Mt Vernon 2026 TIA_Project Manual PART 2e_Map.pdf
PDF 28 MB Posted
- Solicitation number
- PE-66425-NONST-2026-000000003
- Issued by
- Georgia
About this file
This is a project manual map document for the City of Mt. Vernon, Georgia, detailing the Mt. Vernon HOGA TIA 2.0 Band 2 infrastructure improvement project. The project encompasses approximately 3.75 miles of roadway improvements on East Days Street and other locations within Mt. Vernon, including pavement patching, leveling, resurfacing, milling, and striping work. The document identifies specific street segments and associated parcel numbers, including E. Jefferson Street (parcel 0018758, segment 96) and N. Walker Street (parcel 0018759, segment 97), which serve as reference points for the project scope and work areas.
The map document functions as a reference guide for bidders to identify and locate the specific project areas subject to the improvement work. No pricing terms, set-asides, response deadlines, site visit requirements, or contract award information is contained within this map file itself; such details would be found in the associated project bid solicitation and contract documents for the Mt. Vernon HOGA TIA 2.0 Band 2 project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E. JEFFERSON STREET
0018758
N. WALKER STREET
0018759
File details come from the government source that posted it. Updated .