Mt Vernon 2026 TIA_Project Manual PART 2a_Map.pdf
PDF 41 MB Posted
- Solicitation number
- PE-66425-NONST-2026-000000003
- Issued by
- Georgia
About this file
This is a project manual map document for the City of Mt. Vernon, Georgia, detailing the HOGA TIA 2.0 Band 2 infrastructure improvement project. The project encompasses approximately 3.75 miles of roadway work on East Days Street and other designated streets within the city limits. The scope of work includes patching, leveling, resurfacing, milling, and striping activities. The document identifies specific street segments with corresponding parcel numbers, including E. Days Street (parcel 0018746), E. Edwards Street (parcel 0018747), and N. Minnie Street (parcel 0018748), providing a geographic reference for the project boundaries and work locations.
No specific response deadlines, bid due dates, site visit requirements, pre-bid meetings, or contract award information is provided in this document excerpt. Pricing terms, funding sources, and additional contract administration details are not included in this project manual map section.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E. DAYS STREET
0018746
E. EDWARDS STREET
0018747
N MINNIE STREET
0018748
File details come from the government source that posted it. Updated .