Mt Vernon 2026 TIA_Project Manual PART 2b_Map.pdf
PDF 41 MB Posted
- Solicitation number
- PE-66425-NONST-2026-000000003
- Issued by
- Georgia
About this file
This project manual map document is associated with the Mt. Vernon HOGA TIA 2.0 Band 2 contract opportunity in Georgia and identifies specific street segments targeted for infrastructure improvements. The project encompasses approximately 3.75 miles of roadway work on East Days Street and other designated streets, including E. Peral Street, Lewis Street, and E. Folsom Street, with work specifications involving patching, leveling, resurfacing, milling, and striping operations. The document appears to serve as a reference map component of the overall project manual, providing geographic identification of the specific parcels or segments assigned identification numbers (0018749, 0018750, and 0018751 corresponding to segments 87, 88, and 89 respectively) that will undergo the outlined pavement rehabilitation activities.
No specific pricing terms, bidding deadlines, site visit information, or contract award details are provided within this map document excerpt. The file functions primarily as a geographic and identification reference tool for the broader Mt. Vernon transportation infrastructure improvement initiative, with full project scope and contractual requirements detailed in other components of the complete project manual.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E. PERAL STREET
0018749
LEWIS STREET
0018750
E. FOLSOM STREET
0018751
File details come from the government source that posted it. Updated .