Mt Vernon 2026 TIA_Project Manual PART 2e_Map.pdf

PDF 28 MB Posted

Attached to
Mt. Vernon HOGA TIA 2. 0 Band 2: E. Days St. & Others
Solicitation number
PE-66425-NONST-2026-000000003
Issued by
Georgia

About this file

This is a project manual map document for the City of Mt. Vernon, Georgia, detailing the Mt. Vernon HOGA TIA 2.0 Band 2 infrastructure improvement project. The project encompasses approximately 3.75 miles of roadway improvements on East Days Street and other locations within Mt. Vernon, including pavement patching, leveling, resurfacing, milling, and striping work. The document identifies specific street segments and associated parcel numbers, including E. Jefferson Street (parcel 0018758, segment 96) and N. Walker Street (parcel 0018759, segment 97), which serve as reference points for the project scope and work areas.

The map document functions as a reference guide for bidders to identify and locate the specific project areas subject to the improvement work. No pricing terms, set-asides, response deadlines, site visit requirements, or contract award information is contained within this map file itself; such details would be found in the associated project bid solicitation and contract documents for the Mt. Vernon HOGA TIA 2.0 Band 2 project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E. JEFFERSON STREET

0018758

N. WALKER STREET

0018759

File details come from the government source that posted it. Updated .