (Sept 2013) 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (Jan 1997) 52.223-4 Recovered Material Certification (May 2008) 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (May 2011) 52.223-7 NOTICE OF RADIOACTIVE MATERIALS (Jan 1997)

52.223-10 WASTE REDUCTION PROGRAM

52.223-19 COMPLIANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS (May 2011)

J. ATTACHMENTS (DOCUMENTS, EXHIBITS AND OTHERS)

EXHIBIT 1 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

EXHIBIT 2 GREEN PURCHASING REPORT

EXHIBIT 3 SUMMARY OF ENVIRONMENTALLY PREFERABLE PRODUCT

ATTRIBUTES157

EXHIBIT 4 BUILDING INFORMATION SHEET

EXHIBIT 5 MONTHLY REPORT TEMPLATE

EXHIBIT 6 BUILDING OPERATING PLAN TEMPLATE

EXHIBIT 7 WATER TREATMENT

EXHIBIT 8 ENERGY & WATER OPERATIONAL PERFORMANCE TARGETS

EXHIBIT 9 ENERGY & WATER EFFICIENCY USE PLAN

EXHIBIT 10 ENERGY AND WATER EFFICIENCY MONTHLY REPORT

EXHIBIT 11 ANNUAL ENERGY & WATER EFFICIENCY REPORT

EXHIBIT 12 QUALIFICATIONS OF ELECTRICAL TESTING TECHNICIANS (ETT)

EXHIBIT 13 MISCELLANEOUS BEST PRACTICES

EXHIBIT 14 INVENTORY/CMMS

EXHIBIT 15 PREVENTIVE MAINTENANCE SCHEDULE

EXHIBIT 16 SOLID WASTE AND RECYCLING REPORT

EXHIBIT 17 UNIT PRICE AGREEMENT

K. REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF

BIDDERS/OFFERORS

L. INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS/OFFERORS

M. EVALUATION FACTORS FOR AWARD

SOLICITATION/CONTRACT FORM

A.1. STANDARD FORMS

B. SERVICES, ORDERING AND PRICES

B.1. DESCRIPTION OF SERVICES

RECURRING SERVICES

ITEM

NO.

SCHEDULE OF

SUPPLIES/SERVICES QTY UNIT

UNIT PRICE TOTAL AMOUNT

Base Option 1 Option 2 Option 3 Option 4 Base

11/1/17 - 10/31/18

Option 1 11/1/18 - 10/31/19

Option 2 11/1/19 - 10/31/20

Option 3 11/1/20 - 10/31/21

Option 4 11/1/21 - 10/31/22

0001 Mechanical Maintenance & Repair 12 MO $ $ $ $ $ $ $ $ $ $

Fire Protection & Life Safety Equipment & Systems Maintenance

12 MO $ $ $ $ $ $ $ $ $ $

0003 Solar Roof Maintenance & Repair 12 HR $ $ $ $ $ $ $ $ $ $

0012 Snow Services 7* MO $ $ $ $ $ $ $ $ $ $

0013 Grounds Maintenance 6 MO $ $ $ $ $ $ $ $ $ $

*Base Years is only 6 months for CLIN 0012/Option years are 7 months.

ADDITIONAL SERVICES

SCHEDULE OF

SUPPLIES/SERVICES

BID

QTY UNIT

UNIT PRICE TOTAL AMOUNT

Base Option 1 Option 2 Option 3 Option 4 Base

11/1/17 - 10/31/18

Option 1 11/1/18 - 10/31/19

Option 2 11/1/19 - 10/31/20

Option 3 11/1/20 - 10/31/21

Option 4 11/1/21 - 10/31/22

Operations & Maintenance (Additional Services)

20 HR $ $ $ $ $ $ $ $ $ $

Operations & Maintenance (Emergency Callback / Overtime)

20 HR $ $ $ $ $ $ $ $ $ $

Reimbursable Repairs over $750.00 (Normal Working Hours)

25 HR $ $ $ $ $ $ $ $ $ $

Reimbursable Repairs over $750.00 (After Normal Working Hours)

25 HR $ $ $ $ $ $ $ $ $ $

ADDITIONAL SERVICES ADMIN FEES

Percentage markup applies to all materials, equipment, and approved subcontractor costs under Additional Service, Emergency Callback / OT and Reimbursable Repair requests.

SCHEDULE OF

SUPPLIES / SERVICES BID QTY

UNIT PRICE TOTAL AMOUNT

Base Burden

Option

Burden

Option

Burden

Option

Burden

Option

Burden

Base 11/1/17 - 10/31/18

Option 1 11/1/18 - 10/31/19

Option 2 11/1/19 - 10/31/20

Option 3 11/1/20 - 10/31/21

Option 4 11/1/21 - 10/31/22

Administrative Fee (Repairs $0 – $4,999.99)

$2,500.00 % % % % % $ $ $ $ $

Administrative Fee (Repairs $5,000.00 – $25,000.00)

$20,000.00 % % % % % $ $ $ $ $

Administrative Fee (Repairs Over $25,000.00)

$50,000 % % % % % $ $ $ $ $

UNIT PRICE AGREEMENT

The following estimates assume that the Contractor will perform the work during normal hours.

SCHEDULE OF

SUPPLIES /

SERVICES

TOTAL

BARE COST

UNIT PRICE TOTAL AMOUNT

Base Diff.

Opt. 1 Diff.

Opt. 2 Diff.

Opt. 3 Diff.

Opt. 4 Diff.

Base 11/1/17 - 10/31/18

Option 1 11/1/18 - 10/31/19

Option 2 11/1/19 - 10/31/20

Option 3 11/1/20 - 10/31/21

Option 4 11/1/21 - 10/31/22

0011 Unit Price Agreement (UPA) Differential $108,900.00 % % % % % $ $ $ $ $

NO. RECURRING ALTERATIONS (YEARLY)

TOTAL BARE COST

BID

QTY UNIT Unit

Price Bare Cost

1A Furnish materials and paint new or previously painted vertical surfaces, plaster and drywall with Eggshell paint (color to be selected by GSA). 12,000 SF $0.42 $5,040.00

1B Furnish and install duplex outlet in a new or existing GWB partition, wire to adjacent outlet Max Run 25 LF. 12,000 SF $0.33 $3,960.00

2 Extra for home run above a new or existing suspended ceiling, to include circuit breaker, EMT and support for a complete installation. 30 Outlets $134.00 $4,020.00

3 Provide labor and materials to demo existing carpet tiles from floor area. 2,000 Linear Feet $5.50 $11,000.00

4 Provide labor and materials to install Government furnished carpet tiles. 2,000 Square Yards $3.50 $7,000.00

5 Provide labor and materials to demo existing VCT from floor area. 1,000 Square Yards $44.00 $44,000.00

6 Provide labor and materials to install Government furnished VCT. 1,000 Square Yards $8.50 $8,500.00

7 Remove existing sprinkler plate, head and pipe drop. Install new elbows and relocate existing sprinkler to include valving off branch and plugging out fire alarm system. 500 Square Yards $39.00 $19,500.00

8 Furnish materials and paint new or previously painted vertical surfaces, plaster and drywall with Eggshell paint (color to be selected by GSA). 20 Sprinklers $294.00 $5,880.00

$108,900.00

C. DESCRIPTION/SPECIFICATION/STATEMENT OF WORK

INTRODUCTION

This is a Performance-based Service Contract and the success of the Contract depends on the satisfaction of the requirements, but also the satisfaction of our shared customer. Rather than a mere list of activities, this is a written expression of the GSA’s expectation of the service to be performed by the Contractor. A higher level of effective communication between the Government and Contractor is essential for partnering and for the performance based service contract to succeed. The success of this Contract is shared between the Government and the Contractor.

More emphasis is placed on the Contractor’s self-management of quality, not the usual external inspection by Government Inspectors, although that is a part of this Contract as well. All parties should act proactively to reduce service cost, therein providing an incentive for the Contractor.

The Contractor, through innovation, technology, or other means, shall perform the required maintenance of these facilities by following the Guiding Principles for Sustainable Existing Buildings:

• Employ Integrated Assessment, Operation and Management Principles

• In conjunction with the Contract Officer (CO) or designee establish operational performance goals for energy, water, material use and recycling, and indoor environmental quality, and ensure incorporation of these goals throughout the life of this Contract.

• Ensure that operating decisions are carried out with regard to sustainable operations.

• Meet ASHRAE standards as noted throughout the SOW for thermal comfort and indoor air quality.

• Use low emitting materials Volatile organic compounds (VOC) or other for maintenance. In particular, use products that have low pollutant emissions, adhesives, sealants, and solvents.

• Use products meeting or exceeding EPA’s recycled content recommendations for building maintenance. For other products such as ceiling tiles, use materials with recycled content. For more information, see EPA’s Comprehensive Procurement Guideline website.

• Use materials with the highest content level per USDA’s bio-based content recommendations for maintenance of or use in the building.

• Use environmentally sustainable products that have a lesser or reduced effect on human health and the environment. See the Green Products Compilation.

• Provide salvage, reuse and recycling services for waste generated from building operations, maintenance, and repair and discarded equipment.

• Eliminate the use of ozone depleting compounds where alternative environmentally sustainable products are available consistent with the Clean Air Act.

Optimize Energy Performance – GSA is in the process of optimizing energy performance through advance metering and monthly reporting. Operate all equipment to optimize efficiency to reduce energy use and otherwise seek operating costs reductions wherever possible.

Protect and Conserve Water where possible inside and outside. Metering systems may be already installed or will be installed in government buildings to aid in reducing consumption. Where available, use EPA’s Water Sense-labeled products or other water conserving products.

Be aware that the building(s) and management involved with this Contract may be in the process of establishing new initiatives, instituting plans, and operational procedures to meet energy efficiency goals either through receiving an ENERGY STAR rating, Smart Building/ GSA link technology, or comparable programs. The Contractor will play an integral part of obtaining these goals and should be aware of the programs and processes.

The purpose of partnering is to adopt procedures wherein the Scope of Work where the Contractor and Government can work together in achieving Contract objectives. Partnering involves the development of a cooperative management team that seeks to identify common goals and objectives.

This is a fixed-price Contract and while working with the Government in obtaining goals the Contractor is motivated to find improved methods of performance in order to increase its profits. Results of an effective partnership should reflect a “mutual win” situation.

C.1. SCOPE OF WORK

C.1.1 GENERAL

The Contractor shall provide management, supervision, labor, materials, equip-ment, and supplies and is responsible for the efficient, effective, economical, and satisfactory operation, scheduled and unscheduled maintenance, and repair of equipment and systems located within the property line of the Murphy Federal Records Center (MA0136ZZ) building(s), to include the following:

• Electrical systems and equipment.

• Mechanical, plumbing, Building Automation System (BAS) where applicable (where BAS/ ECMS systems are connected to the GSA network, the Contractor’s employees will need to obtain a GSA ENT account to access systems) and heating, ventilation, exhaust systems and air conditioning (HVAC) systems and equipment.

• Fire protection and life safety systems and equipment.

• All control systems that are within the scope of this Contract. All Building Automation Systems (BAS), Public Address Systems, and Computerized Lighting Systems that are within the scope of this Contract (BAS, and Computerized s Lighting Systems software maintenance is excluded).

• Architectural and structural systems, fixtures, and equipment within the site (to the property line).

• Service request desk operations as identified in Section C.8.4 to include record keeping using a computerized maintenance management system (CMMS) or by other means as well as other administrative functions.

• Locks, keycard systems, vehicle barrier systems and static and dynamic bollard systems.

• Dock levelers and roll-up and sliding garage doors.

• Storm drainage systems - reduce storm water pollution by minimizing discharges and runoff to the storm sewer system and environment.

• The Contractor shall complete roofing system investigations and repairs.

• The Contractor shall maintain and repair U.S. flag pole, lighting and pulley system.

• The Contractor shall maintain conveying equipment, parking control equipment, and loading dock equipment.

C.1.2 THE CONTRACTOR SHALL:

• Be responsible to make the management and operational decisions to meet the quality standards required under this contract.

• Use innovation, technology and other means and methods to develop and perform the most efficient services for the building.

• Implement an effective Quality Control Plan (QCP).

• Implement an effective service call system, as specified under the Special

Requirements section of this contract that results in prompt, professional, and courteous resolution of tenant concerns.

• Keep the Contracting Officer (CO) or designee informed of current status of the work being performed, provide work schedules, provide a major equipment and critical system break down or impairment form, and provide other pertinent information needed by the CO or designee.

• Reduce the environmental impacts of work performed under this contract by using, to the maximum extent, environmentally sound practices, processes, and products.

• Provide training to their employees that will stress stewardship in maintenance practices i.e., the proper use, disposal, recycling of chemicals, dispensing equipment and packaging. Provide documentation that their employees are completing training in the core competences and participating in continual educational training according to the Federal Building Personnel Training Act. Ensure that their employees are properly licensed and/or certified to operate necessary building systems or equipment for which licensed and/or certified personnel are required by federal, state or local law, codes or ordinances (H.15. Personnel Qualifications).

• Federal Requirements: The Contractor shall comply with all applicable Federal, state and local laws, regulations and codes, including any supplements or revisions. The Contractor shall obtain all applicable licenses training, and permits. If a change in law or regulation requires the Contractor to implement an action that will result in an increase or decrease in Contract price, the Contractor shall implement the required action and within 30 calendar days submit to the CO or their designee a price proposal for such change. If the CO or their designee determines an equitable adjustment is substantiated a modification to the Contract will be issued.

C.1.3 EXCLUDED FROM THIS SCOPE ARE:

• Security systems (does not include mechanical components of the door, closers, keepers, hinges, etc.)

• Telecommunication systems.

• Equipment owned and operated by tenant agencies.

• Furnishings (not installed as fixtures).

• Paper, soap, and hand-sanitizer dispensing equipment in restrooms.

• Kitchen appliances and equipment (but ductwork above the ceiling, grease traps with associated piping, and any fire suppression or fire alarm equipment are included in the scope).

• Equipment owned by servicing public utilities.

• Upgrade of software or software licenses (to include building automation systems (BAS) and CMMS).

• Fitness center equipment.

• Lawn sprinklers.

• Additional services as needed by various agencies

C.2. DEFINITIONS

C.2.1 ACCEPTANCE

“Acceptance” means an authorized representative of the government has in-spected and agreed that the work meets all requirements of this contract, to in-clude documentation requirements.

C.2.2 ACTS OF GOD

These are unanticipated grave natural disasters or other natural phenomenon of an exceptional, inevitable, and irresistible character; the effects of which could not have been prevented or avoided by the exercise of due care or foresight.

C.2.3 ADDITIONAL SERVICES

“Additional services” are services that the contractor will provide at an additional cost to the government, to include all labor, supervision, supplies and materials specifically identified as being outside the provisions of the basic services and included in the offeror’s overall pricing. The co or their designee will issue a sep-arate delivery order before work may proceed.

C.2.4 ADVANCED METERS

Advanced meters are those that have the capability to measure and record inter-val data (at least hourly for electricity), and communicate the data to a remote location in a format that can be easily integrated into an advanced metering sys-tem.

C.2.5 ADVANCED METERING SYSTEMS

A system that collects time-differentiated energy usage data from advanced me-ters via a network system on either an on-request or defined schedule basis. the system is capable of providing usage information on at least a daily basis and can support desired features and functionality related to energy use manage-ment, procurement, and operations, U.S. Department of Energy, EERE: Guid-ance for Electric Metering in Federal Buildings, (February 3, 2006).

C.2.6 APPROVAL

“Approval” means the government has reviewed submittals, deliverables, and administrative documents (e.g., insurance certificates, installation schedules, planned utility interruptions, etc.) and has determined the documents conform to contract requirements.

C.2.7 ARCHITECTURAL AND STRUCTURAL

“Architectural and structural” systems include all building structure, envelope, building improvements and finishes, and site improvements (e.g., paving, walk-ways, asphalt, etc.) to the property line.

C.2.8 BASIC SERVICES

The basic services of the contract consist of the recurring contract requirements for which the contractor is paid as a base price, i.e., the requirements established by the contract statement of work and related general and administrative re-quirements that do not contain provisions for separate reimbursement. Indefinite quantity requirements (additional services and reimbursable repairs) are re-quirements outside of basic services, for which payment is made on a case-by-case basis.

C.2.9 BUILDING AUTOMATION SYSTEM (BAS)

The “building automation system” is a system controlling and monitoring building HVAC, and possibly other systems, to include all device, field, and global control-lers, instrumentation, networking infrastructure, computers and peripherals, soft-ware, programming, database files, and licenses.

C.2.10 BUILDINGLINK

The BuildingLink initiative is one of GSA’s strategic projects. The purpose of this initiative is to leverage automated building analytics technology to measure and substantially lower operational expenses in the existing owned building portfolio.

BuildingLink is a hardware and software solution to capture real-time building systems point data, apply rules-based analytics software to the data, and spot trends and deficiencies while reporting actionable events to building operators, O&M contractors, and GSA service center property managers.

C.2.11 BUILDING OPERATING PLAN

The “building operating plan” is a mandatory plan that the contractor prepares for government approval that describes the contractor’s program for operating and maintaining the building, to include both normal circumstances and contingencies.

C.2.12 COMMISSIONING

A practice used to optimize and verify performance of fundamental building systems.

C.2.13 ONGOING COMMISSIONING

The practice of optimizing system performance by continuing to fine-tune equipment so will result in actively preventing problems for the lifetime of the building. GSA’s ongoing commissioning efforts will focus on maintaining the facility in the optimized state resulting from TBC and re/retro commissioning efforts. GSA will achieve this through its relationship with its service providers (operations and maintenance/custodial/repair and alterations/it/utilities) and the use of technology (networked systems/advanced meters/smart buildings).

C.2.14 COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEM (CMMS)

A “computerized maintenance management system” is a database and applica-tion software package that automates the O&M and repairs record keeping re-quirements. A CMMS is designed to enhance efficiency and effectiveness of maintenance activities. Typical features include planning, scheduling and moni-toring of work orders and maintenance needs.

The national CMMS (N-CMMS) is a central repository (database) for all main-tainable GSA assets. The N-CMMS provides a mandatory, agency-wide means and method for processing and reporting all maintenance work done for GSA re-gardless of region or contractor.

C.2.15 CONSUMABLE PARTS

“Consumable parts” or components are parts or components that customarily re-quire regular replacement rather than repair in a maintenance program and shall be disposed of properly. Examples include, but are not limited to: oil, grease, belts, filters, ballasts, lamps, etc.

The contractor is responsible for any consumables (including fuel) used during day-to-day operation of a generator, i.e., exercising the generator, testing, etc.

operation of a generator for an extended period or due to a power loss would be treated as a reimbursable expense. If the operation of the generator is caused by contractor negligence, the contractor shall be liable for the full cost of refuel-ing, any other provisions notwithstanding

C.2.16 CONTRACTING OFFICER (CO)

Contracting officer (co) has the overall responsibility for the administration of this contract. The co alone, without delegation, is authorized to take actions on be-half of the government to amend, modify or deviate from the contract terms, con-ditions, requirements, specifications, details and/or delivery schedules. However, the co may delegate certain other responsibilities to authorized government rep-resentatives.

C.2.17 CONTRACTING OFFICER'S REPRESENTATIVE (COR) OR DESIGNEE

Contracting officer's representatives (COR) or their designee shall be appointed by letter from the co. CORs or designees will be the primary government representatives for the administration of contract, shall have proper training and experience in inspecting contracts, but will not have the authority to modify the contract.

C.2.18 CONTRACTOR

“Contractor” as used in this document refers to the company or firm awarded this contract.

C.2.19 CONTRACTOR’S OTHER THAN NORMAL WORKING/DUTY HOURS

Hours other than those identified as normal working hours.

C.2.20 CONTROLS AND CONTROL SYSTEM

A “control system” is any low-voltage control, communication and monitoring system, including but not limited to stand alone devices, field and global controllers; instrumentation; networking infrastructure; computers and peripherals; software; programming; database files; and licenses. Examples are the bas, advance metering system (AMS), and lighting control systems. Fire protection systems and security systems are excluded from this definition for purposes of this contract and are defined separately. Gateway devices and mapping software and files for data interchange between a control system and a fire protection or security system are considered part of the control system.

C.2.21 DEFECTIVE SERVICE

A unit of service that does not conform with specified contract requirements.

C.2.22 EMERGENCY

The term “emergency” includes bombings, and bomb threats, civil disturbances, fires, explosions, electrical failure, loss of water pressure, building flooding, sanitary and sewer line stoppage, chemical and gas leaks, medical emergencies, hurricanes, tornadoes, floods, and earthquakes. The term does not apply to civil defense matters such as potential or actual enemy attacks.

C.2.23 EMERGENCY CALLBACK

An “emergency callback” is a service request or other request for service placed outside of normal working hours and of such a nature that response cannot wait for the resumption of the next day’s normal working hours.

C.2.24 ENVIRONMENTALLY SUSTAINABLE

Products or services that have a lesser or reduced effect on human health and the environment when compared with competing products or services that serve the same purpose. This comparison may consider raw materials acquisition, production, manufacturing, products and chemicals, packaging, distribution, reuse, operation, maintenance, or disposal of the product or service. attributes of environmentally sustainable products include those that are energy efficient, water-efficient, biodegradable, environmentally preferable, non-ozone depleting, contain recycle content, non or less toxic, EPA-designated and biobased.

C.2.25 EXISTING DEFICIENCY LIST REPORT

The “existing deficiency list report” or “existing deficiency list” is a list of deficiencies that may exist in the equipment and systems covered by this performance work statement, as well as the contractor's itemized price (including, but not limited to, labor, materials, overhead, and profit) for correcting each deficiency.

C.2.26 EXTERIOR

This includes entrances; landings; steps; sidewalks; parking areas; arcades;

courts; planters; lawns; irrigation systems; fountains; security bollards; gates;

fences; flagpoles; building-mounted, pole, and ground lighting; etc. located adjacent to the facility extending to the legal property line.

C.2.27 FEDERAL HOLIDAYS

“Federal holidays” for the purposes of this contract are new year’s Day, Martin Luther King Day, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day. When federal holidays fall on weekends, a weekday is typically designated as the holiday. Holidays that fall on Saturday are observed on the previous Friday and holidays that fall on a Sunday are observed on the following Monday. Veterans’ Day is always on the 11th of November and Thanksgiving is always the 3rd Thursday of November.

C.2.28 FEDERAL EXECUTIVE HOLIDAYS, UNANTICIPATED

Unanticipated holidays declared by the president will count as federal holidays.

As long as the contractor pays employees as if it were an anticipated federal holiday, the contractor will be paid for the unanticipated holiday as if it were a normal federal holiday.

C.2.29 FIRE PROTECTION AND LIFE SAFETY SYSTEMS

“fire protection and life safety systems “ are systems and equipment installed in the building to (1) detect fire and products of combustion, (2) notify building occupants and emergency responders, (3) initiate smoke control systems (4) initiate fire suppression systems, (5) control or suppress fires and (6) facilitate or enhance emergency egress. These systems also may communicate with other major building systems for fire and smoke control, elevator recall, and utilities control. Life safety systems and equipment includes emergency lighting, exit signage, special egress door locking arrangements, and exit stair markings.

C.2.30 GUIDING PRINCIPLES FOR SUSTAINABLE EXISTING BUILDINGS

A practice of using processes that is environmentally responsible and resource-efficient throughout a building's life-cycle. The goal is to minimize and offset consumption of energy, water, and other resources and to eliminate all waste and pollution in building operations and activities. The result is to reduce the environmental impact of the federal government, which will expand and complement the building design economy, utility, durability, and comfort. The common objective is to reduce the overall impact of the building environment on human health and the natural environment by:

• Improving energy efficiency and reductions in greenhouse gas emissions.

• Reducing water consumption intensity.

• Acquiring green products and services.

• Implementing pollution prevention measure, including reduction or elimina-tion of the use of toxic and hazardous chemicals and materials.

• Implementing cost-effective waste prevention and recycling programs.

• Increasing diversion of solid waste.

C.2.31 GSA GREEN PURCHASING PROGRAM (GPP)

The GPP specifies requirements to promote the purchase of environmentally sustainable products and services.

C.2.32 INDEFINITE QUANTITY

“Indefinite quantity” provisions permit the government to order work, in addition to the basic services, and upon acceptance permit additional payment to the contractor.

C.2.33 MAINTENANCE REPAIR

Work required preventing a breakdown of a piece of equipment or system, or put equipment or systems back in service after a breakdown or failure.

C.2.34 MISCELLANEOUS WORK

“Miscellaneous work” is additional labor that is performed at the request of the agency at no additional cost to the government (i.e., they are part of basic services). The contractor may also have to provide consumable materials to complete the request. Miscellaneous work is treated as a service call and is included in the basic operations and maintenance price quoted per month on the bid sheet. during normal duty hours minor tasks related to routine, day-to-day operational requirements requested by the which will consist of, but not be limited to: making door keys; changing locks; hanging pictures, maps and bulletin boards; trimming door bases; and other similar functions as directed.

Miscellaneous work shall be accomplished in the same time frame as routine service calls unless otherwise directed by the co or designee. The contractor will be paid at the hourly rate quoted for after normal duty hours only if authorized by the co or their designee in advance for specific activities.

C.2.35 MODIFICATION OF CONTRACT

Modification is a bilateral or unilateral change in the terms of a contract.

C.2.36 NEGLIGENCE

“Negligence” is the failure to use due care under the circumstances. It is the doing of some act which a person of ordinary prudence would not have done under similar circumstances or failure to do what a person of ordinary prudence would have done under similar circumstances.

C.2.37 NON-REIMBURSABLE REPAIR

A “non-reimbursable repair” is a repair that is the contractor’s responsibility with no additional reimbursement from the government.

C.2.38 NORMAL WORKING HOURS

“Normal working hours” is the hours of building operations under most circumstances when all services shall be provided to all occupants.

C.2.39 OCCUPANT EMERGENCY PLAN (OEP)

The lead agency in each building is responsible for development and enforcement of the building’s “occupant emergency plan” (OEP). The OEP details what the building tenants shall do in case of an emergency. The plan identifies floor wardens, shelter in place locations etc.

C.2.40 OPEN SYSTEMS

An “open systems” solution is based on industry standard open protocols. This environment and solution is typically designed, procured, installed and maintained in a manner that provides the building owner with as many competitive configuration options as possible while maintaining the integrity of the supported manufacture system. The solution must be procured and installed so that the result delivers device level interoperability amongst different manufactures residing on a common network. In addition, the solution must be maintained with no future need for the original (installing) contractor. Additions, modifications, and retrofits can easily, without significant additional cost, be made to the system without dependence on the original installing contractor nor require substantial engineering or other technical development. Contractors shall specify open systems solutions where feasible and reasonably possible.

C.2.41 OPERATIONS

“Operations” is the continual process of using building equipment systems to accomplish their function, optimize building performance, and improve energy efficiency. operations includes analysis of requirements and systems capabilities, operating controls and control systems, responding to service requests, touring and observing equipment performance and condition, adjusting equipment, identifying needed maintenance and repairs to equipment, and maintaining lubrication and chemical treatments, etc.

C.2.42 PERFORMANCE BASED SERVICE CONTRACTING

The procurement strategy that seeks to issue technical requirements that set forth outcomes for performance instead of specific requirements on how to perform the service. This strategy shifts the risk of performance to the contractor by allowing the contractor to design the methods of achieving desired results as defined by the performance quality standards established by the government.

C.2.43 PERFORMANCE WORK STATEMENT (PWS)

The performance work statement details the work requirement and can be referred to as the specification.

C.2.44 PREDICTIVE MAINTENANCE

“Predictive maintenance” is a program of maintenance activities in which scheduling of maintenance derives from monitoring the operating condition, or changes in the operating condition, of equipment being maintained.

C.2.45 PREVENTIVE MAINTENANCE (SCHEDULED AND UNSCHEDULED)

“Scheduled preventive maintenance” is a program of maintenance activities performed based on a fixed schedule or on equipment runtimes. “unscheduled preventive maintenance” is all work performed including adjustments and procedures necessary to sustain the proper operation of all building equipment and systems pending a scheduled procedure.

C.2.46 PRODUCT PREFERENCE (SEE EXHIBIT 3 SUMMARY OF ENVIRON-

MENTALLY SUSTAINABLE PRODUCT ATTRIBUTES)

Use of “environmentally sustainable” products is mandatory for performance of this contract. As such, products identified as “environmentally sustainable” will be selected over those which do not carry such designations. The following factors should be considered when selecting products: environmental performance, cost performance, bio-based, recycled content, biodegradability, technical performance, and availability.

C.2.47 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

The QASP is the government’s surveillance method of monitoring and evaluating the contractor's performance under a performance based statement of work

(PBSOW).

C.2.48 QUALITY CONTROL PLAN

The “quality control plan” (QCP), is the contractor’s complete written system for identifying and correcting deficiencies in the quality of services before the level of performance becomes unacceptable. Preparation of this document is the responsibility of the contractor.

C.2.49 REPAIR

A “repair” is an act of restoring inoperable, dysfunctional or deteriorated equipment, systems, or material to a fully functional, non-deteriorated state.

Repairs usually involve some combination of labor and replacement parts, components or materials.

C.2.50 REIMBURSABLE REPAIR

A “reimbursable repair” is a repair that is reimbursable to the contractor, in whole or in part, in accordance with the provisions in this document.

C.2.51 SEQUENCE OF OPERATIONS

A “sequence of operations” is the control logic used to operate a system normally put into effect through a control program.

C.2.52 SERVICE REQUEST

A “service request” is a response to a GSA, tenant, or agency request or a response to an observation that some equipment, system or material covered by the contract is inoperable, dysfunctional, deteriorated, or not within normal operating parameters, or that performance standard of the contract is not being met. Service request response involves analysis of the problem and adjustment of operating or monitoring controls or other immediate corrective action. A requirement to perform a repair may result from the analysis stage of a service request. Service requests may be generated automatically from interfaces to bas or diagnostic software.

C.2.53 STANDARD SERVICES

Standard services are defined as all services that are included in the monthly price or as defined in the contract document. Prices are to include all applicable labor, materials, supplies, training/certifications, equipment (except as otherwise provided), supervision, and management.

C.2.54 STEWARDSHIP

The act of stewardship is to take the responsibility for managing, conducting or supervising the quality, state or condition of a commercial building. A stewardship program in addition to caring for the building, its occupants and visitors includes among other things a sense of shared responsibility, occupant participation and communications amongst building management, O&M personnel, cleaning personnel, occupants, contractors and others who have an impact on/in the building.

C.2.55 SUPERVISOR, ON-SITE

The term “on-site supervisor” means a person designated in writing by the contractor who has authority to act for the contract on a day-to-day basis at the work site.

C.2.56 TOUR

A “tour” is generally a scheduled walkthrough of equipment rooms and installations including computer rooms, restrooms, etc. by contractor operating personnel for the purpose of ensuring that equipment is running properly, ensuring that equipment rooms are in good order and without safety hazards, and making any necessary adjustments to operating controls or to lubricate equipment. A tour may also involve a combination of such physical visits in addition to using automated systems for the monitoring of equipment and systems. Equipment log sheets are a part of the tour plan/program. All tours are "inspection" work orders in the CMMS and will comply with all work order requirements.

C.2.57 VERTICAL TRANSPORTATION SYSTEMS

“Vertical transportation systems” include elevators, escalators, dumbwaiters, lifts, etc.

C.2.58 WATCH

A “watch” involves performing certain tasks required for the operation of the HVAC equipment (central systems over 300 tons), boilers, compressors, and related equipment in a centralized location. Watches include, but are not limited to starting equipment, checking at designated intervals all operating equipment in the area, recording readings, shifting equipment and loads, making adjustments at the central control center, taking water samples, making tests, and adding chemicals as required.

C.3. REFERENCES

The following publications are incorporated by reference as setting quality, performance, and design standards for work required in this document. Unless a specific date is provided, references are for the current edition published at the time of issue of the solicitation, to include any addenda or errata published by the issuing organization. The Contractor is responsible for obtaining access to all referenced documents at their own expense, the exception of the Public Building Service Operations and Maintenance standards 2012, the Facilities Standards for the Public Buildings Service (PBS P100), and the U.S. Courts Design Guide, which will be provided by the Government.

• Public Buildings Service Operations and Maintenance Standards 2012

• Facilities Standards for the Public Buildings Service (PBS P100)

• U.S. Courts Design Guide

• SMACNA Sheet Metal and Air Conditioning Contractors National Associa-tion HVAC Systems Testing, Adjusting & Balancing

• AHERA Asbestos Hazard Emergency Response Act

• ASHRAE Guideline 1HVAC Commissioning Process

• ASHRAE Guideline 4 Preparation of Operating and Maintenance Docu-mentation for Building Systems

• ANSI/ASHRAE Standard 15 Safety Code for Mechanical Refrigeration

• ANSI/ASHRAE Standard 34 Number Designation and Safety Classifica-tion of Refrigerants

• ANSI/ASHRAE Standard 55, Thermal Environmental Conditions for Hu-man Occupancy

• ANSI/ASHRAE Standard 62, Ventilation for Acceptable Indoor Air Quality

• ANSI/ASHRAE Standard 100, Energy Conservation in Existing Build-ings/Commercial

• ANSI/ASHRAE Standard 111, Practices for Measurement, Testing, Adjust-ing, and Balancing of Building Heating, Ventilation, Air-Conditioning, and Refrigeration Systems;

• American Society of Mechanical Engineers ASME A17.1/CSA B44, Safety Code for Elevators and Escalators

• American Society of Mechanical Engineers ASME A17.2, Inspector’s Manual for Elevators

• ASME Boiler and Pressure Vessel Code

• ASME CSD-1 Control and Safety Devices of Automatically Fired Boilers

• National Board of Boiler and Pressure Vessel Inspectors, National Board

Inspection Code

• OSHA 29 CFR 1910 and 29 CFR1926

• Clean Air Act

• Clean Water Act

• EPA Green Book

• EPA Purple Book

• GSA SEMS Sustainable Environmental Management System

(GSA.GOV/SEMS)

• International Building Code

• International Fire Code

• International Plumbing Code

• International Mechanical Code

• NETA Maintenance Testing Specification for Electrical Power Distribution

Equipment and Systems

• NFPA 10, Standard for Portable Fire Extinguishers

• NFPA 12, Standard on Carbon Dioxide Extinguishing Systems

• NFPA 12A, Standard on Halon 1301 Fire Extinguishing Systems

• NFPA 13, Standard for the Installation of Sprinkler Systems

• NFPA 14, Standard for the Installation of Standpipe and Hose Systems

• NFPA 17, Standard for Dry Chemical Extinguishing Systems

• NFPA 17A, Standard for Wet Chemical Extinguishing Systems

• NFPA 20, Standard for the Installation of Stationary Pumps for Fire Protec-tion

• NFPA 22, Standard for Water Tanks for Private Fire Protection

• NFPA 24, Standard for the Installation of Private Fire Service Mains and

Their

• Appurtenances

• NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-

Based Fire Protection Systems

• NFPA 70, National Electrical Code (NEC)

• NFPA 70E,Standard for Electrical Safety in the Workplace

• NFPA 72, National Fire Alarm and Signaling Code

• NFPA 85, Boiler and Combustible Systems Hazards Code

• NFPA 92, Standard for Smoke Control Systems

• NFPA 96, Standard for Ventilation Control and Fire Protection of Commer-cial Cooking Operations

• NFPA 101, Life Safety Code

• NFPA 105, Standard for the Installation of Smoke Door Assemblies and

Other Opening Protectives

• NFPA 110, Standard for Emergency and Standby Power Systems

• NFPA 111, Standard on Stored Electrical Energy…

This is the start of the file's text. The full file is on GovTribe.