Multiple_Vendor_-_Aftermarket_Upfitting_Services_for_Fleet_Equipment_and_Vehicles.pdf
PDF 490 KB Posted
- Solicitation number
- ITB 26-063
- Issued by
- Lee County, Fort Lauderdale City, Florida
About this file
This is a Scope of Work document for the City of Fort Myers, Florida, establishing multiple vendor contracts for aftermarket upfitting services for fleet equipment and vehicles. The City seeks qualified respondents to provide furnishing, installation, modification, and repair of aftermarket accessories, specialty equipment, and upfitting components for agency-owned fleet vehicles and equipment. Services must include all labor, materials, tools, supervision, transportation, and incidentals necessary to complete installations and related services in a professional and timely manner. The document establishes a framework for multiple vendors to be awarded contracts to provide these services on an as-needed basis for the City's fleet operations.
The scope of work does not specify particular item quantities, response dates, or contract term lengths in the provided excerpt. Pricing terms, set-asides, incumbent information, and specific funding amounts are not detailed in the available document section. The multiple vendor approach allows the City flexibility in selecting qualified contractors based on project requirements, availability, and competitive pricing for individual upfitting projects as they arise throughout the contract period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AGREEMENT-SERVICE_AGREEMENT_Upfitting_7-17-26_(1).docx | DOCX document | |
| Aftermarket_Upfitting_Services_for_Fleet_Equipment_and_Vehicles.pdf | ||
| AGREEMENT-CONSTRUCTION_6-4-26.docx | DOCX document | |
| CONSTRUCTION_SUPPLEMENTAL_CONDITIONS_2-6-26.pdf | ||
| Solicitation_Checklist_Summary_5.18.26.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB 26-063
Multiple Vendor - Aftermarket Upfitting Services for Fleet Equipment and
Vehicles
The City of Fort Myers Procurement Services utilizes an electronic bidding system to streamline the solicitation process.
City of Fort Myers Procurement Services Website https://procurement.opengov.com/portal/cityftmyers
Multiple Vendor - Aftermarket Upfitting Services for Fleet Equipment and Vehicles, ITB 26-063
TABLE OF CONTENTS
1. INTRODUCTION
2. SCOPE OF WORK (SPECIFICATIONS)
3. INSTRUCTIONS
4. INSURANCE
5. SPECIAL CONDITIONS
6. GENERAL TERMS & CONDITIONS
7. DEFINITIONS
8. SUBMITTAL QUESTIONNAIRE
9. BID SCHEDULE / SCHEDULE OF VALUES
1. INTRODUCTION
1.1. Advertisement
ITB 26-063 Multiple Vendor - Aftermarket Upfitting Services for Fleet Equipment and
Vehicles
The City of Fort Myers is seeking submittals for ITB 26-063 Multiple Vendor - Aftermarket Upfitting
Services for Fleet Equipment and Vehicles. Submittals must be received electronically on or before
Thursday, August 20, 2026 at 2:00 pm. Interested participants are encouraged to download the solicitation documents. For more details visit: https://procurement.opengov.com/portal/cityftmyers.
CITY OF FORT MYERS
Marty K. Lawing, City Manager Legal Ad: News-Press/OpenGov
Mary Hagemann, City Clerk RUN DATES: Monday, July 20, 2026
1.2. Contact Information
Direct inquiries to the following:
Procurement Representative Name
Cathy Scott, Senior Procurement Specialist
2200 Second Street
Fort Myers, FL 33901
Email: cscott@fortmyers.gov
Phone: (239) 321-7235
Requesting Department:
Public Works
1.3. OpenGov Portal
The City of Fort Myers uses OpenGov (https://procurement.opengov.com/portal/cityftmyers) to administer the competitive solicitation process, including but not limited to soliciting responses, issuing addenda, posting results and issuing notification of an intended decision. There is no charge to register and download the solicitation from OpenGov. Contractors are strongly encouraged to read the various Guides and Tutorials available in OpenGov well in advance of their intention of submitting a response to ensure familiarity with the use of OpenGov. The City will not be responsible for submittal failures caused by the Contractor’s equipment or internet connectivity. In the event of a documented system-wide OpenGov outage, the City reserves the right to extend the deadline by addendum.
1.4. Timeline
The Proposed timeline for this solicitation (which is subject to change) is:
Release Project Date: July 20, 2026
Question Submission Deadline: August 6, 2026, 3:00pm
Response Submission Deadline: August 20, 2026, 2:00pm
Proposed City Council Approval: September 8, 2026, 4:30pm
2. SCOPE OF WORK (SPECIFICATIONS)
2.1. Mandatory Minimum Qualifications
2.1.1. Each Submittal must contain evidence of the Contractor's qualifications to do business in the State of Florida.
2.1.2. Contractor shall have been in business under the current company/firm name for a minimum of three (3) consecutive years prior to the date of submittal. This requirement is reasonably related to ensuring Contractor stability and capacity.
2.1.3. Neither Contractor nor any principal, officer, or stockholder shall be in arrears or in default of any debt or contract involving the City, (as a party to a contract, or otherwise); nor have failed to perform faithfully on any previous contract with the City.
2.1.4. Contractor shall inform the City of any relevant legal or ethical issues. Specifically, disclosing:
2.1.4.1. Judgments: Any court decisions against them.
2.1.4.2. Pending Lawsuits: Any legal actions that are currently underway.
2.1.4.3. Criminal Activities: Any criminal conduct, especially if it involves moral turpitude
(actions that are morally reprehensible).
Contractor shall be given a chance to explain or provide additional information regarding these issues if applicable. This allows them to clarify any concerns and provide context.
To demonstrate qualifications to perform the Work, each Contractor shall be prepared to submit within five (5) days of City’s request written evidence, such as financial data, previous experience, present commitments, and other such data as may be requested. Each Solicitation shall contain evidence of the Contractor’s qualifications to do business in the State of Florida, or covenant to obtain such qualification, prior to award of the contract.
The Contractor shall maintain the Minimum Qualifications Requirements during the term of the
Contract and any contract renewals.
The City will evaluate such disclosures solely for purposes of determining responsibility and capacity to perform, in accordance with applicable law.
2.2. Scope of Work
This solicitation and any resulting Agreement are funded solely with local funds. Federal grant-funded provisions, FDOT-specific requirements, and 2 C.F.R. Part 200 requirements do not apply unless the City issues a written addendum identifying the funding source and applicable mandatory clauses.
The City of Fort Myers seeks qualified contractors to furnish, install, modify, transfer, maintain, inspect, and repair aftermarket accessories, specialty equipment, vehicle technologies, and upfitting components for City-owned fleet vehicles and equipment.
The Contractor shall provide all labor, materials, equipment, tools, supervision, transportation, parts, supplies, and incidentals necessary to perform the required services in a safe, professional, and timely manner.
Services may include, but are not limited to:
• Furnishing and procurement of aftermarket accessories, replacement parts, specialty equipment, and upfitting components.
• Installation, modification, relocation, removal, transfer, reinstallation, maintenance, and repair of aftermarket accessories and vehicle upfitting components.
• Fabrication and installation of custom brackets, mounts, racks, storage systems, and specialty equipment.
• Installation, maintenance, and repair of utility bodies, service bodies, liftgates, towing equipment, hitches, toolboxes, ladder racks, and related accessories.
• Installation, integration, maintenance, troubleshooting, and repair of electrical and electronic systems associated with vehicle upfitting, including wiring harnesses, switches, relays, controllers, auxiliary power systems, and power distribution systems.
• Installation and repair of lighting systems, warning lights, work lights, cameras, telematics devices, GPS units, mobile communications equipment, and other vehicle technologies.
• Installation and repair of safety equipment, traffic control devices, backup alarms, beacons, and related accessories.
• Removal, refurbishment, transfer, and reinstallation of existing City-owned equipment between vehicles or equipment as directed by the City.
• Installation and replacement of vehicle graphics, decals, striping, wraps, and identification markings, when requested.
• Diagnostic, inspection, testing, commissioning, maintenance, and repair services for installed accessories, equipment, and upfitting components.
• Emergency, expedited, mobile, and on-site services when requested by the City.
All work shall be performed in accordance with applicable federal, state, and local laws, regulations, industry standards, manufacturer specifications, and safety requirements.
Installations and modifications shall not adversely affect vehicle safety, performance, warranty coverage, or regulatory compliance.
The Contractor shall provide all applicable documentation, operating manuals, warranty information, and wiring diagrams for installed equipment upon request. Manufacturer warranties shall be passed through to the City, and the Contractor shall warrant all workmanship in accordance with the requirements of the solicitation.
Services shall be provided on an as-needed basis at City-designated locations or at the
Contractor's facility, as authorized by the City. Contractors are not required to maintain a facility within a specified distance of the City of Fort Myers; however, contractors shall demonstrate their ability to provide timely service, including emergency and expedited services when requested by the City. Contractors shall identify the location of their primary service facility and any available mobile service capabilities.
At a minimum, contractors shall acknowledge requests for service or quotations within one (1) business day, provide routine quotations within three (3) business days, respond to emergency service requests within twenty-four (24) hours, and commence authorized routine work within ten (10) business days unless otherwise approved by the City. Contractors shall promptly notify the City of any delays affecting quotations, parts availability, scheduling, or project completion.
The City may consider contractor location, response time, service capacity, availability, and other operational factors when assigning work under this contract. Failure to consistently meet response and performance requirements may be considered when evaluating contractor performance and assigning future work.
The City reserves the right to make multiple awards to one or more qualified contractors. The
City may request quotations from any awarded contractor for specific projects or assignments and reserves the right to assign work based on specialty, qualifications, availability, response time, pricing, workload, location, capacity, past performance, or any other factor determined by the City to be in its best interest. No minimum quantity of work is guaranteed under this contract.
3. INSTRUCTIONS
3.1. Procurement Information
Procurement Services is the official source for obtaining information regarding City solicitations.
It is the responsibility of the Contractor to monitor and obtain solicitation updates and current award information both prior to and after the scheduled opening date. Information is updated as it becomes available. The City reserves the right to issue an award or a recommendation of award at any time following the scheduled solicitation opening date.
3.2. Introduction
To be considered, electronic submittals must be completed in accordance with the instructions outlined in this solicitation and submitted within the specified timeframe. The portal will automatically lock at the submittal deadline. The City reserves the right to accept or reject any or all submittals and to waive irregularities or technicalities, as deemed in the best interest of the City. All decisions made by the City regarding these matters shall be final and binding.
3.3. Americans With Disabilities Act
Persons with disabilities requiring special accommodations to participate in this solicitation process should contact Procurement Services at least seven (7) days before the required accommodation.
Contact Information:
Procurement Services
2200 Second Street, Fort Myers, FL 33901
Email: ProcurementServices@fortmyers.gov
Phone: (239) 321-7240
3.4. Incorporation of Procurement Policy and Ordinance
This solicitation is issued in accordance with, and governed by, the provisions and procedures outlined in Chapter 38, Articles III and IV of the City of Fort Myers Code of Ordinances.
The City’s Procurement Policy and Ordinance (38-61 thru 68) are hereby incorporated by reference into this solicitation and any contract awarded as a result of this solicitation. By participating in this solicitation, Contractor agrees to be bound by the City’s Procurement
Ordinance and Policy in all matters related to this solicitation and any subsequent contracts.
Any appeals related to this solicitation must comply with the requirements specified in the City’s
Code of Ordinances and Procurement Policy.
3.5. Solicitation Documents
Solicitations may be accessed the City's Portal of OpenGov. It is the responsibility of the
Contractor to ensure correct contact information is provided. The City will not be held liable for any issues arising from incorrect or incomplete contact information. All submittals must be prepared using the solicitation documents provided in this solicitation. The City assumes no responsibility for errors or misinterpretations resulting from the use of incomplete or unofficial solicitation documents. Solicitation documents, including all attachments, specifications, and mailto:ProcurementServices@fortmyers.gov https://fortmyers.gov/DocumentCenter/View/14396/City-of-Fort-Myers-Procurement-Policy-PDF https://www.fortmyers.gov/1515/Procurement-Ordinances https://www.cityftmyers.com/1171/Procurement-Services exhibits are provided solely to facilitate the preparation and submittal of responses. The City reserves the right to cancel any solicitation at any time without obligation.
3.6. Responsibilities of the Contractor
Each Contractor is responsible for the following actions before submitting an offer:
3.6.1. The Contractor will obtain solicitation documents exclusively from OpenGov. Documents sourced from other platforms or sources are not guaranteed to be accurate.
3.6.2. The Contractor will examine all solicitation documents to fully understand the requirements. If additional clarification is needed, submit questions through the OpenGov Q&A module.
3.6.3. Contractor who intend to submit a bid/proposal are encouraged to "follow" the project. By doing so, you will be notified by email of communications relating to the project.
3.6.4. The Contractors will review, understand, and factor into their bid/proposal all addenda and answers to questions that are submitted via the OpenGov portal. See "Questions and
Addenda Guidelines". All addenda and updates will be made available exclusively via OpenGov.
Contractor is advised to regularly check the portal for any updates related to this solicitation.
3.6.5. Evaluate all Federal, State, and Local laws, ordinances, codes, and regulations that could impact the cost, progress, performance, or execution of the work.
3.6.6. The Contractor will study and carefully align observations with the solicitation documents to ensure consistency.
3.6.7. The Contractor will notify the Procurement Services Department by email to procurementservices@fortmyers.gov and submit a question through the E-Procurement Q&A tab of any conflicts, errors, or discrepancies in the solicitation documents.
3.6.8. The draft agreement intended for award is part of the solicitation as an attachment. This draft contains standard legal language and may be modified. Any exceptions to the standard agreement shall be submitted as a question in the Q&A module before the question deadline. If the question deadline has passed, exceptions should be clearly noted in the Submittal
Questionnaire. Exceptions to the draft agreement may impact the evaluation of the submittal.
3.6.9. The City reserves the right to make modifications to the draft contract for specific solicitations before execution.
3.7. Cone of Silence
Contractors responding to this solicitation or persons acting on their behalf may not contact, between the release of the solicitation and the end of the 72-hour period following the City posting the notice of intended award, excluding Saturdays, Sundays, and state holidays, any employee of the city concerning any aspect of this solicitation, except in writing to the
Procurement Officer or as provided in the solicitation documents. Violation of this provision may be grounds for rejecting a response.
mailto:procurementservices@fortmyers.gov
3.8. Submittal Guidelines
3.8.1. Official Submittal Portal
All submittals must be made electronically through the City’s Bid Portal in OpenGov.
3.8.2. Submittal Requirements and Instructions
The Contractor is responsible for uploading their submittals directly into the OpenGov portal. The representative authorized to bind the Contractor to the submittal must sign the qualification statement. A submittal is considered timely only if received through the
OpenGov portal by the precise date and time stated in the solicitation timeline. The
OpenGov portal time clock serves as the official time for determining timeliness. The portal will not accept submittals after the deadline.
The Contractor must clearly identify any variances from the Solicitation requirements, no matter how minor. Any exceptions to the scope of work must be specifically noted and thoroughly explained in the Contractor’s questionnaire. If no variances are identified in the submittal, the City will assume that: a) the materials, equipment, or services offered fully comply with the Solicitation specifications, b) The Contractor agrees to all terms and conditions outlined in the attached Draft Contract. Failure to disclose variances may result in the Contractor being held to full compliance of the Solicitation requirements.
Contractor shall ensure that all electronic deliverables provided under this Contract, including but not limited to reports, PDFs, presentations, forms, data visualizations, dashboards, online tools, and other digital or web-based content, comply with the Web
Content Accessibility Guidelines (WCAG) 2.1 Level AA. Deliverables must be provided in accessible formats compatible with commonly used assistive technologies. Contractor shall promptly remediate any accessibility deficiencies identified by the City at no additional cost and shall provide corrected deliverables within a mutually agreed-upon timeframe.
City is not responsible for any expenses incurred by Contractor in the preparation and submittal of their proposals, including costs associated with presentations or other activities related to the solicitation process.
3.8.3. Instructions for Uploading Submittals
Log into your OpenGov account and navigate to the solicitation for which you wish to submit a response. Click on “Draft Response”, complete the required information, upload your submittal along with all required attachments, and submit your response.
3.8.4. Mandatory Minimum Qualification Documentation
Contractor must provide clear and specific documentation to verify that all mandatory minimum qualifications, as outlined in the section titled "Mandatory Minimum
Qualifications," have been met.
3.8.5. Required Documents
See the "Submittal Questionnaire" section for a detailed list of required documents.
3.8.6. Corporate Submittals
Must be executed in the corporate name by the President, Vice-President, or another corporate officer with evidence of signing authority. The corporate address and state of incorporation must be included below the signature.
3.8.7. Partnership Submittals
Must be executed in the partnership name and signed by a partner. The title of the signing partner must appear under the signature, and the official address of the partnership must be included below the signature.
3.8.8. Proprietary Information
• Contractor must clearly identify any information in their responses they consider confidential or proprietary, citing the specific legal exemption. Generic notations such as
"confidential" are not sufficient.
• Failure to provide a detailed explanation with statutory citations may result in the entire response being subject to disclosure under Chapter 119.
• Provide a redacted copy of your submittal, suitable for public disclosure, in electronic format. Redact only information exempt under applicable law and include the exemption citation.
• The City reserves the right to exercise its judgment regarding the disclosure of records and may take any necessary actions to comply with federal or state public records laws.
• All submittals received in response to this solicitation become the property of the City of
Fort Myers and will not be returned.
3.9. Questions and Addenda
3.9.1. Submittal of Questions
All questions regarding the meaning or intent of the solicitation documents shall be submitted through the OpenGov Portal. Only questions received before the deadline specified in the solicitation timeline shall be considered.
3.9.2. Authority of Addenda, Responses, and Revisions
Revisions to the solicitation and responses provided via the "Questions & Answers" feature are binding and shall be considered addenda to the solicitation. All information provided in this solicitation, including addenda and responses to questions, will be incorporated into the solicitation and any resulting contract. It is the responsibility of the
Contractor to review all addenda, revisions, and published responses to questions.
Requests for interpretations must be submitted through the OpenGov Portal. Failure to review and comply with the latest addenda or interpretations will not relieve the
Contractor of their obligations under the solicitation or the resulting contract. No oral interpretations will be provided. All official interpretations will be issued as written addenda and made available via OpenGov. The City is not responsible for the distribution of addenda or other solicitation-related information to Contractor who fails to register in
OpenGov.
3.9.3. Modification of Solicitation Documents
The City reserves the right to issue addenda to modify the solicitation documents as necessary. Contractors are strongly encouraged to attend any pre-submittal meetings to gain clarity on the solicitation requirements. The absence of details or the omission of specific descriptions within the Solicitation or any addenda shall be interpreted as requiring adherence to the highest standards of best commercial practices. All interpretations and clarifications of this Solicitation shall be governed by the terms and conditions set forth in this agreement.
3.10. Modification and Withdrawal of Submittals
3.10.1. Modifying or Withdrawing Submittals
Invitations to Bid may be modified or withdrawn by the Contractor through the OpenGov portal at any time before the closing time noted in the Solicitations.
3.10.2. Withdrawal Due to Material Mistake
If, within twenty-four (24) hours after Submittals are opened, a Contractor files a duly signed written notice to the Procurement representative and demonstrating to the
Procurement Director's reasonable satisfaction that a material and substantial mistake occurred in the preparation of its Submittal, the Contractor may withdraw its
Submittal. In such cases:
o The Submittal security, if applicable, will be returned.
o The Contractor shall thereafter be disqualified from further participation in the Work to be provided under the Agreement.
3.11. Opening Submittals for Non-Construction
Non-construction-related submittals will be opened privately. In accordance with section
119.071(1)(b)2., Florida Statutes, sealed bids, proposals, or replies received by the City pursuant to this solicitation are exempt from public disclosure until such time as the City provides notice of an intended decision or until thirty (30) days after opening, whichever occurs earlier. Thereafter, records will be made available in accordance with Chapter 119, Florida
Statutes, and Article I, Section 24 of the Florida Constitution, unless otherwise exempt or confidential by law.
3.12. Reserved Rights
3.12.1. Request for Additional Information
The City reserves the right to request additional information from the Contractor after the closing date. This may include but is not limited to:
o Information necessary to evaluate, clarify, or substantiate any aspect of the submittal o Evidence of financial resources and the ability to provide and maintain the required system and/or services. The City may conduct investigations into the qualifications of any Contractor, which may include background checks.
3.12.2. Flexible Award Options
The City reserves the right to:
o Make awards based on individual items, groups of items, all-or-none, or a combination thereof, potentially involving one or more suppliers.
o Reject any or all submittals or waive informalities or technicalities in the submittals received.
3.12.3. Rejection of Submittals
The City reserves the right to:
• Reject any and all Submittals.
• Waive any and all informalities.
• Disregard nonconforming, non-responsive, unbalanced, or conditional submittals.
• Reject any submittal if it is determined that awarding to the Contractor is not in the
City’s best interest, including cases where:
o The Solicitation is not responsive, o The Contractor is unqualified or has questionable financial ability, or o The Contractor fails to meet any other relevant standards or criteria established by the City.
3.13. Irrevocable Offer
By submitting a response to this Solicitation, the Contractor agrees that their submittal constitutes an irrevocable offer to the City. This offer shall remain valid for a period of one hundred eighty (180) calendar days from the date of the opening. The Contractor agrees to provide the goods and services described in this Solicitation under the terms, conditions, and pricing outlined in their submittal.
3.14. Evaluation and Award Process
3.14.1. Initial Review of Submittals
Procurement Services will conduct an initial review of all submittals to ensure preliminary qualification and compliance with documentation requirements. This review may include but is not limited to:
• Verification of answers to required questions;
• Confirmation of professional licensing;
• Evaluation of references;
• Review of bonding documents, if required;
• Assessment of other relevant criteria.
3.14.2. Recommendation and Notice of Intent to Award for an ITB
The Procurement Representative will email their recommendation to award to the lowest responsive and responsible Contractor to the requesting department. The Department
Representative will analyze the scope requirements and pricing; agreement to the recommendation by the Department Representative will serve as the basis for issuing a
Notice of Intent to Award.
A Notice of Intent to Award does not constitute an Agreement. Final approval and authorization rest with the City Council.
3.14.3. Optional Discussions
At the City’s discretion and in its best interest, the City may engage in discussions with the Contractor to clarify their submittals prior to issuing a Notice of Intent to Award.
3.14.4. Evaluation of Contractor's Capabilities
The City reserves the right to evaluate the following aspects of each Contractor prior to making an award:
o Financial capability.
o Reputation and integrity.
o Skill and business experience.
o Quality of performance on similar projects for either the City or another agency.
This evaluation will ensure all parties are able to perform the work outlined in the Agreement to the City’s satisfaction within the prescribed timeline.
3.14.5. Additional Research
The City may conduct any necessary research to assist in evaluating submittals and determining the responsibility, qualifications, and financial capability of:
o Contractor.
o Proposed Subcontractor and Supplier.
o Other relevant persons or organizations. This evaluation will ensure all parties are able to perform the work outlined in the Contract Documents to the City’s satisfaction within the prescribed timeline.
3.15. Award of Agreement
3.15.1. Formal Award
Agreement(s) will be awarded in accordance with the City’s Procurement Code, Chapter
38, Article 3 of the City of Fort Myers Code of Ordinances. The Agreement will be awarded to the lowest responsive and responsible bidder Contractor based on pricing.
The award is contingent upon final approval by the City Council.
The Agreement shall include the established Construction Agreement and incorporate by reference this Solicitation, any addenda, and the Contractor's submittal. This Agreement shall be governed by and construed in accordance with the laws of the State of Florida.
Venue for any legal action arising out of or relating to this Agreement shall be in a court of competent jurisdiction located in Lee County, Florida.
3.15.2. Multiple Awards
The City reserves the right, at its sole discretion, to award the work described herein to more than one responsive and responsible Contractor. In cases of multiple awards, the
City will apportion work among the selected Contractor as it deems appropriate. No minimum amount or proportion of work is guaranteed to any single Contractor or class of
City.
3.15.3. Purchase Order
The Purchase Order (PO) will be issued by the City to the selected Contractor within the time specified for acceptance.
3.16. Form of Agreement
The City’s intended format for the awarded Agreement is attached to this solicitation. Any exceptions to the terms of this standard Agreement must be brought up as a question in
OpenGov and resolved prior to the solicitation closing so everyone responds to the same terms and conditions. The City reserves the right to revise or alter the language of the Draft
Agreement after responses are received and prior to execution. Revisions may be made to address the specific requirements or circumstances of the solicitation.
3.17. Execution of Agreement
The successful Contractor shall execute the Agreement within fifteen (15) calendar days after the issuance of a Notice of Award and receipt of the Agreement from Procurement Services.
Simultaneously, the Contractor shall provide: any required bonds; Indemnities; and Updated insurance certificates as specified in the Solicitation. Electronic signatures are accepted under the Florida Uniform Electronic Transaction Act (F.S. 668.50). Failure to meet the established deadline for submitting the required documents may result in cancellation of the award at the
City’s discretion.
3.18. Protest Procedure
The City’s protest policy and procedure are outlined in the City of Fort Myers Procurement
Policy, which can be accessed at the following link: City of Fort Myers Procurement Policy (PDF)
For details, refer to Page 20, Item F of the policy document.
3.19. Post Award Debriefing Process
A Contractor may submit a written request for a debriefing to the designated procurement representative no later than thirty (30) calendar days following Council approval of the contract award. Upon receipt of the request, the procurement representative will schedule the debriefing with the Contractor, which may be conducted in person, virtually, or by telephone.
The debriefing will include, at a minimum, the following:
• An overview of the solicitation requirements.
• The final overall ranking of all proposals.
• A discussion of the significant strengths, weaknesses, or deficiencies identified in the
Contractor's submittal in relation to the solicitation requirements. The Contractor submittal will not be compared to any other proposal.
• Upon request, an explanation of the scores assigned for each evaluation criterion, including cost, if applicable.
• If applicable, a summary of the basis for the award recommendation or selection decision.
• Responses to relevant questions from the proposer concerning the evaluation process and results.
https://www.cityftmyers.com/DocumentCenter/View/14396/City-of-Fort-Myers-Procurement-Policy-PDF
4. INSURANCE
Insurance Coverages Required.
Insurance will be provided by the Contractor. If required, the awarded Contractor (and its
Subcontractors to the same extent and on the same terms as set forth below for Contractor) shall maintain the following coverages and furnish the certificate of insurance on the policies and renewals thereof which indicate that insurance coverage has been obtained meeting the requirements of the contract.
4.1. Insurance Terms and Conditions
4.1.1. The Contractor shall obtain and maintain such insurance as will protect the City from: (1) claims under workers' compensation laws, disability benefit laws, or other similar employee benefit laws; (2) claims for damages because of bodily injury, occupational sickness or disease or death of his or her employees including claims insured by usual personal injury liability coverage; (3) claims for damages because of bodily injury, sickness or disease, or death of any person other than his employees including claims insured by usual personal injury liability coverage; and (4) from claims for injury to or destruction of tangible property including loss or use resulting there from; any or all of which claims may arise out of, or result from, the services, work and operations carried out pursuant to and under the requirements of this
Agreement, whether such services, work and operations be by the Contractor, its employees, or by any Subcontractor, or anyone employed by or under the supervision of any of them, or for whose acts any of them may be legally liable.
4.1.2. Subcontractor. Unless expressly specified otherwise in this solicitation, a Contractor and its Subcontractors of any tier will be required at their own expense to maintain in effect at all times during the performance of the work insurance coverages with limits not less than those set forth below with insurers and under forms of policies satisfactory to the City. It shall be the responsibility of the Contractor to maintain the required insurance coverages and to assure that
Subcontractors maintain required insurance coverages at all times. Failure of a Contractor to maintain adequate coverage shall not relieve it of any contractual responsibility or obligation.
The requirements specified herein as to types, limits, and City’s approval of insurance coverage to be maintained by a Contractor and its Subcontractors are not intended to and shall not in any manner limit or qualify the liabilities and obligations assumed by the Contractor and its
Subcontractors under a contract. Any insurance carried by the City that may be applicable shall be deemed to be excess insurance and the Contractor's insurance primary for all purposes despite any conflicting provision in the Contractor's policies to the contrary.
4.1.3. The Contractor shall obtain, have, and maintain during the entire period of this
Agreement, all such insurance policies as are set forth and required herein.
4.1.4.The insurance coverage to be obtained by the Contractor, as set forth in Agreement for:
(1) Worker's Compensation; (2) Commercial General Liability; (3) Commercial Automobile
Liability; and (4) Garage Keeper Liability is understood and agreed to cover any and all of the services or work set forth in Exhibit “A” of this Agreement, or in any and all subsequently executed Change Orders, or Supplemental Agreements. If the total amount of insurance coverage established in, and required by, a Change Order or Supplemental Agreement exceeds the amount of insurance coverage carried by the Contractor, then the Contractor shall be required and expected to acquire such additional insurance, and the compensation established for the Change Order, or Supplemental Agreement, shall include consideration of any additional premium cost incurred by the Contractor to obtain such additional insurance coverage.
4.1.5. The purchasing of any insurance on the behalf of the City shall not waive any defense under Sovereign Immunity.
4.1.6. Additional Insured. All insurance coverages furnished under a contract except Workers’
Compensation, Employers’ Liability and any Professional Liability Policy shall include the City and its officers, elected officials, and employees as additional insureds with respect to the activities of the Contractor and its Subcontractors. The City shall not by reason of their inclusion under these policies incur liability to the insurance carrier for payment of premium for these policies.
4.1.7. Waiver of Subrogation. The Contractor and its Subcontractors shall require their insurance carriers, with respect to all insurance policies, to waive all rights of subrogation against the City, its officers, elected officials, agents, and employees and against other Contractor and Subcontractors.
4.2. Insurance Certificate Required
4.2.1. Certificates of Insurance. Prior to commencing work at the jobsite, and as a condition precedent to the Contractor and their Subcontractors initiation of performance, the Contractor and its Subcontractors shall furnish the City with certificates of insurance as evidence that policies providing the required coverage and limits of insurance are in full force and effect. The certificates shall provide that any company issuing an insurance policy for the work under a contract shall provide not less than 30 days advance notice in writing to the City prior to cancellation, termination, or material change of any policy of insurance (except for notice of non-payment of premium for which not less than 10 days advance notice in writing shall be required). In addition, the Contractor shall immediately provide written notice to the City upon receipt of notice of cancellation of an insurance policy or a decision to terminate an insurance policy. All certificates of insurance shall clearly state that all applicable requirements have been satisfied, including certification that the policies are of the “occurrence” type. Certificates of insurance for a Contractor and Subcontractors-furnished insurance and notices of any cancellations, terminations, or alterations of such policies shall be mailed to the Procurement
Services at the address set forth for delivery of the Solicitation.
4.2.2. All such insurance certificates shall be in a form and underwritten by insurance companies acceptable to the City and licensed in the State of Florida.
4.2.3. Each Certificate of Insurance submitted to the City shall be an original and shall be executed by an authorized representative of the insurance company affording coverage.
4.2.4. Each Certificate of Insurance shall specifically include all of the following:
• The name and type of policy and coverages provided; and
• The amount or limit applicable to each coverage provided and the deductible amount, if any, applicable to each type of insurance coverage being provided; and
• The date of expiration of coverage; and
• The designation of the City, both as an additional insured to the GL & AL on a primary and non-contributory basis, to include both premises/ongoing operations and products/completed operations hazards, and as a certificate holder. (This requirement is exempted for Professional Liability Insurance and for Workers' Compensation
Insurance); and
• A specific reference to this Agreement and the Project to which it pertains. (This requirement may be exempted for Professional Liability Insurance); or In the event the
Contractor has, or expects to enter into an agreement for Professional Services other than those provided for in this Agreement; the Contractor may elect to submit a
Certificate of Insurance containing the following statement:
"This policy covers the services or work provided or performed by the Named Insured for any and all projects undertaken for the City pursuant to one or more written Professional
Services Agreements, or written Supplemental Agreements or Change Orders thereto, and the limit of liability shown shall not be intended or construed as applying to only one project."
Upon receipt and approval of such a Certificate of Insurance, a separate Certificate of
Insurance will not be required for each separate agreement.
• An identifying statement indicating the identification of any services or work that is included in, or required under, the Scope Of Professional Services set forth in Exhibit “A” that is specifically excluded or exempted from coverage under the provisions, terms, conditions or endorsements of the Contractor's insurance policies. A statement which indicates any and all deductible amounts applicable to each type of insurance coverage required. In the absence of any such statements of deductible amount, or coverage statement of exclusions or exemptions, the City will proceed with the understanding, stipulation, and condition that there are no deductible amounts, or exclusions or exemptions to the insurance coverage provided.
• Name of the Project and/or Project Number should be clearly indicated.
• Each Certificate of Insurance shall be issued by an insurance agent and/or agency duly authorized to do so by, and on behalf of, the insurance company affording the insurance coverage indicated on each Certificate of Insurance.
• If the initial or any subsequently issued Certificate of Insurance expires prior to completion of the work or termination of this Agreement, it is the Contractor's responsibility to furnish the City a renewal or replacement Certificate of Insurance, including all endorsements, not later than thirty (30) calendar days prior to the date of their expiration. Failure of the Contractor to provide the City with such renewal certificates shall be considered justification for the City to terminate this Agreement.
4.2.5. It is vitally important that all insurance coverages required under this Agreement be in effect throughout the entire period of this Agreement. If any of the insurance coverages required by this Agreement should reach the date of expiration indicated on the Certificate of
Insurance on record with the City, without the City having received satisfactory evidence in the form of a Certified Binder or a Certificate of Insurance, that the required insurance coverage has either been renewed or replaced, then the Contractor, unless notified in writing by the City to continue, shall therefore automatically and without further notice from the City, stop performing all previously authorized services and work until such date as the City shall receive and approve satisfactory documentation that the expired insurance coverage has been renewed or replaced. During any time period that the Contractor shall fail to comply with the insurance requirements set forth in the Agreement, the City shall not be required to make, nor shall it make payment on any invoices submitted by the Contractor. Payment for any such invoices shall be made promptly by the City after the City receives and approves the renewal or replacement Certificates of Insurance. During any time period that the Contractor's services or work is suspended, as provided above, for failure to comply with the insurance requirements set forth in the Agreement, the Contractor shall not be entitled, as a result of such suspension, to any additional compensation or time to provide and perform the required services or work.
4.3. Comprehensive Automobile Liability
This insurance shall be written in comprehensive form and shall protect the Contractor and the additional insureds against all claims for injuries to members of the public and damage to property of others arising from the use of motor vehicle and shall cover operation on or off the site of all motor vehicles licensed for highway use, whether they are owned, non-owned, or hired. The liability limits shall not be less than:
4.3.1. Minimum limits of $1,000,000 combined single limit liability.
4.3.2. Coverage shall include owned vehicles, hired, leased, non-owned vehicles, employee non-ownership.
4.3.3. Notice of Cancellation and/or Restriction - The policy must be endorsed to provide the
City with thirty (30) days prior written notice of cancellation and/or restriction.
4.4. Commercial General Liability
This insurance shall be an “occurrence” type policy written in comprehensive form and shall protect the Contractor and the additional insureds against all claims arising from bodily injury, sickness, disease, or death of any person or damage to property of the City or others arising out of any act or omission of the Contractor or its agents, employees, or Subcontractors. This policy shall also include protection against claims insured by usual bodily injury liability coverage, a “contractual liability” endorsement to insure the contractual liability assumed by the Contractor under its contract with the City, and “Completed Operations and Products
Liability” coverage (to remain in force for 2 years after final payment and subsequent to project completion). If the Contractor’s work, or work under its direction, requires blasting, explosive conditions, or underground operations, the comprehensive general liability coverage shall contain no exclusion relative to blasting, explosion, collapse of structures, or damage to underground property. The liability limits shall not be less than:
4.4.1. Minimum limits of $1,000,000 per occurrence combined single limit; $1,000,000 aggregate. This shall include premises and/or Operations, Independent Contractors, and
Subcontractors and/or Completed Operations, Broad Form Property Damage, and a Contractual
Liability Endorsement.
4.4.2. Contractual coverage applicable to this specific Agreement including any hold harmless and/or such indemnification agreement excluding professional acts.
4.4.3. Notice of Cancellation and/or Restriction - The policy must be endorsed to provide the
City with thirty (30) days prior written notice of cancellation and/or restriction.
4.5. Workers Compensation and Employer’s Liability
This insurance shall protect the Contractor against all claims under applicable state worker’s compensation laws. The Contractor shall also be protected against claims for injury, disease, or death of employees that, for any reason, may not fall within the provisions of a worker’s compensation law. This policy shall include an “all states” or “other states” endorsement.
Exemption certificates shall be accepted if valid during the term of the contract, but only for those eligible corporate officers pursuant to Chapter 440 of the Florida Statutes. Proof of workers’ compensation coverage must still be provided for all employees, Subcontractors not eligible for exemption. The liability limits shall not be less than:
4.5.1. Employer's Liability with a minimum limit per accident in accordance with statutory requirements, or a minimum limit of $1,000,000 for each accident which limit is greater.
4.5.2. Notice of Cancellation and/or Restriction - The policy must be endorsed to provide the
City with thirty (30) days prior written notice of cancellation and/or restriction.
4.6. Garage Keepers Liability
The Contractor shall maintain Garage Liability Insurance with limits of not less than One Million
Dollars ($1,000,000.00) combined single limit per occurrence for bodily injury and property damage. Such coverage shall be endorsed to include Automobile Service Operations and Garage
Keepers Legal Liability coverage for damage to vehicles in the care, custody, or control of the
Contractor. Coverage shall remain in full force and effect for the duration of the contract and shall be provided by an insurer authorized to do business in the State of Florida.
5. SPECIAL CONDITIONS
To the extent applicable, the provisions of 2 C.F.R. Part 200, Appendix II are incorporated by reference and shall control in the event of conflict with local provisions.
5.1. Local Preference
The City of Fort Myers has a local vendor preference policy (Ordinance 38-71 thru 76). Please click on the ordinance number to review the policy.
5.2. Minority Business Enterprise Program
All forms MUST accompany each set of Solicitation forms. Minority Business Enterprise (MBE)
(Ordinance No 38-122 thru 128): The City has established an MBE Ordinance for expenditures of construction, services, goods, and other services. Minority Business Enterprise’s (MBE’s) are businesses who are certified by the State of Florida Office of Supplier Diversity and whose principal place of business is located within the boundaries of Lee County.
The City's Minority Business Enterprise Policy can be found at:
https://www.fortmyers.gov/1511/Minority-Business-Enterprise-Program https://library.municode.com/fl/fort_myers/codes/code_of_ordinances?nodeId=SPAADCO_CH38FI_ARTIIIPU_DIV2LOVEPR https://library.municode.com/fl/fort_myers/codes/code_of_ordinances?nodeId=SPAADCO_CH38FI_ARTVMIBUENPR https://www.cityftmyers.com/1511/Minority-Business-Enterprise-Program
6. GENERAL TERMS & CONDITIONS
6.1. Eligible Users / Piggyback Option
All departments of the City are eligible to use this contract. At the option of the awarded
Contractor, any submittal in response to this Solicitation constitutes a Proposal made under the same terms and conditions, for the same Contract price, to other governmental agencies. Each governmental agency desiring to accept these submittals, and make an award thereof, shall do so independently of any other governmental agency. Each agency shall be responsible for its own purchases and each shall be liable only for materials and/or services ordered and received by it, and no agency assumes any liability by virtue of this Proposal.
6.2. Equivalent or Substitute Items
The materials and equipment described in the Solicitation Documents establish a standard of required function, dimension, appearance, and quality to be met by a proposed substitution. No substitution will be considered unless written request for approval has been submitted by the Contractor and has been received by the City at least fifteen days prior to the date for receipt of the submittal and entered as a question through the City's E-Procurement portal. Each such request shall include the name of the material or equipment for which it is to be substituted and a complete description of the proposed substitute including drawings, cuts, performance and test data and any other information necessary for an evaluation. A statement setting forth any changes to other materials, equipment or work that use of the substitute would require, shall be included. The Contractor shall bear the burden of proof regarding the merit of the proposed substitution. Such approval will be issued by Addendum to all prospective
Contractors. Contractors shall not rely upon approvals made in any other manner.
6.3. Independent Proposal Affirmation
By submitting a Response, a Contractor warrants that no one was paid a fee, commission, gift, or other consideration contingent upon receipt of an award for the services and/or supplies specified herein.
6.4. Legal Requirements
1. Compliance with Laws and Regulations
The Contractor shall, at its sole cost and expense, comply with all applicable federal, state, and local laws, statutes, codes, ordinances, rules, regulations, orders, and requirements relating to the performance of the Work and this Agreement, including, but not limited to, those governing taxation, licensing, labor, employment, workers’ compensation, nondiscrimination, public safety, records retention, cybersecurity, and procurement. Without limiting the foregoing, the
Contractor acknowledges and agrees to comply with the following provisions, as…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .