MTCB - Cinnamon-Hunter Rehab - Design Drawings (02-29-2024).pdf

PDF 10 MB Posted

Attached to
Cinnamon Mountain Road and Hunter Hill Road Drainage and Paving Rehabilitation
Solicitation number
24-07
Issued by
Grand County, Colorado

About this file

These design drawings represent the engineering plans for the Cinnamon Mountain Road and Hunter Hill Road Drainage and Paving Rehabilitation project for the Town of Mt. Crested Butte, Colorado. The project scope includes drainage and paving improvements on approximately 1,000 linear feet of Cinnamon Mountain Road and 1,571 linear feet of Hunter Hill Road. Specific improvements include stormwater drainage enhancements, culvert replacements and additions, drainage pipe installations, swale improvements, drainage stabilization, sidewalk repairs, curbing work, and Full Depth Reclamation (FDR) of roadway surfaces. The project is set to be completed by September 13, 2024, with bid proposals due on April 1, 2024, at 11:00 AM (MST).

The design drawings, prepared by SGM (Surveying and Geological Management) in Gunnison, Colorado, provide detailed technical specifications for the project, including existing conditions maps, site plans, horizontal and vertical alignment plans, profile and cross-section drawings, and various engineering details. The project involves complex roadway rehabilitation in a mountainous terrain, with specific attention to drainage management, road geometry, and surface reconstruction. The engineering plans indicate careful consideration of existing infrastructure, topographical challenges, and the need for comprehensive road and drainage system improvements to enhance the transportation infrastructure in the Mt. Crested Butte area.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R ev is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

MG/DR

02.23.2024

JB

Hunter-notes&abbrev

DJC

D at e By

C1 Of :

Pr oj ec t M ile st on e:

Scope of Work The work of this project includes full-depth reclamation (FDR), paving, and drainage improvements to Hunter Hill Road, Snowmass Road, and Cinnamon Mountain Road.

Project Site (Hunter Hill Road)

Project Contacts

Jeffrey Smith

C1 Cover Sheet C2 General Notes C3 Legend/Abbreviations C4 Hunter Hill Road Existing Conditions Map C5 Hunter Hill Road Removal Plan C6 Hunter Hill Road Site Plan C7 Hunter Hill Alignment Plan C8-C10 Hunter Hill Road Plan & Profiles C11 Hunter Hill Road Storm Plan & Profile C12-C14 Hunter Hill Road Profile Cross Sections C15-C16 Detail Sheets C17 Cinnamon Mountain Road Existing Conditions Map C18-C19 Cinnamon Mountain Road Site Plan C20-C21 Cinnamon Mountain Road Plan & Profiles C22 Cinnamon Mountain Road Cross Sections

Sheet Index

Vicinity Maps - Mt. Crested Butte

Project Engineer jsmith@mtcb.colorado.gov (970)349-6632 Ext. 108

Gerald E. Burgess, P.E. 38250

BI

D

S

ET

CINNAMON MOUNTAIN ROAD & HUNTER HILL ROAD

DRAINAGE & PAVING REHABILITATION (FDR)

TOWN OF MT. CRESTED BUTTE

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D

R

Cover

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

E

Title:

TOWN OF MT. CRESTED BUTTE

103 W. Tomichi Ave., Suite A Gunnison, CO 81230 970.641.5355 www.sgm-inc.com

Carlos Velado - Town Manager P.O. Box 5800

911 Gothic Road Mt. Crested Butte, CO 81225

Bid Set February 2024

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w w .s gm -in c.

co m

Mark Gayeski, PE markg@sgm-inc.com (970)707-8156

Project Site (Cinnamon Mountain Road)

David Rothwell davidr@sgm-inc.com (970)384-9034 ev is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

MG/DR

02.23.2024

JB

Hunter-notes&abbrev

DJC

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w .s gm -in c.

D at e By

C2 Of :

Pr oj ec t M ile st on e:

BI

D

S

ET

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D

R

General Notes

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

E

Title:

T

C FO

TR U

E

U WT

E FO IR

EC FO

TRT U

GV

ICV

SV

GV

OSW

ET ET

GM EM WM

G W S

GM EM WM

T

C FO

TR U

E

EC FO

TRT U

G W S

SV

ICV

OSW

H

Y D

ICB

CO

SPR

ICB

SPR

CO

H

Y D

R ev is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

MG/DR

02.23.2024

JB

Hunter-notes&abbrev

DJC

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w .s gm -in c.

e By

C3 Of :

Pr oj ec t M ile st on e:

BI

D

S

ET

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D

R

Legend and Abbreviations

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

H

Y D

IC

V

T

U

T

H

Y D

S

F

F

S

S

S

S

H

Y D

IC

V

IC

V

IC

V

H

Y D

T

T

F

E

F

EMEMT T

T

ET

S

Graphic Scale

In Feet: 1" = 50'

0 25 50 100

R ev is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

MG

02.23.2024

JB

Hunter-EXCON

DJC

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w .s gm -in c.

e By

C4 Of :

Pr oj ec t M ile st on e:

BI

D

S

ET

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D

R

Existing Conditions Map

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

D

IC

V

T

U

T

H Y

D

S

F

F

S

S

S

S

H Y

D

IC

V

IC

V

IC

V

H Y

D

T

T

F

E

F

EMEMT T

T

ET

S

Graphic Scale

In Feet: 1" = 50'

0 25 50 100

R ev is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

MG

02.23.2024

JB

Hunter-DemoPlan

DJC

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w .s gm -in c.

e By

C5 Of :

Pr oj ec t M ile st on e:

BI

D

S

ET

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D

R

Removal Plan

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

E

Title:

REMOVAL PLAN SCHEDULE

NUMBER DESCRIPTION

1 APPROXIMATE EXTENT OF FDR AND PROVIDE PAVEMENT JOINT DTL

2 REMOVE AND REPLACE VALLEY PAN

3 REMOVE AND REPLACE VPAN W/ VARYING WIDTH VPAN. SEE SITE PLAN.

4 REMOVE AND REPLACE CURB & GUTTER

5 REMOVE AND REPLACE SIDEWALK

6 REMOVE AND REPLACE CONCRETE DRIVE TO IMPROVE DRAINAGE. CONTRACTOR TO COORDINATE W/ WESTWALL LODGE

REGARDING GLYCOL LINES AND REPLACEMENT.

7 REMOVE AND REPLACE CONCRETE PANELS ACCORDING TO TOWN. SLOPE PANELS NORTHWARD TOWARDS DRAINAGE.

8 IMPROVE DITCHES. GRADE DOWN FROM EOG TO BOTTOM OF SWALE AT 2:1. SEE SPECS.

9 REGRADE FOR IMPROVED DRAINAGE

10 PARTIAL REMOVAL OF CONCRETE SWALE TO JOINT IN ORDER TO PROMOTE DRAINAGE TO EX AREA INLETS.

11 REMOVE AND REPLACE CULVERT WITH NEW STRAIGHT ALIGNMENT. SEE C6.

12 REMOVE AND REPLACE 6' OF ASPHALT DRIVE AND PROVIDE PAVEMENT JOINT DTL

Y D

S

F

F

S

S

S

S

H

Y D

IC

VIC

V

IC

V

H

Y D

T

T

F

E

F

EMEM

T T T

ET

S

W

AY

F

IN

DI

NG

S

IG

N M

AT

CH

LI

NE

S

TA

+0

H

Y D

IC

V

T

M

AT

CH

LI

NE

S

TA

+0

Graphic Scale

In Feet: 1" = 30'

0 15 30 60

R ev is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

MG

02.23.2024

JB

Hunter-SitePlan

DJC

D at e By

C6 Of :

Pr oj ec t M ile st on e:

BI

D

S

ET

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D

R

Overall Site Plan

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

E

Title:

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w .s gm -in c.

IC

VIC

V

IC

V

M

AT

CH

LI

NE

S

TA

+0

IC

V

M

AT

CH

LI

NE

S

TA

+0

Graphic Scale

In Feet: 1" = 30'

0 15 30 60

R ev is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

MG

02.23.2024

JB

Hunter-HorizPlan

DJC

D at e By

C7 Of :

Pr oj ec t M ile st on e:

BI

D

S

ET

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D

R

Horizontal Control Plan

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

E

Title:

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w .s gm -in c.

U

H Y

D

S

F F

S

T

T F

E

F

EM

EM

T

T T

ET

WAY FINDING SIGN

Graphic Scale

In Feet: 1" = 20'

0 10 20 40

R ev is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

MG

02.23.2024

JB

Hunter-P&P

DJC

D at e By

C8 Of :

Pr oj ec t M ile st on e:

BI

D

S

ET

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D

R

Hunter-Snowmass - P&P

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

E

Title:

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w .s gm -in c.

Modify valley pan to enable flow to enter existing storm inlet. Add additional valley pan to drain water to inlet.

F lo

F

S

S

S

S

H

Y D

IC

VIC

V

IC

V

H

Y D

T

T

F

E

F

M

AT

CH

LI

NE

S

TA

+7

Graphic Scale

In Feet: 1" = 20'

0 10 20 40

R ev is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

MG

02.23.2024

JB

Hunter-P&P

DJC

D at e By

C9 Of :

Pr oj ec t M ile st on e:

BI

D

S

ET

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D

R

Hunter-North P&P

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

E

Title:

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w .s gm -in c.

D

IC

V

T

M

AT

CH

LI

NE

S

TA

+7

Graphic Scale

In Feet: 1" = 20'

0 10 20 40

R ev is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

MG

02.23.2024

JB

Hunter-P&P

DJC

D at e By

C10 Of :

Pr oj ec t M ile st on e:

BI

D

S

ET

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D

R

Hunter-South P&P

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

E

Title:

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w .s gm -in c.

IC

V

H

Y D

T

T

E

F

IC

V

H

Y D

T

T

E

F

IC

V

H

Y D

T

T

E

F

IC

V

H

Y D

T

T

E

F

IC

V

H

Y D

T

T

E

F

IC

V

H

Y D

T

T

E

F

IC

V

H

Y D

T

T

E

F

IC

V

H

Y D

T

T

E

F

IC

V

H

Y D

T

T

E

S

Graphic Scale

In Feet: 1" = 10'

0 5 10 20

R ev is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

MG

02.23.2024

JB

Hunter-P&P

DJC

D at e By

C11 Of :

Pr oj ec t M ile st on e:

BI

D

S

ET

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D

R

Storm P&P

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

E

Title:

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w .s gm -in c.

Graphic Scale

In Feet: 1" = 10'

0 5 10 20

R ev is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

MG

02.23.2024

JB

Hunter-XS

DJC

D at e By

C12 Of :

Pr oj ec t M ile st on e:

BI

D

S

ET

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D

R

Hunter Hill and Snowmass Road

Sections

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

E

Title:

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w .s gm -in c.

0 5 10 20

R ev is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

MG

02.23.2024

JB

Hunter-XS

DJC

D at e By

C13 Of :

Pr oj ec t M ile st on e:

BI

D

S

ET

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D

R

Hunter Hill Road North Sections

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

E

Title:

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w .s gm -in c.

0 5 10 20

R ev is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

MG

02.23.2024

JB

Hunter-XS

DJC

D at e By

C14 Of :

Pr oj ec t M ile st on e:

BI

D

S

ET

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D

R

Hunter Hill Road South Sections

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

E

Title:

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w .s gm -in c.

is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

MG/DR

02.23.2024

JB

Hunter-Details

DJC

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w .s gm -in c.

e By

C15 Of :

Pr oj ec t M ile st on e:

BI

D

S

ET

Detail Sheet

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

E

Title:

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

DR

02.23.2024

JB

Hunter-Details

DJC

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w .s gm -in c.

e By

C16 Of :

Pr oj ec t M ile st on e:

BI

D

S

ET

Detail Sheet

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

E

Title:

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D

D

S

S

CO

CO MAT

CHLIN

E

M

AT

CH

LI

NE

In Feet: 1" = 30'

0 15 30 60

R ev is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

DR

02.23.2024

JB

Cinnamon-ExCon

DJC

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w .s gm -in c.

e By

C17 Of :

Pr oj ec t M ile st on e:

BI

D

S

ET

Cinnamon Mountain Road Existing

Conditions

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

E

Title:

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D

D

Graphic Scale

In Feet: 1" = 20'

0 10 20 40

R ev is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

DR

02.23.2024

JB

Cinnamon-Plan

DJC

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w .s gm -in c.

e By

C18 Of :

Pr oj ec t M ile st on e:

BI

D

S

ET

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D

R

Cinnamon Mountain Road Overall Plan

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

In Feet: 1" = 20'

0 10 20 40

R ev is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

DR

02.23.2024

JB

Cinnamon-Plan

KM

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w .s gm -in c.

e By

C19 Of :

Pr oj ec t M ile st on e:

BI

D

S

ET

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D

R

Cinnamon Mountain Road Overall Plan

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

E

Title:

Graphic Scale

0 10 20 40

D

S

S

CO

CO

Graphic Scale

In Feet: 1" = 30'

0 15 30 60

R ev is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

DR

02.23.2024

JB

Cinnamon-Plan&Profile

DJC

D at e By

C20 Of :

Pr oj ec t M ile st on e:

BI

D

S

ET

Cinnamon Mountain Road Plan and Profile

Sta 6+90 to 13+50

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

E

Title:

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w .s gm -in c.

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D

In Feet: 1" = 30'

0 15 30 60

R ev is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

DR

02.23.2024

JB

Cinnamon-Plan&Profile

DJC

D at e By

C21 Of :

Pr oj ec t M ile st on e:

BI

D

S

ET

Cinnamon Mountain Road Plan and Profile Sta 13+50 to 18+00

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

E

Title:

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w .s gm -in c.

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D

0 10 20 40

R ev is io n

Dwg No.

Job No.

Drawn by:

Print Date:

File:

PE:QC:

2023-113.001

DR

02.23.2024

JB

Cinnamon-XSect

DJC

W . T om ic hi A ve

Su ite

A G un ni so n, C O

0.

1.

w .s gm -in c.

e By

C22 Of :

Pr oj ec t M ile st on e:

BI

D

S

ET

Cinnamon Mountain Road Cross Sections

TO

W

N O

F M

T.

C

R

ES

TE

D

B U

TT

E

Title:

C

IN

N

AM

O N

M O

U N

TA

IN

R O

AD

H U

N

TE

R H

IL

L

R O

AD

D

R

AI

N

AG

E

PA

VI

N G

R

EH

AB

IL

IT

AT

IO

N

(F D

Sheets and Views
C1 Cover
C2 General Notes
C3 Legend and Abbreviations
C4 Existing Conditions Map
C5 Removal Plan
C6 Overall Site Plan
C7 Horizontal Control Plan
C8 Hunter-Snowmass - P&P
C9 Hunter-North P&P
C10 Hunter-South P&P
C11 Storm P&P
C12 Hunter Hill and Snowmass Road Sections
C13 Hunter Hill Road North Sections
C14 Hunter Hill Road South Sections
C15 Detail Sheet
C16 Detail Sheet
C17 Cinnamon Mountain Road Existing Conditions
C18 Cinnamon Mountain Road Overall Plan
C19 Cinnamon Mountain Road Overall Plan
C20 Cinnamon Mountain Road Plan and Profile Sta 6+90 to 13+50
C21 Cinnamon Mountain Road Plan and Profile Sta 13+50 to 18+00
C22 Cinnamon Mountain Road Cross Sections

File details come from the government source that posted it. Updated .